Smelting furnace capable of rapidly discharging slag
By introducing a quantitative feeding pipe and waste slag box into the smelting furnace, the waste slag is quickly collected by using the pressing component and airflow, the problem of difficulty in cleaning up waste slag and heat loss in the fuel-heated smelting furnace is solved, and the operation efficiency and smelting efficiency are improved.
Patent Information
- Application Number
- CN202420820853.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-19
AI Technical Summary
During the aluminum alloy smelting process of fuel heating furnace, the burned waste slag is difficult to quickly pass through the slag filter plate and fall into the collection box, reducing the waste slag cleaning speed, and frequent addition of fuel and injecting air, resulting in time-consuming and laborious operation and loss of heat.
A structure including a smelting furnace body, a quantitative feeding pipe and a waste slag box is designed. When pressing down through the pressing component, fuel and air are pressed into the smelting furnace together. Gravity and air flow are used to quickly enter the collection box and pass through Quantitative feed pipes and waste slag boxes avoid waste slag accumulation and heat loss.
It improves the cleaning speed of waste slag, reduces the labor intensity of staff, avoids heat loss, and ensures normal combustion of fuel and rapid discharge of waste gas, improving smelting efficiency.
Smart Images

Figure CN222104338U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of aluminum production, in particular to a smelting furnace capable of quickly discharging slag. Background Art
[0002] A smelting furnace is a device that melts metal ingots and some scrap metals and adds necessary alloy components, and then smelts them into the required alloys through operations such as slagging and refining. There are two types of smelting furnaces: fuel-heated and electric-heated. When smelting aluminum alloys, most of them use low-cost fuel-heated smelting furnaces, but usually solid fuels such as charcoal are burned to reduce the cost of smelting processing. However, a smelting furnace burning solid fuels needs to be equipped with a slag discharge structure to discharge the waste slag produced by combustion, avoid the accumulation of waste slag and reduce the space in the smelting furnace, but it still has the following disadvantages in actual use:
[0003] The utility model with publication number CN218238344U discloses a smelting furnace capable of rapid slag discharge, wherein a cover is rotatably installed on the upper part of the smelting furnace body, and a door is installed on the front side of the smelting furnace body, and fuel can be added into the smelting furnace body by opening the door, the crucible is arranged inside the smelting furnace body, and a support frame is arranged on the outer side of the crucible to provide support for the crucible in the smelting furnace body, and a filter plate is arranged below the crucible to provide support for the fuel, when the smelting furnace is smelting metal, the waste residue generated by combustion falls into the collection box through the filter plate under the action of gravity, but in the actual operation process, the weight of the waste residue after combustion will be greatly reduced, and it may be retained on the upper side of the filter plate, and it is difficult to quickly fall into the collection box, which reduces the cleaning speed of the waste residue;
[0004] During the smelting process of aluminum metal, the smelting furnace often needs to continuously blow air into the furnace during the fuel combustion process to ensure the combustion temperature. However, when a large amount of aluminum metal is smelted, it is often necessary to add fuel and blow air multiple times, which is time-consuming and labor-intensive to operate. In addition, opening and closing the smelting furnace multiple times will cause a large amount of heat loss. Utility Model Content
[0005] The utility model aims to provide a smelting furnace capable of rapid slag discharge. Through the smelting furnace main body, the quantitative feeding pipe and the waste slag box, the utility model solves the problem that when the fuel is burned in the fuel-heated smelting furnace, the waste slag after combustion is difficult to quickly pass through the filter slag plate and fall into the collection box, thereby reducing the speed of waste slag cleaning, and the air needs to be blown in in time during combustion, and the smelting furnace needs to be opened several times to replenish the fuel, which is time-consuming and laborious to operate and easily leads to a large amount of heat loss.
