Bridge jacking device
Through the coordination of oblong nut bolts and nuts, the problem of cumbersome connection between jacks and distribution beams in bridge hoisting construction is solved, rapid disassembly and efficient construction is achieved, and construction efficiency and prefabrication are improved.
Patent Information
- Application Number
- CN202420431704.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-06
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-06
AI Technical Summary
In the construction of existing bridge hoisting, the connection between the jack and the distribution beam is cumbersome, it requires welding and is difficult to remove, resulting in low construction efficiency and a large number of equipment to operate multiple construction surfaces.
The oblong nut bolt and the oblong nut are used to cooperate, and the jack and distribution beam are quickly connected and disassembled through the bolt hole and threaded rod to avoid welding and realize fully assembled construction.
The construction process is simplified, construction efficiency is improved, rapid disassembly and assembly and reuse is achieved, construction costs are reduced, and construction prefabricated level is improved.
Smart Images

Figure CN222119965U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge jacking construction, and in particular relates to a bridge jacking device. Background Art
[0002] The statements in this section merely provide background technical information related to the present invention and do not necessarily constitute prior art.
[0003] With the advancement of urbanization, the phenomenon of population gathering in cities is becoming more and more common. Some existing urban viaducts can no longer meet the needs of urban travel, so some existing viaducts need to be renovated. Lifting the bridge through jacking construction is a way to renovate existing bridges.
[0004] The main process of bridge jacking is to set up temporary supports at the bottom of the bridge, install jacks and distribution beams, lift the bridge deck from the bottom by jacks, and then transform the bottom structure of the bridge. In this process, the distribution beam and jacks need to be reliably connected.
[0005] At present, the installation of jacks and distribution beams requires welding connecting plates on the distribution beam and jack surfaces respectively, and then connecting them with bolts through the bolt holes on the connecting plates, or directly welding the jacks to the distribution beams. However, if this connection method is used, in addition to adding preparation steps before the jacking construction, the connecting plates on the jacks and distribution beams must be removed after the construction is completed. Usually, the jacking operation needs to be carried out on multiple construction work surfaces at the same time, and the bridge structure is large in size, so a large number of jacks and distribution beams are required, so the traditional method needs to be very cumbersome. Utility Model Content
[0006] In view of the above problems, the utility model provides a bridge jacking device, which can be quickly disassembled and assembled, and the size of the jacking force can be adjusted according to the jacking needs of the bridge. It has strong operability and improves construction efficiency.
[0007] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0008] A bridge jacking device comprises a jack and a distribution beam, wherein the distribution beam is arranged on the upper part of the jack; the jack comprises a jack cylinder, and a first bolt hole is arranged on the upper surface of the jack cylinder; an oblong bolt hole is arranged on the distribution beam, one end of the oblong nut bolt is located in the oblong bolt hole, and the other end of the oblong nut bolt is located in the first bolt hole; an oblong nut is arranged between the jack and the distribution beam, and the oblong nut is arranged on the oblong nut bolt.
[0009] Furthermore, the oblong nut bolt comprises an oblong nut and a threaded rod.
[0010] Furthermore, the lower surface of the oblong nut is in close contact with the inner surface of the distribution beam; and the size of the oblong nut is smaller than the size of the oblong bolt hole.
[0011] Furthermore, the upper surface of the oblong nut is in close contact with the outer surface of the distribution beam, and the lower surface of the oblong nut is in close contact with the upper surface of the jack.
[0012] Furthermore, a second threaded hole is provided on the oblong nut.
[0013] Furthermore, the internal thread of the first bolt hole matches the external thread on the threaded rod.
[0014] Furthermore, the oblong bolt holes are arranged at intervals, and the intervals between each oblong bolt hole are the same.
[0015] Furthermore, an oil nozzle is arranged on one side of the jack cylinder body, the oil nozzle is symmetrically arranged up and down, and the oil nozzle is connected to the inside of the jack cylinder body.
[0016] Furthermore, a handle is provided on the other side of the jack cylinder body, the handle is symmetrically arranged on the left and right, and the handle is fixedly connected to the jack cylinder body.
[0017] Furthermore, the distribution beam is a square beam, and the oblong bolt holes are arranged on the lower surface of the distribution beam.
[0018] Compared with the prior art, the utility model has the following advantages and positive effects:
[0019] The utility model simplifies the process of connecting the jack and the distribution beam during the bridge lifting construction process by matching the jack, the distribution beam, the oblong nut bolt and the oblong nut. The construction method is simple, welding is not required, and the construction efficiency is improved.
