Prefabricated station building structure for operation and maintenance
By using the design of components such as connecting slots, connecting blocks, guide slots, limit slots and positioning screws in the operation and maintenance station building, the rapid docking and firm fixation of the prefabricated wall panels and the main body of the station building are achieved, and the existing technology is solved The problem of assembly troublesome and difficulty in rapid separation improves the efficiency of operation and maintenance work.
Patent Information
- Application Number
- CN202420850900.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-23
AI Technical Summary
The assembly method of existing operation and maintenance stations mainly relies on welding and fixed connections, which leads to troublesome assembly and difficult to quickly split, affecting the efficiency of operation and maintenance work.
A prefabricated operation and maintenance station structure is designed, using connecting grooves, connecting blocks, guide grooves, limit grooves and limit buckles to achieve rapid docking limits, and is firmly used to fix the positioning holes and screw holes and the positioning screws. Fixed connection, easy to move with the hoisting ring.
The disassembly and assembly process between station buildings and prefabricated wall panels has been greatly simplified, the efficiency of assembly and disassembly is improved, and the operation and maintenance work is facilitated.
Smart Images

Figure CN222101636U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of station houses for operation and maintenance, and specifically relates to a prefabricated station house structure for operation and maintenance. Background Art
[0002] Operation and maintenance refers to the management activities of operating and maintaining the information technology infrastructure of an enterprise or organization. It involves the comprehensive management of the IT operating environment (such as software and hardware environment, network environment, etc.), IT business systems and IT operation and maintenance personnel. The purpose of operation and maintenance is to ensure the stability of the business, which needs to be achieved through the formulation of monitoring strategies, data backup scripts, server expansion plans, fault recovery plans and other measures. Monitoring is the most critical part because it can detect and solve problems before they occur. In addition, operation and maintenance engineers also have a lot of room for career development and can turn to operation and maintenance development positions. Prefabricated station buildings refer to rooms where operation and maintenance server terminals are placed. When existing operation and maintenance stations are used, they are generally assembled and connected by prefabricated station building bodies and prefabricated wall panels. Most of the assembly methods are fixed by welding. This connection method is more troublesome during assembly and requires the help of tools. It is also difficult to quickly disassemble in the later stage. For this reason, we propose a prefabricated operation and maintenance station building structure. Utility Model Content
[0003] The purpose of the utility model is to provide a prefabricated station building structure for operation and maintenance, so as to solve the problem that the prefabricated station building for operation and maintenance mentioned in the above background technology is troublesome to assemble.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a prefabricated station building structure for operation and maintenance, comprising a station building body, a wall mounting groove is provided on the surface of the station building body, a prefabricated wall panel is arranged inside the wall mounting groove, an assembly fixing mechanism is arranged between the prefabricated wall panel and the wall mounting groove, a hoisting mechanism is fixed on the top of the station building body, and the assembly fixing mechanism comprises:
[0005] A connection assembly, which is arranged at the connection between the prefabricated wall panel and the wall installation groove;
[0006] A guide assembly, the guide assembly being arranged on the inner side of the connecting assembly;
[0007] A limit assembly, which is arranged inside the guide assembly;
[0008] An operating component, which is arranged on the surface of the prefabricated wall panel;
[0009] A positioning component is arranged on the side of the station building body and connected to the connecting component.
[0010] Preferably, the connection assembly includes connection grooves symmetrically arranged on both sides of the inner wall of the wall installation groove and connection blocks symmetrically fixed on both sides of the prefabricated wall panel, and the connection blocks are snap-connected with the connection grooves.
[0011] Preferably, the guide assembly comprises guide grooves symmetrically arranged on both sides of the connecting block and guide blocks symmetrically fixed on both sides of the inner wall of the connecting groove, and the guide blocks are engaged and connected with the guide grooves.
[0012] Preferably, the limiting assembly comprises a limiting groove formed at the end of the guide block and a limiting buckle fixed inside the guide groove, and the limiting buckle is snap-connected with the limiting groove.