[0006] In order to solve the above technical problems, the utility model is realized by the following technical solutions:
[0007] The utility model discloses a smelting furnace capable of rapid slag discharge, comprising a smelting furnace body, a quantitative feeding pipe and a waste slag box, wherein a first hopper is inserted through the bottom of the smelting furnace body, a quantitative feeding pipe is arranged on the top of the outer peripheral surface of the smelting furnace body, a material pressing assembly is inserted through the top of the quantitative feeding pipe, a feeding groove and an air inlet groove are arranged on the inner side of the quantitative feeding pipe, a second hopper is arranged on the top of one side of the quantitative feeding pipe, a waste slag box is arranged on one side of the bottom of the smelting furnace body, a collecting box is inserted on one side of the waste slag box, and an exhaust pipe is inserted through one end of the waste slag box;
[0008] When the smelting furnace is burning fuel, pressing the material pressing assembly downward can make the fuel falling into the feed trough and the air sucked into the air intake trough be pressed into the smelting furnace main body together, so as to intake air and feed the smelting furnace, thereby improving the convenience of use. The fuel poured into the second hopper can fall into the feed trough under the action of gravity, and there is no need to manually add fuel many times, which reduces the labor intensity of the staff and avoids the loss of a large amount of heat when adding fuel. While air is pressed into the smelting furnace main body, the rapid flow of exhaust gas in the smelting furnace main body pushes the waste slag into the collection box through the first hopper for collection, thereby avoiding the accumulation of waste slag in the smelting furnace main body, and can discharge part of the exhaust gas at the same time, thereby avoiding the natural discharge of exhaust gas and easily taking away a large amount of heat.
[0009] Furthermore, a top cover is rotatably connected to the top of the smelting furnace body, a cleaning cover is connected to the outer peripheral surface of the smelting furnace body, a supporting base is welded and fixed to the bottom edge of the first hopper, a crucible support frame and a fuel support net are connected and fixed from top to bottom in the smelting furnace body, and the cleaning cover is located between the crucible support frame and the fuel support net;
[0010] After the smelting furnace is used, the inside of the smelting furnace body can be cleaned by opening the cleaning cover, the crucible can be supported by the crucible support frame to facilitate the smelting of aluminum metal, the fuel can be supported by the fuel support net to ensure the normal combustion of the fuel, and the waste slag after combustion can fall into the first hopper through the support net.
[0011] Furthermore, a feed pipe is welded through the bottom of the second hopper, and the bottom of the feed pipe is welded through the top of one side of the quantitative feeding pipe, the feed pipe is connected to the inner side of the feeding trough, a handle is welded and fixed to the top of one side of the pressing assembly, the bottom of the pressing assembly is plugged into the inner side of the feeding trough and the air inlet trough, an air inlet pipe is welded through the bottom of both sides of the quantitative feeding pipe, and a first one-way valve is inserted through the outer peripheral surface of each air inlet pipe, and the two air inlet pipes are connected to the feeding trough and the air inlet trough respectively, a feed pipe is welded through the bottom of the quantitative feeding pipe, and the bottom of the feed pipe is inserted into the outer peripheral surface of the smelting furnace body, and the feed pipe is located at the top of the fuel support net;
[0012] A large amount of fuel is poured into the inner side of the second hopper. The fuel can fall into the inner side of the feed trough through the feed pipe under the action of gravity, and as the pressing assembly moves downward, the fuel quickly passes through the feed pipe and falls into the inner side of the smelting furnace body. There is no need to add the fuel multiple times, which improves the convenience of use and avoids the loss of heat caused by multiple opening and closing of the smelting furnace body.
[0013] Furthermore, a reset plate is rotatably connected to the bottom of the feed trough, the reset plate is located at the bottom of the air inlet pipe, a partition is welded and fixed to the bottom of the air inlet trough, an air outlet pipe is welded through the bottom of the partition, a second one-way valve is connected to the outer peripheral surface of the air outlet pipe, and the partition is located at the bottom of the air inlet pipe;
[0014] When the pressing assembly is pushed downward to add fuel, the air in the air inlet groove can be pressed into the feed pipe and further into the main body of the smelting furnace to ensure the normal combustion of the fuel, which greatly reduces the workload of the staff. At the same time, the pressed air can make the waste slag after combustion pass through the fuel support net quickly under the action of airflow and gravity, which is convenient for rapid discharge of waste slag and simple and convenient operation.
