Accumulated water removing device for construction site
By using mobile vehicles on construction sites to carry pump suction and drainage and sponge water absorption mechanisms, the water accumulation without excavation of water collection ditches is achieved, and the problems of large workload and safety hazards of water accumulation cleaning in the existing technology are solved, which has improved the Construction progress and safety.
Patent Information
- Application Number
- CN202420796365.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-17
AI Technical Summary
The water accumulation in existing construction sites is cleaned by excavation, which has a large amount of workload, which affects the construction progress and brings safety hazards.
A water accumulation removal device for construction sites including mobile vehicles, pump suction and drainage mechanisms and sponge water absorption mechanisms is designed. The water is quickly pumped through the pump suction and drainage mechanisms and the sponge water absorption mechanisms fully absorbed water, so as to achieve no need to dig a water collection ditch and water collection. Remove the accumulated water in the pit, reduce the excavation workload, shorten the construction period, and eliminate safety hazards.
It has achieved rapid and safe removal of accumulated water, improved construction progress, reduced excavation workload, and eliminated safety hazards caused by water collection ditches and water collection pits.
Smart Images

Figure CN222101074U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a device for removing accumulated water from a construction site. Background Art
[0002] The existing construction sites mainly use the method of digging drainage ditches and collecting the water into drainage pits for centralized pumping. Ditches and drainage pits are suitable for clearing water in fixed places and cannot be moved with the construction surface. When the construction surface moves, the drainage ditches and drainage pits need to be re-excavated. The excavation and backfilling of drainage ditches and drainage pits is labor-intensive. Ditches and drainage pits affect construction traffic and require corresponding safety protection measures. There is a lot of residual water and silt on the working surface. Utility Model Content
[0003] The utility model aims to provide a construction site water removal device to solve the problem that the existing construction site water cleaning adopts excavation to collect water, which results in a large workload and affects the construction progress.
[0004] The technical solution of the utility model to solve the above technical problems is as follows:
[0005] The utility model provides a construction site water removal device, comprising: a mobile carrier, a pump suction and drainage mechanism and a sponge water absorption mechanism;
[0006] The pump suction and drainage mechanism comprises: a water collection tank, a lifting member and a mud pump; the water collection tank is located below the mobile vehicle, the two ends of the lifting member are respectively connected to the bottom end of the mobile vehicle and the water collection tank, and the mud pump is arranged in the water collection tank;
[0007] The sponge water absorption mechanism is located below the mobile carrier, and comprises: a water absorption sponge, a sponge clamp and a rotating member. The water absorption sponge is arranged on the sponge clamp, and the sponge clamp is connected to the water collection tank through the rotating member.
[0008] Furthermore, in the construction site water removal device, the device also includes a filtering water storage mechanism, which includes: a sediment separator and a water storage tank, the water inlet of the sediment separator is connected to the water outlet of the mud pump through a water inlet pipeline, and the water storage tank is connected to the water outlet of the sediment separator through a water outlet pipeline.
[0009] Furthermore, in the construction site water removal device, the filtering and water storage mechanism further includes: a water outlet valve, and the water outlet valve is arranged on the water outlet pipeline.
[0010] Furthermore, in the construction site water removal device, a sand outlet of the sediment separator is provided with a sand discharge valve.
[0011] Furthermore, in the construction site water removal device, the device also includes a water delivery mechanism, which includes: a water delivery pipe and a water pipe reel, the water delivery pipe is connected to one end of the water pipe reel, and the other end of the water pipe reel is connected to the water outlet of the sediment separator through a water delivery pipeline.
[0012] Furthermore, in the construction site water removal device, a water delivery valve is provided on the water delivery pipeline.
[0013] Furthermore, in the construction site water removal device, a check valve is also provided on the water supply pipeline, and the check valve is located between the water supply valve and the water pipe reel.
[0014] Furthermore, in the construction site water removal device, the device also includes a sponge cleaning mechanism, which includes: a cleaning pump and a cleaning nozzle, the water inlet of the cleaning pump is arranged in the water tank, the water outlet of the cleaning pump is connected to the cleaning nozzle through a cleaning pipeline, and the cleaning nozzle is located below the mobile vehicle.
