Sequential control new energy automobile battery pack friction stir welding tool
By introducing a timing control electronic control system into the welding tooling of the battery tray, the problem that traditional welding methods cannot meet the welding requirements is solved, and precise control of the welding area and improvement of production efficiency are achieved.
Patent Information
- Application Number
- CN202420777864.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-16
AI Technical Summary
When the frame of the battery tray is welded by friction stirring, the traditional compression method causes the welding robot to fail to achieve good welding results in special positions and cannot meet the welding requirements.
Design a new energy vehicle battery pack friction stir welding tool with timing control, including an electric control cabinet, support unit, side push unit and upper compression unit. The timing loosening and clamping of cylinders and electric push rods is controlled by PLC to achieve Precise control of welding areas.
The flatness of the welding area is achieved, manual operation is reduced, production efficiency is improved, and welding requirements are met.
Smart Images

Figure CN222113828U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of battery tray production and processing, and specifically to a time-controlled friction stir welding tool for a battery pack of a new energy vehicle. Background Art
[0002] As the power source of new energy vehicles, the battery tray design tends to be functional and reliable: the water cooling system and the battery tray are integrated, replacing the design of the external cooling system, greatly improving the heat dissipation efficiency of the battery, connecting the heat dissipation system to the bottom plate to form an integral bottom plate, and then connecting it to the frame by stir friction welding (as shown in the attached manual). Figure 1 As shown, 1. battery pack frame; 2. water cooling plate).
[0003] When the frame and the water-cooling plate of the battery tray are welded together by stir friction welding, the frame and the water-cooling plate are first positioned and pressed by the tooling. The pressure points set by the tooling are all on the weld bead. The traditional pressing method is adopted, and they are pressed and released together. When the welding robot welds to a special position (when the tooling presses the weld bead area), the position where the tooling contacts the weld bead cannot be well welded and cannot meet the welding requirements. Therefore, a timing-controlled stir friction welding tooling for new energy vehicle battery packs is required. Utility Model Content
[0004] In view of the problems existing in the prior art, the purpose of the utility model is to provide a time-controlled friction stir welding tool for new energy vehicle battery packs to solve the background technology problems.
[0005] To achieve the above purpose, the utility model adopts the following technical solution.
[0006] A time-controlled friction stir welding tool for a battery pack of a new energy vehicle comprises a tool base plate, an electric control cabinet is arranged on the left side of the tool base plate, and a support unit, four limit blocks, two side push units and evenly distributed upper pressing units are arranged on the top of the tool base plate;
[0007] The support unit comprises a support plate, the bottom of the support plate is fixedly connected to the tooling bottom plate, and the top of the support plate is interspersed with evenly distributed electric push rods 1;
[0008] The side push unit comprises an electric push rod 2, the bottom of which is fixedly connected to the tooling bottom plate, and one end of which is fixedly connected to a positioning block;
[0009] The upper pressing unit comprises a cylinder, the bottom of which is fixedly connected to the tooling bottom plate, and the top of which is fixedly connected to a pressing arm.
[0010] As a further description of the above technical solution:
[0011] The electric control cabinet is provided with a PP72 / 48DPN module inside, and the output end of the electric control cabinet is respectively connected with the electric push rod 1, the electric push rod 2 and the cylinder signal.
[0012] Compared with the prior art, the advantages of the present invention are:
[0013] This solution adds an electric control part, using PLC to control the timing of the clamping part to release and clamp, which can not only meet the welding requirements to make the weld smooth, but also reduce the manual operation part and speed up production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a positional relationship diagram of the battery pack frame and the water cooling plate in the utility model;
[0015] Figure 2 It is a schematic diagram of the structure of the utility model;
[0016] Figure 3 This is a schematic diagram of the utility model after the workpiece positioning is completed;
[0017] Figure 4 It is a three-dimensional diagram of the upper pressing unit in the utility model.