[0013] Preferably, the operating assembly includes operating grooves symmetrically opened on the surface of the prefabricated wall panel.
[0014] Preferably, the positioning assembly includes a positioning hole opened at the end of the connecting block and a screw hole passing through the inside of the connecting groove. The side of the station building body is provided with a positioning screw that passes through the inside of the screw hole and is connected to the positioning hole. The positioning screw is screwed and fixedly connected with the positioning hole.
[0015] Preferably, the lifting mechanism includes lifting rings symmetrically fixed at the top corners of the station building body.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] The utility model can realize the rapid docking and limiting of the installation grooves of the prefabricated wall panels and the station building main body through the designed connecting grooves, connecting blocks, guide grooves, guide blocks, limit grooves and limit buckles. At the same time, with the designed positioning holes, screw holes and positioning screws, the connection can be firmly screwed together and fixed. Compared with the existing technology, the disassembly and assembly of the station building and the prefabricated wall panels is greatly facilitated. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the appearance structure of the utility model;
[0019] Figure 2 For the utility model Figure 1 A magnified schematic diagram of point A;
[0020] Figure 3 For the utility model Figure 1 An enlarged schematic diagram of point B;
[0021] In the figure: 1. Station building body; 2. Wall mounting groove; 3. Prefabricated wall panel; 100. Connection groove; 101. Connection block; 200. Guide groove; 201. Guide block; 300. Limit groove; 301. Limit buckle; 400. Operation groove; 500. Positioning hole; 501. Screw hole; 502. Positioning screw; 600. Lifting ring. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figures 1 to 3 The utility model provides a technical solution: a prefabricated station building structure for operation and maintenance, including a station building body 1, a wall mounting groove 2 is opened on the surface of the station building body 1, a prefabricated wall panel 3 is arranged inside the wall mounting groove 2, an assembly fixing mechanism is arranged between the prefabricated wall panel 3 and the wall mounting groove 2, a hoisting mechanism is fixed on the top of the station building body 1, and the assembly fixing mechanism includes:
[0024] A connecting component, which is arranged at the connection between the prefabricated wall panel 3 and the wall mounting groove 2;
[0025] A guide assembly, the guide assembly being arranged on the inner side of the connecting assembly;
[0026] A limit assembly, which is arranged inside the guide assembly;
[0027] An operating component, which is arranged on the surface of the prefabricated wall panel 3;
[0028] A positioning component is arranged on the side of the station building body 1 and connected to the connecting component.
[0029] In this embodiment, preferably, the connecting component includes connecting grooves 100 symmetrically opened on both sides of the inner wall of the wall mounting groove 2 and connecting blocks 101 symmetrically fixed on both sides of the prefabricated wall panel 3. The prefabricated wall panel 3 can be connected to the wall mounting groove 2 by snapping the connecting blocks 101 into the connecting grooves 100.
[0030] In this embodiment, preferably, the guide assembly includes guide grooves 200 symmetrically opened on both sides of the connecting block 101 and guide blocks 201 symmetrically fixed on both sides of the inner wall of the connecting groove 100. The guide blocks 201 are snap-connected with the guide grooves 200 to facilitate accurate docking of the connecting block 101 with the connecting groove 100.
[0031] In this embodiment, preferably, the limiting assembly includes a limiting groove 300 opened at the end of the guide block 201 and a limiting buckle 301 fixed inside the guide groove 200. The limiting buckle 301 is engaged with the limiting groove 300, so that the guide block 201 and the guide groove 200 can be temporarily limited and connected.
[0032] In this embodiment, preferably, the operating component includes an operating groove 400 symmetrically opened on the surface of the prefabricated wall panel 3, which can be gripped and operated to connect the prefabricated wall panel 3 with the wall installation groove 2.
[0033] In this embodiment, preferably, the positioning component includes a positioning hole 500 opened at the end of the connecting block 101 and a screw hole 501 extending through the connecting groove 100. A positioning screw 502 extending through the screw hole 501 and connected to the positioning hole 500 is provided on the side of the station building body 1. The positioning screw 502 is screwed together and fixedly connected with the positioning hole 500, so that the prefabricated wall panel 3 can be firmly fixedly connected to the station building body 1.
