Large blank perforation centering device

The large-scale billet perforation centering device addresses wall thickness inconsistencies and mold damage by ensuring precise alignment between piercing needles and upsetting cylinders, enhancing production efficiency and reducing material waste.

CN222113040UActive Publication Date: 2024-12-06INNER MONGOLIA NORTH HEAVY INDS GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323667789.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-31
Publication Date
2024-12-06
Estimated Expiration
2033-12-31

AI Technical Summary

Technical Problem

Existing large-diameter thick-walled seamless steel pipe manufacturing processes face issues with large wall thickness differences in billets due to poor coaxiality of piercing needles and upsetting cylinders, leading to increased machining time, material waste, and mold damage during bottom cutting.

Method used

A large-scale billet perforation centering device with precise alignment features, including a guide body, split guide liner, and connecting screws, ensures accurate coaxiality between the perforation needle and upsetting cylinder, reducing wall thickness differences and minimizing collisions.

Benefits of technology

The device improves coaxiality, reducing wall thickness variations to ≤8mm in over 90% of billets, shortens production cycles, enhances material utilization, and extends mold life by minimizing collisions and wear.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222113040U_ABST
    Figure CN222113040U_ABST
Patent Text Reader

Abstract

The utility model discloses a large blank perforating centering device which comprises a guide body, a split guide lining, a connecting screw, a perforating needle and an upsetting cylinder lining. A guide body through hole is formed in the middle of the guide body, a guide body ring groove is formed in the outer side of the guide body through hole, a guide body threaded hole is formed in the guide body ring groove, a positioning ring table is arranged on the lower portion of the guide body, and an inclined through hole is formed in the guide body. The split guide lining is installed in the guide body annular groove, and the connecting screw penetrates through the through hole of the split guide lining to be connected to the guide body threaded hole. A lining through hole is formed in the middle of the split guiding lining, and the perforating needle is installed in the lining through hole and penetrates through the guiding body through hole. The positioning ring table is located in an inner cavity in the middle of the upsetting cylinder lining. The utility model solves the problems that the wall thickness difference of the blank prepared by the blank making equipment is large and the convex die piercing needle and the concave die retaining ring lining are frequently collided and abraded during bottom cutting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of large-diameter thick-wall seamless steel pipe preparation devices, and in particular relates to a large-scale billet perforation centering device. Background Art

[0002] In the manufacturing process of large-diameter thick-walled seamless steel pipes, piercing needles and upsetting cylinders are used to form the inner and outer diameters of hollow billets during billet making, in preparation for the subsequent extrusion of steel pipes. In order to enable the extrusion to proceed smoothly and improve the quality of extruded steel pipes, the requirements for billets during extrusion are relatively high, requiring the wall thickness difference of the billets to be ≤10mm. Because the coaxiality of the piercing needle and the upsetting cylinder in the billet making equipment cannot be well guaranteed, when the piercing needle specification is ≤500mm, the billets with a wall thickness difference of ≤10mm after billet making by the billet making equipment account for 10% to 30%; when the piercing needle specification is >500mm, the billets with a wall thickness difference of ≤10mm after billet making account for 30% to 50%. The large wall thickness difference of the billet means that it cannot be extruded directly after billet making. It needs to be annealed and slowly cooled before machining to remove the wall thickness difference, and then heated for extrusion. The large wall thickness difference requires a long machining time and a large amount of machining, which prolongs the manufacturing cycle of the steel pipe, increases the processing cost of the steel pipe, and reduces material utilization.

[0003] In addition, the last step in the blank making process is bottom cutting. The punch piercing needle and the die guard ring lining are used to cut the bottom of the blank. Sometimes the coaxiality of the two is not guaranteed, resulting in frequent collision between the piercing needle and the guard ring lining during the bottom cutting process, causing damage to them and reducing the service life of the mold. Utility Model Content

[0004] The utility model aims to provide a large-scale billet perforation centering device, which solves the problems of large wall thickness difference of billets prepared by billet making equipment and frequent collision and wear between the punch punch needle and the inner lining of the die guard ring during bottom cutting.

