Tunnel portal steel box for shield launching
By dividing the steel box for the starting door for shield structure into multiple pieces and welding extension rings, combining water stops and support plates, the water leakage problem at the connection between the steel box and the steel ring is solved, and the sealing and water leakage prevention effect is achieved, improving the improvement of Construction safety and quality.
Patent Information
- Application Number
- CN202420850096.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-23
AI Technical Summary
When the shield starts, the sealing effect of the steel box and the steel ring connection between the tunnel door is poor, resulting in a hidden danger of water leakage and affecting safety.
Design a steel box for starting shield structure, by dividing the box into multiple pieces and connecting it through full welding, adding an extension ring to form an integral structure, combining the water stop and the support plate, reducing the steel box and the steel ring The gap between them forms a multi-layer sealing effect.
It effectively avoids water leakage between the gap between the hole door and the steel box, improves construction safety, simplifies structure and assembly, saves construction period and improves construction quality.
Smart Images

Figure CN222121521U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of shield construction, in particular to a tunnel portal steel box for shield starting. Background Art
[0002] Shield construction refers to a top culvert construction method. On the basis of retaining the traditional top culvert construction and the prefabrication process of the bridge and culvert structure roadside, the structural jacking support method is reformed, and the open excavation is changed to underground shield support. The dark excavation reduces the impact of construction on driving. Generally, when the shield starts in water-rich strata, the tunnel portal will consider installing an extension device; at this time, the shield starting portal will have two folding flaps and curtains. Since the inner flap and curtain are located between the steel ring set at the entrance and the steel box set at the portal, and the sealing effect of the connection between the steel box and the steel ring is poor, because the flap is a block and not a whole ring, there is a certain gap between the flap plates, and this gap will have the risk of water leakage, resulting in low safety. Therefore, we propose a shield starting portal steel box to solve the above-mentioned problems. Utility Model Content
[0003] In order to solve the above problems, the utility model provides a tunnel portal steel box for starting a shield machine, which solves the problem of water leakage that may occur when the shield machine starts.
[0004] The utility model is realized by the following scheme: a shield tunnel portal steel box, comprising a box body, the box body ring is arranged on the outside of the tunnel portal, the outer end of the box body is fixedly connected with a steel ring pre-buried in the tunnel opening, and an extension ring is welded between the box body and the steel ring for sealing;
[0005] The box body includes a plurality of box blocks, and the plurality of box blocks are connected and fixed by full welding. Grouting ball valves are fixedly installed on the plurality of box blocks, and the grouting ball valves connect the inner side and the outer side of the box body.
[0006] A further improvement of the shield tunnel portal steel box of the utility model is that a second fixing plate is fixedly connected to the inner side of the box body, a plurality of groups of second water stop members are arranged around the second fixing plate, and the second fixing plate is fixedly connected to the second water stop member by a second bolt;
[0007] The second water stop includes a second mounting plate, a second flap, a second curtain arranged between the second mounting plate and the second fixed plate, and a second pin installed at the lower end of the second mounting plate and used to connect the second flap. The second bolt passes through the second fixed plate, the second curtain and the second mounting plate in sequence for connection and fixation.
[0008] A further improvement of the shield tunnel portal steel box of the utility model is that a first fixing plate is fixedly connected to the outer side of the box body, a plurality of first water stop members are arranged around the first fixing plate, and the first fixing plate is fixedly connected to the first water stop member by a first bolt;
[0009] The first water stop includes a first mounting plate attached to the first fixed plate, a first flap, a first curtain arranged between the first mounting plate and the steel ring, and a first pin installed at the lower end of the first mounting plate and used to connect the first flap, and the first bolt passes through the first fixed plate, the first mounting plate, the first curtain and the steel ring in sequence for connection and fixing.
[0010] A further improvement of the tunnel portal steel box for starting a shield tunnel in the utility model is that a plurality of support plates are arranged at intervals on the inner circumference of the box body, and the support plates are supported between the first fixing plate and the second fixing plate.
[0011] A further improvement of the shield tunnel portal steel box of the utility model is that a plurality of first screw holes are opened on the box body, a plurality of second screw holes are opened on the steel ring, and the spacing between the plurality of first screw holes is the same as the spacing between the plurality of second screw holes;
[0012] The first bolt passes through the first screw hole on the box body, the first fixing plate, the first mounting plate, the first curtain cloth and the second screw hole on the steel ring in sequence, and is screwed into the threaded sleeve pre-buried in the soil of the hole.
