Fabricated wallboard connecting joint structure for building

By introducing auxiliary stabilization mechanisms into the prefabricated wall panel connection node structure for construction, including components such as threaded steel bars, rotating columns and handwheels, the problem of concrete overflow is solved, and a tighter connection and simplified operation process is achieved, which improves the Connection strength and assembly efficiency.

CN222101164UActive Publication Date: 2024-12-03SHANDONG GUAN COUNTY MEIAN COMPOSITE MATERIALS CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202323633673.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-12-03
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

The existing prefabricated wall panel connecting node structures for construction lack auxiliary stabilization mechanisms, which leads to the easy overflow of concrete during pouring and requires additional effort to remove.

Method used

A connecting node structure including cement board, butt board, straight steel bar, U-shaped steel bar, threaded steel bar and auxiliary stabilization mechanism was designed. The cement board and the Close connection and adjustment of butt plates to avoid concrete spills.

Benefits of technology

It effectively prevents concrete from overflowing at the connection, simplifies the operation process, improves connection strength and stability, and makes subsequent assembly more convenient and quick through anti-slip sleeves and extended connection holes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101164U_ABST
    Figure CN222101164U_ABST
Patent Text Reader

Abstract

The utility model provides a building assembly type wallboard connection node structure which comprises a cement board, a butt joint board is placed on the right side of the cement board, butt joint holes which are evenly distributed are formed in the right side of the cement board, a plurality of straight steel bars which are arranged at equal intervals are arranged on the left side of the butt joint board, and the straight steel bars and the adjacent butt joint holes are installed in a matched mode. A plurality of evenly-distributed U-shaped steel bars are arranged on the right side of the cement board and the left side of the butt-joint board respectively, a twisted steel bar is inserted into each U-shaped steel bar in a penetrating mode, and auxiliary stabilizing mechanisms are arranged on the front side of the cement board and the front side of the butt-joint board. According to the fabricated wallboard connecting node structure for the building, the auxiliary stabilizing mechanism is matched with the sealing plate, so that the problem that concrete overflows when the concrete is poured between the two wallboards can be avoided, and workers do not need to shovel the concrete with extra effort.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of building wall panels, and particularly relates to a connection node structure of assembled wall panels for buildings. Background Art

[0002] Building wall panels are components used in building walls, usually made of concrete, bricks, steel and other materials. They are installed on the frame structure of the building to form the appearance and function of the wall. As a structural component of the building, the wall panels can withstand vertical and horizontal loads and provide stability and earthquake resistance to the building. The connection node structure of prefabricated wall panels for construction refers to the connection node design between wall panels in prefabricated buildings. Prefabricated buildings are a construction method that prefabricates components in factories and then assembles them on site.

[0003] Most of the existing prefabricated wall panel connection node structures for buildings are formed by bringing two wall panels closer together and fixing them by inserting steel bars between them, and then pouring concrete between them. However, they usually lack an auxiliary stabilizing mechanism between the two, which will cause concrete to overflow from the gap, requiring personnel to subsequently shovel out the overflowed concrete. Utility Model Content

[0004] In view of this, the utility model aims to solve the deficiencies of the prior art and provides a prefabricated wall panel connection node structure for construction. The auxiliary stabilizing mechanism cooperates with the sealing plate to avoid the problem of concrete overflow when pouring between two wall panels, so that personnel do not need to take extra effort to shovel it out.

[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is: an assembled wall panel connection node structure for construction, including a cement board, a butt joint plate is placed on the right side of the cement board, evenly distributed butt joint holes are opened on the right side of the cement board, a plurality of straight steel bars arranged at equal intervals are arranged on the left side of the butt joint plate, and the straight steel bars are respectively installed in cooperation with adjacent butt joint holes, a plurality of evenly distributed U-shaped steel bars are respectively arranged on the right side of the cement board and the left side of the butt joint plate, a threaded steel bar is inserted inside the U-shaped steel bar, auxiliary stabilization mechanisms are arranged on the front sides of the cement board and the butt joint plate, the U-shaped steel bars on the right side of the cement board and the left side of the butt joint plate are staggered with each other, and the auxiliary stabilization mechanisms include respectively passing through A connecting plate is arranged on the front side of the cement board and the docking plate through bolts, and the front side surfaces of the two connecting plates are rotatably connected to two rotating columns corresponding to the upper and lower positions respectively, and connecting rods are fixedly sleeved on the outer arc surfaces of the four rotating columns, and a rotating frame corresponding to the upper and lower positions is rotatably connected between the two adjacent connecting rods on the left and right, and a screw rod is threadedly connected between the two rotating frames, and an installation limiting component is arranged at the bottom end of the screw rod, and an auxiliary rotation mechanism is arranged at the upper end of the screw rod, and the installation limiting component includes a mounting plate arranged at the lower end of the screw rod, and two mounting holes corresponding to the left and right positions are provided inside the mounting plate, and the auxiliary rotation mechanism includes a handwheel arranged at the top end of the screw rod, and the outer side surface of the handwheel is wrapped with an anti-slip sleeve.

