Curtain wall installation structure for deformation joint of tower building and skirt house roof
By using the structure of connecting components and connecting covers at the deformation joints of the tower and the sponge roof, the construction difficulties and water leakage risks caused by the long distance between the tower curtain wall and the main structural column of the tower are solved, and more efficient space utilization is achieved and waterproof effect.
Patent Information
- Application Number
- CN202420813762.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-18
AI Technical Summary
The deformed joint design at the junction of the tower and the roof of the roof is difficult to effectively deal with the existing technology, resulting in construction difficulties and high water leakage risks when the building junction relationship is complex and the tower curtain wall is far away from the main structural columns of the tower.
The structure of connecting components and connecting covers is connected to the curtain wall through the main structure column of the tower, and the roof of the podium is flexible to connect, reducing the force of the curtain wall of the tower to the main structure of the tower, avoiding the reverse beam and slab Used to achieve smooth and waterproofing effects of indoor and outdoor spaces.
It improves the indoor and outdoor space quality at the deformed joints and the appearance of the curtain wall, reduces the risk of water leakage, simplifies the structural relationship, and reduces the difficulty of waterproof construction.
Smart Images

Figure CN222120649U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering construction, in particular to a curtain wall installation structure used for deformation joints of roofs of towers and skirt buildings. Background Art
[0002] There are usually deformation joints at the junction of the tower and the podium roof or in buildings with similar shapes. In order to meet the flashing structure at the junction of the tower and the podium roof, the design of the deformation joint in such cases is usually done as follows:
[0003] Method 1: Figure 1 As shown, a reverse beam 8 and a cantilever plate 7 are added on one side of the deformation joint of the upper tower indoor A and the lower tower indoor B to support the tower curtain wall 3, and a roof parapet 6 is set on one side of the podium roof C, so that the main structures on both sides of the tower and the podium are disconnected and a deformation joint 1 is formed, and this method requires that the net height difference between the cantilever plate 7 on one side of the tower and the roof floor 5b on one side of the podium is at least 600mm, so as to ensure the basic flashing structural dimensions and construction work space at the junction of the roof parapet 6 on one side of the podium roof and the roof floor 5b; this method is a conventional method, which is only applicable to the situation where the connection relationship between the tower and the roof is simple, and cannot be applied to the situation where the building connection relationship is complex, the tower curtain wall is far away from the tower main structure column, and the design has high requirements for the appearance and integrity of the curtain wall.
[0004] Method 2: Figure 2 As shown, the tower curtain wall 3 is far away from the tower main structure column 2a, and the deformation joint 1 is limited by the position of the tower main structure column 2a and the podium main structure column 2b, and can only be set close to the tower main structure column 2a and the podium main structure column 2b. In this case, there are certain defects in the construction method of the deformation joint: the cantilever plate 7 on one side of the tower (refers to the horizontal components such as cantilever beams / cantilever beams / cantilever heads / dougongs at the eaves to support the eaves purlins so as to achieve a method of eaves without columns on the ground) is too far, and the reinforced concrete structure cannot be realized; the space between the cantilever plate 7 and the roof floor 5b of the podium is narrow and long, and the construction work is difficult; the tower indoor space A has a height difference at the reverse beam 8, which affects the net height and quality of the indoor space.
[0005] Therefore, how to effectively deal with the deformation joints between the tower and the podium roof is a technical problem that needs to be solved urgently. Utility Model Content
[0006] The utility model aims at the technical problems existing in the prior art and provides a curtain wall installation structure for the deformation joint between the tower and the podium roof, so as to meet the requirements of buildings in which the distance between the tower curtain wall and the edge of the structural column is between 1.5 meters and 3 meters, and the deformation joint between the tower and the podium roof is arranged at the edge of the tower structural column, so as to improve the indoor and outdoor space quality at such deformation joints and the aesthetics of the curtain wall appearance, and reduce the risk of water leakage at such deformation joints.
[0007] The utility model solves the above technical problems with the following technical solutions: A curtain wall installation structure for the deformation joint between the tower and the podium roof, comprising: a connection assembly, a connection cover plate;
[0008] One side of the tower curtain wall is connected to the tower main structure column through the connection component, and the other side is flexibly connected to the podium through the connection cover plate, so that the force of the tower curtain wall is transmitted to the tower main structure through the connection component;
[0009] Among them, the length L of the tower curtain wall cantilevered deformation joint 1 is 1.5-3m.