[0013] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0014] The utility model divides the entire box body into multiple blocks, which is beneficial for better installation and fixation of the box body and the steel ring during construction, narrowing the gap between the two, and fully welding the multiple box blocks to form the box body, and then welding an extension ring at the connection between the box body and the steel ring, so that the box body and the steel ring become a whole, which can avoid water leakage in the gap between the tunnel door and the steel box at the start, thereby avoiding water leakage between the flap plates and blocks, achieving a sealing and leak-proof effect, with a simple structure and convenient assembly; it improves the construction quality, effectively saves construction time, and improves the safety of shield starting. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The front view of the shield tunnel portal steel box of the utility model is shown;
[0016] Figure 2 A half-section view of a tunnel portal steel box for launching a shield machine according to the present invention is shown.
[0017] In the figure: 1. box body; 2. grouting ball valve; 3. first water stop; 31. first mounting plate; 32. first pin shaft; 33. first flap; 34. first curtain; 4. first fixed plate; 5. second fixed plate; 6. second water stop; 61. second mounting plate; 62. second flap; 63. second curtain; 64. second pin shaft; 7. support plate; 8. extension ring; 9. steel ring; 10. second bolt; 11. first bolt; 12. threaded sleeve. DETAILED DESCRIPTION
[0018] In order to solve the problem of water leakage when the shield machine is started, the utility model provides a shield starting portal steel box. The following is a further description of the shield starting portal steel box with specific embodiments combined with the accompanying drawings.
[0019] See also Figure 1-2 As shown, a shield tunnel portal steel box includes a box body 1, which is arranged on the outside of the tunnel portal, and the outer end of the box body 1 is fixedly connected to a steel ring 9 pre-buried in the tunnel portal, and an extension ring 8 is welded at the connection between the end of the box body 1 located outside the tunnel portal and the steel ring 9, which is used to seal the connection seam between the box body 1 and the steel ring 9;
[0020] The box body 1 includes multiple box blocks (the present embodiment preferably uses five box blocks spliced into an annular whole). Specifically, the box body 1 includes a first box block, a second box block, a third box block, a fourth box block and a fifth box block. The first box block, the second box block, the third box block, the fourth box block and the fifth box block are connected and fixed by full welding. The first box block, the second box block, the third box block, the fourth box block and the fifth box block are all fixedly installed with a grouting ball valve 2, which connects the inner and outer sides of the box body 1.
[0021] By dividing the box body 1 into multiple box blocks, it is beneficial to better install and fix the box body 1 and the steel ring 9 during construction, narrow the gap between the two, and form the box body 1 by full welding between the multiple box blocks, and then weld the extension ring 8 at the connection between the box body 1 and the steel ring 9, so that the box body 1 and the steel ring 9 become a whole, which can avoid water leakage in the gap between the tunnel door and the steel box at the start, and play a sealing and water leakage prevention effect, with a simple structure and convenient assembly; improve the construction quality, effectively save the construction period, and improve the safety of shield starting;
[0022] The multiple grouting ball valves 2 are set up for emergency use during the starting process. If water leakage occurs between the shield body and the curtain during the starting process, polyurethane or inert slurry can be injected into the steel box through the grouting ball valve 2 for emergency rescue, ensuring the safety of the shield machine at the start.
[0023] The inner side of the box body 1 is fixedly connected with a second fixing plate 5, and a plurality of second water stop members 6 are arranged around the second fixing plate 5. The second fixing plate 5 is fixedly connected with the second water stop members 6 by second bolts 10.
[0024] The second water stop 6 includes a second mounting plate 61, a second flap 62, a second curtain 63 arranged between the second mounting plate 61 and the second fixed plate 5, and a second pin shaft 64 installed at the lower end of the second mounting plate 61 and used to connect the second flap 62. The second bolt 10 passes through the second fixed plate 5, the second curtain 63 and the second mounting plate 61 in sequence for connection and fixation.
[0025] The outer side of the box body 1 is fixedly connected with a first fixing plate 4, and a plurality of first water stop members 3 are arranged around the first fixing plate 4. The first fixing plate 4 is fixedly connected with the first water stop members 3 by first bolts 11.
