Dispensing equipment
By using mobile dispensing heads and robots in the dispensing equipment to realize automatic loading and unloading of chips and magnetic rings, the problems of high cost of chip dispensing and low production efficiency in the prior art are solved, reducing equipment manufacturing costs and improving equipment Productivity.
Patent Information
- Application Number
- CN202323583544.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-26
AI Technical Summary
In the prior art, chip dispensing operation costs are high and production efficiency is low. This is mainly due to the large number of dispensing heads in the dispensing equipment and are fixed at the four corners of the chip, which makes it inconvenient to load and unload.
A dispensing device is designed, including a machine tool, a fixture, a dispensing mechanism, a robot and a recognition camera. Through the first translation component and the second translation component, the dispensing head is driven to move the dispensing head to the four corners of the chip for dispensing, reducing the number of dispensing heads. , and automatically load and unload the chip and magnetic ring through a robot.
It effectively reduces the manufacturing cost of dispensing equipment, improves production efficiency, reduces the impact on chip loading and unloading, and achieves efficient dispensing packaging.
Smart Images

Figure CN222093816U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of free space isolator manufacturing, in particular to a glue dispensing device. Background Art
[0002] In the manufacturing of free space isolators, gluing the four corners of the chip and the magnetic ring is a difficult process in the production process. This process requires placing the chip on the magnetic ring in the magnetic ring tooling and dispensing glue on the four corners of the chip to fix the chip on the magnetic ring. In the past, manual gluing was usually used. Due to the low efficiency of manual work and the gradual increase in labor costs, a gluing equipment has been developed on the market to dispense glue on the four corners of the chip.
[0003] The dispensing device is provided with four dispensing heads, which are respectively arranged at the four corners of the chip to dispense glue at the four corners of the chip. The disadvantage of the dispensing device is that the number of dispensing heads is large, so the cost of the dispensing device is high, and since the four dispensing heads are respectively arranged at the four corners of the chip, it is not convenient to load and unload the chip, resulting in low production efficiency. Utility Model Content
[0004] The technical problem to be solved by the embodiments of the utility model is to provide a dispensing device to solve the problem of high chip dispensing operation cost in the prior art.
[0005] The dispensing equipment provided by the embodiment of the utility model includes:
[0006] machine tool;
[0007] A fixture, which is installed on the machine tool and is used to carry the chip and the magnetic ring tooling equipped with the magnetic ring;
[0008] A glue dispensing mechanism, comprising a glue dispensing head, a first translation assembly and a second translation assembly, all of which are mounted on the machine tool; the first translation assembly is connected to the jig or the glue dispensing head to drive the jig or the glue dispensing head to move in a first direction; the second translation assembly is connected to the jig or the glue dispensing head to drive the jig or the glue dispensing head to move in a second direction;
[0009] The first direction is perpendicular to the second direction, so that the dispensing head can move to the four corners of the chip relative to the fixture.
[0010] Optionally, the dispensing equipment further includes:
[0011] A first loading mechanism, which is installed on the machine tool and is used to carry the chip;
[0012] A second material placement mechanism, which is installed on the machine tool and is used to carry the magnetic ring tooling;
[0013] A robot mechanism includes a first robot, a second robot and a transport component, wherein the first robot and the second robot are connected to the machine tool through the transport component; the first robot is used to pick up and place the chip, and the transport component is used to drive the first robot to and from the first material placement mechanism and the fixture; the second robot is used to pick up and place the magnetic ring, and the transport component is used to drive the second robot to and from the second material placement mechanism and the fixture.
[0014] Optionally, the transport assembly includes a third translation assembly, the first manipulator and the second manipulator are both connected to the third translation assembly, and the first material placement mechanism, the second material placement mechanism and the jig are spaced apart in the same straight line direction, so that the third translation assembly can drive the first manipulator to move back and forth between the first material placement mechanism and the jig, and drive the second manipulator to move back and forth between the second material placement mechanism and the jig.
[0015] Optionally, the dispensing device further includes a first recognition camera mounted on the top of the first material placement mechanism, and the first material placement mechanism includes:
[0016] A first material placement seat, which is used to carry the chip;
[0017] a fourth translation assembly, which is installed on the machine tool and connected to the first material placement seat to drive the first material placement seat to move;
[0018] a fifth translation assembly, which is installed on the machine tool and connected to the first material placement seat to drive the first material placement seat to move;
[0019] Among them, the driving direction of the fourth translation assembly is perpendicular to the driving direction of the fifth translation assembly, and the first recognition camera is electrically connected to the fourth translation assembly and the fifth translation assembly to adjust the horizontal position of the first material placement base according to the recognition information of the first recognition camera.
