Pipeline cutting positioning device
By projecting gravity parts on the pipe cutting positioning device to determine the pipe cutting point, the problem that the accuracy of cutting lines in the prior art depends on operating experience, and an efficient and accurate pipeline cutting and connecting process is achieved.
Patent Information
- Application Number
- CN202420171903.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-23
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-23
AI Technical Summary
During the pipe connection process, the accuracy of the cutting line depends on operating experience, and excessive or insufficient cutting is prone to excessive or insufficient cutting, resulting in rework and inefficiency, especially for larger pipes to be more difficult to counterpart before welding.
A pipe cutting positioning device is designed, and the gravity element is projected onto the pipe to be connected through multiple preset points and wire collectors on the prefabricated tube, the cutting point is determined and the cutting surface is connected to determine the cutting surface, and the cutting accuracy and efficiency are improved.
It achieves high success rate and high efficiency of pipeline cutting, simplifies operations, reduces rework, and improves the working efficiency of pipeline connection.
Smart Images

Figure CN222095384U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pipeline cutting, and in particular to a pipeline cutting positioning device. Background Art
[0002] When connecting buried steel pipelines (for example, connecting a new pipe to an old pipe), a prefabricated pipe (whose two end faces are generally circular or elliptical) is usually used to connect the new pipe and the old pipe whose relative position relationship has been fixed. Before connecting, the fixed new and old pipes need to be cut separately, that is, the excess parts are cut off so that the prefabricated pipe can be just embedded between the two pipes to be connected, so as to achieve smooth docking and then welding connection.
[0003] When cutting the old and new pipes that need to be connected, the cutting line must be relatively precise, otherwise it will affect the accurate connection between the pipes and pipe fittings, and even make welding impossible. This is especially difficult for pipes with relatively large diameters before welding. In the related art, when cutting and connecting the old and new pipes that need to be connected, it is highly dependent on operating experience and will consume a lot of time; when cutting, it is easy to over-cut or under-cut, resulting in the need for rework and repair of the pipes, affecting work efficiency. Utility Model Content
[0004] The present application aims to solve at least one of the above technical problems in the prior art to a certain extent. To this end, an embodiment of the present application provides a pipeline cutting and positioning device, which can improve the working efficiency of pipeline connection.
[0005] According to the embodiment of the present application, the pipeline cutting and positioning device includes: a prefabricated pipe, which is arranged directly above the pipe to be connected, the prefabricated pipe has a first end face, the first end face is used for connecting with the pipe to be connected, and a plurality of preset points are arranged on the first end face; a pipeline cutting and positioning device body, which is arranged on the prefabricated pipe, the pipeline cutting and positioning device body includes a bracket, and a plurality of wire take-ups are arranged on the bracket, each of the wire take-ups is located directly above each of the preset points, and a gravity piece is arranged at the end of the wire of each wire take-up, and the wire take-up is used to retract and release the gravity piece, so that the plurality of preset points on the first end face can be projected onto the pipe to be connected to determine the cutting point on the pipe to be connected, and the cutting surface of the pipe to be connected can be determined by connecting the plurality of cutting points.
[0006] Based on the above technical scheme, the embodiment of the present application has at least the following beneficial effects: the pipe cutting and positioning device in the embodiment of the present application can project the preset point on the first end face of the prefabricated pipe onto the pipe to be connected by lowering the gravity member through the wire take-up device to determine the cutting point on the pipe to be connected, and the cutting surface of the pipe to be connected can be determined by connecting multiple cutting points, thereby completing the cutting of the pipe to be connected, with simple operation and high success rate, and can improve the work efficiency of pipe connection.
[0007] According to the pipe cutting positioning device of an embodiment of the present application, the preset points on the first end face include the highest point, the leftmost point and the rightmost point, and the wire reel includes a first wire reel and two second wire reels, the first wire reel is located directly above the highest point of the first end face, and the two second wire reels are respectively located directly above the leftmost point and the rightmost point of the first end face.
[0008] According to the pipe cutting and positioning device of the embodiment of the present application, the bracket includes three frames connected end to end to form a triangular bracket, and the three wire take-ups are respectively arranged at three corners of the triangular bracket.