[0020] The utility model has strong operability. By setting a plurality of oblong bolt holes on the distribution beam, the number of installed jacks can be adjusted according to the conditions of the bridge. All components are prefabricated in the factory and can be assembled on site without welding, thus realizing a fully assembled construction process. Therefore, the prefabrication level of the construction process is greatly improved, which is green and environmentally friendly. After the bridge jacking construction process is completed, the jack and the distribution beam can be easily disassembled and reused, and the cost is low. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0022] Figure 1It is a three-dimensional structural schematic diagram of the bridge jacking device of the utility model;
[0023] Figure 2 It is a schematic diagram of the three-dimensional structure of the jack of the utility model;
[0024] Figure 3 It is a schematic diagram of the three-dimensional structure of the oblong nut bolt of the utility model;
[0025] Figure 4 It is a schematic diagram of the three-dimensional structure of the second oblong nut of the utility model;
[0026] Figure 5 This is a schematic diagram of the three-dimensional structure of the distribution beam of the utility model;
[0027] In the figure: 1-jack; 11-jack cylinder; 12-oil nozzle; 13-handle; 14-first bolt hole; 2-oblong nut bolt; 21-oblong nut; 22-threaded rod; 3-oblong nut; 31-second threaded hole; 4-distribution beam; 41-oblong bolt hole. DETAILED DESCRIPTION
[0028] It should be noted that the following detailed descriptions are all exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0029] The following is a detailed description of the utility model with reference to the accompanying drawings. The present embodiment discloses a bridge lifting device, such as Figure 1 As shown, it includes a jack 1 and a distribution beam 4, and the distribution beam 4 is arranged on the upper part of the jack 1; the jack 1 includes a jack cylinder 11, and a first bolt hole 14 is arranged on the upper surface of the jack cylinder 11; an oblong bolt hole 41 is arranged on the distribution beam 4, one end of the oblong nut bolt 2 is located in the oblong bolt hole 41, and the other end of the oblong nut bolt 2 is located in the first bolt hole 14; an oblong nut 3 is arranged between the jack 1 and the distribution beam 4, and the oblong nut 3 is arranged on the oblong nut bolt 2.
[0030] The oblong nut of the oblong nut bolt 2 has the same shape as the oblong bolt hole 41 on the distribution beam 4, but is slightly smaller in size than the oblong bolt hole 41 on the distribution beam 4. When the oblong nut of the oblong nut bolt 2 is in the same direction as the oblong bolt hole 41 on the distribution beam 4, the oblong bolt on the distribution beam 4 can be passed through; and after passing through, the oblong nut bolt 2 is twisted to be perpendicular to the oblong bolt hole 41 on the distribution beam 4, so as to realize the anchoring of the bolt inside the steel pipe.
[0031] like Figure 3As shown, the oblong nut bolt 2 comprises an oblong nut 21 and a threaded rod 22. The lower surface of the oblong nut 21 is in close contact with the inner surface of the distribution beam 4; the size of the oblong nut 21 is smaller than the size of the oblong bolt hole 41.
[0032] After the installation is completed, the oblong nut 21 and the oblong nut 3 of the oblong nut bolt 2 are respectively located on the inner and outer sides of the oblong bolt hole 41 and are tightly squeezed and contacted with each other; the threaded rod 22 of the oblong nut bolt 2 is anchored in the first bolt hole 14 of the jack 1.
[0033] like Figure 4 As shown, a second threaded hole 31 is provided in the middle of the oblong nut 3, and the oblong nut 3 is sleeved on the threaded rod 22 through the second threaded hole 31. The upper surface of the oblong nut 3 is in close contact with the outer surface of the distribution beam 4, and the lower surface of the oblong nut 3 is in close contact with the upper surface of the jack 1. The oblong nut 3 cooperates with the oblong nut 21 to clamp the distribution beam 4, thereby connecting the jack 1 and the distribution beam 4.
[0034] The internal thread of the first bolt hole 14 matches the external thread on the threaded rod 22. The oblong nut 3 is first installed on the threaded rod 22, and then the threaded rod 22 is installed in 14.
[0035] like Figure 5 As shown, the distribution beam 4 is a square beam, and oblong bolt holes are arranged on the lower surface of the distribution beam 4. The oblong bolt holes 41 are arranged at intervals, and the intervals between each oblong bolt hole 41 are the same. When in use, the number of jacks 1 installed on the distribution beam 4 can be adjusted according to the lifting needs of the bridge. When the bridge is heavy, a jack 1 can be installed at each oblong bolt hole position to ensure sufficient lifting force; when the bridge is light, the jacks 1 can be installed at intervals, which ensures the lifting force and makes the force distribution uniform.