[0020] Optionally, the first material placement mechanism further includes a flipping assembly, which is installed on the machine tool and connected to the first material placement seat. The flipping assembly is electrically connected to the first recognition camera to adjust the flipping angle of the first material placement seat according to the recognition information of the first recognition camera.
[0021] Optionally, the first material placement seat is provided with a plurality of carrying areas for carrying the chips, and the plurality of carrying areas are distributed in a matrix on the first material placement seat.
[0022] Optionally, the second manipulator is also used to pick up and place the finished workpiece, and the second placing mechanism further includes:
[0023] a sixth translation assembly, which is mounted on the machine tool, wherein a driving direction of the sixth translation assembly is perpendicular to a driving direction of the third translation assembly;
[0024] The second material placement seat is installed on the sixth translation assembly, and the sixth translation assembly is used to drive the second material placement seat to move. The second material placement seat is provided with at least two material placement areas, and the multiple material placement areas are adjacently arranged in the driving direction of the sixth translation assembly to accommodate the magnetic ring tooling and the finished workpiece.
[0025] Optionally, each of the material placement areas is provided with two positioning pins, which are spaced apart and are used to be inserted into positioning holes of the magnetic ring tooling.
[0026] Optionally, the transport assembly further includes a first lifting assembly, and the first lifting assembly is connected to the second manipulator to drive the second manipulator to move up and down, so that the magnetic ring tooling can be stacked on the second material placement seat.
[0027] Optionally, the dispensing device further includes a second recognition camera mounted on the top of the fixture, and the fixture includes:
[0028] An assembly platform, which is used to carry the chip and the magnetic ring fixture;
[0029] a seventh translation assembly, which is mounted on the machine tool and connected to the assembly platform to drive the assembly platform to move;
[0030] an eighth translation assembly, which is mounted on the machine tool and connected to the assembly platform to drive the assembly platform to move;
[0031] Among them, the driving direction of the seventh translation component is perpendicular to the driving direction of the eighth translation component, and the seventh translation component and the eighth translation component are both electrically connected to the second recognition camera to adjust the horizontal position of the assembly platform according to the recognition information of the second recognition camera.
[0032] Compared with the prior art, the beneficial effect of the dispensing equipment provided by the embodiment of the utility model is that the first translation assembly and the second translation assembly can drive the dispensing head to move to the four corners of the chip for dispensing, so that the dispensing packaging of the chip and the magnetic ring can be completed by one dispensing head, reducing the number of dispensing heads. Therefore, the utility model can effectively reduce the manufacturing cost of the dispensing equipment, and after dispensing, the first translation assembly and the second translation assembly can move the dispensing head away from the dispensing position, which will not affect the loading and unloading of the chip and has high production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The specific implementation of the utility model will be further described in detail below with reference to the accompanying drawings and embodiments, in which:
[0034] Figure 1 It is a three-dimensional schematic diagram of a dispensing device provided by an embodiment of the utility model;
[0035] Figure 2 It is a three-dimensional schematic diagram of a dispensing mechanism provided by an embodiment of the utility model;
[0036] Figure 3 It is a schematic diagram of the combination of the manipulator mechanism, the first material placement mechanism, the second material placement mechanism and the fixture provided in the embodiment of the utility model;
[0037] Figure 4 It is a three-dimensional schematic diagram of a first material placing mechanism provided in an embodiment of the utility model;
[0038] Figure 5 It is a three-dimensional schematic diagram of a second material placing mechanism provided by an embodiment of the utility model;
[0039] Figure 6 It is a three-dimensional schematic diagram of a fixture provided by an embodiment of the utility model.