[0009] According to the pipe cutting and positioning device of the embodiment of the present application, the bracket is provided with a retractable portion between the two second wire take-ups to adjust the distance between the two second wire take-ups.
[0010] According to the pipe cutting and positioning device of the embodiment of the present application, the first wire take-up device is movably arranged on the bracket, so that the first wire take-up device can move along the length direction of the prefabricated pipe.
[0011] According to the pipe cutting and positioning device of the embodiment of the present application, a telescopic tube parallel to the prefabricated pipe is provided on the bracket, and the first wire take-up device is provided on the telescopic tube. By extending and retracting the telescopic tube, the first wire take-up device can be moved along the length direction of the prefabricated pipe.
[0012] According to the pipe cutting and positioning device of the embodiment of the present application, the pipe cutting and positioning device body also includes a fixing member, the bracket is connected to the fixing member, and the fixing member is connected to the highest point of the first end face of the prefabricated pipe.
[0013] According to the pipeline cutting and positioning device of the embodiment of the present application, a horizontal positioning plate is provided on the fixing member to determine the highest point of the first end surface of the prefabricated pipe.
[0014] According to the pipeline cutting and positioning device of the embodiment of the present application, the gravity member is a laser pendant.
[0015] According to the pipe cutting and positioning device of the embodiment of the present application, the pipe to be connected includes a first pipe and a second pipe that have been fixed, the prefabricated pipe has two first end faces, one of which is used to connect with the first pipe, and the other of which is used to connect with the second pipe, and two pipe cutting and positioning device bodies are provided on the prefabricated pipe, one of which is used to determine the cutting point on the first pipe, and the other of which is used to determine the cutting point on the second pipe.
[0016] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present application is further described below with reference to the accompanying drawings and embodiments;
[0018] Figure 1 This is a structural schematic diagram of the positions of the prefabricated pipe and the pipe to be connected in the embodiment of the present application;
[0019] Figure 2 This is a schematic diagram of the structure of the prefabricated pipe in the embodiment of the present application;
[0020] Figure 3 This is a schematic diagram of the structure of the pipeline cutting and positioning device body in the embodiment of the present application;
[0021] Figure 4 This is a schematic diagram of the structure of the bracket in the embodiment of the present application;
[0022] Figure 5 This is another structural schematic diagram of the pipeline cutting and positioning device body in the embodiment of the present application.
[0023] Figure markings: first tube 110, second tube 120, highest cutting point A1; prefabricated tube 200, first end face 210, highest point A, leftmost point B, rightmost point C; pipeline cutting and positioning device body 300, bracket 310, first connecting rod 311, fixed part 3111, retractable part 3112, second connecting rod 312, third connecting rod 313, retractable tube 314, first wire take-up device 321, second wire take-up device 322, hanging plumb line 323, laser hanging hammer 324, laser beam 325, horizontal positioning plate 330, fixing part 340. DETAILED DESCRIPTION
[0024] This section will describe in detail the specific embodiments of the present application. The preferred embodiments of the present application are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present application, but it cannot be understood as a limitation on the scope of protection of the present application.
[0025] In the description of the present application, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0026] In the description of this application, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed", etc. are understood to exclude the number itself, and "above", "below", "within", etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.
[0027] In the description of this application, unless otherwise clearly defined, words such as setting and connecting should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above words in this application based on the specific content of the technical solution.
[0028] In the embodiment of the present application, the positive direction of the X-axis in the drawing is right, and the negative direction of the X-axis is left; the positive direction of the Y-axis in the drawing is front, and the negative direction of the Y-axis is back; the positive direction of the Z-axis in the drawing is top, and the negative direction of the Z-axis is bottom.
[0029] The embodiment of the present application provides a pipeline cutting and positioning device for determining the cutting surface of the pipe to be connected, which can improve the efficiency of pipeline connection. The pipeline cutting and positioning device includes a prefabricated pipe 200 and a pipeline cutting and positioning device body 300, see Figure 1 and Figure 2 The prefabricated pipe 200 is arranged directly above the pipe to be connected (the first pipe 110 and the second pipe 120), and the prefabricated pipe 200 has a first end face 210, which is used to connect with the pipe to be connected, and a plurality of preset points are arranged on the first end face 210. The first end face 210 of the prefabricated pipe 200 may be circular or may be an inclined ellipse. Figure 2 The first end surface 210 of the prefabricated tube 200 is an inclined ellipse.
