Offshore oil drilling platform pipe clamp testing platform

By designing a clamping structure combining chute and telescopic hydraulic rod on the offshore oil drilling platform, the problem of low installation efficiency of multiple sets of cables in the prior art is solved, and the rapid testing and fixation of multiple sets of pipe cards is achieved, which improves the Installation efficiency.

CN222105518UActive Publication Date: 2024-12-03ZHONGJIN DINGHUI CONSTR & DEV (TIANJIN) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420570015.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-12-03
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

The existing offshore oil drilling platform pipe card testing platform is inefficient when installing multiple sets of cables, and cannot be fast combined and fixed, which makes it time-consuming and labor-intensive to install and cannot effectively test multiple sets of pipe card.

Method used

A test platform including slide chutes, fixing blocks, telescopic hydraulic rods and clamping plates was designed. Through the cooperation of slide chutes and telescopic hydraulic rods, multiple sets of cable pipes can be clamped and fixed simultaneously, improving installation efficiency.

Benefits of technology

The platform can easily test multiple sets of pipe cards, and the telescopic hydraulic rod allows the moving plate and the clamping plate to move horizontally, realizing clamping and fixing of multiple sets of cable pipes, improving installation efficiency and testing capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222105518U_ABST
    Figure CN222105518U_ABST
Patent Text Reader

Abstract

The utility model discloses a pipe clamp testing platform for an offshore oil drilling platform, and relates to the technical field of oil drilling. A sliding groove is formed in the front face of the platform, a fixing block is slidably connected into the sliding groove, connecting blocks are arranged on the left side and the right side of the front face of the fixing block correspondingly, first clamping plates are arranged on the front faces of the connecting blocks correspondingly, a telescopic hydraulic rod is installed on the front face of the fixing block, and the telescopic end of the telescopic hydraulic rod is fixedly connected with a connecting rod. A moving plate is fixedly connected to the front face of the connecting rod, and second clamping plates are arranged at the two ends of the back face of the moving plate correspondingly. The fixing block can be conveniently installed on the platform through the sliding groove, so that multiple sets of pipe clamps can be tested on the pipe clamp testing platform, the telescopic hydraulic rod enables the movable plate to move, the second clamping plate is fixed to the movable plate, multiple cable pipelines can be clamped at the same time, and then multiple sets of cable pipelines and pipe clamps can be tested.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of oil drilling, in particular to an offshore oil drilling platform pipe clamp testing platform. Background Art

[0002] Offshore oil drilling platforms need to have cables connected to the working area at a certain depth below the sea surface. The pipes used to protect the cables must be fixed between the columns of the oil drilling platform to ensure the reliability of the cable pipes. The function of the pipe clamp is to fix the cable pipes to the columns and ensure that the cable pipes are not affected by the flow of seawater.

[0003] On the existing pipe clamp test platform, the cable is fixed to the edge of the platform by the pipe clamp, and the cable is fixed in the pipe clamp by the fastening bolts on the pipe clamp. Generally, the pipe clamp test platform can only test a set of pipe clamps and cables separately. Most cables and pipe clamps have multiple sets, so the data from a single set of tests is not perfect. Utility Model Content

[0004] 1. Technical issues to be resolved

[0005] In view of the deficiencies in the prior art, the utility model provides an offshore oil drilling platform pipe clamp test platform, which solves the problem that the cable is fixed in the pipe clamp by the fastening bolts on the pipe clamp, generally there are multiple groups of cables and pipe clamps, which is time-consuming and laborious to install them separately, and cannot be quickly assembled and installed, resulting in extremely low installation efficiency.

[0006] (II) Technical solution

[0007] To achieve the above purpose, the utility model is implemented through the following technical solutions: a pipe clamp test platform for an offshore oil drilling platform, including a platform, a slide groove is provided on the front of the platform, a fixed block is slidably connected inside the slide groove, connecting blocks are provided on the left and right sides of the front of the fixed block, a first clamping plate is provided on the front of the connecting block, a telescopic hydraulic rod is installed on the front of the fixed block, the telescopic end of the telescopic hydraulic rod is fixedly connected to a connecting rod, a movable plate is fixedly connected to the front of the connecting rod, and second clamping plates are provided at both ends of the back of the movable plate.

[0008] Preferably, the inner walls of the first clamping plate and the second clamping plate are provided with cable ducts.

[0009] Preferably, the inner walls of the first clamping plate and the second clamping plate are both arc-shaped.

[0010] Preferably, the second clamping plate is located on the front side of the first clamping plate.

[0011] Preferably, first threaded holes are provided at both ends of the top of the fixing block, second threaded holes are provided at both ends of the top of the platform, and fixing bolts are threadedly connected between the first threaded holes and the second threaded holes.

[0012] Preferably, the telescopic hydraulic rod is located between two connecting blocks.

[0013] (III) Beneficial effects

[0014] The utility model provides a pipe clamp test platform for an offshore oil drilling platform. It has the following beneficial effects:

[0015] The slide groove facilitates the installation of the fixed block on the platform, so that multiple groups of pipe clamps can be tested on the pipe clamp test platform. The telescopic hydraulic rod enables the movable plate and the second clamping plate to move horizontally, so that the second clamping plate contacts the first clamping plate to clamp the cable pipe. The second clamping plates are fixed on the movable plate, so that two cable pipes can be clamped at the same time, and then multiple groups of cable pipes and pipe clamps can be tested. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of the first clamping plate and the second clamping plate of the utility model;

[0018] Figure 3 This is a schematic diagram of the slide structure of the utility model.

