Circulating water pump replacement and installation construction equipment

By designing the circulating water pump to replace and install construction equipment, lifting and transferring the pump with gears and motor drive systems, and adjusting the position through movable load legs, the inconvenience of manually lifting and adjusting the pump in traditional methods is solved, and the efficiency of replacement and installation is improved and convenience reduce labor consumption.

CN222118701UActive Publication Date: 2024-12-06SHANDONG SUBANG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323640738.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-12-06
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

During the replacement and installation of circulating water pumps, traditional technology requires partial or large-scale disassembly of the water pump equipment and pipelines. Due to the large weight of the pump, it is inconvenient to lift and carry manually, which increases labor demand, and the installation of new pumps requires repeated adjustments. location, increasing labor intensity.

Method used

A circulating water pump replacement and installation construction equipment is designed, including support frames, threaded rods, winding wheels, drive motors, hanging ropes and clamping devices. Through gears and motor drive systems, the waste pump can be lifted and transferred safely and effectively, and Adjust the position of the pump by movable load legs to reduce manual labor.

Benefits of technology

By reducing the number of times the pump is manually lifted and adjusted, the equipment significantly reduces the labor intensity of workers, improves the efficiency and convenience of replacement and installation of circulating water pumps, reduces manpower use, and solves the problem of high labor consumption in traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222118701U_ABST
    Figure CN222118701U_ABST
Patent Text Reader

Abstract

The utility model discloses circulating water pump replacement and installation construction equipment, which belongs to the field of circulating water pump replacement and installation construction, and comprises a support frame, a plurality of first bearings are fixedly embedded on the inner side wall of the support frame, and the inner ring of each group of first bearings is fixedly connected with a threaded rod; according to the device, a waste circulating water pump to be replaced can be lifted through a winding wheel and a clamping device which are arranged in the device, the waste circulating water pump can be transferred through a second driving motor under the cooperation of a supporting frame and two threaded rods, and a new circulating water pump is lifted and moved to a proper position; according to the circulating water pump replacing and installing device, a worker can conveniently install the circulating water pump, the device can be more practical through carrying legs which are arranged in the device and can move to change the interval, and therefore in the process of replacing and installing the circulating water pump, manpower can be effectively reduced through the device, and the problem that the circulating water pump is repeatedly lifted, so that the working efficiency is improved is solved. And the labor force of workers is easily increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of circulating water pump replacement and installation construction, in particular to circulating water pump replacement and installation construction equipment. Background Art

[0002] If the water pump does not operate for a long time, the pump body, pipelines and valves will rust and corrode due to the precipitation and erosion of the medium, or they may be blocked and stuck by the sediment. In addition, the motor is also susceptible to moisture if it does not operate for a long time, which reduces the insulation performance. Frequent switching of the water pump can ensure that the equipment is in good standby condition.

[0003] At present, when replacing and upgrading industrial and civil circulating water pump devices, traditional technology requires partial or even large-scale disassembly of the original installation system of the water pump equipment and pipelines, and the weight of the circulating water pump is generally large, so it is very inconvenient to lift and carry it manually, and when installing the replaced new circulating water pump, it is necessary to adjust its position repeatedly, so workers are required to lift the circulating water pump repeatedly. Multiple liftings are likely to increase the labor of the workers. Therefore, technical personnel in this field provide a circulating water pump replacement and installation construction equipment to solve the problems raised in the above background technology. Utility Model Content

[0004] The utility model aims to provide a circulating water pump replacement and installation construction equipment to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A circulating water pump replacement and installation construction equipment, comprising a support frame, the inner wall of the support frame is fixedly inlaid with a plurality of first bearings, the inner ring of each group of the first bearings is fixedly connected to a threaded rod, the outer surfaces of the two threaded rods are threadedly connected to moving blocks, the bottom surfaces of the two moving blocks are commonly fixedly connected to a hanging plate, the upper surface of the hanging plate is fixedly connected to a winding wheel, the front end of the winding wheel is fixedly connected to a first driving motor, the left side of the support frame is fixedly connected to a connecting frame, the inner wall of the connecting frame is fixedly inlaid with two second bearings, the inner rings of the two second bearings are commonly fixedly connected to a connecting rod, the left ends of the two threaded rods are fixedly connected to a first gear, the outer surface of the connecting rod is fixedly connected to two second gears, each of the first gears is meshed with the second gear, and the front end of the connecting rod is fixedly connected to the second driving motor.

