Mountain photovoltaic panel material transfer cableway
By using pre-embedded pile pipes and rope rope systems in mountain photovoltaic panel material transfer cableways, the problems of transportation blind spots and high labor intensity in the existing technology are solved, precise coverage and efficient installation of photovoltaic panel materials are achieved, and construction efficiency is improved and cost-effective.
Patent Information
- Application Number
- CN202420720471.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-09
AI Technical Summary
The existing mountain photovoltaic panel material transfer cableway has transportation blind spots and cannot cover the installation area of the entire hillside, resulting in installation workers requiring multiple handling, which increases labor intensity and reduces installation efficiency.
A photovoltaic panel material transfer cableway including end point support rods, intermediate support rods and pre-embedded pile pipes was designed. The pre-embedded pile pipes were used for disassembly and assembly, forming multiple sub-installation areas, and photovoltaic panel material was realized through rope ropes and hoisting equipment. Accurate transportation covers the entire installation area.
It realizes one-time precise transportation of photovoltaic panel materials, reduces the labor intensity of installation workers, improves installation efficiency, simplifies the construction process, reduces the damage to vegetation and the foundation construction links.
Smart Images

Figure CN222098778U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a device for transporting photovoltaic panel materials in a mountain environment, in particular to a mountain photovoltaic panel material transport cableway, belonging to the technical field of mountain photovoltaic power station construction. Background Art
[0002] Since the 21st century, the construction of centralized photovoltaic power stations has been the main direction of new energy power generation project construction. As the development and utilization of areas rich in solar energy resources are exhausted, the construction of idle mountain centralized photovoltaic power stations has become inevitable.
[0003] However, due to the special topography of the mountains, the transportation environment of photovoltaic materials is extremely harsh during the construction of photovoltaic power plants. In the past, the transportation of lighter equipment and materials in most projects was completed by people carrying them on their backs, while the heavier equipment and materials were transported by professional mule and horse teams. In recent years, with the development of science and technology, the degree of mechanization in construction has become increasingly high. Cableway transportation is one of the emerging methods that adapts to construction in mountainous areas. In some areas, it has replaced traditional human transportation and mule and horse transportation.
[0004] Cableway transport is a mode of transportation that uses tension cables (usually steel cables) to transport people and goods. Cableway transport is usually used in areas with complex terrain such as mountains and canyons, and has the advantages of being fast, efficient, and safe. The basic principle of cableway transport is to use a bracket and tension cables supported at both ends to achieve the purpose of transportation. The bracket is usually made of high-strength materials that can withstand the tension of the tension cable. The tension cable is composed of multiple strands of thin steel wire ropes, which have high strength and tensile properties.
[0005] like Figure 1 As shown, the terrain of the hillside is complex and uneven, and the photovoltaic panel installation positions are distributed in an array on the hillside 1. Each circle in the figure represents the installation position of the photovoltaic panel bracket. As shown in the figure, there are four columns of A, B, C and D. The existing cableway transportation method is mainly to set a starting point pillar E under the hillside 1, and set a terminal pillar F on the uphill 1. The tension cable 2 is connected between the starting point pillar E and the terminal pillar F through a driving device. A pod and other transportation equipment (not shown in the figure) are arranged on the tension cable 2. When working, the photovoltaic panel material is transported from the starting point pillar E to the terminal pillar F by using the pod and other transportation equipment under the pull of the tension cable 2.
[0006] However, the existing cableway transportation method is a point-to-point transportation method, that is, the photovoltaic panel material is transported from the starting support E to the end support F, and the installation position of the photovoltaic panel bracket (such as Figure 1There are many points on the hillside (as shown by the multiple circles in the figure), and similar points form a planar installation area. If the photovoltaic panel materials can only be transported to the terminal pillar F by point-to-point transportation, the cableway transportation line cannot cover the entire installation area of the hillside, leaving many transportation blind spots. Later, the photovoltaic panel materials transported to the terminal pillar F will need to be manually transported to various installation points in the transportation blind spots. The hillside has a complex and uneven terrain, which will greatly increase the labor intensity of the installation workers and reduce the efficiency of the installation work.
[0007] The following patent documents were retrieved:
[0008] 1. A Chinese invention patent application with application publication number CN115571794A and application publication date January 6, 2023 discloses a photovoltaic panel and bracket mountain transportation device, relating to photovoltaic panels and brackets, the photovoltaic panels and brackets being pre-installed in a wooden box, comprising: a first transportation unit, comprising drive components respectively arranged at the bottom of the mountain and on the hillside, cables being arranged between the drive components, the cables being provided with transfer components which move synchronously therewith, for transporting the goods from the bottom of the mountain to the hillside for the first time: a plurality of second transportation units, respectively arranged on both sides of the first transportation unit, the transportation direction of which forms an angle of ≤90° with the transportation direction of the first transportation unit, for transporting the goods transported for the first time for a second time on the hillside.
[0009] This patent document mainly increases the coverage area of transportation by setting up two intersecting transportation lines, but the device has a complex structure and is very difficult to install and disassemble in mountainous areas, and the angle area formed between the two transportation lines is still a transportation blind spot.
