Precast concrete member heating maintenance device
By designing a heating and curing device, using structures such as steam conveying components and discharge pipes, the problem of poor contact between the bottom of the concrete prefabricated parts and steam is solved, the maintenance quality and operational flexibility are improved, and effective steam contact and rapid discharge are achieved.
Patent Information
- Application Number
- CN202420702307.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-08
AI Technical Summary
During the steam heating and maintenance process of existing concrete prefabricated parts, the bottom of the bottom is not easy to come into contact with the steam, affecting the maintenance quality.
A precast concrete component heating and curing device is designed, including maintenance box, conveyor belt and placement rack. Through steam conveying components and discharge pipes, sealing components, ventilation components and other structures, it ensures that the steam can effectively contact the bottom of the concrete and after maintenance. Quickly discharge steam, improve contact quality and operational flexibility.
The contact quality between concrete prefabricated parts and steam is improved, the maintenance effect is ensured, and the steam overflow is reduced through good separation performance, which facilitates the staff to adjust the maintenance time.
Smart Images

Figure CN222096491U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated concrete component processing, in particular to a prefabricated concrete component heating and curing device. Background Art
[0002] Precast concrete parts are building components made in factories using concrete as the basic material. During the molding process of precast concrete parts, they usually need to be cured. Steam curing is one of the commonly used heating curing methods. It uses steam heating to increase the temperature and humidity of concrete and promote its hydration reaction.
[0003] After searching, a Chinese patent (publication number: CN214871478U) discloses a precast concrete component heating and curing device, which includes a curing box for curing the component body, a water tank is arranged at the bottom of the curing box, a water pump is arranged in the water tank, and a plurality of atomizing sprinklers are arranged on the inner bottom wall of the curing box. The bottom of the atomizing sprinkler penetrates the bottom wall of the curing box and extends into the water tank. A water pipe is connected between the water pump and the side wall inside the curing box. A heating plate is arranged on the side wall inside the curing box.
[0004] In the prior art, when a precast concrete part is heated and cured by steam, its bottom is not easily in contact with the steam, which causes the curing quality of the precast concrete part to be easily affected. Therefore, the utility model proposes a precast concrete component heating and curing device. Utility Model Content
[0005] The utility model aims to provide a precast concrete component heating and curing device.
[0006] The technical problem solved by the utility model is: how to improve the contact quality between prefabricated concrete components and steam.
[0007] The utility model can be realized by the following technical scheme: a precast concrete component heating and curing device, comprising a curing box, a conveyor belt and a placing rack, a steam conveying assembly and a discharge pipe are installed on the side of the curing box, and sealing assemblies are installed on both sides of the curing box. During curing, two sets of sealing assemblies separate the two ends of the curing box from the outside;
[0008] A connecting frame is installed on one side of the interior of the maintenance box through a plurality of first stroke cylinders, and the connecting frame is connected to the steam delivery assembly;
[0009] When working, the steam delivery assembly is connected to the steam transmission device to deliver steam to the connection frame. A valve is installed inside the discharge pipe. When steam maintenance is performed, the valve inside the discharge pipe is closed;
[0010] The conveyor belt passes through the interior of the maintenance box, and the steam delivery assembly moves to the interior of the maintenance box based on the conveyor belt;
[0011] A ventilation box is installed on the top of the maintenance box, and a plurality of unit compartments are opened inside the ventilation box. A ventilation component is installed inside each unit compartment. After the maintenance is completed, the valve in the discharge pipe is opened, and each ventilation component is started to discharge the steam in the maintenance box from the discharge pipe.
[0012] A further technical improvement of the utility model is that: the sealing assembly comprises a second stroke cylinder connected to the maintenance box, the output end of the second stroke cylinder is equipped with a sealing plate, and both sides of the sealing plate are slidably connected to the maintenance box;
[0013] After the second stroke cylinder is started, it drives the sealing plate to slide up and down along the maintenance box.