[0040] The reference numerals in the figures are: 1000, dispensing equipment;
[0041] 100. Machine tools;
[0042] 200, fixture; 210, assembly platform; 220, seventh translation assembly; 230, eighth translation assembly;
[0043] 300, glue dispensing mechanism; 310, glue dispensing head; 320, first translation assembly; 330, second translation assembly;
[0044] 400, first material placement mechanism; 410, first material placement seat; 411, bearing area; 420, fourth translation assembly; 430, fifth translation assembly; 440, flip assembly;
[0045] 500, second material placement mechanism; 510, sixth translation assembly; 520, second material placement seat; 521, material placement area; 521a, positioning pin;
[0046] 600, manipulator mechanism; 610, first manipulator; 620, second manipulator; 630, transport assembly; 631, third translation assembly; 632, first lifting assembly;
[0047] 700. First recognition camera. DETAILED DESCRIPTION
[0048] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. Now, in conjunction with the accompanying drawings, a preferred embodiment of the present utility model is described in detail.
[0049] The present utility model embodiment provides a dispensing device 1000, such as Figure 1 to Figure 2 As shown, the dispensing device 1000 includes a machine tool 100, a fixture 200 and a dispensing mechanism 300; the fixture 200 is installed on the machine tool 100, and is used to carry a chip and a magnetic ring tooling equipped with a magnetic ring; the dispensing mechanism 300 includes a dispensing head 310, a first translation assembly 320 and a second translation assembly 330, all of which are installed on the machine tool 100; the first translation assembly 320 is connected to the fixture 200 or the dispensing head 310 to drive the fixture 200 or the dispensing head 310 to move along a first direction (such as Figure 1 The second translation assembly 330 is connected to the fixture 200 or the dispensing head 310 to drive the fixture 200 or the dispensing head 310 to move along the second direction (as shown in the X direction); Figure 1 wherein the first direction is perpendicular to the second direction so that the dispensing head 310 can move to the four corners of the chip relative to the fixture 200.
[0050] The glue dispensing device 1000 is suitable for gluing the four corners of a chip during the manufacturing process of a free space isolator. Compared with the prior art glue dispensing device 1000 which is provided with four glue dispensing heads 310 to implement glue dispensing at the four corners of a chip, the glue dispensing device 1000 of the utility model can reduce the number of glue dispensing heads 310, thereby reducing the manufacturing cost of the glue dispensing device 1000.
[0051] Specifically, the first translation assembly 320 and the second translation assembly 330 can drive the dispensing head 310 to move to the four corners of the chip for dispensing, so that the dispensing packaging of the chip and the magnetic ring can be completed by one dispensing head 310, reducing the number of dispensing heads 310, so the utility model can effectively reduce the manufacturing cost of the dispensing device 1000. In addition, after dispensing, the first translation assembly 320 and the second translation assembly 330 can move the dispensing head 310 away from the dispensing position, which will not affect the loading and unloading of the chip, and the production efficiency is high.
[0052] In the solution of the utility model, the fixture 200 is used to fix the position of the magnetic ring tooling to avoid movement of the chip and the magnetic ring during the gluing process, thereby improving the output rate of the finished product.
[0053] It should be noted that a magnetic ring is installed on the magnetic ring tooling placed in the fixture 200, and the glue hanging on the four corners of the chip is used to connect the chip and the magnetic ring. Because the first translation component 320 and the second translation component 330 can drive the dispensing head 310 to move in two dimensions, the magnetic ring tooling can be provided with multiple fixed positions to fix multiple magnetic rings, so that the dispensing equipment 1000 can dispense glue on multiple chips and magnetic rings, thereby improving production efficiency.
[0054] Reference Figure 1In one embodiment, the dispensing equipment 1000 also includes a first material placement mechanism 400, a second material placement mechanism 500 and a manipulator mechanism 600. The first material placement mechanism 400 is installed on the machine tool 100 to carry chips; the second material placement mechanism 500 is installed on the machine tool 100 to carry magnetic ring tooling; the manipulator mechanism 600 includes a first manipulator 610, a second manipulator 620 and a conveying component 630. The first manipulator 610 and the second manipulator 620 are both connected to the machine tool 100 through the conveying component 630; the first manipulator 610 is used to pick up and place chips, and the conveying component 630 is used to drive the first manipulator 610 to travel back and forth between the first material placement mechanism 400 and the fixture 200; the second manipulator 620 is used to pick up and place magnetic ring tooling, and the conveying component 630 is used to drive the second manipulator 620 to travel back and forth between the second material placement mechanism 500 and the fixture 200. Such an arrangement realizes the automatic loading of the chip and the magnetic ring fixture, and the assembly of the chip and the magnetic ring is completed by the manipulator mechanism 600, further improving the production efficiency. Specifically, the first material placement mechanism 400 is used to store the chip, the second material placement mechanism 500 is used to store the magnetic ring fixture, and the transport component 630 can drive the first manipulator 610 to move back and forth between the first material placement mechanism 400 and the fixture 200 to install the chip on the magnetic ring of the magnetic ring fixture, and the transport component 630 can also drive the second manipulator 620 to move back and forth between the second material placement mechanism 500 and the fixture 200 to place the magnetic ring fixture on the fixture 200, and automatically complete the assembly of the chip and the magnetic ring before the chip and the magnetic ring are glued, thereby speeding up the production efficiency.