[0006] As a further improvement of the utility model, the upper end of the cement board and the upper end of the butt joint plate are respectively provided with evenly distributed connection holes.

[0007] As a further improvement of the utility model, two sealing plates are respectively provided on the right side of the cement board and the left side of the butt joint plate.

[0008] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0009] First, personnel align the straight steel bars on the docking plate with the docking holes on the cement board and then dock them together. Then, personnel insert the threaded steel bars into the cement board and the U-shaped steel bars on the docking plate. Inserting the straight steel bars into the docking holes can prevent the cement board and the docking plate from offsetting after connection. Inserting the threaded steel bars into the U-shaped steel bars can further increase the connection strength between the cement board and the docking plate.

[0010] Secondly, fix the mounting plate in a suitable position through the mounting holes on the mounting plate, and then fix the two connecting plates on the cement board and the docking plate respectively. Then, the personnel rotate the handwheel to drive the screw to rotate, and then drive the two rotating frames to move downward, so that the connecting rod inside them contracts, and then drive the cement board and the docking plate closer together to make them more tightly connected. At this time, the two sealing plates are in contact, and the auxiliary stabilizing mechanism cooperates with the sealing plates to avoid the problem of concrete overflow during pouring between the two wall panels, so that personnel do not need to take extra effort to shovel it out.

[0011] Thirdly, the protective cover on the hand wheel can prevent people from slipping, making it smoother to turn the hand wheel and more convenient for people to operate.

[0012] Fourthly, the connection holes can be used to realize the extended connection between the cement board and the upper end of the docking board, making the subsequent assembly more convenient and quick. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 It is a schematic diagram of the explosion structure of the utility model;

[0016] Figure 3 It is a schematic diagram of the enlarged structure of point A of the utility model;

[0017] Figure 4 It is a schematic diagram of the cross-sectional front view structure of the utility model.

[0018] In the figure: 101, cement board; 102, docking plate; 103, connecting hole; 104, U-shaped steel bar; 105, straight steel bar; 106, threaded steel bar; 107, sealing plate; 108, docking hole; 201, connecting plate; 202, rotating frame; 203, screw rod; 204, connecting rod; 205, hand wheel; 206, mounting plate; 207, mounting hole. DETAILED DESCRIPTION

[0019] In order to better understand the present invention, the content of the present invention is further clearly described below in conjunction with the embodiments, but the protection content of the present invention is not limited to the following embodiments. In the following description, a large number of specific details are given in order to provide a more thorough understanding of the present invention. However, it is obvious to those skilled in the art that the present invention can be implemented without one or more of these details.

[0020] like Figure 1 , 2As shown in Figures 3 and 4, a prefabricated wall panel connection node structure for construction includes a cement board 101, a docking plate 102 is placed on the right side of the cement board 101, and evenly distributed docking holes 108 are opened on the right side of the cement board 101. A plurality of straight steel bars 105 arranged at equal intervals are arranged on the left side of the docking plate 102, and the straight steel bars 105 are respectively installed in cooperation with adjacent docking holes 108. A plurality of evenly distributed U-shaped steel bars 104 are respectively arranged on the right side of the cement board 101 and the left side of the docking plate 102, and a threaded steel bar 106 is interspersed inside the U-shaped steel bar 104. Auxiliary stabilization mechanisms are arranged on the front sides of the cement board 101 and the docking plate 102, and the U-shaped steel bars 104 on the right side of the cement board 101 and the left side of the docking plate 102 are staggered with each other.

[0021] like Figure 1 As shown, the auxiliary stabilization mechanism includes connecting plates 201 which are respectively arranged on the front sides of the cement board 101 and the docking plate 102 by bolts, the front sides of the two connecting plates 201 are respectively rotatably connected to two rotating columns corresponding to the upper and lower positions, and the outer arc surfaces of the four rotating columns are fixedly sleeved with connecting rods 204, and two connecting rods 204 adjacent to the left and right are respectively rotatably connected to a rotating frame 202 corresponding to the upper and lower positions, and a screw rod 203 is threadedly connected between the two rotating frames 202, and the bottom end of the screw rod 203 is provided with a mounting limit assembly, and the upper end of the screw rod 203 is provided with an auxiliary rotation mechanism, the mounting limit assembly includes a mounting plate 206 arranged at the lower end of the screw rod 203, and the interior of the mounting plate 206 is provided with two mounting holes 207 corresponding to the left and right positions, and the auxiliary rotation mechanism includes a handwheel 205 arranged at the top of the screw rod 203, and the outer side surface of the handwheel 205 is wrapped with an anti-slip sleeve.