[0010] As a further technical solution, the connection assembly includes a connection embedded part 9c, a cantilever beam, and a side beam connected in sequence;
[0011] The end of the connecting embedded part away from the cantilever beam is connected to the main structural column of the tower, and the end of the side beam 9b away from the cantilever beam is connected to the curtain wall of the tower.
[0012] As a further technical solution, the roof slab of the podium is flush with the indoor floor slab at the same level inside the tower.
[0013] As a further technical solution, the main structural columns of the tower are connected to the deformation joints.
[0014] As a further technical solution, the lower end of the connecting cover plate is connected to the roof parapet of the podium.
[0015] The beneficial effects of the utility model are as follows: utilizing the inefficient building space between the main structural columns of the tower and the curtain wall, setting connection components, connection cover plates, etc. for the installation of the curtain wall, thereby achieving the goal that the tower floor does not need to be turned up and cantilevered, and the podium roof does not need to be lowered, thereby improving the quality of indoor and outdoor spaces at the deformation joints and the aesthetics of the curtain wall appearance, and reducing the risk of water leakage at the deformation joints; the structural relationship is simple and flexible. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a schematic diagram of a conventional curtain wall installation structure in which the deformation joint between the tower curtain wall and the podium roof is relatively close in the first method in the background technology;
[0017] Figure 2This is a schematic diagram of the construction when the deformation joint between the tower curtain wall and the podium roof is far away from each other in the second method in the prior art;
[0018] Figure 3 It is a schematic diagram of the curtain wall installation structure in which the deformation joint between the tower and the podium roof is far away from each other in the utility model.
[0019] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0020] Deformation joint 1, tower main structure column 2a, podium main structure column 2b, tower curtain wall 3, tower internal main structure beam 4a, podium internal main structure beam 4b, indoor floor slab 5a, roof floor slab 5b, roof parapet 6, cantilever plate 7, reverse beam 8, cantilever beam 9a, side beam 9b, connection embedded parts 9c, connection cover plate 9d;
[0021] Expansion joints are located in the upper tower interior A, the lower tower interior B, the podium roof C, and the lower podium interior D. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of this application.
[0023] In the description of this application, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "plurality" means two or more, unless otherwise clearly and specifically defined.
[0024] In the description of the present application, the term "for example" is used to mean "used as an example, illustration or description". Any embodiment described as "for example" in the present application is not necessarily to be construed as being more preferred or advantageous than other embodiments. In order to enable any technician in the field to implement and use the utility model, the following description is given. In the following description, details are listed for the purpose of explanation. It should be understood that a person of ordinary skill in the art can recognize that the utility model can be implemented without using these specific details. In other examples, well-known structures and processes will not be elaborated in detail to avoid unnecessary details that make the description of the utility model obscure. Therefore, the utility model is not intended to be limited to the embodiments shown, but is consistent with the widest range of principles and features disclosed in the present application.
[0025] The utility model provides a curtain wall installation structure for the deformation joint between the tower and the podium roof. Figure 3 The curtain wall installation structure is suitable for buildings where the distance between the tower curtain wall and the tower main structure column 2a is between 1.5 meters and 3 meters, and the deformation joint 1 between the tower and the podium roof C is set at the edge of the tower structure column; specifically, it includes a connection component and a connection cover plate 9d; one side of the tower curtain wall 3 is connected to the tower main structure column 2a through the connection component, and the other side is flexibly connected to the podium through the connection cover plate 9d, that is, the inefficient space A outside the tower main structure column 2a is used to set the connection component and the connection cover plate 9d, so that there is no height difference in the indoor space and there is no need to set the indoor The inner upper inverted beam 8 and the cantilever plate 7 that supports the tower curtain wall 3 utilize the force of the tower curtain wall 3 to be transmitted to the tower main structure through the connecting assembly; wherein, the length L of the cantilevered deformation joint 1 of the tower curtain wall 3 is 1.5-3m. As shown in Example 3 in this embodiment, the length L is 2.3m, and the deformation joint 1 is located indoors and connected to the tower main structure column 2a, which reduces the difficulty of waterproof construction and the risk of water leakage in the later stage. At this time, the indoor D of the lower podium of the deformation joint is located below the roof floor 5b, and the deformation joint 1 connects the tower main structure column 2a and the podium main structure column 2b on both sides.