[0055] Reference Figure 3In one embodiment, the transport assembly 630 includes a third translation assembly 631, the first manipulator 610 and the second manipulator 620 are both connected to the third translation assembly 631, and the first material placement mechanism 400, the second material placement mechanism 500 and the fixture 200 are arranged at intervals in the same straight line direction, so that the third translation assembly 631 can drive the first manipulator 610 to and from the first material placement mechanism 400 and the fixture 200, and drive the second manipulator 620 to and from the second material placement mechanism 500 and the fixture 200. In this way, on the one hand, only one third translation assembly 631 is needed to complete the motion control of the first manipulator 610 and the second manipulator 620, which can reduce the volume of the overall system and improve space utilization. In addition, the number of additional drive devices and controllers is reduced, and the cost of equipment manufacturing and maintenance can be reduced. On the second hand, the third translation assembly 631 simultaneously drives the first manipulator 610 and the second manipulator 620, which has better coordination and completely eliminates the possibility of collision between the first manipulator 610 and the second manipulator 620, thereby achieving higher safety. On the third hand, since the first material placement mechanism 400, the second material placement mechanism 500 and the fixture 200 are arranged at intervals in the same straight line direction, this means that the third translation assembly 631 can simultaneously drive the first manipulator 610 and the second manipulator 620 to clamp the chip and the magnetic tooling and transfer them to the fixture 200, which can greatly improve production efficiency.
[0056] The third translation assembly 631 in the above embodiment may be a linear electric cylinder, or an assembly combination of a motor and a lead screw assembly, or of course, other motion units capable of linear movement, which is not limited here.
[0057] The first manipulator 610 and the second manipulator 620 may be gripper cylinders, or may use suction cups to pick up and place materials by suction. The configuration of the first manipulator 610 and the second manipulator 620 is not limited herein.
[0058] Reference Figure 1 and Figure 3In one embodiment, the dispensing device 1000 further includes a first recognition camera 700 mounted on the top of the first material placement mechanism 400, and the first material placement mechanism 400 includes a first material placement seat 410, a fourth translation assembly 420, and a fifth translation assembly 430; the first material placement seat 410 is used to carry the chip; the fourth translation assembly 420 is mounted on the machine tool 100 and connected to the first material placement seat 410 to drive the first material placement seat 410 to move; the fifth translation assembly 430 is mounted on the machine tool 100 and connected to the first material placement seat 410 to drive The first material placement seat 410 is moved; wherein, the driving direction of the fourth translation component 420 is perpendicular to the driving direction of the fifth translation component 430, and the first recognition camera 700 is electrically connected to the fourth translation component 420 and the fifth translation component 430 to adjust the horizontal position of the first material placement seat 410 according to the recognition information of the first recognition camera 700. Such a setting facilitates the alignment of chips at different positions on the first material placement seat 410 with the first recognition camera 700, so as to provide the first robot 610 with chip clamping position information to achieve hardcover clamping.
[0059] Reference Figure 1 and Figure 4 In one embodiment, the first material placement mechanism 400 further includes a flip assembly 440, which is mounted on the machine tool 100 and connected to the first material placement seat 410. The flip assembly 440 is electrically connected to the first recognition camera 700 to adjust the flip angle of the first material placement seat 410 according to the recognition information of the first recognition camera 700. Specifically, the flip assembly 440 can adjust the chip to a suitable angle by rotating the first material placement seat 410, so that the first manipulator 610 can pick up the chip. The first recognition camera 700 is used to identify the clamping position of the chip at a suitable angle, improve the success rate of picking up, reduce the occurrence of accidental chip falling, and improve the reliability of the dispensing device.