[0015] Furthermore, in the construction site water removal device, the cleaning nozzle is located above the water collecting tank, and the rotating member drives the sponge clamp to rotate to below the cleaning nozzle.
[0016] Furthermore, in the construction site water removal device, a water tank inlet is provided below the water collecting tank.
[0017] The utility model has the following beneficial effects:
[0018] The construction site water accumulation clearing device provided by the utility model realizes movable water absorption through a mobile carrier. Deep water accumulation is pumped out and drained by a pump suction drainage mechanism with a fast drainage rate; shallow water accumulation is absorbed and cleared by a sponge suction mechanism with sufficient water absorption; there is no need to dig drainage ditches and water collection pits to clear water from the construction site, thus reducing the excavation workload, shortening the excavation period, and improving the construction progress, eliminating the safety hazards caused by drainage ditches and water collection pits. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings described herein are used to provide a further understanding of the embodiments of the present utility model, constitute a part of this application, and do not constitute a limitation of the embodiments of the present utility model. In the drawings:
[0020] Figure 1 It is a structural schematic diagram of a construction site water removal device of the utility model;
[0021] Figure 2 It is a partial schematic diagram of the construction site water removal device of the utility model;
[0022] Figure 3 The utility model is used for the construction site water removal device Figure 1 ; Among them, the water inlet of the sink is closed, and the clamped water-absorbing sponge is put down;
[0023] Figure 4 for Figure 3 A partial enlarged view of the middle part;
[0024] Figure 5 The utility model is used for the construction site water removal device Figure 2 ; Among them, the water-absorbing sponge relaxes and absorbs water;
[0025] Figure 6 for Figure 5 A magnified view of the part at B in the middle;
[0026] Figure 7 The utility model is used for the construction site water removal device Figure 3 ; Among them, the water-absorbing sponge rises;
[0027] Figure 8 for Figure 7 A magnified view of the part at C in the middle;
[0028] Fig. 9 The utility model is used for the construction site water removal device Figure 4 ; Among them, the water-absorbing sponge clamps the drainage;
[0029] Fig.10 for Fig. 9 The enlarged view of the part at D in the middle;
[0030] Fig.11 The utility model is a flow chart of sponge water absorption of the construction site water removal device.
[0031] Marks and corresponding parts names in the attached drawings:
[0032] In the figure: 10-mobile carrier, 21-water collecting tank, 22-lifting member, 23-mud pump, 24-water inlet of the tank, 31-water absorbing sponge, 32-sponge clamp, 33-rotating member, 41-sediment separator, 42-water storage tank, 43-sand discharge valve, 44-water outlet valve, 51-water pipe, 52-water pipe reel, 53-water valve, 54-check valve, 61-cleaning pump, 62-cleaning nozzle. DETAILED DESCRIPTION
[0033] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.
[0034] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] Example
[0036] Please refer to Figure 1 and 2 The construction site water removal device provided by the embodiment of the utility model comprises: a mobile carrier 10, a pump suction and drainage mechanism and a sponge water absorption mechanism;
[0037] The pump suction and drainage mechanism includes: a water collection tank 21, a lifting member 22 and a mud pump 23; the water collection tank 21 is located below the mobile vehicle 10, and the two ends of the lifting member 22 are respectively connected to the bottom end of the mobile vehicle 10 and the water collection tank 21, and the mud pump 23 is arranged in the water collection tank 21;
[0038] The sponge water absorption mechanism is located below the mobile carrier 10 , and includes: a water absorption sponge 31 , a sponge clamp 32 and a rotating member 33 . The water absorption sponge 31 is arranged on the sponge clamp 32 , and the sponge clamp 32 is connected to the water collection tank 21 through the rotating member 33 .
[0039] The construction site water accumulation clearing device provided by the utility model realizes movable water absorption through the mobile carrier 10. Deep water accumulation is pumped out and drained by a pump suction drainage mechanism with a fast drainage rate; shallow water accumulation is absorbed and cleared by a sponge suction mechanism with sufficient water absorption; there is no need to dig drainage ditches and water collection pits to clear water from the construction site, which reduces the excavation workload, shortens the excavation period, improves the construction progress, and eliminates the safety hazards caused by drainage ditches and water collection pits.
