Anti-seepage and anti-impact structure of tower footing

By introducing drainage tanks, guardrails, leveling instruments and vibration alarms into the tower foundation structure, the problems of rainwater penetration and stability of the tower foundation are solved, effective water export, protection and real-time monitoring are achieved, and the foundation is improved. Stability and safety of use.

CN222083619UActive Publication Date: 2024-11-29苏州庞源建筑机械科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420782894.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-16
Publication Date
2024-11-29
Estimated Expiration
2034-04-16

AI Technical Summary

Technical Problem

The existing anti-seepage and impact-resistant structure of the tower foundation is difficult to effectively avoid rainwater penetration when it rains, affecting the stability of the tower foundation, and lacking effective protection and monitoring measures.

Method used

A tower foundation anti-seepage and impact resistance structure is designed, including soil layer, tower foundation, drainage tank, guardrail, protective door, leveling and vibration alarm. The surrounding water is exported through the drainage tank, the guardrail provides protection, and the leveling device monitors the foundation in real time The seat is tilted and the vibration alarm sounds when it hits.

Benefits of technology

It effectively avoids rainwater penetration, enhances the stability of the tower foundation, provides protective measures and real-time monitoring functions, ensuring the safety of staff and the reliability of the tower foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083619U_ABST
    Figure CN222083619U_ABST
Patent Text Reader

Abstract

The utility model discloses an anti-seepage and anti-impact structure of a tower footing. The anti-seepage and anti-impact structure comprises a soil layer and the tower footing, the tower footing is built on the upper side of the soil layer, the tower footing is composed of a foundation column, a base, a concrete table and a concrete covering face, the foundation column is poured in the soil layer, the base is poured on the upper side of the foundation column, the concrete covering face covers the upper side of the soil layer and is connected with the base, and drainage grooves are formed in the periphery of the concrete covering face. A concrete table is arranged on the upper side of the base, and a protective fence is installed at the upper end of the concrete table. In the using process, water around the tower footing is guided out in a unified mode through the drainage grooves, rainwater permeation is avoided, the stability of the tower footing is prevented from being affected, protection can be achieved through the protective fences, collision in the using process is avoided, an alarm can be given out through the vibration alarm when the protective fences are collided or damaged, and the service life of the tower footing is prolonged. Workers can conveniently perceive at the first time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tower foundations, in particular to an anti-seepage and anti-impact structure of a tower foundation. Background Art

[0002] Tower crane, short for "tower crane", is also called "tower crane". It is a kind of lifting equipment used in construction. Tower crane needs to use tower base during construction.

[0003] The Chinese patent number CN202222286562.X discloses an anti-seepage and anti-impact structure for a tower foundation, including a foundation pit surrounding the tower foundation, an anti-seepage membrane laid in the foundation pit, and a backfill layer and an anti-impact layer filled in the foundation pit. The foundation pit is an inverted quadrangular pyramid structure, the anti-seepage membrane is a geomembrane, the anti-seepage membrane surrounds and adheres to the side wall of the tower foundation pedestal and its lower edge extends to the bottom of the foundation pit, the backfill layer is clay, the anti-impact layer is dry masonry, the backfill layer and the anti-impact layer are filled in the foundation pit from bottom to top, and a transition cushion is laid between the anti-impact layer and the backfill layer, and the transition cushion is a sand and gravel mixture. When the prior art is in use, in the case of heavy rain during rain, it is inevitable that rain will penetrate into the soil layer and affect the stability of the tower foundation. Utility Model Content

[0004] The utility model aims to provide a tower base anti-seepage and anti-impact structure to solve the problems raised in the prior art.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a tower base anti-seepage and anti-impact structure, including a soil layer and a tower base; the tower base is built on the upper side of the soil layer, and the tower base is composed of a base column, a pedestal, a concrete platform and a concrete covering surface, the base column is cast inside the soil layer, the pedestal is cast on the upper side of the base column, the concrete covering surface covers the upper side of the soil layer and is connected to the pedestal, drainage grooves are arranged around the concrete covering surface, a concrete platform is arranged on the upper side of the pedestal, and a guardrail is installed at the upper end of the concrete platform.

[0006] Preferably, a protective door is provided on one side of the protective fence, and the protective door is rotatably installed on one side of the protective fence.

[0007] Preferably, door locks are installed at corresponding positions of the protective door and the protective fence.

[0008] Preferably, a corrosion-resistant layer is provided on the outer side of the guardrail, and the corrosion-resistant layer is configured as a corrosion-resistant coating.

[0009] Preferably, a vibration alarm is provided on the outside of the guardrail, and the vibration alarm is fixed on the outside of the guardrail by bolts.

[0010] Preferably, a level is provided on the upper side of the base, and the level is fixed on the upper side of the base by bolts.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] 1. During use, the water around the tower base is uniformly drained through the drainage trough to prevent rainwater from penetrating and affecting the stability of the tower base. The setting of the guardrail can provide protection to avoid impact during use;

[0013] 2. The setting of the protective door makes it easy to open the guardrail, so that the staff can enter the interior of the guardrail;

[0014] 3. The setting of the level can monitor whether the base is level in real time and can quickly detect when the base is tilted;

[0015] 4. The setting of the vibration alarm can sound an alarm when the guardrail is hit or damaged, so that the staff can detect it at the first time. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0017] Figure 1 It is a schematic diagram of the structure of the utility model;

[0018] Figure 2 It is a side view structural schematic diagram of the utility model;

[0019] Figure 3 This is a structural schematic diagram of the concrete platform of the utility model;

[0020] Figure 4 It is a structural schematic diagram of the protective fence of the utility model.