[0010] 2. A Chinese utility model patent with authorization announcement number CN220055223U and authorization announcement date November 21, 2023 discloses a workpiece transportation device for mountain slopes, including a support frame, which is fixedly connected at the bottom and top of the mountain slope, and a group of symmetrical steel strands are fixedly connected between the support frames, and a winch is also fixedly connected to the bottom of the upper support frame. The top surface of the symmetrical steel strands is provided with a transportation mechanism, and the transportation mechanism is composed of a fixing mechanism and a connecting mechanism. The fixing mechanism includes a concave transport plate, a pressure plate and a threaded knob. The pressure plate is movably connected to the recess of the concave transport plate through sliders on both sides of the bottom surface, and the threaded knob is movably connected to the concave transport plate through a threaded hole on the rear wall of the concave transport plate and through The rotating block at the bottom is movably connected to the pressure plate, and the concave transport plate is movably connected to the steel strands through connecting mechanisms on both sides of the bottom surface, and the connecting mechanism includes a concave bottom plate, a sliding rod, a concave shell, a bidirectional screw rod and a pulley. The concave bottom plate is fixedly connected to both sides of the bottom surface of the concave transport plate, and a group of symmetrical sliding rods are fixedly connected in the recess of the concave bottom plate, the bidirectional screw rod is movably connected in the recess of the concave bottom plate through first rotating rods at both ends and is located between the sliding rods, and the two concave shells are respectively movably connected to the sliding rods through sliding sleeves on both sides of the top surface, the concave shell is also movably connected to the bidirectional screw rod through a nut on the top surface, and the two pulleys are movably connected to the inside of the concave shell through second rotating rods at the upper and lower ends, and the concave transport plate is fixedly connected to the steel cable on the winch.
[0011] This patent document is the point-to-point transportation method adopted in the background technology of this application. Therefore, it will leave many transportation blind spots, which will subsequently increase the workload of the installation workers and reduce the installation efficiency.
[0012] In summary, how to design a mountain photovoltaic panel material transfer cableway so that it can cover the installation area on the hillside to the greatest extent, eliminate transportation blind spots, and accurately transport photovoltaic panel materials to the installation location at one time, avoiding the secondary transportation operation of the installation workers, reducing the labor intensity of the installation workers, and improving the installation efficiency of the project is a technical problem that needs to be solved urgently. Utility Model Content
[0013] The technical problem to be solved by the utility model is to provide a mountain photovoltaic panel material transfer cableway in response to the defects existing in the prior art, which can cover the installation area on the hillside to the greatest extent, eliminate the transportation blind spot, and can accurately transport the photovoltaic panel materials to the installation location at one time, avoiding the secondary transportation operation of the installation workers, reducing the labor intensity of the installation workers, and improving the installation efficiency of the project.
[0014] In order to solve the above technical problems, the technical solution adopted by the utility model is: a mountain photovoltaic panel material transfer cableway, which includes an end point support rod one, an end point support rod two and an intermediate support rod arranged between the end point support rod one and the end point support rod two, and the end point support rod one, the end point support rod two and the intermediate support rod can be disassembled and assembled with the embedded pile pipe; a rope is detachably connected to the end point support rod one, the intermediate support rod and the end point support rod two, and a lifting device is detachably connected to the rope, the lifting device is used for lifting photovoltaic panel materials and the lifting device can move back and forth along the rope driven by a driving device.
[0015] Preferably, the first and second terminal support rods each include an terminal rod body and a fixed pulley first arranged at the top of the terminal rod body; a pair of through holes is opened on the circumferential surface of the terminal rod body located at the bottom of the terminal rod body, and a plurality of the pair of through holes are arranged along the axial direction of the terminal rod body; a pair of through holes matching the first pair of through holes is arranged on the circumferential surface of the pile pipe located at one end of the pile pipe; a plurality of locking screws are also arranged on the circumferential surface of the pile pipe located at one end of the pile pipe, and the plurality of locking screws are threadedly connected to the circumferential surface of the pile pipe and can pass through the circumferential surface of the pile pipe and be screwed into the inner cavity of the pile pipe;
[0016] Insert the bottom of the terminal rod body into the pile pipe, use the fixing pins to align one hole in the second through hole, one of them to one hole in the first through hole, one of them to another hole in the first through hole and another hole in the second through hole in sequence, and then tighten a plurality of locking screws so that the plurality of locking screws are pressed against the circumferential surface of the terminal rod body, thereby connecting the terminal support rods one and two to the pile pipe.
[0017] Preferably, the intermediate support rod comprises an intermediate rod body and a rope locking support mechanism arranged at the top of the intermediate rod body; a third pair of through holes is opened on the circumferential surface of the intermediate support rod located at the bottom of the intermediate support rod, and a plurality of the third pair of through holes are arranged along the axial direction of the intermediate support rod; a second pair of through holes matching the third pair of through holes is arranged on the circumferential surface of the pile pipe located at one end of the pile pipe; a plurality of locking screws are also arranged on the circumferential surface of the pile pipe located at one end of the pile pipe, and the plurality of locking screws are threadedly connected to the circumferential surface of the pile pipe and the plurality of locking screws can pass through the circumferential surface of the pile pipe and be screwed into the inner cavity of the pile pipe;
[0018] Insert the bottom of the middle rod body into the pile pipe, use the fixing pins to align one hole in the second through hole, one of them to one hole in the third through hole, one of them to another hole in the third through hole and another hole in the second through hole in sequence, and then tighten a plurality of locking screws so that the plurality of locking screws are pressed against the circumferential surface of the middle rod body, thereby connecting the middle rod body and the pile pipe.
