Building engineering pipeline mounting structure

By designing a construction engineering pipeline installation structure containing electric slide rails and clamping plates, the problem of inclination misalignment during pipeline installation is solved, and clamping, fixing and calibration of pipes of different lengths is achieved, improving the installation effect.

CN222102931UActive Publication Date: 2024-12-03XINXIANG HONGTAI CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420661843.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-12-03
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

In construction projects, due to different lengths of pipelines during pipeline installation, one end of the pipeline is prone to tilt, resulting in offset and misalignment, affecting the installation effect.

Method used

A construction engineering pipeline installation structure is designed, including support plates, U-shaped support blocks, electro-hydraulic push rods, auxiliary plates, pallets, positioning grooves, connecting rods, connecting plates, electric slide rails and clamping plates, through electric sliding The coordination between the rail and the clamping plate realizes clamping and fixing and calibration of the pipe to prevent tilt and misalignment.

Benefits of technology

It effectively prevents one end of the pipe from tilting and misaligning during installation, improves the accuracy and stability of pipeline installation, and is suitable for pipes of different lengths.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222102931U_ABST
    Figure CN222102931U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of constructional engineering, and particularly relates to a constructional engineering pipeline installation structure which comprises a supporting plate, U-shaped supporting blocks are fixedly installed on the two sides of the bottom of the supporting plate, electric hydraulic push rods are fixedly installed on the inner walls of the U-shaped supporting blocks, and one ends of the electric hydraulic push rods are fixedly connected with auxiliary plates. And a supporting plate is arranged on one side of the top of the auxiliary plate. An electric sliding rail is started to drive a second small electric push rod and clamping plates to move through a sliding block, so that the clamping plates can move to different positions of the surface of the pipeline, the second small electric push rod can drive the clamping plates to move after being started, and the two clamping plates can clamp and fix the surface of the pipeline through extrusion force between the two clamping plates; according to the pipeline clamping device, the pipeline is lifted up, the deviated pipeline is calibrated, the pipelines with different lengths are clamped, the phenomenon that one end of each pipeline is prone to inclination and dislocation in the installation process is avoided, and the pipeline installation effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction engineering, and in particular relates to a pipeline installation structure for construction engineering. Background Art

[0002] Construction engineering refers to the engineering entity formed by the construction of various types of housing buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. Among them, "housing buildings" refer to projects with roofs, beams, columns, walls, foundations, and can form internal spaces to meet people's production, living, learning, and public activities. Construction engineering is the planning, investigation, design, construction, completion and other technical work and completed engineering entities for the construction, reconstruction or expansion of housing buildings and ancillary structures and facilities, as well as the installation of supporting lines, pipelines, and equipment. It also refers to the construction of various houses and buildings, also known as construction workload. This part of the investment must be started and materials can be realized through construction activities. During the construction of construction engineering, it is necessary to install and lay pipelines. However, at present, due to the different lengths of the installed pipelines, one end of the pipeline is easy to tilt during the installation of the pipeline, resulting in the displacement and dislocation of the pipeline during installation, which affects the installation effect of the pipeline. Therefore, a construction engineering pipeline installation structure is needed. Utility Model Content

[0003] In order to solve the problems raised in the above-mentioned background technology, the utility model provides a construction engineering pipeline installation structure, which solves the problem that during the current pipeline installation, due to the different lengths of the installed pipelines, one end of the pipeline is prone to tilt during the pipeline installation process, resulting in the pipeline being offset and misaligned during installation, thus affecting the pipeline installation effect.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a construction engineering pipeline installation structure, comprising a support plate, wherein two sides of the bottom of the support plate are fixedly installed with a U-shaped support block, the inner wall of the U-shaped support block is fixedly installed with an electric hydraulic push rod, one end of the electric hydraulic push rod is fixedly connected to an auxiliary plate, and a support plate is provided on the top side of the auxiliary plate, and a positioning groove is provided on the upper surface of the support plate, and a connecting rod is fixedly installed on both sides of the support plate, one end of the connecting rod is fixedly connected to a connecting plate, a first small electric push rod is fixedly installed on the surface of the connecting plate, one end of the first small electric push rod is fixedly connected to a clamping plate, and electric slide rails are fixedly installed on both sides of the upper surface of the auxiliary plate, a slider is slidably connected to the surface of the electric slide rail, a connecting plate is fixedly installed on the surface of the slider, a second small electric push rod is fixedly installed on one side of the connecting plate, and one end of the second small electric push rod is fixedly connected to a clamping plate.