[0022] like Figure 1 , 2 As shown in FIGS. 3 and 4 , two sealing plates 107 are respectively provided on the right side of the cement board 101 and the left side of the docking plate 102 .

[0023] The personnel align the straight steel bars 105 on the docking plate 102 with the docking holes 108 on the cement board 101, and then dock them together. Then the personnel insert the threaded steel bars 106 into the U-shaped steel bars 104 on the cement board 101 and the docking plate 102. Then the personnel fix the mounting plate 206 in a suitable position through the mounting holes 207 on the mounting plate 206, and then fix the two connecting plates 201 on the cement board 101 and the docking plate 102 respectively. Then the personnel rotate the hand wheel 205 to drive the screw rod 203 to rotate, and then drive the two rotating frames 202 to move downward, so that the connecting rod 204 inside it contracts, and then drive the cement board 101 and the docking plate 102 to move closer to each other to make them more tightly connected. At this time, the two sealing plates 107 are in contact, and the protective cover on the hand wheel 205 can prevent the personnel from slipping, making it smoother to twist the hand wheel 205, and then pour concrete into the connection between the cement board 101 and the docking plate 102, which can effectively prevent concrete overflow.

[0024] According to another embodiment of the present invention, Figure 1 , 2 As shown, the upper end of the cement board 101 and the upper end of the docking board 102 are respectively provided with evenly distributed connection holes 103, and the upper ends of the cement board 101 and the docking board 102 can be extended and connected through the connection holes 103.

[0025] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the utility model by ordinary technicians in this field should be included in the scope of the claims of the utility model as long as they do not depart from the spirit and scope of the technical solution of the utility model.

Claims

1. A construction assembled wall panel connection node structure, comprising a cement board (101), characterized in that: A butt joint plate (102) is placed on the right side of the cement board (101), and evenly distributed butt joint holes (108) are opened on the right side of the cement board (101). A plurality of straight steel bars (105) arranged at equal intervals are arranged on the left side of the butt joint plate (102), and the straight steel bars (105) are respectively installed in cooperation with adjacent butt joint holes (108). A plurality of evenly distributed U-shaped steel bars (104) are respectively arranged on the right side of the cement board (101) and the left side of the butt joint plate (102), and a threaded steel bar (106) is inserted inside the U-shaped steel bar (104). Auxiliary stabilization mechanisms are arranged on the front sides of the cement board (101) and the butt joint plate (102).

2. The construction assembly type wall panel connection node structure as claimed in claim 1, characterized in that: The U-shaped steel bars (104) on the right side of the cement board (101) and the left side of the butt joint board (102) are arranged in a mutually staggered manner.

3. The construction assembly wall panel connection node structure according to claim 1, characterized in that: The auxiliary stabilizing mechanism comprises connecting plates (201) respectively arranged on the front side surfaces of the cement board (101) and the docking plate (102) by bolts, the front side surfaces of the two connecting plates (201) are respectively rotatably connected to two rotating columns corresponding to upper and lower positions, connecting rods (204) are fixedly sleeved on the outer arc surfaces of the four rotating columns, and a rotating frame (202) corresponding to the upper and lower positions is respectively rotatably connected between two adjacent connecting rods (204) on the left and right, and a screw rod (203) is threadedly connected between the two rotating frames (202), the bottom end of the screw rod (203) is provided with a mounting limiting component, and the upper end of the screw rod (203) is provided with an auxiliary rotating mechanism.

4. The construction assembly type wall panel connection node structure as claimed in claim 3, characterized in that: The installation restriction assembly comprises a mounting plate (206) arranged at the lower end of the screw rod (203), and two mounting holes (207) corresponding to left and right positions are provided inside the mounting plate (206).

5. The construction assembly type wall panel connection node structure as claimed in claim 3, characterized in that: The auxiliary rotation mechanism comprises a hand wheel (205) arranged at the top end of the screw rod (203), and the outer side surface of the hand wheel (205) is wrapped with an anti-slip sleeve.

6. The construction prefabricated wall panel connection node structure according to claim 1, characterized in that: Two sealing plates (107) are respectively arranged on the right side of the cement board (101) and the left side of the butt joint board (102).

7. The construction prefabricated wall panel connection node structure according to claim 1, characterized in that: The upper end of the cement board (101) and the upper end of the butt joint board (102) are respectively provided with evenly distributed connection holes (103).

Citation Information

Cited By

  • Prefabricated wallboard secondary beam structure and construction method

    CN121183864A

  • Prefabricated wallboard secondary beam structure and construction method

    CN121183864B