[0060] The flip assembly 440 can be a motor with a hollow rotating platform, or a rotating cylinder, and of course it can also be other motion units that can rotate and move, which is not limited here.
[0061] Reference Figure 4 In one embodiment, a plurality of bearing areas 411 for bearing chips are provided on the first material placement seat 410, and the plurality of bearing areas 411 are distributed in a matrix on the first material placement seat 410. With such a configuration, the first material placement seat 410 can hold more chips, reduce the number of times workers fill chips, and reduce the downtime of chip filling of the dispensing equipment 1000, thereby improving production efficiency. Specifically, four bearing areas 411 can be provided, and the four bearing areas 411 are distributed in a matrix. The bearing areas 411 can be placement grooves, which are more convenient to process, and their outer contour shape can be adapted according to the shape of the chip to improve the chip limiting effect;
[0062] It should be noted that the carrying area 411 can be used to place chips directly, or to place a carrier for mounting chips. For example, the carrier can be a chip adhesive box, or a homemade fixture, which is not limited here.
[0063] Reference Figure 5 In one embodiment, the second manipulator 620 is also used to pick up and place the finished workpiece, and the second material placement mechanism 500 also includes a sixth translation assembly 510 and a second material placement seat 520; the sixth translation assembly 510 is installed on the machine tool 100, and the driving direction of the sixth translation assembly 510 is perpendicular to the driving direction of the third translation assembly 631; the second material placement seat 520 is installed on the sixth translation assembly 510, and the sixth translation assembly 510 is used to drive the second material placement seat 520 to move, and at least two material placement areas 521 are provided on the second material placement seat 520, and multiple material placement areas 521 are adjacently arranged in the driving direction of the sixth translation assembly 510 to accommodate the magnetic ring fixture and the finished workpiece. In this way, the material placement area 521 can be used for feeding and receiving materials, and cooperates with the second manipulator 620 to complete loading and unloading, without the need to set up a separate unloading mechanism, and the structure is simpler and more space-saving. Specifically, the sixth translation assembly 510 is used to drive any material placement area 521 to align with the second manipulator 620 to facilitate picking and placing. The sixth translation assembly 510 can be a linear electric cylinder; the second material placement seat 520 is installed at the moving end of the sixth translation assembly 510, and the material placement area 521 can be a positioning groove, and its shape can be adapted according to the shape of the magnetic ring tooling. Four material placement areas 521 can be set, and the four material placement areas 521 are adjacently arranged to reduce the time for aligning the two material placement areas 521 with the second manipulator 620. It can be understood that the number of material placement areas 521 can also be set to six or ten; technical personnel in this field can make adjustments according to actual production needs, and no limitation is made here.
[0064] In order to better understand the function of the second material loading seat 520 to realize the material delivery and receiving function, the following is an application scenario of the dispensing equipment 1000 for illustration. For example, there are four material loading areas 521, and the four material loading areas 521 are divided into a first material loading area, a second material loading area, a third material loading area and a fourth material loading area. The first material loading area, the second material loading area and the third material loading area are filled with magnetic tooling, and the fourth material loading area is empty to store finished workpieces. The second manipulator 620 takes away the magnetic tooling in the first material loading area for dispensing, and transfers the finished workpiece to the fourth material loading area until the magnetic tooling in the first material loading area is emptied and all the finished workpieces are transferred to the fourth material loading area. The first material loading area is emptied and can be used as a new storage area for finished workpieces. The above actions are repeated until all the magnetic tooling on the second material loading seat 520 is fully dispensed. Therefore, by implementing the second material loading seat 520 of the above embodiment, material delivery and receiving can be realized, and workers can fill more efficiently, thereby improving production efficiency.
[0065] Reference Figure 5 In one embodiment, the second material placement seat 520 can be detachably mounted on the sixth translation assembly 510, so as to facilitate workers to take away the finished workpiece at one time and quickly change materials. Specifically, the detachable installation method can be a magnetic connection, a snap connection, or it can be clamped and fixed by a clamping cylinder. The detachable installation method is not limited here.
