Building drainage pipeline based on BIM

By setting up installation blocks and fixing blocks on the wall of the building drainage pipe, and using the fixing components and card blocks of BIM technology, the problem of unstable fixation of drainage pipes under strong wind or water flow erosion is solved, achieving higher stability and connection firmness.

CN222122428UActive Publication Date: 2024-12-06GUANGDONG YUSHENGDA CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420334735.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2024-12-06
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

Existing building drainage pipes can easily lead to unstable fixation of flexible support frames and easy to fall off under strong winds or water flow.

Method used

The design of building drainage pipes based on BIM is adopted. By setting up installation blocks and fixing blocks on the wall, the first and second fixing components, as well as the coordination of the card blocks and sliding grooves, the pipe body is ensured to be stable in windy weather.

Benefits of technology

Improve the stability of building drainage pipes, prevent falling off in bad weather conditions, and enhance the firmness and stability of fixed connections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222122428U_ABST
    Figure CN222122428U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of drainage pipelines, in particular to a BIM-based building drainage pipeline, which comprises a pipeline body and a wall body for mounting the pipeline body, a mounting block is arranged on the wall body, the mounting block is fixed on the wall body through a first fixing assembly, and a first pipeline groove is formed in the mounting block; the side, close to the mounting block, of the pipeline body is matched with the first pipeline groove in a clamped mode, a fixing block is arranged on the side, away from the wall, of the mounting block, a second pipeline groove is formed in the side wall, facing the mounting block, of the fixing block, the second pipeline groove is matched with the pipeline body in a clamped mode, and the mounting block is fixedly connected with the fixing block through a second fixing assembly. A sliding groove is formed in the mounting block, and the clamping block is clamped and matched with the sliding groove. The building drainage pipeline has the beneficial effect that the stability of the building drainage pipeline is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of drainage pipes, and in particular to a BIM-based building drainage pipe. Background Art

[0002] At present, BIM is a building information model. It takes the relevant information data of the construction project as the basis of the model to establish the building model, and simulates the real information of the building through digital information simulation. It has eight characteristics: information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and mapability. From the three basic dimensions of resources, behavior and delivery in the BIM design process, it provides the specific methods and practical contents of the implementation standards of the design enterprise. BIM is not a simple integration of digital information, but an application of digital information, and can be used for digital methods of design, construction and management. This method supports the integrated management environment of construction projects, which can significantly improve the efficiency and reduce risks of construction projects throughout their entire process. During commercial exhibitions and business talks, the designer will use more convenient electronic devices such as tablets to generally introduce the design style to the partner to facilitate cooperation.

[0003] In the related technology, a Chinese patent with announcement number CN204611209U discloses a sound insulation structure for a building drainage pipe, including a wall, a building drainage pipe is connected to the outside of the wall through a flexible support frame, an annular bracket for fixing the drainage pipe is arranged on the flexible support frame, and a sound insulation strip is arranged between the annular bracket and the drainage pipe. The sound insulation strip can reduce the noise generated when water flows through the water pipeline.

[0004] The above-mentioned prior art solutions have the following defects: the annular bracket fixed on the outside of the drain pipe is fixed by a flexible support frame, and a single flexible support frame is fixed on the wall. After some windy weather, the overall longer drain pipe is blown or washed by water, which can easily cause the flexible support frame to be unstable and easy to fall off, so there is room for improvement. Utility Model Content

[0005] In order to improve the stability of building drainage pipes, the present application provides a building drainage pipe based on BIM.

[0006] The application provides a BIM-based building drainage pipeline that adopts the following technical solution:

[0007] A BIM-based building drainage pipe comprises a pipe body and a wall for installing the pipe body, wherein a mounting block is arranged on the wall, the mounting block is fixed to the wall through a first fixing assembly, a first pipe groove is formed on the mounting block, a side of the pipe body close to the mounting block is snap-fitted with the first pipe groove, a fixing block is arranged on a side of the mounting block away from the wall, a second pipe groove is formed on a side wall of the fixing block facing the mounting block, the second pipe groove is snap-fitted with the pipe body, the mounting block is fixedly connected to the fixing block through a second fixing assembly, a clamping block is fixed on the fixing block, a sliding groove is formed on the mounting block, and the clamping block is snap-fitted with the sliding groove.