[0007] As a further solution of the utility model: a suspension rope is wound around the outer surface of the winding wheel, and a clamping device is fixedly connected to the bottom end of the suspension rope.

[0008] As a further solution of the utility model: a plurality of slide grooves are provided on the inner wall of the support frame, and two sliding blocks are fixedly connected to the outer surfaces of the two moving blocks, and each of the slide grooves is adapted to the sliding block.

[0009] As a further solution of the utility model: a protection frame is fixedly connected to the front side of the connection frame, and a heat dissipation window is provided on the front side of the protection frame.

[0010] As a further solution of the utility model: a control panel is fixedly connected to the front side of the support frame, and a sliding frame is fixedly connected to the right side of the support frame and the left side of the connecting frame.

[0011] As a further solution of the utility model: the bottom surfaces of the two sliding frames are each provided with two loading legs, and the bottom end of each loading leg is fixedly connected to a mounting pad.

[0012] As a further solution of the utility model: the two sliding frames are provided with through openings on their side surfaces away from each other, and the interior of each through opening is threadedly connected with two bolts.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] The circulating water pump replacement and installation construction equipment can lift the old circulating water pump to be replaced through the winding wheel and clamping device provided in the device, and with the cooperation of the support frame and the two threaded rods, the second drive motor can transport the old circulating water pump and lift the new circulating water pump to a suitable position, so that the workers can install the circulating water pump conveniently. The movable loading legs with changeable spacing provided in the device can make the device more practical. Therefore, in the process of replacing and installing the circulating water pump, the device can effectively reduce the use of manpower, and solves the problem of repeatedly lifting the circulating water pump, which easily increases the labor force of the workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional structural schematic diagram of a circulating water pump replacement and installation construction equipment;

[0016] Figure 2 It is a schematic diagram of the top-down structure of a circulating water pump replacement and installation construction equipment;

[0017] Figure 3 Replacement and installation of a circulating water pump Figure 2 The enlarged structural diagram at A in the middle;

[0018] Figure 4 This is a schematic diagram of the side section structure of a circulating water pump replacement and installation construction equipment.

[0019] In the figure: 1. support frame; 2. connecting frame; 3. bolts; 4. through-port; 5. loading legs; 6. mounting pads; 7. heat dissipation window; 8. control panel; 9. protection frame; 10. sliding frame; 11. threaded rod; 12. moving block; 13. first bearing; 14. second drive motor; 15. connecting rod; 16. second gear; 17. first gear; 18. first drive motor; 19. winding wheel; 20. suspension plate; 21. slide groove; 22. slider; 23. suspension rope; 24. clamping device; 25. second bearing. DETAILED DESCRIPTION

[0020] In the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present utility model, unless otherwise specified, "multiple" means two or more.

[0021] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0022] See also Figures 1 to 4In an embodiment of the utility model, a circulating water pump replacement and installation construction equipment comprises a support frame 1, the inner side wall of the support frame 1 is fixedly inlaid with a plurality of first bearings 13, the inner ring of each group of first bearings 13 is fixedly connected with a threaded rod 11, the outer surfaces of the two threaded rods 11 are threadedly connected with a moving block 12, the bottom surfaces of the two moving blocks 12 are commonly fixedly connected with a hanging plate 20, the upper surface of the hanging plate 20 is fixedly connected with a winding wheel 19, the front end of the winding wheel 19 is fixedly connected with a first driving motor 18, the left side of the support frame 1 is fixedly connected with a connecting frame 2, the inner wall of the connecting frame 2 is fixedly inlaid with two second bearings 25, the inner rings of the two second bearings 25 are commonly fixedly connected with a connecting rod 15, the left ends of the two threaded rods 11 are fixedly connected with a first gear 17, the outer surface of the connecting rod 15 is fixedly connected with two second gears 16, each first gear 17 is meshed with the second gear 16, and the front end of the connecting rod 15 is fixedly connected with a second driving motor 14.

[0023] A hanging rope 23 is wound around the outer surface of the winding wheel 19, and a clamping device 24 is fixedly connected to the bottom end of the hanging rope 23 to facilitate lifting the waste circulating water pump. A plurality of slide grooves 21 are provided on the inner wall of the support frame 1, and two sliders 22 are fixedly connected to the outer surfaces of the two moving blocks 12, and each slide groove 21 is adapted to the slider 22. A protective frame 9 is fixedly connected to the front of the connecting frame 2, and a heat dissipation window 7 is provided on the front of the protective frame 9 to dissipate heat for the drive motor and ensure the normal operation of the device.

