Large shaft connection reaming tool for vertical pump

Through the combined tooling of the annular fixed seat and the vertical twisting boring machine, the problems of low efficiency and poor safety on-site reaming operation of the vertical pump unit are solved, and efficient and safe hole opening operation is achieved, reducing costs and on-site operation time is achieved. .

CN222094868UActive Publication Date: 2024-12-03HITACHI PUMP MFG WUXI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420629834.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-12-03
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

When installing the vertical large-scale hybrid and axial flow pump units on site, the artificial reaming efficiency is low, the safety is poor, the quality is unstable and the cost is high, especially the opening operation of large-sized holes is complicated and dangerous.

Method used

Using a combined tooling for ring-shaped fixing seat, vertical twisting boring machine and clamping machine, the positioning of ring-shaped fixing seat and the automatic drilling of vertical twisting boring machine reduces manpower operation, improves hole opening efficiency and safety, and reduces cost.

Benefits of technology

It significantly improves the reaming efficiency and quality, reduces on-site operation time, reduces dependence on professional technicians, and avoids the need to repeatedly build construction platforms, improving safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222094868U_ABST
    Figure CN222094868U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of vertical pumps, in particular to a reaming tool for large shaft connection of a vertical pump, which can effectively improve tapping efficiency, guarantee quality and safety and reduce cost, and comprises an annular fixing seat, a concave spigot is arranged on the annular fixing seat, a mounting plate is arranged on the outer side face of the annular fixing seat, and the concave spigot is provided with a convex spigot. And a vertical reaming and boring machine is arranged on the mounting plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of vertical pumps, in particular to a vertical pump main shaft connection reaming tool. Background Art

[0002] For vertical large-scale mixed and axial flow pump units, the motor and the water pump are arranged in a vertical line. The motor is used as a power source, and the output torque is transmitted to the pump shaft, which in turn rotates the water pump impeller, converting kinetic energy into potential energy and lifting the conveying medium.

[0003] The motor power of vertical large-scale mixed and axial flow pump units is relatively large, usually greater than 1000 kilowatts, and the speed is relatively low, generally less than 200 rpm. The pump shaft needs to withstand huge torque, and the size of the connecting bolts that connect the motor shaft and the pump shaft is also large, generally greater than M42 (the project in which the patent structure is applied in practice uses M64 connecting bolts).

[0004] The motor rotor (motor shaft) and the water pump rotor (water pump shaft) are connected to form the rotor component of the pump unit. When the unit is running, it is necessary to ensure that the running runout of the rotor component is less than 15 microns per meter of length. This requires adjusting the coaxiality when connecting the motor shaft and the pump shaft, and fixing them by reaming and inserting reaming bolts.

[0005] For vertical large-scale mixed and axial flow pump units, the connection and debugging of the motor shaft and the water pump shaft can only be implemented during the installation process of the unit on the pump station site, so the reaming of the shaft connection bolt holes can only be completed on the pump station site. In order to improve the efficiency of reaming holes, the motor manufacturer and the water pump manufacturer will negotiate to reserve the appropriate reaming reserved cutting amount and matching length, and determine the number of reaming holes through force calculation. Despite this, the on-site reaming work still takes a considerable amount of time (an average of 1 to 2 days to complete the work of one hole), and requires professional, skilled and experienced technicians to complete it.

[0006] Due to the different structures of pump stations, the traditional method has the following problems: 1. At least two professionals are required to operate, and the work efficiency is extremely low when using manual reamers. In addition, the quality is uneven, which is not conducive to ensuring the assembly quality of the unit; 2. The connecting flange is located between the water pump installation plane and the motor installation plane, and an operating table needs to be built. Each unit needs to be rebuilt for construction, which has a high investment cost; 3. Holes larger than Ф65mm are difficult to achieve by manual reaming. The tools are too heavy, and reaming requires a lot of torque. In addition, two people standing on a high operating table are working hard, which is very dangerous. Summary of the invention

[0007] In order to solve the problems of low efficiency, poor safety, unstable quality and high investment cost of existing manual drilling, the utility model provides a vertical pump shaft connection reaming tool, which can effectively improve the drilling efficiency, ensure quality and safety, and reduce costs.

[0008] The technical solution is as follows: a vertical pump shaft connection reaming tool, characterized in that it includes an annular fixing seat, a concave stop is arranged on the annular fixing seat, a mounting plate is arranged on the outer side of the annular fixing seat, and a vertical reaming boring machine is arranged on the mounting plate.

