Energy storage system capable of saving cost and increasing efficiency
By designing energy storage systems in enterprise power systems, storing electricity during low electricity prices and releasing electricity during peak hours, the problem of high electricity consumption costs in enterprises during peak hours is solved, and the reduction of power costs and the balance of grid load is achieved. , improves the stability and reliability of power supply.
Patent Information
- Application Number
- CN202420384978.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-02-28
AI Technical Summary
The electricity cost of enterprises during peak and peak hours is high, and the time-divided electricity price mechanism restricts production activity planning, resulting in an increase in electricity bill expenditure and affecting normal operations.
Design an energy storage system to use the energy storage system in the low-voltage cabinet in the factory to charge during the low-voltage period, and release electricity to the enterprise production line during the peak period, reducing power consumption during the peak period, including PCS energy storage converters , EMS energy management system, BMS battery management system and Pack battery system, and realizes power scheduling through current transformer modules and circuit breakers.
It reduces power consumption during peak periods, reduces energy costs, balances grid load, improves power quality, and reduces grid losses through local storage and use of energy, improving the stability and reliability of power supply.
Smart Images

Figure CN222107593U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of distributed energy storage, and specifically relates to an energy storage system for reducing costs and increasing efficiency. Background Art
[0002] The existing enterprise power supply system consists of: State Grid---power lines---enterprise transformers---power metering equipment---power control cabinets. The electricity consumption and electricity cost of the enterprise's production and operation process are measured according to the peak, high and valley time-based electricity prices formulated by the State Grid Corporation. At present, the time-based electricity prices under the jurisdiction of the State Grid Corporation Zhejiang Province are as follows:
[0003] Peak hours: 09:00-11:00, 15:00-17:00
[0004] January, July, August and December every year: 13:00-15:00 is the peak period
[0005] Peak electricity price: about 1.25 yuan / kWh (the price is slightly adjusted every month);
[0006] Peak hours: 08:00-09:00, 13:00-15:00, 17:00-22:00
[0007] Peak electricity price: about 1.00 yuan / kWh (the price is slightly adjusted every month);
[0008] Low hours: 11:00-13:00, 22:00-08:00 the next day
[0009] Peak electricity price: around 0.325 yuan / kWh (the electricity price is slightly adjusted every month).
[0010] However, the working hours of today's physical production enterprises are generally concentrated between 07:00-11:30 and 12:30-17:00. After the above data survey, the applicant found that the working hours of enterprises are concentrated between 07:00-11:30 and 12:30-17:00, and the peak hours are 09:00-11:00 and 15:00-17:00. At the same time, 13:00-15:00 in January, July, August and December each year are also peak hours; the peak hours are 08:00-09:00, 13:00-15:00, and 17:00-22:00. Most enterprises' main electricity consumption time happens to be in the period with higher electricity prices, which increases the production electricity cost. In addition, the time-based electricity price mechanism makes enterprises subject to electricity price fluctuations when planning production activities. In order to reduce electricity expenses, companies may need to adjust their production plans and avoid production activities during periods of high electricity prices, which may cause inconvenience to the normal operation of the company. To this end, we propose an energy storage system that can reduce costs and increase efficiency. Utility Model Content
[0011] The purpose of the utility model is to provide an energy storage system that can reduce costs and increase efficiency, which can charge the electric energy in the off-peak period into the energy storage system in the form of charging, release the electric energy of the energy storage system during the peak period of electricity consumption, and invest it in the production line equipment of the enterprise to reduce the power consumption during the peak period. In order to solve the problems raised in the above background technology.
[0012] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: including, a factory low-voltage cabinet, characterized in that: the factory low-voltage cabinet is equipped with at least a second electric circuit breaker, a first current transformer module and a second current transformer module, the second electric circuit breaker is electrically connected to the low-voltage busbar, and is used to control the power supply in the factory, the first current transformer module and the second current transformer module are connected in series to the second electric circuit breaker in sequence, and an energy storage system is connected in parallel between the first current transformer module and the second current transformer module.
[0013] Furthermore, a short circuit fault indicator is connected between the first current transformer module and the second electric circuit breaker module.
[0014] Furthermore, the first current transformer module and the second current transformer module each have at least three interconnected current transformers, and at least one of the three current transformers in the second current transformer module is a current transformer with two iron cores and two secondary windings or a current transformer with two secondary windings on one iron core.
[0015] Furthermore, the energy storage system includes: a PCS energy storage inverter, an EMS energy management system, a BMS battery management system and a Pack battery system. The EMS energy management system is electrically connected to the first current transformer module and the second current transformer through a cable. The PCS energy storage inverter and the BMS battery management system are both connected to the EMS energy management system, and the Pack battery system is electrically connected to the BMS battery management system.
[0016] Furthermore, it also includes: a variable resistor, a break contact, a third electric circuit breaker and a third current transformer module, the third electric circuit breaker is connected in parallel between the first current transformer module and the second current transformer, the third current transformer module is electrically connected to the third electric circuit breaker, the break contact is connected in parallel between the third current transformer module and the PCS energy storage inverter, the variable resistor is connected in parallel with the third current transformer module, and is grounded.
