Prefabricated pipe gallery prefabricated double-skin wall

By using translationally staggered inner and outer plates in prefabricated double-leather walls in prefabricated pipe gallery, combined with the design of main ribs and C-shaped support steel bars, the manufacturing cost is reduced and structural strength and installation simplicity is improved, and the existing technology is solved The problem of high cost of middle truss ribs.

CN222100946UActive Publication Date: 2024-12-03HUNAN GUOKE JIANTOU TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420524779.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-12-03
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

The manufacturing cost of prefabricated double-leather walls in the existing prefabricated pipe gallery is high, mainly due to the high cost of truss ribs, and it is necessary to design a structure that can reduce the manufacturing cost.

Method used

The prefabricated inner plate and outer plate are staggered in the length direction. There are main bars and C-shaped support steel bars extending in the vertical direction between the inner plate and the outer plate. The upper and lower ends of the C-shaped support steel bars are hooked on the inner plate and the outer plate. The main ribs in the plate are tied with iron wire to reduce structural complexity and material use.

Benefits of technology

It effectively reduces the manufacturing cost of prefabricated double-leather walls in prefabricated pipe gallery, improves structural strength and installation simplicity, and avoids the problem of the inner and outer plates being away from each other.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100946U_ABST
    Figure CN222100946U_ABST
Patent Text Reader

Abstract

The utility model provides an assembly type pipe gallery prefabricated double-skin wall, and relates to the technical field of assembly type pipe galleries. The fabricated pipe gallery prefabricated double-skin wall comprises a prefabricated inner plate and a prefabricated outer plate, the prefabricated inner plate and the prefabricated outer plate are arranged in a horizontally-moving and staggered mode in the length direction of a pipe gallery, main ribs extending in the vertical direction are arranged in the prefabricated inner plate and the prefabricated outer plate correspondingly, and C-shaped supporting steel bars are arranged between the prefabricated inner plate and the prefabricated outer plate; and the upper ends and the lower ends of the C-shaped supporting steel bars are respectively hooked on the main bars in the prefabricated inner plate and the prefabricated outer plate. Based on the technical scheme, the prefabricated inner plate and the prefabricated outer plate are supported and connected through the C-shaped supporting steel bars, the manufacturing cost of the prefabricated double-skin wall of the assembly type pipe gallery can be effectively reduced, and the prefabricated double-skin wall has the advantages of being simple in structure, easy and convenient to install and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of assembled pipe gallery, in particular to a prefabricated double-skin wall of an assembled pipe gallery. Background Art

[0002] At present, the urban underground comprehensive pipeline corridor refers to an infrastructure building built underground in the city, which is mainly used to accommodate municipal pipelines such as water supply and drainage pipelines, heat pipelines, gas pipelines, power cables, and communication cables. Compared with the traditional direct burial method of pipelines, the urban underground comprehensive pipeline corridor has many advantages, including: unified management of pipelines and convenient maintenance; solving the problems of "road zippers" and "spider webs in the sky", reducing the impact on traffic, beautifying the city environment; optimizing the layout of underground pipelines and rationally developing underground space resources.

[0003] At present, domestic pipe gallery projects often adopt prefabricated composite assembly construction methods. In the prior art, the joints of adjacent panels of the prefabricated double-skin wall of the prefabricated pipe gallery are connected by the cast-in-place concrete layer in the middle of the double-skin wall. The inner and outer panels of the existing prefabricated double-skin wall of the prefabricated pipe gallery are connected by truss reinforcement support. For example, the patent document CN112323859A discloses a prefabricated double-skin wall structure and joint structure of a prefabricated composite prefabricated pipe gallery. The cost of the truss reinforcement is relatively high. Therefore, it is necessary to design a prefabricated double-skin wall of the prefabricated pipe gallery that can reduce the manufacturing cost. Utility Model Content

[0004] In response to the above-mentioned problems in the prior art, the present application proposes a prefabricated double-skin wall of an assembled pipe gallery, which can reduce the manufacturing cost of the prefabricated double-skin wall of the assembled pipe gallery.

[0005] The utility model provides a prefabricated double-skin wall of an assembled pipe gallery, which comprises a prefabricated inner panel and a prefabricated outer panel. The prefabricated inner panel and the prefabricated outer panel are arranged to be staggered along the length direction of the pipe gallery. Both the prefabricated inner panel and the prefabricated outer panel are provided with main reinforcement extending in the vertical direction. C-shaped supporting steel bars are provided between the prefabricated inner panel and the prefabricated outer panel. The upper end and the lower end of the C-shaped supporting steel bar are respectively hooked on the main reinforcement in the prefabricated inner panel and the prefabricated outer panel.

[0006] As a further improvement of the above technical solution:

[0007] The above-mentioned prefabricated double-skin wall of the assembled pipe gallery further has a plurality of limit grooves evenly spaced apart on the outer sides of the main reinforcements in the prefabricated inner panels and the prefabricated outer panels along the extension direction of the main reinforcements, and the end hooks of the C-shaped supporting steel bars are limitedly positioned in the limit grooves.