[0019] Preferably, a support frame is provided on one side of the intermediate rod body at the top of the intermediate rod body, and the cable locking support mechanism is installed on the support frame, and the cable locking support mechanism includes a fixing frame and a tightening screw, and the fixing frame is installed on the support frame through a connecting seat, and the tightening screw is threadedly connected to the bottom of the fixing frame through a locking nut and can be screwed into the inner cavity of the fixing frame, and a tightening block is also provided in the inner cavity of the fixing frame;
[0020] After the rope passes through the inner cavity between the fixing frame and the tightening block, tighten the tightening screw so that the tightening screw drives the tightening block to move, thereby using the tightening block to tighten the rope against the inner wall of the fixing frame, and then tighten the locking nut to connect the rope and the middle rod body.
[0021] Preferably, the top ends of both sides of the fixing frame are arranged as beveled edges.
[0022] Preferably, the lifting equipment includes boom 1 and boom 2, boom 1 and boom 2 both include side panel 1 and side panel 2, side panel 1 and side panel 2 are connected together by a connecting shaft, a walking wheel is rotatably connected to the connecting shaft between side panel 1 and side panel 2 by a bearing, a groove matching the rope is provided on the circumference of the walking wheel, a hand lever hoist is connected to the bottom of side panel 2 by a connecting rope, and the bottom of the hand lever hoist lifts the photovoltaic panel by the lifting rope; a detachable locking block is provided on the side of side panel 1, and the locking block is used to connect the driving device.
[0023] Preferably, the driving device includes winch one, winch two and a pull rope, winch one is installed on the end point rod body of end point support rod one, and fixed pulley two is also provided on the end point rod body of end point support rod one; winch two is installed on the end point rod body of end point support rod two, and fixed pulley two is also provided on the end point rod body of end point support rod two; one end of the pull rope is connected to winch one for transmission, and the other end of the pull rope passes through fixed pulley two on the end point rod body of end point support rod one, the locking block on boom one, the locking block on boom two and fixed pulley two on the end point rod body of end point support rod two in sequence, and then is connected to winch two for transmission.
[0024] Preferably, the locking block includes an arc block and horizontal blocks located on both sides of the arc block. The curvature of the arc block matches the pull rope. After the pull rope passes through the arc block of the locking block, the locking block screw is passed through the side plate 1 and the horizontal block of the locking block and then locked with the locking block nut, thereby connecting the pull rope to the boom.
[0025] The beneficial effect of the utility model is that the utility model can use the pre-buried pile pipe to quickly disassemble and assemble the photovoltaic panel material transfer ropeway according to the actual working conditions, which changes the traditional point-to-point transportation method, so that the ropeway transportation line in the utility model can cover the installation area on the hillside to the greatest extent, eliminate the transportation blind spot, and can accurately transport the photovoltaic panel material to the installation position at one time, avoiding the secondary transportation operation of the installation workers, reducing the labor intensity of the installation workers, and improving the installation efficiency of the project. By designing a specific disassembly and assembly method of the photovoltaic panel material transfer ropeway, the photovoltaic panel material transfer ropeway is realized. Rapid disassembly and assembly at the installation site is achieved, thereby further improving the installation efficiency of the project. In addition, the pre-buried pile pipe of the photovoltaic bracket is used as the basis of the ropeway bracket. Compared with the previous ropeway transportation, the basic construction link is reduced, the construction period is shortened, the cost is saved, and the damage to vegetation during the construction process is reduced; the simple ropeway is easy to disassemble, and the photovoltaic material can be unloaded at any position on the ropeway. The transportation method is optimized from point to point to point to line, reducing secondary transportation, improving construction efficiency, and reducing labor intensity and construction cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of transporting photovoltaic panels on mountainous land in the prior art;
[0027] Figure 2 This is a schematic diagram of the main structure when transporting photovoltaic panels in an embodiment of the utility model;
[0028] Figure 3 for Figure 2 A schematic diagram of a partial main structure located at one end support rod;
[0029] Figure 4 The three-dimensional structure diagram of the disassembly and assembly between the end support rod and the pile pipe in the embodiment of the utility model is shown in FIG. Figure 1 ;
[0030] Figure 5 The three-dimensional structure diagram of the disassembly and assembly between the end support rod and the pile pipe in the embodiment of the utility model is shown in FIG. Figure 2 ;
[0031] Figure 6 for Figure 2 A schematic diagram of a partial main structure located at an intermediate support rod;
[0032] Figure 7 It is a left-side structural schematic diagram of an intermediate support rod in an embodiment of the utility model;
[0033] Figure 8 for Figure 7 A schematic diagram of the local structure at the rope locking support mechanism;
[0034] Fig. 9 for Figure 7 A schematic diagram of a local structure located at a boom;
[0035] Fig.10 for Figure 6 A schematic diagram of a local structure at a fixing frame of a rope locking support mechanism;
[0036] In the figure: 1. hillside, 2. tension cable, 3. pile pipe, 4. end support rod 1, 411. end rod body, 412. fixed pulley 1, 413. fixed pulley 2, 5. end support rod 2, 6. middle support rod, 611. middle rod body, 612. rope locking support mechanism, 6121. fixed frame, 61211. bevel, 6122. top screw, 6123. connecting seat, 6124. locking nut, 6125. top block, 613. support frame, 7. rope, 8. lifting equipment, 811. boom 1, 812. boom 2, 813. side plate 1, 814. side plate 2, 815 .Connecting shaft, 816. Walking wheel, 817. Nut, 9. Driving device, 911. Winch one, 912. Winch two, 913. Pull rope, 10. Hand plate tensioner one, 11. End rod tensioning rope one, 12. Hand plate tensioner two, 13. Through hole one, 14. Through hole two, 15. Locking screw, 16. Fixing pin, 17. Middle rod tensioning rope, 18. Hand plate tensioner three, 19. Connecting rope, 20. Hand plate hoist, 21. Lifting rope, 22. Photovoltaic panel material, 23. Locking block, 231. Arc block, 232. Horizontal block, 233. Locking block screw, 234. Locking block nut. DETAILED DESCRIPTION
[0037] The technical solution of the utility model is further elaborated in detail below with reference to the accompanying drawings and specific embodiments.