[0017] Furthermore, the PCS energy storage converter is bidirectional or unidirectional.
[0018] Furthermore, the Pack battery system is specifically a large battery array consisting of multiple battery cells connected in series and / or in parallel.
[0019] Compared with the prior art, the beneficial effects of the present invention are:
[0020] 1. A short circuit fault in the circuit can be detected by connecting a short circuit fault indicator between the first current transformer module and the second electric circuit breaker. When a short circuit occurs, the short circuit fault indicator can respond quickly, notify the operator through an alarm or other signal or automatically trigger a protection device to cut off the fault circuit, thereby protecting the safe operation of the power system.
[0021] 2. Energy storage systems can also be set up to provide additional energy during peak electricity demand periods or store energy during low demand periods, thereby balancing the grid load, reducing voltage fluctuations and flicker, and improving power quality. Energy can also be stored when electricity prices are low and then used when electricity prices are high, reducing energy costs. By storing and using energy locally, grid losses caused by long-distance transmission can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention.
[0023] Figure 1 It is a schematic diagram of the circuit structure of the utility model;
[0024] Figure 2 It is a schematic diagram of a local circuit structure of the utility model;
[0025] Figure 3 It is a schematic diagram of the connection structure of the utility model; DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0027] Reference Figure 1-Figure 2 The utility model proposes a technical solution for a energy storage system that reduces costs and increases efficiency, including: a power supply point, a first electric circuit breaker, a three-phase transformer and a low-voltage cabinet in a factory area. The power supply point is electrically connected to the first electric circuit breaker, the first electric circuit breaker is electrically connected to one end of the three-phase transformer, and the other end of the three-phase transformer is connected to the low-voltage cabinet in the factory area through a low-voltage bus.
[0028] Among them, the factory low-voltage cabinet is equipped with at least a second electric circuit breaker, a first current transformer module and a second current transformer module. The second electric circuit breaker is electrically connected to the low-voltage busbar to control the power supply in the factory. The first current transformer module and the second current transformer module are connected in series on the second electric circuit breaker in sequence. A short-circuit fault indicator is connected between the first current transformer module and the second electric circuit breaker module, and an energy storage system is connected in parallel between the first current transformer module and the second current transformer module, so as to monitor and adjust the current flowing through the second electric circuit breaker in real time through the above-mentioned energy storage system. At the same time, in the overall power system, the energy storage system can also play a role in balancing the load, improving energy utilization efficiency and ensuring power supply reliability.
[0029] In the above configuration, a short circuit fault in the circuit can be detected by a short circuit fault indicator connected between the first current transformer module and the second electric circuit breaker. When a short circuit occurs, the short circuit fault indicator can respond quickly, notify the operator through an alarm or other signal or automatically trigger a protection device to cut off the fault circuit, thereby protecting the safe operation of the power system.
[0030] On the other hand, the energy storage system can be set up to provide additional energy during peak electricity demand periods or store energy during low demand periods, thereby balancing the grid load, reducing voltage fluctuations and flicker, and improving power quality. It can also store energy when electricity prices are low and then use it when electricity prices are higher, reducing energy costs. By storing and using energy locally, it can reduce grid losses caused by long-distance transmission.
[0031] To sum up, compared with the prior art, the configuration scheme mentioned in this embodiment plays multiple important roles in the configuration of low-voltage cabinets in the factory area, which not only improves the stability and reliability of power supply, but also promotes the economical and efficient use of energy.
[0032] For example, the first current transformer module and the second current transformer module each have at least three interconnected current transformers, and at least one of the three current transformers in the second current transformer module is a current transformer with two iron cores and two secondary windings or a current transformer with two secondary windings on one iron core.
[0033] In the above configuration, more accurate and reliable current monitoring is provided by including at least three interconnected current transformers in the first current transformer module and the second current transformer module. This multi-transformer configuration helps to achieve redundancy, thereby improving the robustness of the system and ensuring that the system can continue to operate even if a transformer fails. At the same time, by using a current transformer with two cores and two secondary windings, or a current transformer with two secondary windings on one core, the accuracy and response speed of current measurement are improved, and the second current transformer module is provided with higher flexibility, and the configuration of the secondary winding can be adjusted as needed to adapt to different measurement and protection requirements.
[0034] On the other hand, the combined use of multiple current transformers, combined with short-circuit fault indicators, can achieve more sophisticated power system protection and control, helping to quickly isolate problem areas and reduce the impact on the entire power network when a short circuit or other fault occurs.
[0035] In one embodiment, the energy storage system includes: a PCS energy storage inverter, an EMS energy management system, a BMS battery management system and a Pack battery system. The EMS energy management system is electrically connected to a first current transformer module and a second current transformer through a cable. The PCS energy storage inverter and the BMS battery management system are both connected to the EMS energy management system, and the Pack battery system is electrically connected to the BMS battery management system.