[0026] The first water stop 3 includes a first mounting plate 31 attached to the first fixed plate 4, a first flap 33, a first curtain 34 arranged between the first mounting plate 31 and the steel ring 9, and a first pin 32 installed at the lower end of the first mounting plate 31 and used to connect the first flap 33. The first bolt 11 passes through the first fixed plate 4, the first mounting plate 31, the first curtain 34 and the steel ring 9 in sequence for connection and fixing.
[0027] The second flap 62 and the second curtain 63, the first flap 33 and the first curtain 34 can be used as two sealing members for the cave door, thereby forming a multi-layer seal to reduce the risk of water leakage.
[0028] A plurality of support plates 7 are arranged at intervals on the inner circumferential surface of the box body 1 , and the support plates 7 are supported between the first fixing plate 4 and the second fixing plate 5 .
[0029] The multiple support plates 7 can provide support and limit effects, so that the internal structure of the box body 1 is more stable in actual use.
[0030] The box body 1 is provided with a plurality of first screw holes, the steel ring 9 is provided with a plurality of second screw holes, and the spacing between the plurality of first screw holes is the same as the spacing between the plurality of second screw holes;
[0031] The first bolt 11 passes through the first screw hole on the box body 1, the first fixing plate 4, the first mounting plate 31, the first curtain 34 and the second screw hole on the steel ring 9 in sequence, and is screwed into the threaded sleeve 12 pre-buried in the soil of the hole.
[0032] The above-mentioned structural setting is conducive to symmetrical and stable installation of each box block on the steel ring 9; in actual application, if the steel ring 9 is slightly deformed, arc steel can be used to reinforce and fully weld it on the outside after the block installation, which has better adaptability.
[0033] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0034] The utility model is described in detail above in conjunction with the embodiments of the drawings. A person skilled in the art can make various variations of the utility model according to the above description. Therefore, some details in the embodiments should not constitute a limitation of the utility model, and the scope of protection of the utility model shall be defined by the scope of the attached claims.
Claims
1. A shield tunnel portal steel box, comprising a box body, characterized in that: The box body is arranged on the outside of the cave entrance, and the outer end of the box body is fixedly connected with a steel ring pre-buried in the cave entrance, and an extension ring is welded between the box body and the steel ring for sealing; The box body includes a plurality of box blocks, and the plurality of box blocks are connected and fixed by full welding. Grouting ball valves are fixedly installed on the plurality of box blocks, and the grouting ball valves connect the inner side and the outer side of the box body.
2. A shield tunnel portal steel box as claimed in claim 1, characterized in that: A second fixing plate is fixedly connected to the inner side of the box body, a plurality of groups of second water stoppers are arranged around the second fixing plate, and the second fixing plate is fixedly connected to the second water stoppers by second bolts; The second water stop includes a second mounting plate, a second flap, a second curtain arranged between the second mounting plate and the second fixed plate, and a second pin installed at the lower end of the second mounting plate and used to connect the second flap. The second bolt passes through the second fixed plate, the second curtain and the second mounting plate in sequence for connection and fixation.
3. A shield tunnel portal steel box as claimed in claim 2, characterized in that: A first fixing plate is fixedly connected to the outer side of the box body, a plurality of groups of first water stoppers are arranged around the first fixing plate, and the first fixing plate is fixedly connected to the first water stoppers by first bolts; The first water stop includes a first mounting plate attached to the first fixed plate, a first flap, a first curtain arranged between the first mounting plate and the steel ring, and a first pin installed at the lower end of the first mounting plate and used to connect the first flap, and the first bolt passes through the first fixed plate, the first mounting plate, the first curtain and the steel ring in sequence for connection and fixing.
4. A shield tunnel portal steel box as claimed in claim 3, characterized in that: A plurality of support plates are arranged at intervals on the inner circumferential surface of the box body, and the support plates are supported between the first fixing plate and the second fixing plate.
5. A shield tunnel portal steel box as claimed in claim 3, characterized in that: The box body is provided with a plurality of first screw holes, the steel ring is provided with a plurality of second screw holes, and the spacing between the plurality of first screw holes is the same as the spacing between the plurality of second screw holes; The first bolt passes through the first screw hole on the box body, the first fixing plate, the first mounting plate, the first curtain cloth and the second screw hole on the steel ring in sequence, and is screwed into the threaded sleeve pre-buried in the soil of the hole.