[0030] The main body 300 of the pipe cutting and positioning device is arranged on the prefabricated pipe 200. The main body 300 of the pipe cutting and positioning device includes a bracket 310. A plurality of wire take-ups are arranged on the bracket 310. Each wire take-up is located directly above each preset point. A gravity piece is arranged at the end of the wire of each wire take-up. The wire take-up is used to retract and release the gravity piece, so that the preset point on the first end face 210 can be projected onto the pipe to be connected to determine the cutting point on the pipe to be connected. By connecting a plurality of cutting points, the cutting surface of the pipe to be connected can be determined, so that the cutting of the pipe to be connected can be completed. The pipe cutting and positioning device in the embodiment of the present application is simple to operate, has a high success rate, and can improve the working efficiency of pipe connection.
[0031] In some embodiments, see Figure 2 The preset points on the first end surface 210 include the highest point A, the leftmost point B and the rightmost point C, see Figure 3 The wire take-up device includes a first wire take-up device 321 and two second wire take-ups 322. The first wire take-up device 321 is located directly above the highest point A of the first end surface 210, so that the wire of the first wire take-up device 321 can pass through the highest point A of the first end surface 210 of the preformed tube 200 when the wire is lowered to lower the weight member, and the two second wire take-ups 322 are respectively located directly above the leftmost point B and the rightmost point C of the first end surface 210, so that the wire of the two second wire take-ups 322 can be tangent to the left and right sides of the first end surface 210 of the preformed tube 200 when the wire is lowered to lower the weight member.
[0032] It is understandable that the number of wire take-ups is the same as the number of preset points, and they correspond one to one. It is conceivable that in order to improve the accuracy of determining the cutting surface, the preset points can be increased to determine more cutting points. The specific number and specific setting positions of the wire take-ups can be adjusted according to actual needs, and no specific restrictions are made here. The following is a further explanation using the setting of the above three wire take-ups as an example.
[0033] In some embodiments, the bracket 310 is a triangular bracket 310 , and three wire take-ups are respectively disposed at three corners of the triangular bracket 310 .
[0034] See also Figure 4 The triangular support 310 is formed by connecting the first connecting rod 311, the second connecting rod 312 and the third connecting rod 313 end to end, wherein the first connecting rod 311 is placed horizontally. Figure 3 and Figure 4 , two second wire take-ups 322 are arranged at the corners at both ends of the first connecting rod 311, and one first wire take-up 321 is arranged at the corner where the second connecting rod 312 and the third connecting rod 313 meet. It can be understood that the specific arrangement position of the bracket 310 can be adjusted according to actual needs, for example, see Figure 5 , the top of the triangular bracket 310 is tilted backward.
[0035] It is understandable that the specific shape of the bracket 310 can be transformed into other shapes such as square, semicircle, semi-ellipse or irregular shapes, and no specific limitation is made here.
[0036] Furthermore, the bracket 310 is provided with a retractable portion 3112 between the two second wire take-ups 322 to adjust the distance between the two second wire take-ups 322 .
[0037] See also Figure 4 A retractable portion 3112 is provided on the first connecting rod 311, and the distance between the two second wire take-ups 322 can be adjusted by retracting the retractable portion 3112, so that the pipe cutting and positioning device in the embodiment of the present application can be suitable for determining cutting surfaces with different horizontal diameters.
[0038] In some embodiments, the first wire take-up device 321 is movably disposed on the bracket 310 , so that the first wire take-up device 321 can move along the length direction of the prefabricated tube 200 .
[0039] In some of the embodiments, see Figure 5 A telescopic tube 314 parallel to the preformed tube 200 is provided on the bracket 310, and a first wire take-up device 321 is provided on the telescopic tube 314. By extending and retracting the telescopic tube 314, the first wire take-up device 321 can be moved along the length direction of the preformed tube 200, so that the position of the first wire take-up device 321 can be adjusted to be located directly above the highest point A of the first end surface 210 of the preformed tube 200.
[0040] In some other embodiments, a rod parallel to the preformed tube 200 is provided on the bracket 310, and the first wire take-up device 321 is slidably connected to the rod via a slider, and the first wire take-up device 321 can be moved along the length direction of the preformed tube 200 by sliding the slider.