[0008] The above-mentioned prefabricated double-skin wall of the assembled pipe gallery further has two ends of the C-shaped supporting steel bars respectively tied to the main bars in the prefabricated inner plate and the prefabricated outer plate by iron wire.

[0009] The above-mentioned prefabricated double-skin wall of the assembled pipe gallery further has the ends of the C-shaped supporting steel bars located inside the prefabricated inner plate or the prefabricated outer plate.

[0010] The above-mentioned prefabricated double-skin wall of the assembled pipe gallery, further, the upper parts of the prefabricated inner panels and the prefabricated outer panels are provided with lifting rings, and the lifting rings are used to be connected to lifting equipment to lift the prefabricated double-skin wall of the assembled pipe gallery.

[0011] The above technical features can be combined in various suitable ways or replaced by equivalent technical features as long as the purpose of the utility model can be achieved.

[0012] The utility model provides an assembled pipe gallery prefabricated double-skin wall, which has at least the following beneficial effects compared with the prior art: the prefabricated inner plate and the prefabricated outer plate are both provided with main bars extending in the vertical direction, which can strengthen the structural strength of the prefabricated inner plate and the prefabricated outer plate, and a C-shaped supporting steel bar is provided between the prefabricated inner plate and the prefabricated outer plate, and the upper and lower ends of the C-shaped supporting steel bar are respectively hooked on the main bars in the prefabricated inner plate and the prefabricated outer plate, and when pouring concrete between the prefabricated inner plate and the prefabricated outer plate, the C-shaped supporting steel bar provides a tensioning force to the prefabricated inner plate and the prefabricated outer plate to prevent the prefabricated inner plate and the prefabricated outer plate from moving away from each other. Compared with the structure in the prior art in which the inner plate and the outer plate of the double-skin wall are supported and connected by truss bars, the assembled pipe gallery prefabricated double-skin wall provided by the utility model has a C-shaped supporting steel bar support connection between the prefabricated inner plate and the prefabricated outer plate, which can effectively reduce the manufacturing cost of the assembled pipe gallery prefabricated double-skin wall, and has the advantages of simple structure and easy installation.

[0013] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and understandable, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0015] The present invention will be described in more detail below based on embodiments and with reference to the accompanying drawings.

[0016] Figure 1The front view of the prefabricated double-skin wall of the assembled pipe gallery provided by the embodiment of the utility model is shown;

[0017] Figure 2 A side view of the prefabricated double-skin wall of the assembled pipe gallery provided in an embodiment of the utility model is shown.

[0018] In the drawings, like reference numerals are used for like parts. The drawings are not necessarily to scale.

[0019] Description of reference numerals:

[0020] 100-prefabricated double-skin wall of assembled pipe gallery, 110-prefabricated inner plate, 120-prefabricated outer plate, 130-main reinforcement, 140-C-shaped supporting reinforcement, 150-lifting ring. DETAILED DESCRIPTION

[0021] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0022] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0023] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0024] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0025] In the present utility model, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0026] The utility model will be further described below in conjunction with the accompanying drawings.

[0027] The embodiment of the utility model provides a prefabricated double-skin wall 100 of an assembled pipe gallery, which can reduce the manufacturing cost of the prefabricated double-skin wall 100 of the assembled pipe gallery.

[0028] See also Figure 1 and Figure 2 The prefabricated double-skin wall 100 of an assembled pipe gallery provided by an embodiment of the utility model includes a prefabricated inner panel 110 and a prefabricated outer panel 120. The prefabricated inner panel 110 and the prefabricated outer panel 120 are arranged to be staggered along the length direction of the pipe gallery. The prefabricated inner panel 110 and the prefabricated outer panel 120 are both provided with main reinforcement 130 extending in the vertical direction. A C-shaped supporting steel bar 140 is provided between the prefabricated inner panel 110 and the prefabricated outer panel 120. The upper end and the lower end of the C-shaped supporting steel bar 140 are respectively hooked on the main reinforcement 130 in the prefabricated inner panel 110 and the prefabricated outer panel 120.

[0029] The precast inner panel 110 and the precast outer panel 120 are both provided with main reinforcement 130 extending in the vertical direction, and the main reinforcement 130 can strengthen the structural strength of the precast inner panel 110 and the precast outer panel 120. A C-shaped supporting steel bar 140 is provided between the precast inner panel 110 and the precast outer panel 120, and the upper and lower ends of the C-shaped supporting steel bar 140 are respectively hooked on the main reinforcement 130 in the precast inner panel 110 and the precast outer panel 120. When concrete is poured between the precast inner panel 110 and the precast outer panel 120, the C-shaped supporting steel bar 140 provides tensioning force to the precast inner panel 110 and the precast outer panel 120 to prevent the precast inner panel 110 and the precast outer panel 120 from moving away from each other. Compared with the structure in the prior art in which the inner plate and the outer plate of the double wall are supported and connected by truss bars, the prefabricated double wall 100 of the assembled pipe gallery provided by the utility model has a prefabricated inner plate 110 and a prefabricated outer plate 120 supported and connected by C-shaped supporting steel bars 140, which can effectively reduce the manufacturing cost of the prefabricated double wall 100 of the assembled pipe gallery and has the advantages of simple structure and easy installation.