[0014] The further technical improvement of the utility model is that: the conveyor belt comprises a frame, a plurality of rollers are rotatably connected inside the frame, and a driving assembly is installed on one side of the frame, the driving assembly is connected to each roller to drive the rollers to rotate;
[0015] The frame is provided with an embedding groove on the lower side of each sealing plate, the roller body is not installed inside the embedding groove, and the bottom of the sealing plate is provided with an extended portion protruding downward. After the sealing plate descends based on the second stroke cylinder, the extended portion at the bottom of the sealing plate is embedded in the embedding groove, and the remaining portion of the sealing plate contacts the frame, thereby cooperating with the conveyor belt to complete the separation of the maintenance box.
[0016] A further technical improvement of the utility model is that: the placement rack includes an assembly rack, and a multi-layer placement board is installed inside the assembly rack;
[0017] A communicating steam passage is provided between the assembly rack and the placement plate, and a plurality of steam outlet holes are provided on the upper surface of each placement plate.
[0018] A further technical improvement of the utility model is that: a plurality of steam inlet pipes are installed on one side of the assembly frame facing the connection frame, and the steam inlet pipes are connected to the steam channel;
[0019] A plurality of steam outlet pipes are installed on one side of the connecting frame facing the placement frame, and the distribution position of each steam outlet pipe matches the distribution position of each steam inlet pipe;
[0020] After the placement rack moves to a preset position inside the maintenance box based on the conveyor belt, the connecting rack moves horizontally based on the first stroke cylinder, and the steam outlet pipe on the side of the connecting rack is connected to the steam inlet pipe on the side of the placement rack.
[0021] A further technical improvement of the utility model is that: the ventilation assembly includes a blowing mechanism and a plurality of baffles;
[0022] The air blowing mechanism is installed inside the corresponding unit bin, one end of each baffle is rotatably connected to the bottom of the unit bin, and an elastic member is installed between the lower surface of each baffle and the unit bin;
[0023] When there is no external force, each elastic member supports the corresponding baffle at the bottom of the corresponding unit compartment, separating the unit compartment from the inner wall of the maintenance box.
[0024] Compared with the prior art, the utility model has the following beneficial effects:
[0025] The utility model adopts a placing rack to place the precast concrete components, and moves them to the inside of the maintenance box through a conveyor belt. After the placing rack is in the maintenance box, the connecting rack is connected to the placing rack. During maintenance, steam is sprayed from each layer of placing plates in the placing rack, so as to heat and maintain the bottom of the precast concrete components.
[0026] And after maintenance, the steam inside the maintenance box can be quickly discharged through the cooperation of various ventilation components and discharge pipes, so that the staff can adjust the maintenance time conveniently;
[0027] At the same time, during steam maintenance, the maintenance box has good separation performance, which can reduce steam overflow. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings.
[0029] Figure 1 It is a schematic diagram of the structure of the utility model;
[0030] Figure 2 It is a side sectional view of the maintenance box in the utility model;
[0031] Figure 3 It is a top sectional view of the maintenance box in the utility model;
[0032] Figure 4 It is a partial top view of the conveyor belt in the utility model;
[0033] Figure 5 For this utility model Figure 2 A partial enlarged view of the middle A;
[0034] In the figure: 1. maintenance box; 2. conveyor belt; 3. steam delivery assembly; 4. discharge pipe; 5. sealing assembly; 6. first stroke cylinder; 7. connecting frame; 8. placement frame; 9. ventilation box; 10. ventilation assembly; 21. embedding groove; 51. second stroke cylinder; 52. sealing plate; 81. assembly frame; 82. placement plate; 101. blowing mechanism; 102. baffle; 103. elastic member. DETAILED DESCRIPTION
[0035] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined purpose of the utility model, the specific implementation method, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.
[0036] See also Figure 1-5 As shown, a precast concrete component heating and curing device comprises a curing box 1, a conveyor belt 2 and a placing rack 8. A steam conveying assembly 3 and a discharge pipe 4 are installed on the side of the curing box 1, and sealing assemblies 5 are installed on both sides of the curing box 1. During curing, two sets of sealing assemblies 5 separate the two ends of the curing box 1 from the outside.