[0034] In this embodiment, preferably, the lifting mechanism includes a lifting ring 600 symmetrically fixed at the top corner of the station building body 1, which can be connected to a crane to lift the station building body 1 and move it.
[0035] Working principle and use process of the utility model: When the prefabricated wall panel 3 needs to be installed with the station building body 1, the prefabricated wall panel 3 is first lifted through the operating groove 400 to be embedded in the wall installation groove 2 and connected with the station building body 1, so that the connecting block 101 is embedded in the connecting groove 100, and the guide groove 200 is driven to engage with the guide block 201 to play a docking guide role, and at the same time, the limit buckle 301 is squeezed and engaged with the limit groove 300, so that the connection block 101 can be temporarily limited. , and make the positioning hole 500 and the screw hole 501 accurately aligned, then use the positioning screw 502 to pass through the inside of the screw hole 501 from the side of the station house body 1 and connect with the positioning hole 500, finally tighten the positioning screw 502 so that it is screwed and fixed with the positioning hole 500, and the prefabricated wall panel 3 and the station house body 1 can be assembled. When the station house body 1 needs to be moved as a whole, the crane can be connected to the lifting ring 600 at the top of the station house body 1, and the station house body 1 can be lifted and moved.
[0036] Although the embodiments of the present invention have been shown and described (see the above detailed description for details), it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A prefabricated station building structure for operation and maintenance, comprising a station building body (1), a wall installation groove (2) is provided on the surface of the station building body (1), a prefabricated wall panel (3) is provided inside the wall installation groove (2), Features: An assembly fixing mechanism is provided between the prefabricated wall panel (3) and the wall mounting groove (2), and a hoisting mechanism is fixed on the top of the station building body (1). The assembly fixing mechanism comprises: A connection component, which is arranged at the connection between the prefabricated wall panel (3) and the wall installation groove (2); A guide assembly, the guide assembly being arranged on the inner side of the connecting assembly; A limit assembly, which is arranged inside the guide assembly; An operating component, which is arranged on the surface of the prefabricated wall panel (3); A positioning component is arranged on the side of the station building body (1) and connected to the connection component.
2. A prefabricated station building structure for operation and maintenance according to claim 1, Features: The connection assembly comprises connection grooves (100) symmetrically arranged on both sides of the inner wall of the wall installation groove (2) and connection blocks (101) symmetrically fixed on both sides of the prefabricated wallboard (3), wherein the connection blocks (101) are snap-fitted and connected to the connection grooves (100).
3. A prefabricated station building structure for operation and maintenance according to claim 1, Features: The guide assembly comprises guide grooves (200) symmetrically arranged on both sides of the connection block (101) and guide blocks (201) symmetrically fixed on both sides of the inner wall of the connection groove (100), and the guide blocks (201) are snap-fitted and connected to the guide grooves (200).
4. A prefabricated station building structure for operation and maintenance according to claim 1, Features: The limiting assembly comprises a limiting groove (300) provided at the end of the guide block (201) and a limiting buckle (301) fixed inside the guide groove (200), and the limiting buckle (301) is snap-fitted and connected with the limiting groove (300).
5. The prefabricated station building structure for operation and maintenance according to claim 1, Features: The operating assembly comprises an operating groove (400) symmetrically arranged on the surface of the prefabricated wall panel (3).
6. A prefabricated station building structure for operation and maintenance according to claim 1, Features: The positioning assembly comprises a positioning hole (500) provided at the end of the connecting block (101) and a screw hole (501) extending through the interior of the connecting groove (100); a positioning screw rod (502) extending through the interior of the screw hole (501) and connected to the positioning hole (500) is provided on the side of the station building body (1); the positioning screw rod (502) is screwed together and fixedly connected to the positioning hole (500).
7. The prefabricated station building structure for operation and maintenance according to claim 1, Features: The lifting mechanism comprises a lifting ring (600) symmetrically fixed at the top corner of the station building body (1).
