Auxiliary mounting bracket structure for electric power engineering

By designing an auxiliary installation bracket structure for power engineering including bottom plate, wire retraction roller, hydraulic cylinder, hydraulic rod, working platform and roller, the problem of integration of lifting mechanism and cable retraction in the prior art is solved, and the problem of integration of lifting mechanism and cable retraction in the existing technology is realized. The effect of convenient installation of cables at high places and portability.

CN222118810UActive Publication Date: 2024-12-06JINAN ZHONGTE ELECTRIC POWER ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420364350.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-27
Publication Date
2024-12-06
Estimated Expiration
2034-02-27

AI Technical Summary

Technical Problem

The lifting mechanism and cable retracting and laying mechanism of the existing power engineering auxiliary installation bracket structure are incompatible, resulting in a large area of ​​the equipment, bulky and high cost, and failure to effectively utilize the space.

Method used

A power engineering auxiliary installation bracket structure including bottom plate, line retraction roller, hydraulic cylinder, hydraulic rod, working platform, lift plate, roller and threaded rod is designed. The threaded rod is driven to rotate and lift the lift plate by the motor, and the hydraulic rod is adjusted. Platform height, rollers and threaded rods are adjusted to accommodate cables of different diameters, enabling convenient installation of cables at high places.

Benefits of technology

It realizes the convenience and flexibility of cable winding and installation, reduces the equipment's footprint, improves mobile portability and adaptability, and is suitable for various cable diameters.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222118810U_ABST
    Figure CN222118810U_ABST
Patent Text Reader

Abstract

The utility model discloses an electric power engineering auxiliary installation support structure which comprises a bottom plate and a take-up roller and is characterized in that a cable is wound on the surface of the take-up roller, hydraulic cylinders are arranged at the four corners of the top of the bottom plate, hydraulic rods are arranged at the tops of the hydraulic cylinders, a working platform is arranged at the tops of the hydraulic rods, and the working platform is arranged on the bottom plate. Side plates are arranged on the top, close to the front face, of the bottom plate, a lifting plate is arranged between the two side plates, a first rolling wheel is arranged in the center of the top of the lifting plate, and a second rolling wheel is arranged below the first rolling wheel. According to the electric power engineering auxiliary installation support structure, a cable is wound on the take-up roller, a first threaded rod is driven by a motor to rotate to lift the lifting plate, an operator adjusts the height of the working platform through a hydraulic cylinder, it is ensured that the operator can make contact with the cable to conduct installation operation when the cable is located at the high position, and the working platform is located above the take-up roller; the whole platform is relatively small in occupied space, convenient to move and high in portability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electric power engineering, in particular to an auxiliary installation bracket structure for electric power engineering. Background Art

[0002] Power engineering is engineering related to the production, transmission and distribution of electric energy. In a broad sense, it also includes engineering that uses electricity as power and energy in various fields. At the same time, it can be understood that the power transmission and transformation industry is expanding, so the laying of cables is particularly important. There are many auxiliary installation structures for cable laying in the prior art, such as the prior art: CN217720491U, an auxiliary installation bracket for power engineering, which belongs to the field of power engineering construction technology, including a load-bearing base, and the bottom of the load-bearing base is provided with electric pulleys near the edges of the four corners.

[0003] There are other existing technologies:

[0004] CN216750945U, an auxiliary mounting bracket for electric power engineering;

[0005] CN219991049U, an auxiliary installation lifting device for electric power engineering.

[0006] The single-profit engineering auxiliary installation bracket structure mentioned in the above-mentioned prior art can cope with high-altitude cable installation, but the lifting mechanism and the cable winding and unwinding mechanism of some prior arts are not integrated, or are only simply connected. The overall footprint of the device is large, and the effective space is not reasonably utilized, resulting in bulky equipment and increased costs. Utility Model Content

[0007] The purpose of the utility model is to provide an auxiliary installation bracket structure for electric power engineering to solve the problems raised in the above background technology.

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: an auxiliary installation bracket structure for electric power engineering, comprising a base plate, characterized in that: tripods are arranged on both sides of the top of the base plate, a take-up roller is arranged between the two tripods, and a cable is rolled up on the surface of the take-up roller, a hydraulic cylinder is arranged at the four corners of the top of the base plate, a hydraulic rod is arranged on the top of the hydraulic cylinder, and a working platform is arranged on the top of the hydraulic rod, a side plate is arranged on the top of the base plate near the front, a slide groove is opened on one side of the side plate, a motor is installed on the top of the side plate, a lifting plate is arranged between the two side plates, threaded holes are opened through the top of the lifting plate near the two sides, a threaded rod 1 is rotatably installed in the threaded hole, bosses are fixedly connected to the left and right sides of the lifting plate, the boss is arranged in the slide groove, a roller 1 is arranged at the center position of the top of the lifting plate, and a roller 2 is arranged below the roller 1.

[0009] Preferably, a sleeve rod is installed through the center of the roller one, the lifting plate is provided with insertion holes on the left and right sides of the roller one, the threaded rod two is inserted into the insertion holes, and an adjustment hole is provided between the insertion holes and the roller one.