[0038] The applicant has found through research that Figure 1 As shown, before transporting the photovoltaic panel materials, according to the progress of the project, the various installation locations (such as Figure 1 The pile pipes 3 are pre-buried at the positions (shown as multiple circles in the figure) for the installation of the photovoltaic panel materials, so the pre-buried multiple pile pipes 3 are also distributed in the installation area on the hillside in an array shape. The photovoltaic panel materials include photovoltaic panels, photovoltaic brackets, photovoltaic purlins and tie rods, etc. Since the photovoltaic panel materials need to be installed on each pile pipe 3 in the end, the position of each pre-buried pile pipe 3 is actually the transportation target position of the photovoltaic panel materials. If the pre-buried pile pipes 3 can be fully utilized for transportation, and the photovoltaic panel materials can be directly transported to each pre-buried pile pipe 3, the problems existing in the prior art can be well solved.
[0039] In the present application, a photovoltaic panel material transfer ropeway device is designed that can be disassembled and assembled between pre-buried pile pipes, and the entire installation area on the hillside is divided into multiple sub-installation areas; after the photovoltaic panel material transfer ropeway device is assembled in one sub-installation area to transport the photovoltaic panel materials in the sub-installation area, photovoltaic panel material transfer ropeway devices are assembled in other sub-installation areas in turn to transport photovoltaic panel materials, or multiple photovoltaic panel material transfer ropeway devices are assembled in multiple sub-installation areas at the same time to transport the photovoltaic panel materials in multiple sub-installation areas. Example
[0040] like Figure 1 As shown, in this embodiment, the entire installation area on the hillside where the positions of the four rows of pre-buried pile pipes A, B, C and D are installed can be divided into four sub-installation areas A, B, C and D.
[0041] In this embodiment, one of the multiple sub-installation areas is first selected, such as sub-installation area A, and a photovoltaic panel material transfer ropeway is assembled using the embedded pile pipes in the one sub-installation area. The photovoltaic panel material transfer ropeway is used to transport multiple photovoltaic panel materials to various installation positions in the one sub-installation area, and then the photovoltaic panel material transfer ropeway is disassembled and assembled in the next sub-installation area among the multiple sub-installation areas to transport the photovoltaic panel materials in the next sub-installation area; the operation is repeated until the transportation of photovoltaic panel materials in the entire installation area on the hillside is completed.
[0042] like Figure 2 As shown, the transport method in the present application is carried out by utilizing the pre-buried pile pipe 3, that is, an end point support rod 1 4 which can be disassembled and assembled with the pre-buried pile pipe 3 is arranged on a pre-buried pile pipe 3 under the hillside 1, an end point support rod 2 5 which can be disassembled and assembled with the pre-buried pile pipe 3 is arranged on another pre-buried pile pipe 3 on the hillside 1, and an intermediate support rod 6 which can be disassembled and assembled with the pre-buried pile pipe 3 in the middle is arranged on the pre-buried pile pipe 3 located between the end point support rod 1 4 and the end point support rod 2 5. The number of intermediate support rods 6 can be set according to the actual length. The end support rod 1 4, the middle support rod 6 and the end support rod 2 5 are detachably connected with ropes 7. The ropes 7 are detachably connected with lifting equipment 8. The lifting equipment 8 is used to lift the photovoltaic panel material and can move back and forth along the ropes 7 under the drive of the driving device 9. The end support rod 1 4, the middle support rod 6, the end support rod 2 5, the ropes 7, the lifting equipment 8 and the driving device 9 form a photovoltaic panel material transportation cableway. When working, first, a row of pre-buried pile pipes 3 (such as Figure 1The photovoltaic panel material transfer ropeway is assembled on the A column of pile pipes in the photovoltaic panel material transfer ropeway so that the transportation route of the photovoltaic panel material transfer ropeway can cover the multiple pile pipes 3 pre-buried in this column, and then the photovoltaic panel material is transported to the multiple pile pipes 3 in this column covered by the transportation route by using the lifting equipment 8; after the transportation is completed, the photovoltaic panel material transfer ropeway is dismantled, and then another column of pre-buried pile pipes 3 (such as Figure 1 The photovoltaic panel material transfer ropeway is assembled on the B column pile pipes in the middle) so that the transportation route of the photovoltaic panel material transfer ropeway can cover the multiple pile pipes 3 of another column that are pre-buried, and then the photovoltaic panel materials are transported to the multiple pile pipes 3 of another column covered by the transportation route by using the lifting equipment 8; after the transportation is completed, the photovoltaic panel material transfer ropeway is dismantled, and then the next column of pre-buried pile pipes 3 (such as Figure 1 The photovoltaic panel material transfer ropeway is assembled based on the C column pile pipe in the top of the hill (the pile pipe in the row of pile pipes ...