[0037] A connecting frame 7 is installed on one side of the interior of the maintenance box 1 through a plurality of first stroke cylinders 6, and the connecting frame 7 is connected to the steam delivery assembly 3;
[0038] When working, the steam delivery assembly 3 is connected to the steam transmission device to deliver steam to the connection frame 7. A valve is installed inside the discharge pipe 4. When steam maintenance is performed, the valve inside the discharge pipe 4 is closed;
[0039] The conveyor belt 2 passes through the interior of the maintenance box 1, and the steam delivery assembly 3 moves to the interior of the maintenance box 1 based on the conveyor belt 2;
[0040] A ventilation box 9 is installed on the top of the maintenance box 1. A plurality of unit compartments are provided inside the ventilation box 9. A ventilation component 10 is installed inside each unit compartment. After the maintenance is completed, the valve in the discharge pipe 4 is opened, and each ventilation component 10 is started to discharge the steam in the maintenance box 1 from the discharge pipe 4.
[0041] See also Figure 2-3 As shown, the sealing assembly 5 includes a second stroke cylinder 51 connected to the maintenance box 1, and a sealing plate 52 is installed at the output end of the second stroke cylinder 51, and both sides of the sealing plate 52 are slidably connected to the maintenance box 1;
[0042] After the second stroke cylinder 51 is started, it drives the sealing plate 52 to slide up and down along the maintenance box 1.
[0043] The placement rack 8 includes an assembly rack 81, and a multi-layer placement board 82 is installed inside the assembly rack 81;
[0044] A communicating steam passage is provided between the assembly frame 81 and the placement plates 82 , and a plurality of steam outlet holes are provided on the upper surface of each placement plate 82 .
[0045] A plurality of steam inlet pipes are installed on one side of the assembly frame 81 facing the connection frame 7, and the steam inlet pipes are connected to the steam channel;
[0046] A plurality of steam outlet pipes are installed on one side of the connecting frame 7 facing the placement frame 8, and the distribution position of each steam outlet pipe matches the distribution position of each steam inlet pipe;
[0047] After the placement rack 8 moves to a preset position inside the maintenance box 1 based on the conveyor belt 2, the connecting rack 7 moves horizontally based on the first stroke cylinder 6, and the steam outlet pipe on the side of the connecting rack 7 is connected to the steam inlet pipe on the side of the placement rack 8;
[0048] The positioning of the connecting frame 7 and the placement frame 8 can adopt any mature solution in the prior art or manual identification and alignment. In this embodiment, an infrared structure is adopted. The infrared structure is distributed on one side of the connecting frame 7 and the placement frame 8, and before maintenance, the identification part of the infrared structure is kept dry and tidy.
[0049] See also Figure 4 As shown, the conveyor belt 2 includes a frame body, a plurality of roller bodies are rotatably connected inside the frame body, and a driving assembly is installed on one side of the frame body, and the driving assembly is connected to each roller body for driving the same to rotate.
[0050] The frame is provided with an embedding groove 21 at the lower side of each sealing plate 52, and no roller body is installed inside the embedding groove 21, and the bottom of the sealing plate 52 is provided with an extended portion protruding downward. After the sealing plate 52 descends based on the second stroke cylinder 51, the extended portion at the bottom of the sealing plate 52 is embedded in the embedding groove 21, and the remaining portion of the sealing plate 52 contacts the frame, thereby cooperating with the conveyor belt 2 to complete the separation of the maintenance box 1.
[0051] See also Figure 5 As shown, the ventilation assembly 10 includes a blowing mechanism 101 and a plurality of baffles 102;
[0052] The air blowing mechanism 101 is installed inside the corresponding unit bin, one end of each baffle 102 is rotatably connected to the bottom of the unit bin, and an elastic member 103 is installed between the lower surface of each baffle 102 and the unit bin;
[0053] The unit compartment is located on the upper side of each baffle 102 and a limiting member is installed;
[0054] When there is no external force, each elastic member 103 supports the corresponding baffle 102 at the bottom of the corresponding unit compartment, separating the unit compartment from the inner wall of the maintenance box 1 .
