Large-caliber concrete sewage pipeline construction pipe wall protection device
By designing a protective device for large-diameter concrete sewage pipes, the use of reinforced mesh structures and sliding connection components, the problems of long construction time, high cost and inconvenient installation are solved, and the effect of simplifying construction processes and reducing costs is achieved.
Patent Information
- Application Number
- CN202420886197.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-25
AI Technical Summary
Due to the lack of locking structure during the construction process, large-diameter concrete sewage pipes are prone to relative rotation and disengagement due to uneven installations, and are prone to cracking during the earth backfilling and rolling process, which increases construction time and cost, and requires multiple workers in the connection process. It is inconvenient to cooperate with the crane.
A construction pipe wall protection device including a protective component, a connecting component and a supporting component is designed to fix the pipe wall through a mesh structure formed by radial steel bars, axial steel bars and fixing plates, and to use a screw rod, a fixed cover and a rocker The sliding structure realizes pipe docking, and the support assembly achieves height adjustment through support rods and nuts, simplifying the installation process.
By pre-welding and fixing the components to the foundation, construction time and cost are reduced, and pipeline docking is required for only one worker and the crane, simplifying the construction process and reducing worker workload.
Smart Images

Figure CN222102941U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sewage pipelines, in particular to a large-diameter concrete sewage pipeline construction pipe wall protection device. Background Art
[0002] Large-diameter concrete pipes are widely used in drainage areas such as roads, railway subgrades, subway projects, waste landfills, tunnels, green belts, sports fields, and slope protection caused by high water content, as well as underground irrigation and drainage systems in agriculture and horticulture. Today's concrete pipes generally use a socket connection, and the end parts do not have a locking structure. During the installation process, the round pipe fittings are prone to relative rotation due to the unevenness of the installation surface, and thus gradually detach. In addition, since the pipes need to be backfilled with earth after installation and then repeatedly rolled by compaction machinery, during this process, if the pipe is buried too shallowly, it will crack.
[0003] Concrete pipes generally use a combination of reinforcing ribs and outer protective sleeves to form an outer protective structure of the concrete pipe, which improves the overall strength of the concrete pipe and effectively avoids local damage and cracking during backfilling and rolling. However, this method of protecting the pipe wall by welding angle steel on the outside of the concrete pipe requires welding to be completed before the concrete pipe can be placed during the construction process, which increases construction time and thus costs. In addition, when connecting large-diameter concrete pipes, it usually requires multiple workers and cranes to cooperate in fixing the connection, which makes installation inconvenient. Summary of the invention
[0004] In order to overcome the problems of long construction time, high cost and inconvenient installation in the prior art, the utility model provides a large-diameter concrete sewage pipeline construction pipe wall protection device.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A large-diameter concrete sewage pipeline construction pipe wall protection device, comprising a protection component for protecting the outer wall of a concrete pipe, a connection component for connecting adjacent concrete pipes, and a support component for assisting the connection component in connection;
[0007] The protection component is arranged along the outer side of the pipe wall of the upper half of the concrete pipe and fixed on the left and right sides of the pipe wall of the concrete pipe. The connecting component is arranged at one end of the pipe opening of the concrete pipe. The supporting component is arranged inside another concrete pipe adjacent to the other pipe opening of the concrete pipe and is connected to the connecting component through a supporting rod. When in use, the supporting component is first installed inside the concrete pipe, and then the connecting component is connected to the supporting component through the supporting rod and is arranged at one end of the rear pipe opening of another adjacent concrete pipe. Under the supporting action of the supporting component, the two adjacent concrete pipes are docked through the connecting component. After docking, the protection component is installed on the concrete pipe to protect the pipe wall.
[0008] Furthermore, the protection component includes radial steel bars, axial steel bars and fixed plates. The radial steel bars are arranged in parallel and spaced apart and connected to the fixed plates at both ends. The axial steel bars are arranged in parallel and spaced apart on the inner side of the radial steel bars and are respectively arranged perpendicular to the radial steel bars to form a mesh structure. The fixed plates are symmetrically provided with a number of limit holes. The fixed plates are fixed to the foundation on both sides of the concrete pipe wall by screwing expansion bolts into the limit holes to fix the protection component.
[0009] Furthermore, the radial steel bars are semicircular and the center of the semicircle formed by the radial steel bars is located on the central axis of the concrete pipe.
[0010] Furthermore, the radial steel bars, the axial steel bars and the fixing plate are integrally arranged.
[0011] Furthermore, the connecting assembly includes a screw rod, a fixed cover, a nut and a rocker arm, the screw rod is horizontally arranged on the central axis inside the concrete pipe, the nut is arranged on the screw rod, the outer side of the nut is connected to the fixed cover, the rocker arm is arranged at one end of the screw rod, and the end of the screw rod away from the rocker arm is connected to the support rod. The nut is moved on the screw rod by rotating the rocker arm, and the nut drives the fixed cover to move, and the movement of the fixed cover pushes the concrete pipe.