[0066] Reference Figure 5 In one embodiment, two positioning pins 521a are provided on each material placement area 521, and the two positioning pins 521a are arranged at intervals. The positioning pins 521a are used to be plugged into the positioning holes of the magnetic ring fixture. By inserting the positioning pins 521a into the positioning holes, it can be ensured that the magnetic ring fixture has an accurate position and direction when placed, thereby achieving precise positioning and alignment. During the production process, it can prevent the finished workpiece from shifting or swinging after the second manipulator 620 releases the material; and through accurate positioning and alignment, the second manipulator 620 can place the finished workpiece on the material placement area 521 more quickly, saving time and improving production efficiency, especially in mass production or automated production lines.
[0067] Reference Figure 3 and Figure 5 In one embodiment, the transport assembly 630 also includes a first lifting assembly 632, and the first lifting assembly 632 is connected to the second manipulator 620 to drive the second manipulator 620 to rise and fall, so that the magnetic ring tooling can be stacked on the second material placement seat 520. With this arrangement, the magnetic ring tooling can be placed in the material placement area 521 in a stacked manner, and more magnetic ring tooling can be accommodated in a limited space, which can reduce the loading and unloading time and frequency and improve production efficiency; the stacking method can effectively utilize the vertical space, thereby reducing the occupied horizontal space. This is very beneficial for production environments with limited horizontal space, and can save space to the greatest extent and improve space utilization. Specifically, the first lifting assembly 632 is a linear electric cylinder, which can drive the second manipulator 620 in the vertical direction (such as Figure 1 The workpieces are moved in the Z direction (as shown in the center) so that a plurality of completed workpieces are sequentially stacked and placed in the material placement area 521.
[0068] Reference Figure 6In one embodiment, the dispensing equipment 1000 also includes a second recognition camera (not shown in the figure) installed on the top of the fixture 200, and the fixture 200 includes an assembly platform 210, a seventh translation component 220 and an eighth translation component 230, and the assembly platform 210 is used to carry the chip and the magnetic ring tooling; the seventh translation component 220 is installed on the machine tool 100 and connected to the assembly platform 210 to drive the assembly platform 210 to move; the eighth translation component 230 is installed on the machine tool 100 and connected to the assembly platform 210 to drive the assembly platform 210 to move; wherein, the driving direction of the seventh translation component 220 is perpendicular to the driving direction of the eighth translation component 230, and the second recognition camera is electrically connected to the seventh translation component 220 and the eighth translation component 230 to adjust the horizontal position of the assembly platform 210 according to the recognition information of the second recognition camera. Specifically, the second recognition camera accurately identifies the glue dispensing positions at the four corners of the chip. The seventh translation component 220 and the eighth translation component 230 drive the glue dispensing position of the chip in the assembly platform 210 to align with the glue dispensing head 310 according to the recognition information, thereby achieving precise positioning of the glue dispensing position of the chip, facilitating the glue dispensing head 310 to dispense glue more quickly and improving the yield rate of the finished workpiece after gluing.
[0069] More specifically, an assembly groove can be set on the side of the assembly platform 210 facing the dispensing head 310, and the assembly groove is adapted to the magnetic tooling. A supporting cylinder can also be set on the assembly platform 210. The magnetic tooling is supported by the supporting cylinder to be tightly attached to the groove wall of the assembly groove, thereby ensuring that the magnetic tooling does not shift during the assembly process and improving the assembly efficiency.
[0070] Reference Figure 1 In one embodiment, the dispensing device 1000 is provided with two first material placement mechanisms 400, a second material placement mechanism 500 and a manipulator mechanism 600, and the two first material placement mechanisms 400, the second material placement mechanism 500 and the manipulator mechanism 600 are all arranged in a mirrored manner in the first direction. With such a design, the dispensing device 1000 can simultaneously load, assemble and dispense two chips, further improving production efficiency.
[0071] It should be understood that the above embodiments are only used to illustrate the technical solutions of the present utility model rather than to limit it. For those skilled in the art, the technical solutions described in the above embodiments can be modified, or some of the technical features therein can be replaced by equivalents; and all these modifications and replacements should fall within the scope of protection of the claims attached to the present utility model.
Claims
1. A dispensing device, characterized in that: include: machine tool; A fixture, which is installed on the machine tool and is used to carry the chip and the magnetic ring tooling equipped with the magnetic ring; A glue dispensing mechanism, comprising a glue dispensing head, a first translation assembly and a second translation assembly, all of which are mounted on the machine tool; the first translation assembly is connected to the jig or the glue dispensing head to drive the jig or the glue dispensing head to move in a first direction; the second translation assembly is connected to the jig or the glue dispensing head to drive the jig or the glue dispensing head to move in a second direction; The first direction is perpendicular to the second direction, so that the dispensing head can move to the four corners of the chip relative to the fixture.