[0041] Of course, the rod may be movably connected to the bracket 310 to achieve movement of the first wire take-up device 321 along the length direction of the rod, which will not be elaborated herein.
[0042] It is understandable that the two second wire take-ups 322 can also be movably arranged on the bracket 310, so that the second wire take-ups 322 can move along the length direction of the prefabricated tube 200, and the arrangement method is the same as the first wire take-up 321, which will not be described in detail here. When the two second wire take-ups 322 are movably arranged on the bracket 310, by moving the two second wire take-ups 322, the weight members on the two second wire take-ups 322 can be aligned with the leftmost point B and the rightmost point C of the first end face 210, respectively.
[0043] In some embodiments, the pipe cutting and positioning device body 300 further includes a fixing member 340, the bracket 310 is connected to the fixing member 340, and the fixing member 340 is connected to the highest point A of the first end surface 210 of the preformed pipe 200 to fix the bracket 310 at the highest point A of the first end surface 210 of the preformed pipe 200. The fixing member 340 is disposed at the highest point A of the first end surface 210 of the preformed pipe 200, which is conducive to maintaining the balance of the gravity members on both sides of the bracket 310.
[0044] Furthermore, a horizontal positioning plate 330 is provided on the fixing member 340 to determine the highest point A of the first end surface 210 of the prefabricated tube 200. It can be understood that since the highest point A of the prefabricated tube 200 is tangent to the horizontal line, the highest point A of the prefabricated tube 200 can be determined by the horizontal positioning plate 330.
[0045] In some of the embodiments, the fixing member 340 is a clamp.
[0046] See also Figure 3 and Figure 4 The first connecting rod 311 of the triangular bracket 310 is connected to the horizontal positioning plate 330, and the horizontal positioning plate 330 is connected to the clamp through a connecting piece.
[0047] In some embodiments, the first connecting rod 311 of the triangular bracket 310 is rotatably connected to the horizontal positioning plate 330, so that the first connecting rod 311 can rotate in the horizontal plane, thereby driving the triangular bracket 310 to rotate. When the projection of the first end surface 210 of the prefabricated tube 200 on the horizontal plane is an oblique line, the weight members on the two second wire take-ups 322 can be aligned with the leftmost point B and the rightmost point C of the first end surface 210 of the prefabricated tube 200 respectively by rotating the triangular bracket 310 and appropriately extending the retractable portion 3112 on the first connecting rod 311.
[0048] Specifically, see Figure 4 A fixed portion 3111 is provided in the middle of the first connecting rod 311 to be rotatably connected to the horizontal positioning plate 330 , and a retractable portion 3112 is provided on both sides of the fixed portion 3111 of the first connecting rod 311 , so that the length of the first connecting rod 311 can be adjusted through the two retractable portions 3112 .
[0049] When the first connecting rod 311 of the triangular bracket 310 is fixedly connected to the horizontal positioning plate 330, the position of the prefabricated tube 200 can also be adjusted so that the first end face 210 of the prefabricated tube 200 is symmetrical on the left and right, so that the gravity members on the two second wire collectors 322 can be aligned with the leftmost point B and the rightmost point C of the first end face 210 respectively.
[0050] In some embodiments, the gravity member is a laser pendulum 324. The vertical line 323 of the first wire take-up 321 passes through the highest point A of the first end surface 210 of the preformed tube 200, and the vertical lines 323 of the two second wire take-ups 322 pass through the leftmost point B and the rightmost point C of the first end surface 210 of the preformed tube 200, respectively, and are tangent to the left and right sides of the first end surface 210 of the preformed tube 200.
[0051] It can be understood that since the fixing member 340 is connected to the highest point A of the first end face 210 of the prefabricated pipe 200, a through hole is provided on the fixing member 340 for the pendant line of the first wire take-up device 321 to pass through, so that the laser beam 325 of the laser pendant 324 can reach the surface of the pipe to be connected to determine the highest cutting point A1 of the pipe to be connected.
[0052] Of course, in other embodiments, the gravity member may also be an iron block with a pointed end, and the pointed end is used to determine the cutting point on the pipe to be connected, which will not be elaborated here.