[0015] Furthermore, a filter element is inserted through one side of the collection box, a material passage is inserted through the other side of the collection box, a slag discharge pipe is inserted through one side of the waste slag box, the slag discharge pipe is located on the other side of the waste slag box relative to the exhaust pipe, the material passage is attached to one end of the slag discharge pipe, and a third one-way valve is inserted through the outer peripheral surface of the exhaust pipe;
[0016] The waste slag is collected in the collection box along with the waste gas, and the waste gas is filtered through the filter element and then discharged through the exhaust pipe to avoid pollution to the environment. The accumulation of waste slag in the collection box can prevent the accumulation of waste slag in the main body of the smelting furnace from affecting combustion, thereby ensuring smelting efficiency.
[0017] The utility model has the following beneficial effects:
[0018] The utility model provides a quantitative feeding pipe and a waste slag box, thereby solving the problem that when the smelting furnace smelts metal, the waste slag produced by combustion falls into the collection box through the filter slag plate under the action of gravity. However, in the actual operation process, the weight of the waste slag after combustion will be greatly reduced, and it may be retained on the upper side of the filter slag plate, and it is difficult to quickly fall into the collection box, thereby reducing the cleaning speed of the filter slag. When the pressing assembly is pulled downward to add fuel, air is blown into the main body of the smelting furnace at the same time. The flow of air drives the waste slag to quickly enter the waste slag box for collection, thereby avoiding the waste slag from accumulating in the main body of the smelting furnace, and at the same time, part of the exhaust gas can be discharged through the exhaust pipe, thereby avoiding the natural discharge of the exhaust gas to easily take away a large amount of heat.
[0019] The utility model provides a quantitative feeding pipe and a waste slag box, thereby solving the problem that in the process of smelting aluminum metal in the smelting furnace, air often needs to be continuously blown into the furnace during the combustion of fuel to ensure the combustion temperature. However, when a large amount of aluminum metal is smelted, it is often necessary to add fuel and blow air multiple times, which is time-consuming and labor-intensive to operate, and the problem that multiple opening and closing of the smelting furnace will cause a large amount of heat loss will result. A large amount of fuel poured into the second hopper falls to the inside of the quantitative feeding pipe under the action of gravity, and quickly enters the smelting furnace body as the pressing assembly moves up and down. At the same time, a large amount of air is blown into the smelting furnace body through the air intake groove, and the feeding and air intake operations are completed at the same time, reducing the workload of the staff and avoiding multiple openings of the smelting furnace to add fuel, which will cause a large amount of heat loss. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural effect diagram of the utility model;
[0021] Figure 2 This is a structural diagram of the main body of the smelting furnace of the utility model;
[0022] Figure 3 It is a cross-sectional view of the main body of the smelting furnace of the utility model;
[0023] Figure 4 This is a structural diagram of the quantitative feeding pipe of the utility model;
[0024] Figure 5 It is a cross-sectional view of the quantitative feeding pipe of the utility model;
[0025] Figure 6 It is the structural diagram of the waste slag box of the utility model.