[0009] Its further feature is that the annular fixing seat comprises a left half-ring fixing seat and a right half-ring fixing seat, and a bolt seat is provided at the connection between the left half-ring fixing seat and the right half-ring fixing seat and connected by a Harv bolt and a nut;

[0010] The mounting plate is provided with waist-shaped holes and side tightening bolts are arranged on the sides;

[0011] It also includes a clamp, which includes a C-shaped clamping frame, and a locking bolt is arranged on the C-shaped clamping frame.

[0012] After the utility model is adopted, the annular seat is fixed on the flange and positioned by the concave stop. The annular fixed seat is rotated to the corresponding position according to the hole opening position, and the vertical boring machine is started to complete the hole opening operation, which greatly reduces manual labor, is safe and reliable, effectively improves the hole opening quality and hole opening efficiency, does not need to repeatedly build a construction platform, and reduces costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the implementation state of the utility model;

[0014] Figure 2 It is a top view of the annular fixing seat;

[0015] Figure 3 This is a schematic diagram of the clamp in use;

[0016] Figure 4 This is the reaming sequence diagram. DETAILED DESCRIPTION

[0017] See Figures 1 to 3 As shown, a vertical pump shaft connection reaming tool includes an annular fixing seat 1, on which a concave stop is arranged to ensure reliable positioning, and an outer side of the annular fixing seat 1 is provided with a mounting plate 2, on which a vertical reaming and boring machine 3 is arranged, and the drill bit of the vertical reaming and boring machine 3 is arranged downward.

[0018] The annular fixing seat 1 includes a left half-ring fixing seat 1-1 and a right half-ring fixing seat 1-2. A bolt seat 4 is provided at the connection between the left half-ring fixing seat 1-1 and the right half-ring fixing seat 1-2 and is connected by a Haver bolt 5 and a nut 6. When drilling a hole, the annular fixing seat 1 can be firmly fixed on the flange 7. When the drilling position needs to be adjusted, it is only necessary to loosen the Haver bolt 5 and the nut 6, and tighten them again when rotating to the required position, and continue to start the vertical boring machine 3.

[0019] The mounting plate 2 is provided with a waist-shaped hole 11 and a side tightening bolt 8 is arranged on the side, so that the position of the vertical boring machine 3 can be properly adjusted and the side can be tightened and fixed.

[0020] In order to ensure stability during drilling, a clamp may be added. The clamp includes a C-shaped clamp frame 9 . A locking bolt 10 is provided on the C-shaped clamp frame 9 , which can clamp the annular fixing seat 1 .

[0021] When a hole needs to be drilled, first install six connecting bolts 12 to achieve the positioning connection of the flange 7. Figure 4 As shown, the annular fixing seat 1 is then installed, and the inner ring of the annular fixing seat 1 and the connecting bolt 12 will not interfere with each other. The annular fixing seat 1 is rotated, and the drill bit of the vertical boring machine 3 is first aligned with the first hole opening position, and then the Haver bolts 5 and nuts 6 are tightened to make the annular fixing seat 1 reliably fixed on the flange 7, and finally the vertical boring machine 3 is started to complete the first hole opening; then the Haver bolts 5 and nuts 6 are loosened, and the annular fixing seat 1 is rotated to align the drill bit of the vertical boring machine 3 with the second hole opening position, and the Haver bolts 5 and nuts 6 are tightened again and the vertical boring machine 3 is started to complete the second hole opening; then the above operations are repeated to continue to complete the remaining four hole opening operations.

[0022] The vertical boring machine 3 can set different automatic feed speeds and ream speeds according to the hardness of different materials. For example, 1mm forward and 0.3mm back. No experienced technician is required to operate, only supervision is needed, which greatly reduces the labor.

Claims

1. A vertical pump shaft connection reaming tool, characterized in that: The utility model comprises an annular fixing seat, a concave stopper is arranged on the annular fixing seat, a mounting plate is arranged on the outer side of the annular fixing seat, and a vertical boring machine is arranged on the mounting plate.

2. A vertical pump main shaft connection reaming tool according to claim 1, characterized in that: The annular fixing seat comprises a left half-ring fixing seat and a right half-ring fixing seat. A bolt seat is provided at the connection between the left half-ring fixing seat and the right half-ring fixing seat and the two are connected by Harv bolts and nuts.

3. A vertical pump main shaft connection reaming tool according to claim 1, characterized in that: The mounting plate is provided with a waist-shaped hole and a side tightening bolt is arranged on the side.

4. A vertical pump main shaft connection reaming tool according to claim 1, characterized in that: It also includes a clamp, which includes a C-shaped clamping frame, and a locking bolt is arranged on the C-shaped clamping frame.