[0053] In some embodiments, see Figure 1 , the pipe to be connected includes a fixed first pipe 110 and a second pipe 120. The prefabricated pipe 200 has two first end faces 210, one of which is used to connect with the first pipe 110, and the other first end face 210 is used to connect with the second pipe 120. Two pipe cutting and positioning device bodies 300 are arranged on the prefabricated pipe 200, one of which is used to determine the cutting point on the first pipe 110, and the other pipe cutting and positioning device body 300 is used to determine the cutting point on the second pipe 120. That is, the wire take-up device in one of the pipe cutting and positioning device bodies 300 is used to project the first preset point on one of the first end faces 210 onto the corresponding first pipe 110 to determine the cutting point on the first pipe 110; the wire take-up device in the other pipe cutting and positioning device body 300 is used to project the second preset point on the other first end face 210 onto the corresponding second pipe 120 to determine the cutting point on the second pipe 120.
[0054] In some embodiments, the first tube 110 is a new tube, and the second tube 120 is an old tube.
[0055] The method of using the pipe cutting and positioning device in the embodiment of the present application is as follows: the prefabricated pipe 200 is fixedly secured above the new pipe and the old pipe by a hook machine (see Figure 1 ), and align the prefabricated tube 200 with the new tube and the old tube to prevent deviation during subsequent docking. At the same time, in order to facilitate the subsequent projection of the laser beam 325 of the laser pendant 324, the prefabricated tube 200 can be appropriately rotated to a suitable position.
[0056] Then, the two pipe cutting and positioning device bodies 300 are respectively fixed on the highest points A of the two first end faces 210 of the prefabricated pipe 200 through the fixing parts 340, and then the preset points on each first end face 210 are projected onto the new pipe and the old pipe through the laser hanging hammer 324 on the wire take-up device to respectively determine the cutting points on the new pipe and the old pipe. The cutting route can be determined according to the cutting points, so that the cutting of the new pipe and the old pipe can be realized. After the cutting is completed, the prefabricated pipe 200 is embedded between the new pipe and the old pipe, and an attempt is made to align them. After the alignment is successful, the prefabricated pipe 200 can be connected to the new pipe and the old pipe by welding or the like.
[0057] Among them, each pipeline cutting and positioning device body 300 lowers the laser pendant 324 on its line to the vicinity of the upper surface of the new pipe or the old pipe through the first wire take-up device 321, and the laser beam 325 of the laser pendant 324 can hit the upper surface of the new pipe or the old pipe, so as to determine the highest cutting point A1 of the cutting surface of the new pipe and the old pipe. At the same time, each pipeline cutting and positioning device body 300 lowers the laser pendant 324 on its line to the vicinity of the left and right sides of the new pipe or the old pipe through the two second wire take-ups 322, and the laser beam 325 of the laser pendant 324 hits the outer surfaces of the left and right sides of the new pipe or the old pipe, so as to determine the leftmost cutting point and the rightmost cutting point of the cutting surface of the new pipe or the old pipe.
[0058] The highest cutting point A1, the leftmost cutting point and the rightmost cutting point of the cutting surface are connected with a continuous and smooth arc as a cutting route. When cutting, only cutting along the cutting route is required.
[0059] It can be understood that if the first end face 210 of the prefabricated pipe 200 close to the side of the pipe to be connected (new pipe or old pipe) is circular, then the highest cutting point A1, the leftmost cutting point and the rightmost cutting point of the cutting surface of the pipe to be connected (new pipe or old pipe) are connected by a continuous smooth arc, and the curve formed by connecting the highest cutting point A1, the leftmost cutting point and the rightmost cutting point of the cutting surface of the pipe to be connected (new pipe or old pipe) is a semicircle; if the first end face 210 of the prefabricated pipe 200 close to the side of the pipe to be connected (new pipe or old pipe) is elliptical, then the highest cutting point A1, the leftmost cutting point and the rightmost cutting point of the cutting surface of the pipe to be connected (new pipe or old pipe) are connected by a continuous smooth arc, and the curve formed by connecting the highest cutting point A1, the leftmost cutting point and the rightmost cutting point of the cutting surface of the pipe to be connected (new pipe or old pipe) is a semi-ellipse.