[0026] In this embodiment, the tower curtain wall 3 is continued up and down, so that the integrity and aesthetics are better, and there is no requirement for the roof of the podium and the floor of the tower to form a height difference, and the structural relationship is simple and flexible.
[0027] More specifically, see Figure 3 , the connection assembly includes a connection embedded part 9c, a cantilever beam 9a, and a side beam 9b connected in sequence; the end of the connection embedded part 9c away from the cantilever beam 9a is connected to the tower main structure column 2a, and the end of the side beam 9b away from the cantilever beam 9a is connected to the tower curtain wall 3. That is, the tower curtain wall 3 is connected to the tower main structure column 2a through the additional cantilever beam 9a, the side beam 9b, and the connection embedded part 9c, and the force is transmitted to the tower main structure. The lower end of the connection cover plate 9d is flexibly connected to the roof parapet 6 of the podium, and waterproof sealing treatment is done. At this time, the tower curtain wall 3 is stressed through the tower main structure column 2a, and will not cause stress to the structure of the podium; the connection cover plate 9d can be vertically connected to the roof parapet 6 and the tower curtain wall 3 at the same time. The cantilever beam 9a and the side beam 9b are steel structures, and the cross-sectional shape and size are determined according to the specific structural calculation.
[0028] In the specific implementation process, the roof floor 5b of the podium of this embodiment is flush with the indoor floor 5a at the same level inside the tower, and the main structure beam 4a inside the tower is flush with the main structure beam 4b inside the podium, that is, there is no anti-edge or height difference indoors, and the tower curtain wall 3 has a larger and more flexible cantilever distance from the tower main structure column 2a.
[0029] The utility model does not need to set up a reverse beam 8, the floor of the indoor space A is flat, and there will be no height difference that affects the local net height and space quality of the tower room; there is no need to set up a cantilever plate 7, and the distance between the tower curtain wall 3 and the tower main structure column 2a is not limited by the cantilever distance of the cantilever plate 7, which has greater flexibility and adaptability; finally, the deformation joint 1 is usually a risk point for engineering water leakage and a weak point for waterproofing, while in this structure, the deformation joint 1 is bent and located in the indoor space A, cleverly converting the conventional "roof deformation joint" into a "floor deformation joint", greatly reducing the risk of engineering water leakage and the difficulty of waterproofing construction.
[0030] It should be noted that in the above embodiments, the description of each embodiment has its own emphasis, and for parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0031] Although the preferred embodiments of the utility model have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the utility model.
[0032] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A curtain wall installation structure for the deformation joint of the tower and the podium roof, characterized in that: It comprises a connection component and a connection cover plate (9d); One side of the tower curtain wall (3) is connected to the tower main structure column (2a) through the connection component, and the other side is flexibly connected to the podium through the connection cover plate (9d), so that the force of the tower curtain wall (3) is transmitted to the tower main structure through the connection component; The length L of the cantilevered deformation joint (1) of the tower curtain wall (3) is 1.5-3m.
2. The curtain wall installation structure for the deformation joint between the tower and the podium roof according to claim 1, characterized in that: The connection assembly comprises a connection embedded part (9c), a cantilever beam (9a), and a side beam (9b) which are connected in sequence; One end of the connecting embedded part (9c) away from the cantilever beam (9a) is connected to the tower main structure column (2a), and one end of the side beam (9b) away from the cantilever beam (9a) is connected to the tower curtain wall (3).
3. The curtain wall installation structure for the deformation joint between the tower and the podium roof according to claim 1, characterized in that: The roof slab (5b) of the podium is flush with the indoor slab (5a) at the same level inside the tower.
4. The curtain wall installation structure for the deformation joint between the tower and the podium roof according to claim 1, characterized in that: The tower main structure column (2a) is connected to the deformation joint (1).
5. The curtain wall installation structure for the deformation joint between the tower and the podium roof according to claim 2, characterized in that: The lower end of the connecting cover plate (9d) is connected to the roof parapet wall (6) of the podium.