[0026] Reference numerals:
[0027] 1. Melting furnace body; 101. Top cover; 102. Crucible support frame; 103. Cleaning cover; 104. Support base; 105. Fuel support net; 106. First hopper; 2. Quantitative feeding pipe; 201. Pressing assembly; 202. Second hopper; 203. Handle; 204. Feeding pipe; 205. Feeding pipe; 206. Air inlet pipe; 207. First one-way valve; 208. Feeding trough; 209. Air inlet trough; 210. Partition; 211. Air outlet pipe; 212. Second one-way valve; 213. Reset pressing plate; 3. Waste slag box; 301. Collection box; 302. Filter element; 303. Feeding port; 304. Slag discharge pipe; 305. Exhaust pipe; 306. Third one-way valve. DETAILED DESCRIPTION
[0028] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0029] See also Figure 1-6 As shown, the utility model is a smelting furnace capable of rapid slag discharge, comprising a smelting furnace body 1, a quantitative feeding pipe 2 and a waste slag box 3, a first hopper 106 is inserted through the bottom of the smelting furnace body 1, a quantitative feeding pipe 2 is arranged on the top of the outer peripheral surface of the smelting furnace body 1, a material pressing assembly 201 is inserted and slidably connected on the top of the quantitative feeding pipe 2, a feeding groove 208 and an air intake groove 209 are provided on the inner side of the quantitative feeding pipe 2, a second hopper 202 is arranged on the top of one side of the quantitative feeding pipe 2, a waste slag box 3 is arranged on one side of the bottom of the smelting furnace body 1, a collecting box 301 is inserted on one side of the waste slag box 3, and an exhaust pipe 305 is inserted and welded on one end of the waste slag box 3;
[0030] A large amount of fuel is poured into the inner side of the second hopper 202, and part of the fuel falls into the feed trough 208 under the action of gravity, and part of the fuel is burned in the smelting furnace body 1. When the smelting furnace burns the fuel and smelts the aluminum metal, the pressing assembly 201 is pulled downward to press the fuel in the feed trough 208 and the air in the air intake trough 209 into the smelting furnace body 1 together, so as to intake air and feed the smelting furnace. At the same time, the compressed air squeezes the exhaust gas in the smelting furnace body 1, so that the exhaust gas and air flow quickly and push the waste slag through the fuel support net 105 and the first hopper 106 into the collection box 301 for collection, thereby avoiding the accumulation of waste slag in the smelting furnace body 1, and at the same time, part of the exhaust gas is discharged through the exhaust pipe 305 under the action of air pressure.
[0031] Among them Figure 1-3 As shown, a top cover 101 is rotatably clamped on the top of the smelting furnace body 1, a cleaning cover 103 is penetrated and clamped on the outer peripheral surface of the smelting furnace body 1, a supporting base 104 is welded and fixed on the bottom edge of the first hopper 106, a crucible support frame 102 and a fuel support net 105 are clamped and fixed from top to bottom in the smelting furnace body 1, and the cleaning cover 103 is located between the crucible support frame 102 and the fuel support net 105;
[0032] Before the smelting furnace is used, the crucible containing the aluminum metal to be smelted is placed on the upper side of the crucible support frame 102, and the top cover 101 is rotated to close, the cleaning cover 103 is opened and a certain amount of fuel is placed on the upper side of the fuel support net 105, the fuel is ignited and the cleaning cover 103 is closed. During the combustion of the fuel, the waste slag falls to the inside of the slag discharge pipe 304 through the fuel support net 105 and the first hopper 106 under the action of gravity. After the smelting is completed, the cleaning cover 103 is opened to clean the inside of the smelting furnace body 1.