[0060] The horizontal distance between the highest point A and the lowest point of the first end face 210 of the prefabricated pipe 200 close to the side of the pipe to be connected (new pipe or old pipe) is the first distance, and the horizontal distance between the highest cutting point A1 and the lowest cutting point on the cutting surface of the pipe to be connected (new pipe or old pipe) is the second distance. In order to allow the prefabricated pipe 200 to be embedded between the new pipe and the old pipe after cutting, the first distance should be equal to the second distance. Therefore, the lowest cutting point of the cutting surface of the pipe to be connected (new pipe or old pipe) can be determined by the first distance and the highest cutting point A1 of the cutting surface. In combination with the lowest cutting point of the cutting surface and the above-mentioned cutting route, the cutting of the cutting surface of the pipe to be connected (new pipe or old pipe) can be completed.
[0061] Other structures and operations of the pipe cutting and positioning device according to the embodiment of the present application are known to ordinary technicians in the field and will not be described in detail here.
[0062] The embodiments of the present application are described in detail above in conjunction with the accompanying drawings, but the present application is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present application.
Claims
1. A pipe cutting and positioning device, used to determine the cutting surface of the pipe to be connected, characterized in that: include: A prefabricated pipe, arranged just above the pipe to be connected, the prefabricated pipe having a first end surface, the first end surface being used for connecting with the pipe to be connected, and a plurality of preset points being arranged on the first end surface; The main body of the pipe cutting and positioning device is arranged on the prefabricated pipe. The main body of the pipe cutting and positioning device includes a bracket. A plurality of wire take-ups are arranged on the bracket. Each of the wire take-ups is located directly above each of the preset points. A gravity piece is arranged at the end of the wire of each wire take-up. The wire take-up is used to retract and release the gravity piece, so that the plurality of preset points on the first end face can be projected onto the pipe to be connected to determine the cutting point on the pipe to be connected. The cutting surface of the pipe to be connected can be determined by connecting the plurality of cutting points.
2. The pipe cutting and positioning device according to claim 1, characterized in that: The preset points on the first end face include the highest point, the leftmost point and the rightmost point, and the wire take-up device includes a first wire take-up device and two second wire take-ups, the first wire take-up device is located directly above the highest point of the first end face, and the two second wire take-ups are respectively located directly above the leftmost point and the rightmost point of the first end face.
3. The pipe cutting and positioning device according to claim 2, characterized in that: The bracket is a triangular bracket, and the three wire take-ups are respectively arranged at three corners of the triangular bracket.
4. The pipe cutting and positioning device according to claim 2, characterized in that: The bracket is provided with a retractable portion between the two second wire take-ups to adjust the distance between the two second wire take-ups.
5. The pipeline cutting and positioning device according to claim 2, characterized in that: The first wire take-up device is movably arranged on the bracket, so that the first wire take-up device can move along the length direction of the prefabricated tube.
6. The pipeline cutting and positioning device according to claim 5, characterized in that: The bracket is provided with a telescopic tube parallel to the prefabricated tube, and the first wire take-up device is provided on the telescopic tube. The first wire take-up device can be moved along the length direction of the prefabricated tube by extending and retracting the telescopic tube.
7. The pipeline cutting and positioning device according to claim 1, characterized in that: The pipeline cutting and positioning device body also includes a fixing piece, the bracket is connected to the fixing piece, and the fixing piece is connected to the highest point of the first end surface of the prefabricated pipe.
8. The pipeline cutting and positioning device according to claim 7, characterized in that: A horizontal positioning plate is provided on the fixing member to determine the highest point of the first end surface of the prefabricated pipe.
9. The pipeline cutting and positioning device according to claim 1, characterized in that: The gravity member is a laser pendant.
10. The pipeline cutting and positioning device according to claim 1, characterized in that: The pipe to be connected includes a first pipe and a second pipe that have been fixed. The prefabricated pipe has two first end faces, one of which is used to connect with the first pipe, and the other of which is used to connect with the second pipe. Two pipe cutting and positioning device bodies are arranged on the prefabricated pipe, one of which is used to determine a cutting point on the first pipe, and the other of which is used to determine a cutting point on the second pipe.
Citation Information
Cited By
Inclined pipeline connecting, cutting and opening aligning method
CN119839518A