[0040] The entire device is mounted on a mobile vehicle 10 and can be freely moved in the construction area to perform water removal operations. The collected water can be transported to the construction drainage pipe or water truck for centralized discharge, or it can be transported and discharged by the site water removal device.
[0041] In the pump suction and drainage mechanism, the lifting member 22 realizes the lifting or lowering of the water collection tank 21: the lifting member 22 lifts the water collection tank 21 upward to avoid collision during driving. The lifting member 22 lowers the water collection tank 21 downward, and the accumulated water enters the water collection tank 21 and is pumped by the mud pump 23. The mud pump 23 can be replaced with other liquid delivery pumps. As a preferred embodiment, the mud pump 23 is more suitable for pumping out accumulated water mixed with a large amount of mud and sand on the construction site. When the mud pump 23 pumps deep water and shallow water, one mud pump 23 can be used together; it can also be used separately, one pump to pump deep water, and the other pump to pump the water collected by the sponge in the water collection tank 21.
[0042] In the sponge water absorption mechanism, the rotating member 33 drives the sponge clamp 32 to rotate. The sponge clamp 32 clamps and compresses the water-absorbing sponge 31 to remove the air in the water-absorbing sponge 31. The rotating member 33 drives the sponge clamp 32 and the water-absorbing sponge 31 to the ground and close to each other. The sponge clamp 32 relaxes, and the water-absorbing sponge 31 expands and absorbs water. The rotating member 33 drives the sponge clamp 32 and the water-absorbing sponge 31 to rise above the water collection tank 21. The sponge clamp 32 clamps and squeezes out the accumulated water in the water-absorbing sponge 31 again, and the accumulated water falls into the water collection tank 21 below. The sponge clamp 32 and the water-absorbing sponge 31 are lowered again to absorb water. This reciprocating cycle clears the residual accumulated water on the ground. When the water in the water collection tank 21 accumulates to a certain depth, it is pumped and discharged by the mud pump 23 in the water collection tank 21. In this embodiment, the rotating member 33 can select a rotating arm to realize the lifting and lowering of the sponge clamp 32, and can also use a lifting and translation to realize the lifting and lowering of the sponge clamp 32. The water-absorbing sponge 31 can be one piece of sponge, or a plurality of sponges can be used alternately.
[0043] The entire device can use electricity or fuel, and the movement of each part can be achieved by electric, hydraulic or pneumatic means to achieve the purpose of meeting the requirements, without any limitation on the specific form of power.
[0044] In some feasible embodiments, the device also includes a filtering and water storage mechanism, which includes: a silt separator 41 and a water storage tank 42, the water inlet of the silt separator 41 is connected to the water outlet of the mud pump 23 through an inlet pipeline, and the water storage tank 42 is connected to the water outlet of the silt separator 41 through an outlet pipeline.
[0045] The construction site has a large amount of accumulated water and sand, which is separated by the sediment separator 41 to prevent the sediment from clogging the pipe. The water tank 42 is used to store water for cleaning the sponge and to store the cleared accumulated water, which is then transported away and discharged by the accumulated water removal device, without the need for centralized drainage pipes or water trucks to transport water.
[0046] In some feasible embodiments, the filtering and water storage mechanism further includes: a water outlet valve 44, which is arranged on the water outlet pipeline. By setting the water outlet valve 44, the water outlet flow rate can be controlled.
[0047] In some feasible embodiments, a sand outlet of the sand separator 41 is provided with a sand discharge valve 43. The sand discharge valve 43 is provided to discharge the sand in the sand separator 41.
[0048] In some feasible embodiments, the device further includes a water delivery mechanism, which includes: a water delivery pipe 51 and a water pipe drum 52, wherein the water delivery pipe 51 is connected to one end of the water pipe drum 52, and the other end of the water pipe drum 52 is connected to the water outlet of the sediment separator 41 through the water delivery pipe 51 line. The water delivery mechanism is used to deliver the water separated by the sediment separator 41 to several drainage pipes on the construction site for discharge or to a water truck for transportation, and the water pipe drum 52 is used to retract and release the water delivery pipe 51 when the water removal device is in mobile operation.