[0036] An oil nozzle 12 is provided on one side of the jack cylinder 11, and the oil nozzle 12 is symmetrically arranged up and down, and the oil nozzle 12 is connected to the inside of the jack cylinder 11. Hydraulic oil is provided to the jack cylinder 11 through the oil nozzle 12. When it is necessary to lift upward, the lower oil nozzle 12 supplies oil to the jack cylinder 11 to raise the distribution beam 4. When it is necessary to lower, the upper oil nozzle 12 supplies oil to the jack cylinder 11 to lower the distribution beam 4.
[0037] A handle 13 is arranged on the other side of the jack cylinder 11, and the handle 13 is arranged symmetrically, and the handle 13 is fixedly connected to the jack cylinder 11. The direction of the jack 1 is adjusted by the handle 13, so as to ensure that the installation position of the jack 1 is accurate and facilitate the carrying of the jack 1.
[0038] The specific installation process of the distribution beam 4 and the jack 1 is as follows:
[0039] The first step is to hoist the distribution beam 4, install the distribution beam 4 at the bottom of the bridge to be lifted, and have an oblong bolt hole 41 as the bottom surface, facing downward;
[0040] The second step is to screw the oblong nut 3 onto the oblong nut bolt 2;
[0041] Step 3: Screw the oblong nut bolt 2 into the first bolt hole 14 on the jack 1;
[0042] Step 4: Align the oblong nut 21 of the oblong nut bolt 2 with the oblong bolt hole 41 of the distribution beam, then lift the jack to allow the oblong nut 21 of the oblong nut bolt 2 to pass through the oblong bolt hole 41 of the distribution beam and enter the inside of the distribution beam, while the oblong nut 3 is still outside the distribution beam;
[0043] Step 5: adjust the direction of the jack 1 by using the handle 13 of the jack 1 so that the oblong nuts 21 of the oblong nut bolts 2 and the oblong bolt holes 41 are arranged alternately;
[0044] Step 6: rotate and tighten the oblong nut 3 to allow the oblong nut 3 and the oblong nut 21 to squeeze the oblong bolt hole 41 together, thereby completing the installation of the jack 1 and the distribution beam 4.
[0045] Although the above describes the specific implementation methods of the utility model in combination with the accompanying drawings, it is not intended to limit the scope of protection of the utility model. Technical personnel in the relevant field should understand that on the basis of the technical solution of the utility model, various modifications or deformations that can be made by technical personnel in this field without creative work are still within the scope of protection of the utility model.
Claims
1. A bridge lifting device, characterized in that: It includes a jack and a distribution beam, wherein the distribution beam is arranged on the upper part of the jack; the jack includes a jack cylinder, and a first bolt hole is arranged on the upper surface of the jack cylinder; an oblong bolt hole is arranged on the distribution beam, one end of the oblong nut bolt is located in the oblong bolt hole, and the other end of the oblong nut bolt is located in the first bolt hole; an oblong nut is arranged between the jack and the distribution beam, and the oblong nut is arranged on the oblong nut bolt.
2. A bridge lifting device according to claim 1, characterized in that: The oblong nut bolt comprises an oblong nut and a threaded rod.
3. A bridge lifting device as claimed in claim 2, characterized in that: The lower surface of the oblong nut is in close contact with the inner surface of the distribution beam; and the size of the oblong nut is smaller than the size of the oblong bolt hole.
4. A bridge lifting device as claimed in claim 2, characterized in that: The upper surface of the oblong nut is in close contact with the outer surface of the distribution beam, and the lower surface of the oblong nut is in close contact with the upper surface of the jack.
5. A bridge lifting device as claimed in claim 2, characterized in that: A second threaded hole is arranged on the oblong nut.
6. A bridge lifting device as claimed in claim 2, characterized in that: The internal thread of the first bolt hole matches the external thread on the threaded rod.
7. A bridge lifting device as claimed in claim 1, characterized in that: The oblong bolt holes are arranged at intervals, and the intervals between each oblong bolt hole are the same.
8. A bridge lifting device as claimed in claim 1, characterized in that: An oil nozzle is arranged on one side of the jack cylinder body, the oil nozzle is symmetrically arranged up and down, and the oil nozzle is communicated with the inside of the jack cylinder body.
9. A bridge lifting device as claimed in claim 1, characterized in that: A handle is arranged on the other side of the jack cylinder body, the handle is arranged symmetrically on the left and right, and the handle is fixedly connected to the jack cylinder body.
10. A bridge lifting device according to claim 1, characterized in that: The distribution beam is a square beam, and the oblong bolt holes are arranged on the lower surface of the distribution beam.