2. The dispensing device according to claim 1, characterized in that: The dispensing equipment also includes: A first loading mechanism, which is installed on the machine tool and is used to carry the chip; A second material placement mechanism, which is installed on the machine tool and is used to carry the magnetic ring tooling; A robot mechanism includes a first robot, a second robot and a transport component, wherein the first robot and the second robot are connected to the machine tool through the transport component; the first robot is used to pick up and place the chip, and the transport component is used to drive the first robot to and from the first material placement mechanism and the fixture; the second robot is used to pick up and place the magnetic ring, and the transport component is used to drive the second robot to and from the second material placement mechanism and the fixture.
3. The dispensing device according to claim 2, characterized in that: The conveying assembly includes a third translation assembly, the first manipulator and the second manipulator are both connected to the third translation assembly, and the first material placement mechanism, the second material placement mechanism and the fixture are spaced apart in the same straight line direction, so that the third translation assembly can drive the first manipulator to move back and forth between the first material placement mechanism and the fixture, and drive the second manipulator to move back and forth between the second material placement mechanism and the fixture.
4. The dispensing device according to claim 2, characterized in that: The dispensing device further includes a first recognition camera mounted on the top of the first material placement mechanism, and the first material placement mechanism includes: A first material placement seat, which is used to carry the chip; a fourth translation assembly, which is installed on the machine tool and connected to the first material placement seat to drive the first material placement seat to move; a fifth translation assembly, which is installed on the machine tool and connected to the first material placement seat to drive the first material placement seat to move; Among them, the driving direction of the fourth translation assembly is perpendicular to the driving direction of the fifth translation assembly, and the first recognition camera is electrically connected to the fourth translation assembly and the fifth translation assembly to adjust the horizontal position of the first material placement base according to the recognition information of the first recognition camera.
5. The dispensing device according to claim 4, characterized in that: The first material placement mechanism further includes a flip assembly, which is installed on the machine tool and connected to the first material placement seat. The flip assembly is electrically connected to the first recognition camera to adjust the flip angle of the first material placement seat according to the recognition information of the first recognition camera.
6. The dispensing device according to claim 4, characterized in that: The first material placement seat is provided with a plurality of carrying areas for carrying the chips, and the plurality of carrying areas are distributed in a matrix on the first material placement seat.
7. The dispensing device according to claim 3, characterized in that: The second manipulator is also used to pick up and place the finished workpiece, and the second material placement mechanism also includes: a sixth translation assembly, which is mounted on the machine tool, and a driving direction of the sixth translation assembly is perpendicular to a driving direction of the third translation assembly; The second material placement seat is installed on the sixth translation assembly, and the sixth translation assembly is used to drive the second material placement seat to move. The second material placement seat is provided with at least two material placement areas, and the multiple material placement areas are adjacently arranged in the driving direction of the sixth translation assembly to accommodate the magnetic ring tooling and the finished workpiece.
8. The dispensing device according to claim 7, characterized in that: Two positioning pins are arranged on each of the material placement areas. The two positioning pins are arranged at intervals. The positioning pins are used to be inserted into the positioning holes of the magnetic ring tooling.
9. The dispensing device according to claim 7, characterized in that: The transport assembly further includes a first lifting assembly, which is connected to the second manipulator to drive the second manipulator to move up and down, so that the magnetic ring tooling can be stacked on the second material placement seat.
10. The dispensing device according to claim 8, characterized in that: The dispensing device further includes a second recognition camera mounted on the top of the fixture, and the fixture includes: An assembly platform, which is used to carry the chip and the magnetic ring fixture; a seventh translation assembly, which is mounted on the machine tool and connected to the assembly platform to drive the assembly platform to move; an eighth translation assembly, which is mounted on the machine tool and connected to the assembly platform to drive the assembly platform to move; Among them, the driving direction of the seventh translation component is perpendicular to the driving direction of the eighth translation component, and the seventh translation component and the eighth translation component are both electrically connected to the second recognition camera to adjust the horizontal position of the assembly platform according to the recognition information of the second recognition camera.