[0005] The technical solution is as follows:

[0006] A large-scale billet perforation and centering device comprises: a guide body, a split guide liner, connecting screws, a perforating needle, and an upsetting tube liner; a guide body through hole is arranged in the middle of the guide body, a guide body annular groove is arranged on the outside of the guide body through hole, a guide body threaded hole is arranged in the guide body annular groove, a positioning ring stage is arranged at the lower part of the guide body, and the guide body is provided with an oblique through hole, the oblique through hole is located on the outside of the guide body threaded hole, and openings at both ends are respectively located at the top of the guide body and the bottom of the positioning ring stage; the split guide liner is installed in the guide body annular groove, and the connecting screw passes through the through hole of the split guide liner and is connected to the guide body threaded hole; a liner through hole is arranged in the middle of the split guide liner, and the perforating needle is installed in the liner through hole and passes through the guide body through hole; the positioning ring stage is located in the inner cavity in the middle of the upsetting tube liner.

[0007] Furthermore, the outer circle of the positioning ring is matched with the inner hole of the upsetting tube lining, the coaxiality between the positioning ring and the upsetting tube lining is ≤2.5mm, and the coaxiality between the punching needle and the upsetting tube lining is ≤2.5mm.

[0008] Furthermore, the gap between the guide body and the upsetting cylinder liner is 5 mm, and the gap between the split guide liner and the piercing needle needs to be 10 mm.

[0009] Compared with the prior art, the utility model has the following advantages:

[0010] The utility model can improve the coaxiality of the punching needle and the upset cylinder structure and the inner lining of the die guard ring in the blank making equipment, that is, the punching needle and the upset cylinder are connected, the degree of freedom of the punching needle is reduced, and the problem of large wall thickness difference of the blanks made by the blank making equipment is solved, so that more than 90% of the blanks can meet the requirement of wall thickness difference ≤8mm, so that the blanks are easy to machine and the amount of machining of the blanks is reduced. At the same time, when the bottom of the blank is cut, the punching needle and the inner lining of the guard ring are reduced to reduce the damage caused by collision, and the service life of the mold is extended. The production cycle is shortened, the material utilization rate and the surface quality of the finished product are improved, the production cost is reduced, and the production efficiency is improved.

[0011] The utility model can meet the needs of blank production, effectively reduce the wall thickness difference of the blank, and reduce the wear rate of the piercing needle and the guard ring liner. After using the guide device, the swing amplitude of the piercing needle will be reduced, and the swing amplitude will be between 0 and 5 mm; the wall thickness difference of the blank is reduced, and more than 90% of the wall thickness difference of the blank is between 0 and 10 mm; the damage rate of the piercing needle and the guard ring liner is reduced by 50%. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a structural schematic diagram of a large-scale blank perforation centering device of the utility model. DETAILED DESCRIPTION

[0013] The following description sufficiently illustrates specific embodiments of the present invention to enable those skilled in the art to practice and reproduce the same.

[0014] like Figure 1 The figure is a schematic diagram of the structure of the large-sized blank perforation centering device of the utility model.

[0015] A large-scale billet perforation and centering device comprises: a guide body 1, a split guide liner 2, a connecting screw 3, a perforating needle 4, and an upsetting tube liner 5; a guide body through hole is provided in the middle of the guide body 1, a guide body annular groove is provided on the outside of the guide body through hole, a guide body threaded hole is provided in the guide body annular groove, a positioning ring stage is provided at the lower part of the guide body 1, and the guide body 1 is provided with an oblique through hole, the oblique through hole 7 is located on the outside of the guide body threaded hole, and the openings at both ends are respectively located at the top of the guide body 1 and the bottom of the positioning ring stage; the split guide liner 2 is installed in the guide body annular groove, and the connecting screw 3 passes through the through hole of the split guide liner 2 and is connected to the guide body threaded hole; the split guide liner 2 is provided with a lining through hole, and the perforating needle 4 is installed in the lining through hole and passes through the guide body through hole; the positioning ring stage is located in the inner cavity in the middle of the upsetting tube liner 5.

[0016] The guide body 1, the split guide liner 2 and the connecting screws 3 form a perforation guide device. The split guide liner 2 cooperates with the perforation needle 4, and the guide body 1 cooperates with the upsetting tube liner 5. The perforation needle 4 and the upsetting tube liner 5 respectively determine the size and position of the inner hole and outer circle of the blank. The outer circle of the positioning ring is matched with the inner hole of the upsetting tube liner 5, and the coaxiality is ≤2.5mm. The split guide liner 2 is a split structure, which is divided into two identical parts, both of which are fixed to the guide body 1 by the connecting screws 3. The inner hole of the split guide liner 2 cooperates with the perforation needle 4 to achieve a coaxiality of ≤2.5mm between the perforation needle 4 and the upsetting tube liner 5.