[0012] Furthermore, the support assembly includes a support ring, a connecting rod and a support plate. The support rings are provided in multiple groups in parallel and at intervals and are connected to the end of the support rod away from the screw rod. The connecting rods are hinged between each group of support rings, and the ends of the connecting rods on the same side away from the support rods are hinged to the support plates. A sliding ring is sleeved on the support rod, and the sliding ring is hinged to the connecting rod near one end of the support ring. The connecting rod is hinged to the support plate. A driving assembly is provided at the other end of the sliding ring. The driving assembly is rotated to make the sliding ring slide on the support rod, so that the connecting rod can contract and expand, and the height of the support plate changes.
[0013] Furthermore, the driving assembly is a nut, and a thread is provided on the outer wall of the support rod, the nut is threadedly connected to the outer wall of the support rod, and the sliding ring is pushed to move on the support rod and fixed by rotating the nut.
[0014] Furthermore, at least three groups of the support plates are axially arranged around the support rod.
[0015] Furthermore, the support plate is arc-shaped and has the same curvature as the inner wall of the concrete pipe.
[0016] Furthermore, a rubber layer is provided on the inner wall of the fixed cover.
[0017] Compared with the prior art, the utility model has the following beneficial effects:
[0018] The utility model completes the welding of the protection component in the factory, places the protection component above the concrete pipe by a crane, and fixes it to the foundation by expansion bolts, which is beneficial to saving construction time. At the same time, the support plate is fitted with the inner wall of the concrete pipe, and the fixing cover is installed on the outside of another concrete pipe. The rocker is rotated to drive the fixing cover to push the concrete pipe, so that the two concrete pipes can be butted together. The installation is simple and easy to operate. The utility model can manufacture finished protection components and directly install the protection components on the outside of the concrete pipe during the construction process, thereby reducing construction time and thus reducing costs. Moreover, when the two concrete pipes are butted together, only one worker and the crane are required to cooperate to fix the connection, thereby reducing the number of construction personnel and the workload of the workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 The utility model is shown in the main view structure schematic diagram;
[0020] Figure 2 A schematic diagram of the side structure of the support assembly and the connection assembly is shown;
[0021] Figure 3 A top view of the protection assembly is shown;
[0022] Figure 4 A schematic structural diagram of a fixed cover is shown;
[0023] In the figure: 1-concrete pipe,
[0024] 2-protection assembly, 201-radial reinforcement, 202-axial reinforcement, 203-fixing plate, 204-limiting hole,
[0025] 3-Support rod, 4-Sliding ring, 5-Nut,
[0026] 6-support assembly, 601-support ring, 602-connecting rod, 603-support plate,
[0027] 7-connecting assembly, 701-screw rod, 702-fixing cover, 703-nut, 704-rocker, 721-rubber layer. DETAILED DESCRIPTION
[0028] The present invention will be further described in detail below in conjunction with specific embodiments, which are intended to explain the present invention rather than to limit it.
[0029] Example:
[0030] A large diameter concrete sewage pipeline construction pipe wall protection device, such as Figure 1-Figure 4 As shown, it includes a protection component 2 for protecting the outer wall of the concrete pipe 1, a connection component 7 for connecting adjacent concrete pipes 1, and a support component 6 for assisting the connection component 7 to perform connection.
[0031] The protection component 2 is arranged along the outer side of the pipe wall of the upper half of the concrete pipe 1 and fixed on the left and right sides of the pipe wall of the concrete pipe 1. The connecting component 7 is arranged at one end of the pipe mouth of the concrete pipe 1. The supporting component 6 is arranged inside another concrete pipe 1 adjacent to the other pipe mouth of the concrete pipe 1 and is connected to the connecting component 7 through the supporting rod 3. When in use, the supporting component 6 is first installed inside the concrete pipe 1, and then the connecting component 7 is connected to the supporting component 6 through the supporting rod 3 and is arranged at one end of the rear pipe mouth of another adjacent concrete pipe 1. Under the support of the supporting component 6, the two adjacent concrete pipes 1 are docked through the connecting component 7. After docking, the protection component 2 is installed on the concrete pipe 1 to protect the pipe wall.