[0043] In order to realize the rapid disassembly and assembly between the end support rod 4 and the pile pipe 3 and the cable rope 7, Figure 3 As shown, the endpoint support rod 4 includes an endpoint rod body 411 and a fixed pulley 412 arranged at the top of the endpoint rod body 411.
[0044] When disassembling and assembling between the end point support rod 1 4 and the pile pipe 3:
[0045] During assembly, the bottom of the endpoint rod body 411 is inserted into the pile pipe 3 pre-buried on the hillside 1; during disassembly, the bottom of the endpoint rod body 411 is pulled out from the pile pipe 3 pre-buried on the hillside 1, thereby realizing rapid disassembly and assembly between the endpoint support rod 4 and the pile pipe 3.
[0046] When disassembling and assembling between the end point support rod 1 4 and the rope 7:
[0047] During assembly, one end of the rope 7 is passed around the fixed pulley 412 and then tightened by the hand tensioner 10, and then one end of the rope 7 is fixed, which can be fixed to the end point rod body 411 or the pile pipe 3; during disassembly, one end of the rope 7 is first loosened, and then the rope 7 is pulled out from the fixed pulley 412, thereby realizing rapid disassembly and assembly between the end point support rod 4 and the rope 7.
[0048] In order to ensure the stability of the end support rod 4 during operation, an end rod tensioning rope 11 is also connected to one side of the end rod body 411. After the end rod tensioning rope 11 is tensioned by a hand plate tensioner 12, one end of the end rod tensioning rope 11 is fixed and can be fixed on the pile pipe 3 or the ground.
[0049] The specific quick disassembly and assembly structure between the end point support rod 4 and the pile pipe 3 is as follows: Figure 4 and Figure 5 As shown, a pair of through holes 13 are provided on the circumferential surface of the end point rod body 411 at the bottom of the end point rod body 411. The pair of through holes 13 are provided in a plurality along the axial direction of the end point rod body 411. Figure 4 Four are provided in the middle; a second through hole 14 matching the first through hole 13 is provided on the circumferential surface of the pile pipe 3 located at one end of the pile pipe 3, and a plurality of locking screws 15 are also provided on the circumferential surface of the pile pipe 3 located at one end of the pile pipe 3, and the plurality of locking screws 15 are threadedly connected to the circumferential surface of the pile pipe 3 and the plurality of locking screws 15 can pass through the circumferential surface of the pile pipe 3 and be screwed into the inner cavity of the pile pipe 3. When assembling the end point support rod 14 and the pile pipe 3, first insert the bottom of the end point rod body 411 into the pile pipe 3 pre-buried on the hillside 1, so that the second through hole 14 is aligned with one of the first through holes 13, and then use the fixing pin 16 to fix one hole in the second through hole 14, one hole in the first through hole 13, another hole in the first through hole 13 and another hole in the second through hole 14 in sequence, and then tighten the multiple locking screws 15 so that the multiple locking screws 15 are pressed against the circumference of the end point rod body 411, so that the end point support rod 14 and the pile pipe 3 are assembled; when disassembling the end point support rod 14 and the pile pipe 3, loosen the locking screws 15, pull out the fixing pin 16, and pull the end point support rod 14 out of the pile pipe 3, so as to complete the disassembly of the end point support rod 14 and the pile pipe 3. In this embodiment, multiple through holes 13 are provided, mainly to adjust the height of the end point support rod 14 according to actual working conditions.
[0050] It should be noted that the structure and method for realizing the rapid disassembly and assembly between the end point support rod 2 5 and the pile pipe 3 and the rope 7 are the same as the structure and method for realizing the rapid disassembly and assembly between the end point support rod 1 4 and the pile pipe 3 and the rope 7, and will not be described again here.
[0051] The following describes the method and structure for realizing the rapid disassembly and assembly between the intermediate support rod 6, the pile pipe 3 and the cable rope 7:
[0052] like Figure 6 As shown, the middle support rod 6 includes a middle rod body 611 and a rope locking support mechanism 612 arranged at the top of the middle rod body 611 .
[0053] When disassembling and assembling the intermediate support rod 6 and the pile pipe 3:
[0054] During assembly, the bottom of the intermediate rod body 611 is inserted into the pile pipe 3 pre-buried on the hillside 1; during disassembly, the bottom of the intermediate rod body 611 is pulled out from the pile pipe 3 pre-buried on the hillside 1, thereby realizing rapid disassembly and assembly between the intermediate rod body 611 and the pile pipe 3.