[0033] Among them Figure 1 , 4As shown in Figure 5, a feed pipe 204 is welded through the bottom of the second hopper 202, and the bottom of the feed pipe 204 is welded through the top of one side of the quantitative feeding pipe 2, and the feed pipe 204 is connected to the inner side of the feed groove 208. A handle 203 is welded and fixed to the top of one side of the pressing component 201, and the bottom of the pressing component 201 is plugged into the inner side of the feed groove 208 and the air intake groove 209. An air intake pipe 206 is welded through the bottom of both sides of the quantitative feeding pipe 2, and each air intake pipe 206 is penetrated and connected with a first one-way valve 207 on the outer peripheral surface. The two air intake pipes 206 are respectively connected to the feed groove 208. , the air inlet groove 209 is connected through and through, a feed pipe 205 is welded through the bottom of the quantitative feeding pipe 2, the bottom of the feed pipe 205 is inserted through the outer peripheral surface of the smelting furnace body 1, the feed pipe 205 is located at the top of the fuel support net 105, and a reset plate 213 is rotatably clamped at the bottom of the feed groove 208, and the reset plate 213 is located at the bottom of the air inlet pipe 206, a partition 210 is welded and fixed at the bottom of the air inlet groove 209, and an air outlet pipe 211 is welded through the bottom of the partition 210, and a second one-way valve 212 is clamped through the outer peripheral surface of the air outlet pipe 211, and the partition 210 is located at the bottom of the air inlet pipe 206;
[0034] A large amount of fuel is poured into the inner side of the second hopper 202, and part of the fuel falls into the inner side of the feed trough 208 through the discharge pipe 204 under the action of gravity. When it is necessary to supplement air and fuel, the handle 203 is pulled downward to move the pressing assembly 201 downward, so that the fuel squeezes the reset pressing plate 213 and is poured into the smelting furnace body 1 through the feed pipe 205, and at the same time, the air enters the feed pipe 205 through the second one-way valve 212 and the air outlet pipe 211 to supplement oxygen in the smelting furnace body 1. After the fuel and oxygen are supplemented, the reset pressing plate 213 is rotated upward to be reset, and the handle 203 is pulled upward to allow air to enter the feed trough 208 and the air intake trough 209 through the first one-way valve 207 and the air intake pipe 206 until the bottom of the pressing assembly 201 is higher than the discharge pipe 204, and the fuel is supplemented in the feed trough 208 again.
[0035] Among them Figure 1 , 6 As shown, a filter element 302 is inserted through one side of the collection box 301, a material passage 303 is inserted through the other side of the collection box 301, a slag discharge pipe 304 is welded through one side of the waste slag box 3, the slag discharge pipe 304 is located on the other side of the waste slag box 3 relative to the exhaust pipe 305, the material passage 303 is attached to one end of the slag discharge pipe 304, and a third one-way valve 306 is inserted through the outer peripheral surface of the exhaust pipe 305;
[0036] When air is introduced into the smelting furnace body 1 through the quantitative feeding pipe 2, the flowing gas drives the waste slag to quickly pass through the fuel support net 105, and falls into the collecting box 301 along the first hopper 106 and the slag discharge pipe 304 for collection, and part of the waste gas is filtered by the exhaust gas filter element 302 and discharged through the exhaust pipe 305 and the third one-way valve 306. After the smelting is completed, the collecting box 301 is pulled out to centrally clean the waste slag.
[0037] The specific working principle of the utility model is as follows: before the smelting furnace is used, the crucible containing the aluminum metal to be smelted is placed on the upper side of the crucible support frame 102, and the top cover 101 is rotated to close, the cleaning cover 103 is opened and a certain amount of fuel is placed on the upper side of the fuel support net 105, the fuel is ignited and the cleaning cover 103 is closed, a large amount of fuel is poured into the inner side of the second hopper 202, and part of the fuel falls into the inner side of the feed trough 208 through the feed pipe 204 under the action of gravity. When the fuel is burned, part of the waste residue produced by the combustion falls into the first hopper 106, and part of it is retained on the surface of the fuel support net 105. When it is necessary to supplement air and fuel, the handle 203 is pulled downward to move the pressing assembly 201 downward, so that the fuel squeezes the reset pressing plate 213 and is poured into the smelting furnace body 1 through the feed pipe 205, and the air passes through the second one-way valve 212 and the air outlet pipe 211 enter the feed pipe 205 to supplement the oxygen in the smelting furnace body 1, and the flowing gas drives the waste slag to quickly pass through the fuel support net 105, and falls into the collection box 301 along the first hopper 106 and the slag discharge pipe 304 for collection, and part of the waste gas filter element 302 is filtered and discharged through the exhaust pipe 305 and the third one-way valve 306. After the fuel and oxygen are supplemented, the reset plate 213 is rotated upward to reset, and the handle 203 is pulled upward to allow air to pass through the first one-way valve 207 and the air inlet pipe 206 into the feed trough 208 and the air inlet trough 209 until the bottom of the pressing assembly 201 is higher than the discharge pipe 204, and the fuel is supplemented in the feed trough 208 again. After the smelting is completed, the collection box 301 is pulled out to centrally clean the waste slag, and the cleaning cover 103 is opened to clean the inside of the smelting furnace body 1.