[0005] Preferably, screws are provided on the surface of the support plate, and the support plate is connected to the auxiliary plate through the screws.

[0006] Preferably, the electric slide rail is connected to the connecting plate via a slider, and two of each of the electric slide rail, the slider and the connecting plate are provided.

[0007] Preferably, the positioning groove is semicircular, and a rubber pad is arranged inside the positioning groove.

[0008] Preferably, an operation warning light is fixedly mounted on one side of the auxiliary plate.

[0009] Preferably, the clamping plate is semicircular in shape, and there are two clamping plates.

[0010] Preferably, a support rod is fixedly mounted on the bottom of the support plate, and one end of the support rod is movably connected to a universal wheel.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] The electric slide rail can start up and drive the second small electric push rod and the clamping plate to move through the slider, so that the clamping plate can be moved to different positions on the pipe surface. After the second small electric push rod is started up, it can drive the clamping plate to move. The two clamping plates can clamp and fix the pipe surface through the extrusion force between each other, thereby lifting the pipe and calibrating the offset pipe, so as to clamp pipes of different lengths, prevent one end of the pipe from tilting and misaligning during installation, and improve the pipe installation effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0014] Figure 1 It is a three-dimensional structural diagram of the utility model;

[0015] Figure 2 This is a three-dimensional structural diagram of the support plate of the utility model;

[0016] Figure 3 This is a three-dimensional structural diagram of the clamping plate of the utility model.

[0017] In the figure: 1. Support plate; 2. U-shaped support block; 3. Electric hydraulic push rod; 4. Auxiliary plate; 5. Support plate; 6. Positioning groove; 7. Connecting rod; 8. Connecting plate; 9. First small electric push rod; 10. Clamping plate; 11. Electric slide rail; 12. Slider; 13. Connecting plate; 14. Second small electric push rod; 15. Clamping plate; 16. Operation warning light; 17. Support rod; 18. Universal wheel. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] See also Figure 1-3 The utility model provides the following technical solutions: a construction engineering pipeline installation structure, comprising a support plate 1, U-shaped support blocks 2 are fixedly installed on both sides of the bottom of the support plate 1, an electric hydraulic push rod 3 is fixedly installed on the inner wall of the U-shaped support block 2, one end of the electric hydraulic push rod 3 is fixedly connected to an auxiliary plate 4, a support plate 5 is provided on one side of the top of the auxiliary plate 4, a positioning groove 6 is opened on the upper surface of the support plate 5, connecting rods 7 are fixedly installed on both sides of the support plate 5, one end of the connecting rod 7 is fixedly connected to a connecting plate 8, a first small electric push rod 9 is fixedly installed on the surface of the connecting plate 8, one end of the first small electric push rod 9 is fixedly connected to a clamping plate 10, electric slide rails 11 are fixedly installed on both sides of the upper surface of the auxiliary plate 4, a slider 12 is slidably connected to the surface of the electric slide rail 11, a connecting plate 13 is fixedly installed on the surface of the slider 12, a second small electric push rod 14 is fixedly installed on one side of the connecting plate 13, and a clamping plate 15 is fixedly connected to one end of the second small electric push rod 14.

[0020] The support rod 17 is used to support and fix the universal wheel 18. After the universal wheel 18 rotates, the installation structure can be moved to different positions for use, which is convenient for installing the pipeline. After the staff moves the installation structure to a suitable use position, the staff can place one end of the pipeline into the positioning groove 6. After the first small electric push rod 9 is started, it can drive the clamping plate 10 to adjust the downward movement. After the clamping plate 10 moves downward, the clamping plate 10 can clamp and fix one end of the pipeline, which is convenient for subsequent installation and fixation of the pipeline. After one end of the pipeline is fixed, the electric slide rail 11 is started to drive the second small electric push rod 14 and the clamping plate 15 to move through the slider 12, so that the clamping plate 15 can be moved to different positions on the surface of the pipeline. After the rod 14 is started, it can drive the clamping plate 15 to move. The two clamping plates 15 can clamp and fix the surface of the pipeline through the squeezing force between each other, so as to lift the pipeline and calibrate the offset pipeline, so as to clamp pipelines of different lengths, prevent one end of the pipeline from tilting and misalignment during installation, and improve the pipeline installation effect. After the pipeline is calibrated, the staff can install and fix the pipeline. At the same time, after the electric hydraulic push rod 3 is started, it can drive the auxiliary plate 4 to adjust the lifting movement, adjust the height of the lifted pipeline, and facilitate the installation and fixation of the pipeline. After the operation warning light 16 is started, it can warn the surrounding area of ​​the pipeline installation. All electrical equipment in this device is powered by a built-in battery.