[0024] A control panel 8 is fixedly connected to the front of the support frame 1, and a sliding frame 10 is fixedly connected to the right side of the support frame 1 and the left side of the connecting frame 2, so as to facilitate the control of the device. Two loading legs 5 are provided on the bottom surfaces of the two sliding frames 10, and a mounting pad 6 is fixedly connected to the bottom end of each loading leg 5. A through opening 4 is provided on the side surfaces of the two sliding frames 10 that are away from each other, and two bolts 3 are threadedly connected to the inside of each through opening 4, so as to ensure the stability of the device during operation.

[0025] The working principle of the utility model is: this kind of circulating water pump replacement and installation construction equipment, when in use, first the staff will place the device in a suitable position, and by screwing a plurality of bolts 3, a plurality of load-bearing legs 5 in the device can be placed in a suitable position to support the device, and secondly, the clamping device 24 in the device is used to clamp the waste circulating water pump with the cooperation of a plurality of auxiliary workpieces, and then the first drive motor 18 is started through the control panel 8, so that the first drive motor 18 drives the winding wheel 19 to rotate, so that the suspension rope 23 is recovered, so that the waste circulating water pump can be pulled out, and then the second drive motor 14 in the device, with the cooperation of a plurality of gears and threaded rods 11, transports the waste circulating water pump to a suitable position, and finally the staff repeats the above operations to install a new circulating water pump in a suitable position.

[0026] The above is only a preferred specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solution and utility model concept of the utility model within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. For those skilled in the art, it is obvious that the utility model is not limited to the details of the above exemplary embodiments, and can be implemented in other specific forms without departing from the spirit or basic features of the utility model. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the utility model is limited by the attached claims rather than the above description, so it is intended to include all changes that fall within the meaning and scope of the equivalent elements of the claims in the utility model. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0027] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A circulating water pump replacement and installation construction equipment, comprising a support frame (1), characterized in that: The inner wall of the support frame (1) is fixedly inlaid with a plurality of first bearings (13); the inner ring of each group of the first bearings (13) is fixedly connected to a threaded rod (11); the outer surfaces of the two threaded rods (11) are threadedly connected to a moving block (12); the bottom surfaces of the two moving blocks (12) are commonly fixedly connected to a hanging plate (20); the upper surface of the hanging plate (20) is fixedly connected to a winding wheel (19); the front end of the winding wheel (19) is fixedly connected to a first driving motor (18); the left side surface of the support frame (1) A connecting frame (2) is fixedly connected, two second bearings (25) are fixedly embedded on the inner wall of the connecting frame (2), the inner rings of the two second bearings (25) are commonly fixedly connected to a connecting rod (15), the left ends of the two threaded rods (11) are fixedly connected to a first gear (17), the outer surface of the connecting rod (15) is fixedly connected to two second gears (16), each of the first gears (17) is meshed with the second gear (16), and the front end of the connecting rod (15) is fixedly connected to a second drive motor (14).

2. The circulating water pump replacement and installation construction equipment according to claim 1, characterized in that: A suspension rope (23) is wound around the outer surface of the winding wheel (19), and a clamping device (24) is fixedly connected to the bottom end of the suspension rope (23).

3. The circulating water pump replacement and installation construction equipment according to claim 1, characterized in that: The inner wall of the support frame (1) is provided with a plurality of slide grooves (21), and the outer surfaces of the two moving blocks (12) are fixedly connected to two sliding blocks (22), and each of the slide grooves (21) is adapted to fit the sliding block (22).

4. The circulating water pump replacement and installation construction equipment according to claim 1, characterized in that: A protective frame (9) is fixedly connected to the front of the connection frame (2), and a heat dissipation window (7) is provided on the front of the protective frame (9).

5. The circulating water pump replacement and installation construction equipment according to claim 1, characterized in that: A control panel (8) is fixedly connected to the front of the support frame (1), and a sliding frame (10) is fixedly connected to the right side of the support frame (1) and the left side of the connection frame (2).

6. The circulating water pump replacement and installation construction equipment according to claim 5, characterized in that: The bottom surfaces of the two sliding frames (10) are each provided with two object-carrying legs (5), and the bottom end of each object-carrying leg (5) is fixedly connected to a mounting pad (6).

7. The circulating water pump replacement and installation construction equipment according to claim 5, characterized in that: A through opening (4) is provided on the side surfaces of the two sliding frames (10) that are away from each other, and two bolts (3) are threadedly connected inside each of the through openings (4).