[0010] Preferably, circular arcs are formed on the surfaces of the roller one and the roller two.

[0011] Preferably, the second bottom of the threaded rod is fixedly connected to a limiting block.

[0012] Preferably, a guardrail is provided on the top of the working platform near the edge, and an escalator is provided on the left side of the top of the working platform.

[0013] Preferably, a handle is fixedly connected to the top of the second threaded rod.

[0014] Preferably, casters are provided at the bottom of the base plate.

[0015] Preferably, an arc-shaped notch is provided on the front side of the working platform near the first roller and the second roller.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] 1. The auxiliary installation bracket structure of the power engineering project, the cable is wound on the take-up roller, one end passes between roller one and roller two, the motor drives the threaded rod one to rotate and raise the lifting plate, and raises one end of the cable. The operator adjusts the height of the working platform through the hydraulic rod to ensure that the operator can also touch the cable for installation operation when the cable is at a higher place. The working platform is located above the take-up roller. The entire platform occupies a relatively small space, is easy to move, and is highly portable.

[0018] 2. The auxiliary installation bracket structure of the power engineering project adjusts the distance between the roller one and the roller two by rotating the threaded rod two to allow the sleeve rod to slide on the threaded rod two. The gap size between the roller one and the roller two changes to be suitable for cables of various diameters. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the structure of the utility model;

[0020] Figure 2 It is a schematic diagram of another perspective of the structure of the utility model;

[0021] Figure 3 This is a cross-sectional view of the lifting plate of the utility model structure;

[0022] Figure 4 for Figure 3 An enlarged view of point A is shown.

[0023] In the figure: 1. bottom plate; 2. tripod; 3. take-up roller; 4. cable; 5. hydraulic cylinder; 6. hydraulic rod; 7. side plate; 8. slide; 9. threaded rod one; 10. working platform; 11. guardrail; 12. escalator; 13. motor; 14. lifting plate; 15. threaded hole; 16. threaded rod two; 17. sleeve rod; 18. roller one; 19. roller two; 20. adjustment hole; 21. socket; 22. limit block; 23. caster. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] Example: See Figure 1 The utility model provides a technical solution: an auxiliary installation bracket structure for electric power engineering.

[0026] Among them, tripods 2 are arranged on both sides of the top of the bottom plate 1, a take-up roller 3 is arranged between the two tripods 2, and a cable 4 is rolled up on the surface of the take-up roller 3, hydraulic cylinders 5 are arranged at the four corners of the top of the bottom plate 1, a hydraulic rod 6 is arranged on the top of the hydraulic cylinder 5, and a working platform 10 is arranged on the top of the hydraulic rod 6, a side panel 7 is arranged on the top of the bottom plate 1 near the front, a slide groove 8 is opened on one side of the side panel 7, a motor 13 is installed on the top of the side panel 7, a lifting plate 14 is arranged between the two side panels 7, threaded holes 15 are opened through the top of the lifting plate 14 near both sides, a threaded rod 9 is rotatably installed in the threaded hole 15, bosses are fixedly connected on the left and right sides of the lifting plate 14, the bosses are arranged in the slide groove 8, a roller 18 is arranged at the center position of the top of the lifting plate 14, and a roller 2 19 is arranged below the roller 18

[0027] In this embodiment, the cable 4 is wound on the winding roller 3, and the winding roller 3 is set up by the tripod 2. The operator can push the wound winding roller 3 into the device from the back and install it on the tripod, pull the cable 4 at the other end, and the winding roller 3 rotates to release the cable, and the other end of the cable 4 passes between the two rollers. When the cable 4 is installed at a low position, the lifting plate 14 is located below the working platform 10, and the operator does not need to climb onto the working platform 10 to operate and install the cable 4. When the cable 4 is installed at a high position, the operator cannot install it without the help of tools. When the lifting plate 14 is lifted up, the lifting platform 14 is lifted up and the lifting platform 14 is installed. The lifting plate 14 is installed in the lifting platform 14 and the lifting platform 14 is installed in the lifting platform 14. The lifting plate 14 is installed in the lifting platform 14 and the lifting platform 14 is installed in the lifting platform 14. The lifting plate 14 is installed in the lifting platform 14 and the lifting plate 14 is installed in the lifting platform 14. When the lifting plate 14 is lifted up, the ... installed

[0028] Among them, a sleeve rod 17 is installed through the center of roller 18, and the lifting plate 14 has holes 21 on the left and right sides of roller 18. The threaded rod 2 16 is inserted into the hole 21, and an adjustment hole 20 is set between the hole 21 and roller 18.

[0029] In this embodiment, holes are formed at both ends of the sleeve rod 17, and threads are formed in the holes to engage with threads on the threaded rod 16. By rotating the two threaded rods 16 at the same time, the sleeve rod 17 can move in the adjustment hole 20, driving the roller 18 to move, while the position of the roller 19 is fixed. The distance between the two rollers can be adjusted by moving the roller 18, so that cables 4 of different diameters can pass between the two rollers.

[0030] The surfaces of roller 1 18 and roller 2 19 are provided with circular arcs.