[0017] The material used for making the guide body 1 is 5CrNiMo with a hardness of 269 to 323HB. The inside and outside of the guide body 1 cooperate with the split guide liner 2 and the upsetting tube liner 5 respectively. The guide body 1 and the split guide liner 2 are assembled by connecting screws 3, and the gap between the guide body 1 and the upsetting tube liner 5 is 5mm. The height of the guide body 1 is 400mm to prevent the possibility of the perforation guide device being carried away due to the bending of the perforation needle 4. Because in the prior art, it is impossible to add lubricant from above the upsetting tube liner 5 during the blank making process, an oblique through hole 7 for feeding is designed on the guide body 1 to ensure the application of the lubricant.

[0018] The selection of the material of the split guide lining 2 requires a certain wear resistance in a high-temperature service environment, and the hardness matches the piercing needle. Therefore, the material used to make the split guide lining 2 is G4335V, with a hardness of 35-40HRC. The gap between the split guide lining 2 and the piercing needle 4 must be 10mm. If the gap is too small, the guide device and the piercing needle will get stuck. If the guide gap is too large, it cannot play a guiding role. The split guide lining 2 can be designed with corresponding specifications according to the different specifications of the piercing needle.

[0019] The guide body 1 and the split guide liner 2 are connected by connecting screws 3, and the external placement and model of the connecting screws 3 must meet the connection requirements.

[0020] The upsetting of the blank 6 requires the use of a large blank perforation centering device. The perforation needle 4 is located at the device station. The split guide liner 2 and the guide body 1 are connected and fixed by connecting screws 3. The guide body 1 is assembled on the upsetting cylinder liner 5. When the movable beam drives the upsetting cylinder liner 5 to move vertically, the perforation needle 4 with no degree of freedom in the vertical direction moves up and down relative to the blank, which can realize the association state of the perforation needle 4 and the upsetting cylinder liner 5; after the perforation needle 4 moves downward relatively, the coaxiality of the perforation needle 4 and the upsetting cylinder liner 5 is guaranteed. After perforation and bottom cutting, the perforation needle 4 moves upward relatively, and the guide body 1 can be disassembled. When in use, the guide device moves with the perforation needle 4 to the top of the upsetting cylinder liner 5, and the movable beam rises to realize the cooperation between the guide device and the inner hole of the upsetting cylinder liner 5. The guide device guides the perforation needle 4 during perforation. When punching the blank, lubricant needs to be added on the blank. Two oblique through holes 7 are provided on the guide body 1, and glass powder is applied through the oblique through holes 7.

[0021] The terms used in the present invention are illustrative and exemplary, rather than restrictive. Since the present invention can be implemented in various forms without departing from the spirit or essence of the technical solution, it should be understood that the above embodiments are not limited to any of the aforementioned details, but should be widely interpreted within the spirit and scope defined by the attached claims, so all changes and modifications falling within the scope of the claims or their equivalents should be covered by the attached claims.

Claims

1. A large-scale billet perforation centering device, characterized in that: include: A guide body, a split guide liner, connecting screws, a punching needle, and an upsetting tube liner; a guide body through hole is provided in the middle of the guide body, a guide body annular groove is provided on the outside of the guide body through hole, a guide body threaded hole is provided in the guide body annular groove, a positioning ring stage is provided at the lower part of the guide body, and the guide body is provided with an oblique through hole, the oblique through hole is located on the outside of the guide body threaded hole, and the openings at both ends are respectively located at the top of the guide body and the bottom of the positioning ring stage; the split guide liner is installed in the guide body annular groove, and the connecting screw passes through the through hole of the split guide liner and is connected to the threaded hole of the guide body; a liner through hole is provided in the middle of the split guide liner, and the punching needle is installed in the liner through hole and passes through the guide body through hole; the positioning ring stage is located in the inner cavity in the middle of the upsetting tube liner.

2. The large-scale billet perforation centering device according to claim 1, characterized in that: The outer circle of the positioning ring is matched with the inner hole of the upsetting tube lining, the coaxiality between the positioning ring and the upsetting tube lining is ≤2.5mm, and the coaxiality between the punching needle and the upsetting tube lining is ≤2.5mm.

3. The large-scale billet perforation centering device according to claim 1, characterized in that: The gap between the guide body and the upsetting cylinder lining is 5mm, and the gap between the split guide lining and the piercing needle needs to be 10mm.