[0032] The protection assembly 2 includes radial steel bars 201, axial steel bars 202 and fixing plates 203. The radial steel bars 201 are arranged in parallel and equidistantly and connected to the fixing plates 203 at both ends. The radial steel bars 201 are semicircular and the center of the semicircle surrounded by the radial steel bars 201 is located on the central axis of the concrete pipe 1. The axial steel bars 202 are welded to the inner side of the radial steel bars 201 in parallel and equidistantly and are respectively arranged perpendicular to the radial steel bars 201 to form a mesh structure. The radial steel bars 201 and the axial steel bars 202 are welded in an interlaced manner to form a protection net, thereby protecting the concrete pipe 1. The outer side of the concrete pipe 1 wall is protected, and the radial steel bars 201, the axial steel bars 202 and the fixing plate 203 are welded into an integrated structure, which can prevent the concrete pipe 1 from being directly subjected to force and is beneficial to protecting the pipe wall. A number of limiting holes 204 are symmetrically arranged on the fixing plate 203. The fixing plate 203 is fixed to the foundation at both ends of the concrete pipe 1 wall by screwing the expansion bolts into the limiting holes 204, and the protection component 2 is fixed, so that the protection component 2 can be directly installed on the outer side of the concrete pipe 1 during the construction process, thereby reducing the construction time and thus reducing the cost.
[0033] The connecting assembly 7 includes a screw rod 701, a fixing cover 702, a nut 703 and a rocker 704. The screw rod 701 is horizontally arranged on the central axis of the concrete pipe 1. The nut 703 is movably connected to the screw rod 701 through a thread. The outer side of the nut 703 is connected to the fixing cover 702. The fixing cover 702 is cylindrical and has a concave cylinder on one side of the bottom surface. The diameter of the concave cylinder is consistent with the diameter of the outer wall of the concrete pipe 1. The screw rod 701 and the nut 703 can drive the fixing cover 702 to move left and right. The rocker 704 is arranged at the right end of the screw rod 701, and the fixed cover 702 forms a sliding structure with the screw rod 701 through the nut 703, so that the fixed cover 702 pushes the concrete pipe 1 to move horizontally, which is convenient for the docking of the two concrete pipes 1, and by setting the rocker 704, only one worker and the crane are required to complete the docking, thereby reducing the workload of construction personnel and workers, and because the fixed cover 702 slides horizontally along the support rod 3, the coaxiality of the docking of the two concrete pipes 1 can be increased.
[0034] A rubber layer 721 is provided on the recessed inner wall of the fixing cover 702 to protect the concrete pipe 1 and avoid damage.
[0035] The left end of the screw rod 701 is threadedly connected to the support rod 3, and the outer wall of the support rod 3 is provided with a thread. A sliding ring 4 is sleeved on the support rod 3. The sliding ring 4 is cylindrical and hollow in the middle. The hollow diameter is consistent with the diameter of the support rod 3. A nut 5 that fits with the outer wall thread of the support rod 3 is provided on one side of the sliding ring 4. The sliding ring 4 is pushed to move on the support rod 3 by rotating the nut 5, and the sliding ring 4 is fixed after moving to a suitable position.
[0036] The support assembly 6 includes a support ring 601, a connecting rod 602 and a support plate 603. Three groups of support rings 601 are arranged in parallel and spaced apart and are connected to the left end of the support rod 3. The connecting rods 602 are hinged between each group of support rings 601, and the ends of the connecting rods 602 on the same side away from the support rod 3 are hinged together with support plates 603. The stability of the support assembly 6 can be improved by the connecting rods 602 and the three groups of support rings 601. The support plate 603 is arc-shaped and has the same arc as the inner wall of the concrete pipe 1, so that the outer wall of the support plate 603 can be completely fitted with the inner wall of the concrete pipe 1, thereby increasing the friction between the two and providing support for the connecting assembly 7.
[0037] The left end of the sliding ring 4 is hinged to the connecting rod 602, and the connecting rod 602 is hinged to the support plate 603. The sliding ring 4 is slid on the support rod 3 by rotating the nut 5, so that the connecting rod 602 can shrink and expand like an umbrella rib, so that the height of the support plate 603 changes, which is convenient for taking and placing the support assembly 6.
[0038] The installation and use process of this embodiment is as follows:
[0039] First, place the support assembly 6 and the support rod 3 on the inner central axis of the concrete pipe 1, rotate the nut 5 to push the sliding ring 4 to the left, drive the connecting rod 602 to rotate along the hinge, and make the support plate 603 rise continuously until the outer side of the support plate 603 fits the inner wall of the concrete pipe 1, and the nut 5 fixes the sliding ring 4 to prevent the sliding ring 4 from sliding to the right, and then pull the support rod 3 to the right to open the connecting rod 602 at the left end of the support rod 3, thereby further supporting the support plate 603. At the same time, the crane suspends another concrete pipe 1 on the right side of the concrete pipe 1, and then connects the connecting assembly 7 to the right end of the support rod 3, and makes the fixing cover 702 located on the right side of the suspended concrete pipe 1. At this time, only one A worker turns the rocker 704 on the right side of the suspended concrete pipe 1 to move the nut 703 to the left, thereby driving the fixing cover 702 to move to the left until the recessed cylinder on the fixing cover 702 catches the pipe mouth, and continues to turn the rocker 704 to make the fixing cover 702 push the suspended concrete pipe 1 to the left until the two concrete pipes 1 are docked. After the docking is completed, the nut 5 is rotated to the right and the sliding ring 4 is slid to the right to make the support plate 603 away from the inner wall of the concrete pipe 1, the support assembly 6 and the connecting assembly 7 are taken out, and then the welded finished protection assembly 2 is placed above the concrete pipe 1 by a crane, and the protection assembly 2 is fixed to the foundation by the expansion bolt passing through the limit hole 204 to complete the installation.