[0018] Description of the numbers in the figure:
[0019] 1. Tooling base plate; 2. Electric control cabinet; 3. Support unit; 301. Support plate; 302. Electric push rod 1; 4. Limit block; 5. Side push unit; 501. Electric push rod 2; 502. Positioning block; 6. Upper clamping unit; 601. Cylinder; 602. Pressing arm; 7. PP72 / 48DPN module. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0021] See also Figures 2 to 4 In the utility model: a time-controlled friction stir welding tool for new energy vehicle battery packs, comprising a tool base plate 1, an electric control cabinet 2 is arranged on the left side of the tool base plate 1, and a support unit 3, four limit blocks 4, two side push units 5 and evenly distributed upper clamping units 6 are arranged on the top of the tool base plate 1.
[0022] The support unit 3 includes a support plate 301 , the bottom of the support plate 301 is fixedly connected to the tooling bottom plate 1 , and the top of the support plate 301 is interspersed with evenly distributed electric push rods 302 .
[0023] The side push unit 5 includes an electric push rod 501 , the bottom of which is fixedly connected to the tooling bottom plate 1 , and one end of which is fixedly connected to a positioning block 502 .
[0024] The upper pressing unit 6 comprises a cylinder 601 , the bottom of the cylinder 601 is fixedly connected to the tooling bottom plate 1 , and the top of the cylinder 601 is fixedly connected to a pressing arm 602 .
[0025] The PP72 / 48DPN module 7 is arranged inside the electric control cabinet 2, and the output end of the electric control cabinet 2 is respectively connected with the electric push rod 1 302, the electric push rod 2 501 and the cylinder 601.
[0026] In the present invention, after the workpiece is placed on the top of the support plate 301, multiple electric push rods 302 are turned on at the same time. After the electric push rod 302 is turned on, the workpiece to be welded will be moved to a suitable height to position the height of the welded workpiece. At this time, two electric push rods 501 are turned on. The electric push rods 501 will drive the two positioning blocks 502 to move toward the two corners of the workpiece until the positioning blocks 502 contact the two corners of the workpiece. With the movement of the positioning blocks 502, the workpiece will be tightly attached to the limit blocks 4, thereby completing the positioning of the workpiece. At this time, the user turns on the cylinders 601 distributed around the workpiece, and the cylinders 601 will drive the pressure arms 602 to descend until they are tightly attached to the workpiece and the weld. After the workpiece is clamped, the welding robot is turned on and starts welding according to the specified path. When the welding robot is about to weld to the nearest pressure arm 602 area, the PP72 / 48DPN module 7 inside the electric control cabinet 2 will control the cylinder 601 to start in reverse to move the pressure arm 602 away from the weld position until the welding of the area is completed. The cylinder 601 is turned on again and then the workpiece is clamped. During the entire welding process, the PP72 / 48DPN module 7 is connected to the machine tool PLC to control the timing of opening and clamping the pressure arm 602 in the welding area during the welding process. After the welding is completed, all pneumatic clamping units are opened, and the staff takes away the completed workpiece and loads the next workpiece to work.
[0027] The above are only preferred specific implementations of the utility model; however, the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and improved ideas of the utility model within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model.
Claims
1. A time-controlled friction stir welding tool for a new energy vehicle battery pack, comprising a tool base plate (1), characterized in that: An electric control cabinet (2) is arranged on the left side of the tooling base plate (1), and a support unit (3), four limit blocks (4), two side push units (5) and evenly distributed upper pressing units (6) are arranged on the top of the tooling base plate (1); The support unit (3) comprises a support plate (301), the bottom of the support plate (301) is fixedly connected to the tooling bottom plate (1), and the top of the support plate (301) is interspersed with evenly distributed electric push rods (302); The side push unit (5) comprises a second electric push rod (501), the bottom of which is fixedly connected to the tooling bottom plate (1), and one end of which is fixedly connected to a positioning block (502); The upper pressing unit (6) comprises a cylinder (601), the bottom of the cylinder (601) is fixedly connected to the tooling base plate (1), and the top of the cylinder (601) is fixedly connected to a pressing arm (602).
2. According to the timing-controlled friction stir welding tool for new energy vehicle battery packs of claim 1, it is characterized in that: The electric control cabinet (2) is provided with a PP72 / 48DPN module (7) inside, and the output end of the electric control cabinet (2) is respectively connected to the electric push rod 1 (302), the electric push rod 2 (501) and the cylinder (601) for signal.