[0049] In some feasible embodiments, a water delivery valve 53 is provided on the water delivery pipe 51. The water delivery valve 53 is provided to control the delivery flow rate.
[0050] In some feasible embodiments, a check valve 54 is further provided on the water delivery pipe 51, and the check valve 54 is located between the water delivery valve 53 and the water pipe reel 52. The check valve 54 is provided to prevent water in the centralized drainage pipe of the construction site from flowing back into the pipeline of the water accumulation removal device.
[0051] In some feasible embodiments, the device also includes a sponge cleaning mechanism, which includes: a cleaning pump 61 and a cleaning nozzle 62, the water inlet of the cleaning pump 61 is arranged in the water tank 42, and the water outlet of the cleaning pump 61 is connected to the cleaning nozzle 62 through a cleaning pipeline, and the cleaning nozzle 62 is located below the mobile vehicle 10.
[0052] The sponge cleaning mechanism is used to clean the sponge. The water for cleaning the sponge comes from the water storage tank 42. The water-absorbing sponge 31 is cleaned to remove dirt, so as to keep the water-absorbing sponge 31 clean so as to continue to absorb water.
[0053] In some feasible embodiments, the cleaning nozzle 62 is located above the water collecting tank 21 , and the rotating member 33 drives the sponge clamp 32 to rotate to below the cleaning nozzle 62 .
[0054] In some feasible ways, a water tank inlet 24 is provided below the water collecting tank 21. The water tank inlet 24 is used to allow as low water as possible to enter the bottom of the mud pump 23 and be pumped away when pumping deep water, thereby reducing the workload of the sponge absorbing water. The water tank inlet 24 can be provided at the bottom or side of the water collecting tank 21.
[0055] Please refer to Figure 3-11 The working process of the construction site water removal device provided by the utility model is as follows:
[0056] When the mobile vehicle 10 is traveling, the lifting member 22 lifts the entire pump suction and drainage mechanism and the sponge water absorption mechanism to prevent the water collection tank 21 from contacting the ground and causing scratches during driving.
[0057] When the operation of clearing the accumulated water begins, the lifting member 22 lowers the entire pump suction and drainage mechanism and the sponge water absorption mechanism to clear the accumulated water.
[0058] The water collection tank 21 is provided with an openable and closable water tank inlet 24. If the water level is deep, the water tank inlet 24 is opened, and the water collection tank 21 becomes a lower open structure. The accumulated water above the bottom of the water collection tank 21 can flow into the water collection tank 21, and the accumulated water is pumped to the sediment separator 41 through the mud pump 23.
[0059] The accumulated water is stratified after passing through the sediment separator 41, and the sediment settles to the bottom of the sediment separator 41 and is discharged through the sand discharge valve 43, with the upper layer being the water layer. The water outlet of the sediment separator 41 is connected to two branch pipelines, namely, a water outlet pipeline and a water delivery pipeline 51. A water outlet valve 44 is provided on the water outlet pipeline, a water delivery valve 53 and a check valve 54 are provided on the water delivery pipeline 51, and a water pipe reel 52 and a water delivery pipeline 51 are connected to the water delivery pipeline 51.
[0060] When the outlet valve 44 is closed and the water delivery valve 53 is opened, the water separated by the sediment separator 41 is delivered to the centralized drainage pipeline of the construction site through the water delivery valve 53, the check valve 54, and the water delivery pipe 51 for discharge or delivered to the water truck for transportation.
[0061] When the water outlet valve 44 is opened and the water delivery valve 53 is closed, the water separated by the sediment separator 41 flows into the water storage tank 42 through the water outlet valve 44 .