[0055] When disassembling and assembling between the middle support rod 6 and the rope 7:
[0056] During assembly, after passing the rope 7 through the rope locking support mechanism 612, the rope locking support mechanism 612 is used to lock and support the rope 7; during disassembly, first loosen the rope locking support mechanism 612, and then pull the rope 7 out of the rope locking support mechanism 612, thereby realizing rapid disassembly and assembly between the intermediate support rod 6 and the rope 7.
[0057] like Figure 7 As shown, in order to ensure the stability of the middle support rod 6 during operation, an middle rod tensioning rope 17 is also connected to one side of the middle support rod 6. After the middle rod tensioning rope 17 is tensioned by the hand plate tensioner 3 18, one end of the middle rod tensioning rope 17 is fixed, and it can be fixed on the pile pipe 3 or the ground.
[0058] The specific quick disassembly structure between the middle support rod 6 and the pile pipe 3 is the same as the quick disassembly structure between the end support rod and the pile pipe (see Figure 4 and Figure 5 ), that is: a third pair of through holes is opened on the circumferential surface of the middle support rod located at the bottom of the middle support rod, and a plurality of the third pair of through holes are arranged along the axial direction of the middle support rod, and a second pair of through holes matching the third pair of through holes is arranged on the circumferential surface of the pile pipe located at one end of the pile pipe, and a plurality of locking screws are also arranged on the circumferential surface of the pile pipe located at one end of the pile pipe, and the plurality of locking screws are threadedly connected to the circumferential surface of the pile pipe and can pass through the circumferential surface of the pile pipe and be screwed into the inner cavity of the pile pipe. When assembling the middle support rod and the pile pipe, first insert the bottom of the middle support rod into the pile pipe pre-buried on the hillside, so that the pair of through holes 2 are aligned with one of the pair of through holes 3, and then use the fixing pin to sequentially align one hole in the through hole 2, one hole in the through hole 3, another hole in the through hole 3 and another hole in the through hole 2 to fix them, and then tighten a plurality of locking screws so that the plurality of locking screws are pressed against the circumference of the middle support rod, thereby assembling the middle support rod and the pile pipe; when disassembling the middle support rod and the pile pipe, loosen the locking screws, pull out the fixing pin, and pull the middle support rod out of the pile pipe, and the disassembly of the middle support rod and the pile pipe can be completed. In this embodiment, a plurality of pairs of through holes 3 are provided, mainly to adjust the height of the middle support rod according to actual working conditions.
[0059] The specific quick disassembly and assembly structure between the middle support rod 6 and the rope 7 is as follows: Figure 7 and Figure 8 As shown, a support frame 613 is arranged on one side of the intermediate rod body 611 located at the top of the intermediate rod body, and a rope locking support mechanism 612 is installed on the support frame 613. The rope locking support mechanism 612 includes a fixed frame 6121 and a tightening screw 6122. The fixed frame 6121 is installed on the support frame 613 through a connecting seat 6123. The tightening screw 6122 is threadedly connected to the bottom of the fixed frame 6121 through a locking nut 6124 and the tightening screw 6122 can be screwed into the inner cavity of the fixed frame 6121. A tightening block 6125 is also arranged in the inner cavity of the fixed frame 6121. During assembly, after the rope 7 passes through the inner cavity between the fixing frame 6121 and the tightening block 6124, the tightening screw 6122 is tightened so that the tightening screw 6122 drives the tightening block 6125 to move, so that the rope 7 is tightened against the inner wall of the fixing frame 6121 by the tightening block 6125, and then the locking nut 6124 is locked. During disassembly, the locking nut 6124 is loosened, and the tightening screw 6122 is reversed and unscrewed, so that the tightening block 6125 releases the tightening state of the rope 7, and the rope 7 can be pulled out.
[0060] The specific structure of the hoisting equipment 8 is described below:
[0061] like Figure 2 , Figure 7 and Fig. 9As shown, the hoisting device 8 includes a boom 1 811 and a boom 2 812, and the boom 1 811 and the boom 2 812 both include a side plate 1 813 and a side plate 2 814, and the side plate 1 813 and the side plate 2 814 are connected together by a connecting shaft 815, and a walking wheel 816 is rotatably connected to the connecting shaft 815 between the side plate 1 813 and the side plate 2 814 through a bearing, and the circumferential surface of the walking wheel 816 is provided with a groove matching the cable 7, and in the present embodiment, it is provided as an arc groove, so that the walking wheel contacts the cable 7 to enable the hoisting device 8 to move back and forth along the cable 7. The connecting shaft 815 can adopt a pin structure to connect the side plate 1 813 and the side plate 2 814. Alternatively, as in the present embodiment, the connecting shaft 815 can be designed to include a middle polished rod and two threaded rods, and the outer diameter of the two threaded rods is less than the outer diameter of the middle polished rod, so that a step structure of position limiting is formed between the threaded rod and the polished rod, and then the two threaded rods are respectively passed through the side plate 1 and the side plate 2, and the position between the two side plates is limited by the above step structure, and finally two nuts 817 are respectively tightened on the two threaded rods, and the side plate 1 813 and the side plate 2 814 are locked on the connecting shaft 815, so that the side plate 1 813 and the side plate 2 814 are connected together. The length of the side plate 1 813 is less than the length of the side plate 2 814, because the side plate 1 813 is located on the side of the middle support rod 6, and the support frame 613 on the middle support rod needs to be avoided during the movement of the boom. A hand hoist 20 is connected to the bottom of the second side panel 814 through a connecting rope 19, and the bottom of the hand hoist 20 lifts the photovoltaic panel material 22 through a lifting rope 21. Since the photovoltaic panel material 22 itself is not heavy, the above-mentioned simple structure can bear its weight and lift it. The hand hoist 20 is mainly set to control the up and down movement of the photovoltaic panel material 22, thereby adjusting the height of the photovoltaic panel material 22 and facilitating the lifting and lowering of the photovoltaic panel material 22. A detachable locking block 23 is set on the side of the first side panel 813, and the locking block 23 is used to connect the driving device 9.