[0030] The prefabricated double-skin wall 100 of the assembled pipe gallery provided by the utility model further has a plurality of limiting grooves (not shown) evenly spaced apart on the outer side of the main reinforcement 130 in the prefabricated inner plate 110 and the prefabricated outer plate 120 along the extension direction of the main reinforcement 130, and the end hooks of the C-shaped supporting steel bar 140 are limited in the limiting grooves. When installing the C-shaped supporting steel bar 140, the two ends of the C-shaped supporting steel bar 140 are correspondingly hooked and limited in the limiting grooves on the outer side of the main reinforcement 130 in the prefabricated inner plate 110 and the prefabricated outer plate 120, and the limiting grooves can limit the position of the C-shaped supporting steel bar 140 to prevent the C-shaped supporting steel bar 140 from moving relative to the main reinforcement 130 along the length direction of the main reinforcement 130, and the outer side of the main reinforcement 130 is evenly spaced apart along the extension direction of the main reinforcement 130, so that a plurality of C-shaped supporting steel bars 140 can be evenly spaced along the extension direction of the main reinforcement 130.

[0031] In this embodiment, the two ends of the C-shaped support steel bar 140 are tied to the main reinforcement 130 in the prefabricated inner plate 110 and the prefabricated outer plate 120 by iron wire (not shown). After the two ends of the C-shaped support steel bar 140 are hooked and limited in the limiting grooves outside the main reinforcement 130 in the prefabricated inner plate 110 and the prefabricated outer plate 120, the two ends of the C-shaped support steel bar 140 are tied to the main reinforcement 130 in the prefabricated inner plate 110 and the prefabricated outer plate 120 by iron wire, so as to further prevent the C-shaped support steel bar 140 from moving relative to the main reinforcement 130 along the length direction of the main reinforcement 130. Please refer to Figure 2 The end of the C-shaped supporting steel bar 140 is located inside the prefabricated inner panel 110 or the prefabricated outer panel 120 , so that when pouring concrete between the prefabricated inner panel 110 and the prefabricated outer panel 120 , the end of the C-shaped supporting steel bar 140 can be prevented from affecting the discharge of concrete.

[0032] The utility model provides a prefabricated double-skin wall 100 for the assembled pipe gallery. For further information, please refer to Figure 1 The upper parts of the prefabricated inner plate 110 and the prefabricated outer plate 120 are both provided with lifting rings 150, which are used to be connected with lifting equipment to lift the prefabricated double-skin wall 100 of the assembled pipe gallery. When it is necessary to lift the prefabricated double-skin wall 100 of the assembled pipe gallery provided by the utility model, the lifting rings 150 can be connected with the lifting equipment to lift the prefabricated double-skin wall 100 of the assembled pipe gallery provided by the utility model.

[0033] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0034] Although the present invention is described herein with reference to specific embodiments, it should be understood that these embodiments are merely examples of the principles and applications of the present invention. It should therefore be understood that many modifications may be made to the exemplary embodiments, and other arrangements may be designed without departing from the spirit and scope of the present invention as defined by the appended claims. It should be understood that the features described in the various dependent claims and herein may be combined in a manner different from that described in the original claims. It may also be understood that the features described in conjunction with the individual embodiments may be used in other described embodiments.

Claims

1. A prefabricated double-skin wall of an assembled pipe gallery, characterized in that: The prefabricated double-skin wall of the assembled pipe gallery includes a prefabricated inner panel and a prefabricated outer panel. The prefabricated inner panel and the prefabricated outer panel are arranged to be staggered and shifted along the length direction of the pipe gallery. Both the prefabricated inner panel and the prefabricated outer panel are provided with main reinforcement extending in the vertical direction. C-shaped supporting steel bars are provided between the prefabricated inner panel and the prefabricated outer panel. The upper and lower ends of the C-shaped supporting steel bars are respectively hooked on the main reinforcement in the prefabricated inner panel and the prefabricated outer panel.

2. The prefabricated double-skin wall of the assembled pipe gallery according to claim 1 is characterized in that: A plurality of limiting grooves are evenly spaced apart on the outer sides of the main reinforcements in the prefabricated inner plate and the prefabricated outer plate along the extension direction of the main reinforcements, and the end hooks of the C-shaped supporting reinforcements are limitedly positioned in the limiting grooves.

3. The prefabricated double-skin wall of the assembled pipe gallery according to claim 2 is characterized in that: The two ends of the C-shaped supporting steel bar are respectively tied to the main bars in the prefabricated inner plate and the prefabricated outer plate by iron wire.

4. The prefabricated double-skin wall of the assembled pipe gallery according to claim 1 is characterized in that: The end of the C-shaped supporting steel bar is located inside the prefabricated inner plate or the prefabricated outer plate.

5. The prefabricated double-skin wall of the assembled pipe gallery according to claim 1 is characterized in that: The upper parts of the prefabricated inner panels and the prefabricated outer panels are both provided with lifting rings, and the lifting rings are used to be connected with lifting equipment to lift the prefabricated double-skin wall of the assembled pipe gallery.