[0062] If the accumulated water is shallow and lower than the water absorption depth of the mud pump 23, the water inlet 24 of the water collection tank 21 is closed, and the water collection tank 21 becomes a closed water tank. The sponge clamp 32 clamps and compresses the water-absorbing sponge 31 to remove the air in the water-absorbing sponge 31, and drives the sponge clamp 32 and the water-absorbing sponge 31 to the ground and close to it through the rotating part 33. The sponge clamp 32 relaxes and the water-absorbing sponge 31 absorbs water and expands. The sponge clamp 32 and the water-absorbing sponge 31 are driven to rise above the water collection tank 21 through the rotating part 33. The sponge clamp 32 clamps and squeezes out the accumulated water in the water-absorbing sponge 31 again, and the accumulated water falls into the water collection tank 21 below. The sponge clamp 32 and the water-absorbing sponge 31 are driven to descend again through the rotating part 33 to absorb water. This reciprocating cycle clears the residual accumulated water on the ground. When the water in the water collection tank 21 accumulates to a certain depth, it is pumped and discharged by the mud pump 23 in the concentrated water tank.
[0063] If the absorbent sponge 31 becomes dirty and affects its absorption of water, the sponge clamp 32 and the absorbent sponge 31 are driven by the rotating part 33 to rise above the water collecting tank 21 and stay there, the cleaning pump 61 is turned on, and the cleaning water is washed from the cleaning nozzle 62 to rinse the absorbent sponge 31, the sponge clamp 32 repeatedly loosens and clamps the absorbent sponge 31, and the absorbent sponge 31 repeatedly absorbs and discharges the cleaning water to remove the mud and sand.
[0064] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.
Claims
1. A construction site water removal device, characterized in that: include: A mobile carrier (10), a pump suction and drainage mechanism, and a sponge water absorption mechanism; The pump suction and drainage mechanism comprises: a water collecting tank (21), a lifting member (22) and a mud pump (23); the water collecting tank (21) is located below the mobile vehicle (10), two ends of the lifting member (22) are respectively connected to the bottom end of the mobile vehicle (10) and the water collecting tank (21), and the mud pump (23) is arranged in the water collecting tank (21); The sponge water absorption mechanism is located below the mobile carrier (10), and comprises: a water absorption sponge (31), a sponge clamp (32) and a rotating member (33); the water absorption sponge (31) is arranged on the sponge clamp (32), and the sponge clamp (32) is connected to the water collection tank (21) via the rotating member (33).
2. The construction site water removal device according to claim 1, characterized in that: The device further comprises a filtering water storage mechanism, which comprises: a sediment separator (41) and a water storage tank (42), wherein the water inlet of the sediment separator (41) is connected to the water outlet of the mud pump (23) via a water inlet pipeline, and the water storage tank (42) is connected to the water outlet of the sediment separator (41) via a water outlet pipeline.
3. The construction site water removal device according to claim 2, characterized in that: The sand outlet of the sediment separator (41) is provided with a sand discharge valve (43).
4. The construction site water removal device according to claim 2, characterized in that: The filtering and water storage mechanism further comprises: a water outlet valve (44), wherein the water outlet valve (44) is arranged on the water outlet pipeline.
5. The construction site water removal device according to claim 2, characterized in that: The device further comprises a water delivery mechanism, which comprises: a water delivery pipe (51) and a water pipe reel (52), wherein the water delivery pipe (51) is connected to one end of the water pipe reel (52), and the other end of the water pipe reel (52) is connected to the water outlet of the sediment separator (41) through the water delivery pipe (51).
6. The construction site water removal device according to claim 5, characterized in that: A water delivery valve (53) is arranged on the water delivery pipe (51).
7. The construction site water removal device according to claim 6, characterized in that: A check valve (54) is also provided on the water delivery pipe (51), and the check valve (54) is located between the water delivery valve (53) and the water pipe reel (52).
8. The construction site water removal device according to claim 2, characterized in that: The device further comprises a sponge cleaning mechanism, which comprises: a cleaning pump (61) and a cleaning nozzle (62); a water inlet of the cleaning pump (61) is arranged in the water storage tank (42); a water outlet of the cleaning pump (61) is connected to the cleaning nozzle (62) via a cleaning pipeline; and the cleaning nozzle (62) is located below the mobile vehicle (10).
9. The construction site water removal device according to claim 8, characterized in that: The cleaning nozzle (62) is located above the water collecting tank (21), and the rotating member (33) drives the sponge clamp (32) to rotate to the bottom of the cleaning nozzle (62).