[0021] In the figure: 1. Soil layer; 2. Tower base; 3. Guardrail; 4. Concrete platform; 5. Base; 6. Concrete cover; 7. Drainage trough; 8. Base column; 9. Protective door; 10. Level; 11. Vibration alarm; 12. Corrosion-resistant layer; 13. Door lock. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1, Figure 2 , Figure 3 , Figure 4 In the embodiment of the utility model, a tower foundation anti-seepage and anti-impact structure includes a soil layer 1 and a tower foundation 2; the tower foundation 2 is built on the upper side of the soil layer 1, and the tower foundation 2 is composed of a base column 8, a pedestal 5, a concrete platform 4 and a concrete covering surface 6. The base column 8 is cast inside the soil layer 1, and the pedestal 5 is cast on the upper side of the base column 8. The concrete covering surface 6 covers the upper side of the soil layer 1 and is connected to the pedestal 5. Drainage grooves 7 are arranged around the concrete covering surface 6. A concrete platform 4 is arranged on the upper side of the pedestal 5, and a guardrail 3 is installed at the upper end of the concrete platform 4.

[0024] A protective door 9 is provided on one side of the guardrail 3, and the protective door 9 is rotatably installed on one side of the guardrail 3. The setting of the protective door 9 facilitates the opening of the guardrail 3, so that it is convenient for the staff to enter the interior of the guardrail 3. A door lock 13 is installed at the corresponding position of the protective door 9 and the guardrail 3. The door lock 13 is used to lock the protective door 9 and the guardrail 3 to prevent people from entering the interior of the guardrail 3 at will. A corrosion-resistant layer 12 is provided on the outside of the guardrail 3. The corrosion-resistant layer 12 is set as a corrosion-resistant paint. The corrosion-resistant paint used in the corrosion-resistant layer 12 has strong corrosion resistance and can reduce the corrosion of the guardrail 3 when in use. A vibration alarm 11 is provided on the outside of the guardrail 3. The vibration alarm 11 is fixedly installed on the outside of the guardrail 3 by bolts. The setting of the vibration alarm 11 can sound an alarm when the guardrail 3 is hit or damaged, so that the staff can detect it at the first time.

[0025] A level 10 is provided on the upper side of the base 5 , and the level 10 is fixedly installed on the upper side of the base 5 by bolts; the setting of the level 10 can monitor in real time whether the base 5 is level, and can quickly detect when the base 5 is tilted.

[0026] The working principle and use process of the utility model are as follows: during use, the base 5 and the tower column are buried in the soil layer 1 to increase the stability of the tower base 2, and the concrete covering surface 6 can protect the base 5 around to prevent rainwater from penetrating. At the same time, during use, the water around the tower base 2 is uniformly discharged through the drainage ditch 7 to prevent rainwater from penetrating and affecting the stability of the tower base 2. The setting of the guardrail 3 can provide protection to avoid impact during use.

[0027] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions described in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A tower foundation anti-seepage and anti-scour structure, comprising a soil layer (1) and a tower foundation (2); characterized in that: The tower base (2) is constructed on the upper side of the soil layer (1), and the tower base (2) is composed of a base column (8), a pedestal (5), a concrete platform (4) and a concrete covering surface (6). The base column (8) is cast inside the soil layer (1), the pedestal (5) is cast on the upper side of the base column (8), the concrete covering surface (6) covers the upper side of the soil layer (1) and is connected to the pedestal (5), drainage grooves (7) are arranged around the concrete covering surface (6), a concrete platform (4) is arranged on the upper side of the pedestal (5), and a guardrail (3) is installed at the upper end of the concrete platform (4).

2. The tower foundation anti-seepage and anti-impact structure according to claim 1, characterized in that: A protective door (9) is provided on one side of the protective fence (3), and the protective door (9) is rotatably mounted on one side of the protective fence (3).

3. The tower foundation anti-seepage and anti-impact structure according to claim 2, characterized in that: Door locks (13) are installed at corresponding positions of the protective door (9) and the protective fence (3).

4. The tower foundation anti-seepage and anti-impact structure according to claim 1, characterized in that: A corrosion-resistant layer (12) is arranged on the outer side of the guardrail (3), and the corrosion-resistant layer (12) is arranged as a corrosion-resistant coating.

5. The tower foundation anti-seepage and anti-impact structure according to claim 1, characterized in that: A vibration alarm (11) is arranged on the outside of the guardrail (3), and the vibration alarm (11) is fixedly mounted on the outside of the guardrail (3) by means of bolts.

6. The tower foundation anti-seepage and anti-impact structure according to claim 1, characterized in that: A level (10) is provided on the upper side of the base (5), and the level (10) is fixedly mounted on the upper side of the base (5) by means of bolts.