[0019] In the figure: 1. platform; 2. fixed block; 3. connecting block; 4. first clamping plate; 5. telescopic hydraulic rod; 6. fixing bolt; 7. connecting rod; 8. moving plate; 9. second clamping plate; 10. cable duct; 11. slide groove; 12. first threaded hole; 13. second threaded hole. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-3The utility model provides a technical solution: a pipe clamp test platform for an offshore oil drilling platform, comprising a platform 1, a slide groove 11 is arranged on the front of the platform 1, a fixed block 2 is slidably connected inside the slide groove 11, a connecting block 3 is arranged on the left and right sides of the front of the fixed block 2, a first clamping plate 4 is arranged on the front of the connecting block 3, a telescopic hydraulic rod 5 is installed on the front of the fixed block 2, a connecting rod 7 is fixedly connected to the telescopic end of the telescopic hydraulic rod 5, a mobile plate 8 is fixedly connected to the front of the connecting rod 7, and a second clamping plate 9 is arranged on both ends of the back of the mobile plate 8. The slide groove 11 facilitates the installation of the fixed block 2 on the platform 1, so that multiple groups of pipe clamps can be tested on the pipe clamp testing platform 1. The telescopic hydraulic rod 5 enables the movable plate 8 and the second clamping plate 9 to move horizontally, so that the second clamping plate 9 contacts the first clamping plate 4 to clamp the cable pipe 10. The second clamping plates 9 are fixed on the movable plate 8, so that two cable pipes 10 can be clamped at the same time, and then multiple groups of cable pipes 10 and pipe clamps can be tested.

[0022] See also Figure 1-3 The utility model provides a technical solution: the inner walls of the first clamping plate 4 and the second clamping plate 9 are provided with a cable duct 10. When the first clamping plate 4 and the second clamping plate 9 are in contact, the cable duct 10 can be clamped, thereby preventing the cable duct 10 from sliding.

[0023] See also Figure 1-3 The utility model provides a technical solution: the inner wall shapes of the first clamping plate 4 and the second clamping plate 9 are both arc-shaped. The inner wall shapes of the first clamping plate 4 and the second clamping plate 9 are arc-shaped, and can clamp the circular cable duct 10 after merging.

[0024] See also Figure 1-3 The utility model provides a technical solution: the second clamping plate 9 is located in front of the first clamping plate 4. The second clamping plate 9 is moved toward the first clamping plate 4 by the moving plate 8, so that the first clamping plate 4 and the second clamping plate 9 are in contact, thereby clamping the cable duct 10.

[0025] See also Figure 1-3 The utility model provides a technical solution: the two ends of the top of the fixing block 2 are provided with first threaded holes 12, the two ends of the top of the platform 1 are provided with second threaded holes 13, and the first threaded holes 12 and the second threaded holes 13 are threadedly connected with fixing bolts 6. The fixing bolts 6 are threadedly connected with the first threaded holes 12 and the second threaded holes 13, so that the fixing block 2 is fixedly installed inside the slide groove 11.

[0026] See also Figure 1-3The utility model provides a technical solution: the telescopic hydraulic rod 5 is located between the two connecting blocks 3. The telescopic hydraulic rod 5 is located between the two connecting blocks 3, so that the moving plate 8 moves when the telescopic hydraulic rod 5 is conveniently extended.

[0027] During operation, the fixed block 2 is slidably connected to the slide groove 11 and then fixed by the fixing bolt 6. The cable pipe 10 is then placed on the inner wall of the first clamping plate 4. The connecting rod 7 and the movable plate 8 are moved backward by the telescopic hydraulic rod 5, so that the two second clamping plates 9 on the back of the movable plate 8 are close to and contacted with the first clamping plate 4, thereby clamping the cable pipe 10. The movable plate 8 drives the two second clamping plates 9 to clamp two cable pipes 10 at the same time, so that multiple groups of cable pipes 10 and pipe clamps can be tested on the pipe clamp test platform 1.

[0028] In summary, this offshore oil drilling platform pipe clamp test platform solves the problem that the cable is fixed in the pipe clamp by the fastening bolts on the pipe clamp, generally there are multiple groups of cables and pipe clamps, which makes it time-consuming and laborious to install them separately, and cannot be quickly assembled and installed, resulting in extremely low installation efficiency.

[0029] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pipe clamp test platform for an offshore oil drilling platform, comprising a platform (1), Features: The front of the platform (1) is provided with a slide groove (11), the interior of the slide groove (11) is slidably connected to a fixed block (2), the left and right sides of the front of the fixed block (2) are provided with connecting blocks (3), the front of the connecting blocks (3) are provided with a first clamping plate (4), the front of the fixed block (2) is installed with a telescopic hydraulic rod (5), the telescopic end of the telescopic hydraulic rod (5) is fixedly connected to a connecting rod (7), the front of the connecting rod (7) is fixedly connected to a moving plate (8), and the two ends of the back of the moving plate (8) are provided with second clamping plates (9).

2. The offshore oil drilling platform pipe clamp test platform according to claim 1, Features: The inner walls of the first clamping plate (4) and the second clamping plate (9) are provided with cable ducts (10).

3. The offshore oil drilling platform pipe clamp test platform according to claim 1, Features: The inner walls of the first clamping plate (4) and the second clamping plate (9) are both arc-shaped.

4. The offshore oil drilling platform pipe clamp test platform according to claim 1, Features: The second clamping plate (9) is located on the front side of the first clamping plate (4).

5. The offshore oil drilling platform pipe clamp test platform according to claim 1, Features: The two ends of the top of the fixing block (2) are provided with first threaded holes (12), the two ends of the top of the platform (1) are provided with second threaded holes (13), and a fixing bolt (6) is threadedly connected between the first threaded hole (12) and the second threaded hole (13).

6. The offshore oil drilling platform pipe clamp test platform according to claim 1, Features: The telescopic hydraulic rod (5) is located between the two connecting blocks (3).