[0021] In one aspect of this embodiment, after the electric slide rail 11 is started, the connecting plate 13 can be driven to move through the slider 12, which facilitates the connecting plate 13 to drive the clamping plate 15 to move, so that the clamping plate 15 can clamp and fix different positions on the surface of the pipeline, thereby facilitating auxiliary support for the installed pipeline and lifting the pipeline.

[0022] In one aspect of this embodiment, after the staff loosens the screws on the support plate 5, the staff can remove the support plate 5 from the auxiliary plate 4, and conversely install the support plate 5 on the auxiliary plate 4 through the screws, so as to facilitate the support plate 5 to support and install one end of the pipeline.

[0023] In one aspect of this embodiment, after being activated, the operation warning light 16 can provide a warning reminder around the pipeline installation.

[0024] In one aspect of this embodiment, the semicircular positioning groove 6 facilitates the placement and installation of the pipeline, and the rubber pad in the positioning groove 6 can provide anti-slip protection for the fixed pipeline.

[0025] In one aspect of this embodiment, the support rod 17 is used to support and fix the universal wheel 18. After the universal wheel 18 rotates, the installation structure can be moved to different positions for use, thereby facilitating the installation of the pipeline.

[0026] In one aspect of this embodiment, the semicircular clamping plate 15 can clamp and fix the pipe, making it convenient to clamp and fix the pipe surfaces of different lengths.

[0027] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A construction engineering pipeline installation structure, comprising a support plate (1), characterized in that: U-shaped support blocks (2) are fixedly mounted on both sides of the bottom of the support plate (1), an electric hydraulic push rod (3) is fixedly mounted on the inner wall of the U-shaped support block (2), one end of the electric hydraulic push rod (3) is fixedly connected to an auxiliary plate (4), a support plate (5) is arranged on one side of the top of the auxiliary plate (4), a positioning groove (6) is provided on the upper surface of the support plate (5), connecting rods (7) are fixedly mounted on both sides of the support plate (5), one end of the connecting rod (7) is fixedly connected to a connecting plate (8), and the surface of the connecting plate (8) is fixedly A first small electric push rod (9) is fixedly installed, one end of the first small electric push rod (9) is fixedly connected to a clamping plate (10), electric slide rails (11) are fixedly installed on both sides of the upper surface of the auxiliary plate (4), the surface of the electric slide rail (11) is slidably connected to a slider (12), the surface of the slider (12) is fixedly installed with a connecting plate (13), one side of the connecting plate (13) is fixedly installed with a second small electric push rod (14), and one end of the second small electric push rod (14) is fixedly connected to a clamping plate (15).

2. A construction engineering pipeline installation structure according to claim 1, characterized in that: The surface of the support plate (5) is provided with screws, and the support plate (5) is connected to the auxiliary plate (4) via the screws.

3. A construction engineering pipeline installation structure according to claim 1, characterized in that: The electric slide rail (11) is connected to a connecting plate (13) via a slider (12), and two of each of the electric slide rail (11), the slider (12) and the connecting plate (13) are provided.

4. A construction engineering pipeline installation structure according to claim 1, characterized in that: The positioning groove (6) is semicircular, and a rubber pad is arranged inside the positioning groove (6).

5. A construction engineering pipeline installation structure according to claim 1, characterized in that: An operation warning light (16) is fixedly mounted on one side of the auxiliary plate (4).

6. A construction engineering pipeline installation structure according to claim 1, characterized in that: The clamping plate (15) is semicircular in shape, and there are two clamping plates (15).

7. A construction engineering pipeline installation structure according to claim 1, characterized in that: A support rod (17) is fixedly mounted on the bottom of the support plate (1), and one end of the support rod (17) is movably connected to a universal wheel (18).