[0055] When the utility model is in use, the placement rack 8 is placed on the conveyor belt 2, and the side of the placement rack 8 facing away from the connecting rack 7 is abutted against the side of the frame of the conveyor belt 2, so as to facilitate the placement rack 8 to be limited and facilitate the subsequent assembly with the connecting rack 7;
[0056] Each precast concrete component is placed on each layer of the placing plate 82 in the placing rack 8, the conveyor belt 2 is started, the placing rack 8 is moved into the maintenance box 1, and aligned with the connecting rack 7, and then the first stroke cylinder 6 is started to assemble the connecting rack 7 and the placing rack 8;
[0057] Then the sealing assembly 5 is started to separate the two ends of the maintenance box 1, and the steam delivery assembly 3 delivers the steam to the placement rack 8 through the connecting rack 7, and the steam is ejected from the steam outlet holes of the placement plates 82 of each layer in the placement rack 8 to perform heating and maintenance;
[0058] After maintenance, the valve of the discharge pipe 4 is opened, each ventilation assembly 10 is started, and the blowing mechanism 101 in the ventilation assembly 10 is started to expand each baffle 102 downward by pressing the elastic member 103, thereby discharging the steam inside the maintenance box 1 from the discharge pipe 4.
[0059] The above description is only a preferred embodiment of the present invention and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.
Claims
1. A precast concrete component heating and curing device, comprising a curing box (1), a conveyor belt (2) and a placement rack (8), wherein a steam delivery assembly (3) and a discharge pipe (4) are installed on the side of the curing box (1), and sealing assemblies (5) are installed on both sides of the curing box (1), characterized in that: A connecting frame (7) is installed on one side of the interior of the maintenance box (1) via a plurality of first stroke cylinders (6), and the connecting frame (7) is connected to the steam delivery assembly (3); The placement rack (8) comprises an assembly rack (81), wherein a plurality of placement plates (82) are installed inside the assembly rack (81); a communicating steam passage is provided between the assembly rack (81) and the placement plates (82), and a plurality of steam outlet holes are provided on the upper surface of each placement plate (82); a plurality of steam inlet pipes are installed on the side of the assembly rack (81) facing the connection rack (7), and the steam inlet pipes are connected to the steam passage; a plurality of steam outlet pipes are installed on the side of the connection rack (7) facing the placement rack (8), and the distribution position of each steam outlet pipe matches the distribution position of each steam inlet pipe; The conveyor belt (2) passes through the interior of the maintenance box (1); A ventilation box (9) is installed on the top of the maintenance box (1), and a plurality of unit compartments are provided inside the ventilation box (9), and a ventilation assembly (10) is installed inside each unit compartment.
2. A precast concrete component heating and curing device according to claim 1, characterized in that: The conveyor belt (2) is provided with an embedding groove (21) on the lower side of each sealing component (5).
3. The precast concrete component heating and curing device according to claim 1, characterized in that: The ventilation assembly (10) comprises an air blowing mechanism (101) and a plurality of baffles (102); The air blowing mechanism (101) is installed inside the corresponding unit bin, one end of each baffle (102) is rotatably connected to the bottom of the unit bin, and an elastic member (103) is installed between the lower surface of each baffle (102) and the unit bin.
4. A precast concrete component heating and curing device according to claim 2, characterized in that: The sealing assembly (5) comprises a second stroke cylinder (51) connected to the maintenance box (1), and a sealing plate (52) is installed at the output end of the second stroke cylinder (51); The bottom of the sealing plate (52) is provided with an extended portion protruding downwards; After the sealing plate (52) is lowered, the extended portion is embedded in the corresponding embedding groove (21).