[0062] The specific structure of the driving device 9 is described below:
[0063] like Figure 2 , Figure 3 and Fig. 9As shown, the driving device 9 includes a winch 1 911, a winch 2 912 and a pull rope 913. The winch 1 911 is mounted on the end rod body 411 of the end rod 1 4, and a fixed pulley 2 413 is also provided on the end rod body 411 of the end rod 1 4; the winch 2 is mounted on the end rod body of the end rod 2, and a fixed pulley 2 is also provided on the end rod body of the end rod 2. One end of the pull rope 913 is connected to the winch 1 911 in a transmission cooperation, and the other end of the pull rope 913 is connected to the winch 2 912 in a transmission cooperation after passing through the fixed pulley 2 413 on the end rod body 411 of the end rod 1 4, the locking block 23 on the boom 1 811, the locking block 23 on the boom 2 812 and the fixed pulley 2 on the end rod body of the end rod 2. The forward and reverse rotation of the winch can drive the pull rope 913 to move back and forth, thereby pulling the boom 1 811 and the boom 2 812 to move back and forth along the rope 7 to realize the transportation of photovoltaic panel materials.
[0064] The specific connection structure between the pull rope 913 and the boom is as follows: Fig. 9 As shown, the pull rope 913 is locked on the side plate 813 of the boom through the locking block 23. In this embodiment, the locking block 23 is designed to include an arc block 231 and horizontal blocks 232 located on both sides of the arc block 23. The curvature of the arc block 231 matches the pull rope 913. After the pull rope 913 passes through the arc block 231 of the locking block 23, the locking block screw 233 passes through the side plate 813 and the horizontal block 232 of the locking block 23 and is locked with the locking block nut 234, thereby connecting the pull rope 913 to the boom.
[0065] like Fig.10 As shown, the upper end of the fixed frame 6121 of the rope locking support mechanism and the two ends of the fixed frame 6121 are set as bevels 61211, so that when the running wheel 816 of the boom moves to this place along the rope 7, the bevel 61211 contacts the running wheel 816, which plays a guiding role for the running wheel 816, and can reduce the vibration of the boom when it moves past this place, so that the boom can move smoothly.
[0066] In summary, the utility model can use the pre-buried pile pipe to quickly disassemble and assemble the photovoltaic panel material transfer ropeway according to the actual working conditions, which changes the traditional point-to-point transportation method, so that the ropeway transportation line in the utility model can cover the installation area on the hillside to the greatest extent, eliminate the transportation blind spot, and can accurately transport the photovoltaic panel materials to the installation position at one time, avoiding the secondary transportation operation of the installation workers, reducing the labor intensity of the installation workers, and improving the installation efficiency of the project. By designing a specific disassembly and assembly method of the photovoltaic panel material transfer ropeway, the photovoltaic panel material transfer ropeway can be quickly disassembled and assembled at the installation site, thereby further improving the installation efficiency of the project. In addition, the pre-buried pile pipe of the photovoltaic bracket is used as the basis of the ropeway bracket. Compared with the previous ropeway transportation, it reduces the basic construction links, shortens the construction period, saves costs, and reduces the damage to vegetation during the construction process; the simple ropeway is easy to disassemble, and can realize the unloading of photovoltaic materials at any position on the ropeway. The transportation method is optimized from point to point to point to line, reducing secondary transportation, improving construction efficiency, and reducing labor intensity and construction costs.
[0067] The "multiple" mentioned in the above embodiments of the present invention refers to the number of "two or more". The above embodiments are only used to illustrate the present invention, but not to limit the present invention. Those skilled in the relevant technical field can make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the protection scope of the present invention, and the protection scope of the present invention should be defined by the claims.
Claims
1. A mountain photovoltaic panel material transportation cableway, characterized by: It includes an endpoint support rod 1, an endpoint support rod 2 and an intermediate support rod arranged between the endpoint support rod 1 and the endpoint support rod 2, and the endpoint support rod 1, the endpoint support rod 2 and the intermediate support rod can be disassembled and assembled with the pre-buried pile pipe; the endpoint support rod 1, the intermediate support rod and the endpoint support rod 2 are detachably connected with ropes, and the ropes are detachably connected with lifting equipment, which is used for lifting photovoltaic panel materials and can move back and forth along the ropes driven by a driving device.