[0036] In the above configuration, by connecting the EMS energy management system with the current transformer, the input and output currents of the energy storage system can be monitored in real time, thereby providing accurate load management and grid monitoring. In addition, the EMS energy management system can intelligently schedule the operation of the PCS energy storage inverter according to grid demand, electricity price changes and energy storage status, thereby achieving optimal energy storage and release, thereby improving energy efficiency and economy.
[0037] At the same time, the electrical connection between the BMS battery management system and the Pack battery system ensures that the health of the battery is monitored and maintained in real time, extending the battery life and providing protection in abnormal situations, such as preventing overcharging or over-discharging.
[0038] In summary, the interconnection of the EMS energy management system, PCS energy storage inverter, Pack battery system and BMS battery management system supports the system integration and automated operation, improves the performance and efficiency of the energy storage system, enhances its support capabilities for the power grid, and also improves the reliability and safety of the system.
[0039] At the same time, the specific structural settings of the above-mentioned EMS energy management system, BMS battery management system and PCS energy storage inverter belong to the existing technology for technicians in this field and will not be elaborated here.
[0040] Reference Figure 3 In one embodiment, it also includes: a variable resistor, a break contact, a third electric circuit breaker and a third current transformer module, the third electric circuit breaker is connected in parallel between the first current transformer module and the second current transformer, the third current transformer module is electrically connected to the third electric circuit breaker, the break contact is connected in parallel between the third current transformer module and the PCS energy storage converter, the variable resistor is connected in parallel with the third current transformer module, and is grounded.
[0041] In the above configuration, the current flowing through the branch can be adjusted by connecting a variable resistor in parallel in the circuit, thereby affecting the current distribution of the entire system. The power consumption of the energy storage system can be fine-tuned or different load conditions can be simulated. At the same time, the third electric circuit breaker automatically cuts off the connection between the first current transformer module and the second current transformer when an abnormal current is detected to protect other components in the system. The third current transformer module monitors the current between the third electric circuit breaker and the break contact to provide real-time data for the EMS. Finally, the break contact controls the on and off of the circuit to disconnect the electrical connection between the PCS energy storage converter and the third current transformer module when necessary.
[0042] In one embodiment, the PCS energy storage converter is bidirectional or unidirectional.
[0043] Specifically, the bidirectional PCS energy storage converter has the function of converting DC power into AC power for grid use or charging energy storage batteries, and can also convert AC power into DC power for battery storage. Such converters not only support energy storage, but also support energy feedback, improving the flexibility and economic benefits of the entire system.
[0044] In one embodiment, the Pack battery system is specifically a large battery array consisting of multiple battery cells connected in series and / or in parallel, which is used to provide sufficient energy storage to meet power needs.
[0045] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A cost-saving and efficiency-enhancing energy storage system, comprising a low-voltage cabinet in a factory area, characterized in that: The factory low-voltage cabinet is equipped with at least a second electric circuit breaker, a first current transformer module and a second current transformer module. The second electric circuit breaker is electrically connected to the low-voltage busbar and is used to control the power supply within the factory. The first current transformer module and the second current transformer module are connected in series to the second electric circuit breaker in sequence, and an energy storage system is connected in parallel between the first current transformer module and the second current transformer module.
2. The energy storage system for reducing costs and increasing efficiency according to claim 1, characterized in that: A short circuit fault indicator is connected between the first current transformer module and the second electric circuit breaker module.
3. The energy storage system for reducing costs and increasing efficiency according to claim 1, characterized in that: The first current transformer module and the second current transformer module each have at least three interconnected current transformers, and at least one of the three current transformers in the second current transformer module is a current transformer with two iron cores and two secondary windings or a current transformer with two secondary windings on one iron core.
4. The energy storage system for reducing costs and increasing efficiency according to claim 1, characterized in that: The energy storage system includes: a PCS energy storage inverter, an EMS energy management system, a BMS battery management system and a Pack battery system. The EMS energy management system is electrically connected to the first current transformer module and the second current transformer through a cable. The PCS energy storage inverter and the BMS battery management system are both connected to the EMS energy management system, and the Pack battery system is electrically connected to the BMS battery management system.
5. The energy storage system for reducing costs and increasing efficiency according to claim 1, characterized in that: Also includes: A variable resistor, a break contact, a third electric circuit breaker and a third current transformer module, wherein the third electric circuit breaker is connected in parallel between the first current transformer module and the second current transformer, the third current transformer module is electrically connected to the third electric circuit breaker, the break contact is connected in parallel between the third current transformer module and the PCS energy storage converter, and the variable resistor is connected in parallel to the third current transformer module and is grounded.
6. The energy storage system for reducing costs and increasing efficiency according to claim 5, characterized in that: The PCS energy storage converter is bidirectional or unidirectional.
7. The energy storage system for reducing costs and increasing efficiency according to claim 4, characterized in that: The Pack battery system is specifically a large battery array consisting of multiple battery cells connected in series and / or in parallel.