Claims
1. A large-diameter concrete sewage pipeline construction pipe wall protection device, characterized by: It comprises a protection component (2) for protecting the outer wall of a concrete pipe (1), a connection component (7) for connecting adjacent concrete pipes (1), and a support component (6) for assisting the connection component (7) in connection; The protection component (2) is arranged along the outer side of the pipe wall of the upper half of the concrete pipe (1) and fixed to the left and right sides of the pipe wall of the concrete pipe (1); the connection component (7) is arranged at one end of the pipe mouth of the concrete pipe (1); the support component (6) is arranged inside another concrete pipe (1) adjacent to another pipe mouth of the concrete pipe (1) and connected to the connection component (7) through a support rod (3); when in use, the support component (6) is first installed inside the concrete pipe (1); then the connection component (7) is connected to the support component (6) through the support rod (3) and arranged at one end of the rear pipe mouth of another adjacent concrete pipe (1); under the support of the support component (6), the two adjacent concrete pipes (1) are butt-jointed through the connection component (7); after butt-jointing, the protection component (2) is installed on the concrete pipe (1) to protect the pipe wall.
2. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 1, characterized in that: The protection component (2) comprises radial steel bars (201), axial steel bars (202) and a fixing plate (203); the radial steel bars (201) are arranged in parallel and spaced apart and connected to the fixing plate (203) at both ends; the axial steel bars (202) are arranged in parallel and spaced apart on the inner side of the radial steel bars (201) and are respectively arranged perpendicular to the radial steel bars (201) to form a mesh structure; a plurality of limiting holes (204) are symmetrically provided on the fixing plate (203); the fixing plate (203) is fixed to the foundation on both sides of the wall of the concrete pipe (1) by screwing expansion bolts into the limiting holes (204), thereby fixing the protection component (2).
3. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 2, characterized in that: The radial steel bars (201) are semicircular in shape, and the center of the semicircle formed by the radial steel bars (201) is located on the central axis of the concrete pipe (1).
4. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 2, characterized in that: The radial steel bars (201), the axial steel bars (202) and the fixing plate (203) are integrally arranged.
5. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 1, characterized in that: The connecting assembly (7) comprises a screw rod (701), a fixing cover (702), a nut (703) and a rocker (704); the screw rod (701) is horizontally arranged on the central axis of the concrete pipe (1); the nut (703) is arranged on the screw rod (701); the outer side of the nut (703) is connected to the fixing cover (702); the rocker (704) is arranged at one end of the screw rod (701); the end of the screw rod (701) away from the rocker (704) is connected to the support rod (3); the nut (703) is moved on the screw rod (701) by rotating the rocker (704); the nut (703) drives the fixing cover (702) to move; the fixing cover (702) moves to push the concrete pipe (1).
6. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 5, characterized in that: The support assembly (6) comprises a support ring (601), a connecting rod (602) and a support plate (603). The support ring (601) is provided with a plurality of groups in parallel and spaced apart and connected to one end of the support rod (3) away from the screw rod (701). The connecting rods (602) are hingedly connected between each group of the support rings (601). One end of the connecting rod (602) on the same side away from the support rod (3) is hingedly connected to the support plate (603). A sliding ring (4) is sleeved on the support rod (3). One end of the sliding ring (4) close to the support ring (601) is hingedly connected to the connecting rod (602). The connecting rod (602) is hingedly connected to the support plate (603). A driving assembly is provided at the other end of the sliding ring (4). By rotating the driving assembly, the sliding ring (4) slides on the support rod (3), thereby enabling the connecting rod (602) to contract and expand, thereby changing the height of the support plate (603).
7. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 6, characterized in that: The driving component is a nut (5), and a thread is provided on the outer wall of the support rod (3). The nut (5) is threadedly connected to the outer wall of the support rod (3). By rotating the nut (5), the sliding ring (4) is pushed to move on the support rod (3) and the sliding ring (4) is fixed.
8. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 6, characterized in that: At least three groups of the support plates (603) are axially arranged around the support rod (3).
9. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 6, characterized in that: The support plate (603) is arc-shaped and has the same curvature as the inner wall of the concrete pipe (1).
10. A large-diameter concrete sewage pipeline construction pipe wall protection device as claimed in claim 5, characterized in that: The inner wall of the fixed cover (702) is provided with a rubber layer (721).