[0038] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions recorded in the aforementioned embodiments and any equivalent replacement of some of the technical features therein, any modification, equivalent replacement, and improvement made are all within the protection scope of the present invention.
Claims
1. A smelting furnace capable of rapid slag removal, comprising a smelting furnace body (1), a quantitative feed pipe (2) and a waste slag box (3), characterized in that: A first hopper (106) is inserted through the bottom of the smelting furnace body (1), a quantitative feeding pipe (2) is arranged on the top of the outer peripheral surface of the smelting furnace body (1), a material pressing assembly (201) is inserted through the top of the quantitative feeding pipe (2), a feeding groove (208) and an air intake groove (209) are provided on the inner side of the quantitative feeding pipe (2), a second hopper (202) is arranged on the top of one side of the quantitative feeding pipe (2), a waste slag box (3) is arranged on one side of the bottom of the smelting furnace body (1), a collecting box (301) is inserted on one side of the waste slag box (3), and an exhaust pipe (305) is welded through one end of the waste slag box (3).
2. A smelting furnace capable of rapid slag discharge according to claim 1, characterized in that: The top of the smelting furnace body (1) is rotatably clamped with a top cover (101), the outer peripheral surface of the smelting furnace body (1) is penetrated by a cleaning cover (103) clamped, the bottom edge of the first hopper (106) is welded with a supporting base (104), and a crucible support frame (102) and a fuel support net (105) are clamped and fixed from top to bottom in the smelting furnace body (1), and the cleaning cover (103) is located between the crucible support frame (102) and the fuel support net (105).
3. A smelting furnace capable of rapid slag discharge according to claim 2, characterized in that: A feeding tube (204) is welded through the bottom of the second hopper (202), and the bottom of the feeding tube (204) is welded through the top of one side of the quantitative feeding tube (2), and the feeding tube (204) is connected to the inner side of the feeding trough (208). A handle (203) is welded and fixed to the top of one side of the pressing component (201), and the bottom of the pressing component (201) is plugged into the inner side of the feeding trough (208) and the air inlet trough (209). The bottoms of both sides of the quantitative feeding tube (2) are welded through. An air inlet pipe (206) is connected, and a first one-way valve (207) is inserted through the outer peripheral surface of each of the air inlet pipes (206). The two air inlet pipes (206) are respectively connected to the feed trough (208) and the air inlet trough (209). A feed pipe (205) is welded through the bottom of the quantitative feeding pipe (2). The bottom of the feed pipe (205) is inserted through the outer peripheral surface of the smelting furnace body (1). The feed pipe (205) is located on the top of the fuel support net (105).
4. A smelting furnace capable of rapid slag discharge according to claim 3, characterized in that: A reset pressure plate (213) is rotatably clamped at the bottom of the feed trough (208), and the reset pressure plate (213) is located at the bottom of the air inlet pipe (206). A partition (210) is welded and fixed to the bottom of the air inlet trough (209), and an air outlet pipe (211) is welded through the bottom of the partition (210), and a second one-way valve (212) is clamped through the outer peripheral surface of the air outlet pipe (211), and the partition (210) is located at the bottom of the air inlet pipe (206).
5. The smelting furnace capable of rapid slag discharge according to claim 1, characterized in that: A filter element (302) is inserted through one side of the collection box (301) and clamped thereon; a material passage opening (303) is inserted through the other side of the collection box (301); a slag discharge pipe (304) is welded through one side of the waste slag box (3); the slag discharge pipe (304) is located on the other side of the waste slag box (3) relative to the exhaust pipe (305); the material passage opening (303) is attached to one end of the slag discharge pipe (304); and a third one-way valve (306) is inserted through the outer peripheral surface of the exhaust pipe (305) and clamped thereon.