2. The mountain photovoltaic panel material transport cableway according to claim 1, characterized in that: The first and second end support rods each include an end rod body and a fixed pulley first arranged at the top of the end rod body; a pair of through holes is opened on the circumferential surface of the end rod body located at the bottom of the end rod body, and a plurality of the pair of through holes are arranged along the axial direction of the end rod body; a pair of through holes second matching the pair of through holes first is arranged on the circumferential surface of the pile pipe located at one end of the pile pipe; a plurality of locking screws are also arranged on the circumferential surface of the pile pipe located at one end of the pile pipe, the plurality of locking screws are threadedly connected to the circumferential surface of the pile pipe, and the plurality of locking screws can pass through the circumferential surface of the pile pipe and be screwed into the inner cavity of the pile pipe; Insert the bottom of the terminal rod body into the pile pipe, use the fixing pins to align one hole in the second through hole, one of them to one hole in the first through hole, one of them to another hole in the first through hole and another hole in the second through hole in sequence, and then tighten a plurality of locking screws so that the plurality of locking screws are pressed against the circumferential surface of the terminal rod body, thereby connecting the terminal support rods one and two to the pile pipe.
3. The mountain photovoltaic panel material transport cableway according to claim 2 is characterized in that: The intermediate support rod comprises an intermediate rod body and a rope locking support mechanism arranged at the top of the intermediate rod body; a third pair of through holes is opened on the circumferential surface of the intermediate support rod located at the bottom of the intermediate support rod, and a plurality of the third pair of through holes are arranged along the axial direction of the intermediate support rod; a second pair of through holes matching the third pair of through holes is arranged on the circumferential surface of the pile pipe located at one end of the pile pipe; a plurality of locking screws are also arranged on the circumferential surface of the pile pipe located at one end of the pile pipe, and the plurality of locking screws are threadedly connected to the circumferential surface of the pile pipe and the plurality of locking screws can pass through the circumferential surface of the pile pipe and be screwed into the inner cavity of the pile pipe; Insert the bottom of the middle rod body into the pile pipe, use the fixing pins to align one hole in the second through hole, one of them to one hole in the third through hole, one of them to another hole in the third through hole and another hole in the second through hole in sequence, and then tighten a plurality of locking screws so that the plurality of locking screws are pressed against the circumferential surface of the middle rod body, thereby connecting the middle rod body and the pile pipe.
4. The mountain photovoltaic panel material transport cableway according to claim 3 is characterized in that: A support frame is provided on one side of the intermediate rod body at the top of the intermediate rod body, and a cable locking support mechanism is installed on the support frame. The cable locking support mechanism includes a fixing frame and a tightening screw. The fixing frame is installed on the support frame through a connecting seat. The tightening screw is threadedly connected to the bottom of the fixing frame through a locking nut and can be screwed into the inner cavity of the fixing frame. A tightening block is also provided in the inner cavity of the fixing frame. After the rope passes through the inner cavity between the fixing frame and the tightening block, tighten the tightening screw so that the tightening screw drives the tightening block to move, thereby using the tightening block to tighten the rope against the inner wall of the fixing frame, and then tighten the locking nut to connect the rope and the middle rod body.
5. The mountain photovoltaic panel material transport cableway according to claim 4, characterized in that: The top ends of both sides of the fixing frame are arranged as bevel edges.
6. The mountain photovoltaic panel material transport cableway according to any one of claims 1 to 5, characterized in that: The lifting equipment includes boom 1 and boom 2, and boom 1 and boom 2 both include side panel 1 and side panel 2, and side panel 1 and side panel 2 are connected together through a connecting shaft, and a walking wheel is rotatably connected to the connecting shaft between side panel 1 and side panel 2 through a bearing, and a groove matching the rope is arranged on the circumference of the walking wheel, and a hand-operated hoist is connected to the bottom of side panel 2 through a connecting rope, and the bottom of the hand-operated hoist lifts the photovoltaic panel through the lifting rope; a detachable locking block is arranged on the side of side panel 1, and the locking block is used to connect the driving device.
7. The mountain photovoltaic panel material transportation cableway according to claim 6 is characterized by: The driving device includes winch 1, winch 2 and a pull rope, wherein winch 1 is installed on the end point rod body of end point support rod 1, and fixed pulley 2 is also provided on the end point rod body of end point support rod 1; winch 2 is installed on the end point rod body of end point support rod 2, and fixed pulley 2 is also provided on the end point rod body of end point support rod 2; one end of the pull rope is connected to winch 1 for transmission, and the other end of the pull rope passes through fixed pulley 2 on the end point rod body of end point support rod 1, the locking block on boom 1, the locking block on boom 2 and fixed pulley 2 on the end point rod body of end point support rod 2 in sequence, and then is connected to winch 2 for transmission.
8. The mountain photovoltaic panel material transportation cableway according to claim 7, characterized in that: The locking block includes an arc block and horizontal blocks located on both sides of the arc block. The curvature of the arc block matches the pull rope. After the pull rope passes through the arc block of the locking block, the locking block screw passes through the side plate 1 and the horizontal block of the locking block and is locked with the locking block nut, thereby connecting the pull rope to the boom.