[0031] In this embodiment, the arc can better fit the cable 4 and increase the contact area with the cable 4, so that the two rollers can better clamp the cable 4.

[0032] The bottom of the threaded rod 16 is fixedly connected to the limiting block 22 .

[0033] In this embodiment, the diameter of the limit block 22 is larger than the diameter of the threaded rod 16 and smaller than the diameter of the insertion hole 21. It is embedded in the bottom of the insertion hole 21 to ensure that the threaded rod 16 will not fall out from the bottom when rotating and will not move up and down when rotating, thereby prompting the sleeve rod 17 to move.

[0034] A guardrail 11 is provided on the top of the working platform 10 near the edge, and an escalator 12 is provided on the left side of the top of the working platform 10 .

[0035] In this embodiment, the operator climbs up the escalator 12 to get onto the working platform 10 . Since the working platform 10 is at a relatively high height after being raised, the guardrail 11 can prevent the operator from accidentally falling off the working platform 10 .

[0036] Among them, a handle is fixedly connected to the top of the threaded rod 16.

[0037] In this embodiment, the handle passes through the top of the second threaded rod 16 horizontally, and it is more convenient for the operator to hold the handle when rotating the second threaded rod 16.

[0038] Among them, casters 23 are arranged at the bottom of the base plate 1.

[0039] In this embodiment, the entire device can be moved relatively easily by the casters 23, thereby improving the portability of the entire device.

[0040] An arc-shaped notch is provided on the front side of the working platform 10 near the roller 1 18 and the roller 2 19 .

[0041] In this embodiment, when the lifting plate 14 is raised above the working platform 10, the cable 4 passes through the notch in the front of the working platform 19 to connect to the take-up roller 3, so as to avoid the cable 4 from rupturing due to friction with the working platform 10 when being pulled.

[0042] Working principle: The auxiliary installation bracket structure of the power engineering project is moved to a suitable position through the casters 23, the front of the lifting plate 14 is aligned with the installation cable, the cable 4 passes between the roller 18 and the roller 2 19, the threaded rod 2 16 is rotated to adjust the distance between the two rollers to compress the cable, and the motor 13 is started to drive the two threaded rods 19 to rotate to drive the lifting plate 14 upward until the height is suitable. At this time, the operator climbs onto the working platform 10 through the escalator 12, and the hydraulic cylinder 5 drives the hydraulic rod 6 to lift the working platform 10 to raise it until the operator can contact the cable on the lifting plate 14, and loosens the roller 18 so that the cable can be pulled freely between the two rollers. At this time, the operator can start to arrange the cables.

[0043] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An auxiliary installation support structure for electric power engineering, comprising a base plate (1), characterized in that: Tripods (2) are arranged on both sides of the top of the bottom plate (1), a wire take-up roller (3) is arranged between the two tripods (2), a wire take-up roller (3) is wound with a cable (4) on its surface, hydraulic cylinders (5) are arranged at the four corners of the top of the bottom plate (1), a hydraulic rod (6) is arranged on the top of the hydraulic cylinder (5), a working platform (10) is arranged on the top of the hydraulic rod (6), a side plate (7) is arranged near the front of the top of the bottom plate (1), a slide groove (8) is opened on one side of the side plate (7), and the side plate (7) A motor (13) is installed on the top, a lifting plate (14) is arranged between the two side plates (7), a threaded hole (15) is opened through the top of the lifting plate (14) near both sides, a threaded rod (9) is rotatably installed in the threaded hole (15), a boss is fixedly connected to the left and right sides of the lifting plate (14), the boss is arranged in the slide groove (8), a roller (18) is arranged at the center position of the top of the lifting plate (14), and a roller (19) is arranged below the roller (18).

2. The auxiliary installation bracket structure for electric power engineering according to claim 1, characterized in that: A sleeve rod (17) is installed through the center of the roller one (18), and the lifting plate (14) is provided with insertion holes (21) on the left and right sides of the roller one (18), and the threaded rod two (16) is inserted into the insertion holes (21), and an adjustment hole (20) is provided between the insertion holes (21) and the roller one (18).

3. The auxiliary installation bracket structure for electric power engineering according to claim 1, characterized in that: The surfaces of the roller one (18) and the roller two (19) are provided with circular arcs.

4. The auxiliary installation bracket structure for electric power engineering according to claim 2, characterized in that: The bottom of the second threaded rod (16) is fixedly connected to a limiting block (22).

5. The auxiliary installation bracket structure for electric power engineering according to claim 1, characterized in that: A guardrail (11) is arranged on the top of the working platform (10) near the edge, and an escalator (12) is arranged on the left side of the top of the working platform (10).

6. The auxiliary installation bracket structure for electric power engineering according to claim 2, characterized in that: A handle is fixedly connected to the top of the second threaded rod (16).

7. The auxiliary installation bracket structure for electric power engineering according to claim 1, characterized in that: Casters (23) are provided at the bottom of the base plate (1).

8. The auxiliary installation bracket structure for electric power engineering according to claim 1, characterized in that: The front of the working platform (10) is provided with an arc-shaped notch near the position of the roller one (18) and the roller two (19).