[0008] By adopting the above technical solution, the mounting block is fixed to the wall through the first fixing component, the first pipe groove and the second pipe groove have a clamping effect on the pipe body, the first pipe groove and the second pipe groove are both snap-fitted with the pipe body, a clamping block is fixed on the fixing block, and a sliding groove is provided on the mounting block, the clamping block is snap-fitted with the sliding groove, so that the fixing block and the mounting block are fixed together, and are further fixed by the second fixing component. Even in windy weather, the pipe body can still be stably installed on the wall, thereby improving the stability of the building drainage pipe.

[0009] Preferably, the clamping block is a T-shaped block, the sliding groove is correspondingly configured as a T-shaped groove, and the T-shaped block is clamped and matched with the T-shaped groove.

[0010] By adopting the above technical solution, the clamping block is set as a T-block, and the sliding groove is correspondingly set as a T-slot. The groove wall of the T-slot plays a limiting role on the end of the T-block, so that the clamping connection between the T-block and the T-slot is tighter and not easy to loosen and disengage from each other, thereby improving the stability of the clamping connection between the clamping block and the sliding groove.

[0011] Preferably, the second fixing assembly includes a first connecting block and a second connecting block, the first connecting block is fixedly connected to the side wall of the mounting block, the second connecting block is fixedly connected to the side wall of the fixing block, the first connecting block is provided with an elastic protrusion, the second connecting block is provided with a card slot, and the elastic protrusion is card-engaged with the card slot.

[0012] By adopting the above technical solution, the elastic protrusion is engaged with the card slot, so that the connection between the fixing block and the installation block is more stable and not easy to loosen, thereby improving the stability of the pipeline body.

[0013] Preferably, the ends of the first connecting block and the second connecting block are sleeved with clamping sleeves, and the clamping sleeves abut against the outer side walls of the first connecting block and the second connecting block.

[0014] By adopting the above technical solution, the clamping sleeve limits and fixes the first connecting block and the second connecting block, so that the connection between the first connecting block and the second connecting block is more firmly established.

[0015] Preferably, the ferrule is provided with a buckle hole, the first connecting block and the second connecting block are correspondingly provided with buckle holes, and a U-shaped buckle is inserted into the buckle hole.

[0016] By adopting the above technical solution, the U-shaped buckle plays a role of limiting and fixing the ferrule, and further limits and fixes the first connecting block and the second connecting block, thereby further improving the connection stability of the first connecting block and the second connecting block.

[0017] Preferably, the middle portion of the U-shaped buckle abuts against the hole wall of the buckle hole, and the outer diameter of the end portion of the U-shaped buckle is smaller than the outer diameter of the middle portion of the U-shaped buckle.

[0018] By adopting the above technical solution, the outer diameter of the end of the U-shaped buckle is smaller than the outer diameter of the middle of the U-shaped buckle, making it easier for the U-shaped buckle to be inserted into the ferrule, thereby facilitating the limiting and fixing of the first connecting block and the second connecting block.

[0019] Preferably, a protrusion is fixed on the fixing block, and a groove is correspondingly formed on the mounting block, and the groove is slidably connected to the protrusion.

[0020] By adopting the above technical solution, the protrusion and the groove are slidably connected, which increases the contact area between the fixed block and the mounting block, improves the friction force, makes the connection between the fixed block and the mounting block tighter, increases the connection strength, and further improves the connection stability.

[0021] Preferably, the first fixing assembly includes a bearing block and a bolt, the bearing block is fixedly connected to the end of the mounting block, one side of the bearing block abuts against the wall, and the bolt passes through the bearing block and is threadedly connected to the wall.

[0022] By adopting the above technical solution, the bolts penetrate the bearing block and are threadedly connected to the wall, thereby achieving the function of fixing the mounting block to the wall, which is simple, fast and easy to implement.

[0023] In summary, the present application includes at least one of the following beneficial technical effects: the mounting block is fixed to the wall by a first fixing component, the first pipe groove and the second pipe groove have a clamping effect on the pipe body, the first pipe groove and the second pipe groove are both snap-fitted with the pipe body, a clamping block is fixed on the fixing block, and a sliding groove is provided on the mounting block, the clamping block is snap-fitted with the sliding groove, so that the fixing block and the mounting block are fixed together, and are further fixed by the second fixing component, even in windy weather, the pipe body can still be stably installed on the wall, thereby improving the stability of the building drainage pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall structure of a building drainage pipe based on BIM in an embodiment of the present application.

[0025] Figure 2 It is a schematic diagram of the assembly relationship of the building drainage pipe based on BIM in an embodiment of the present application.

[0026] Explanation of the reference numerals: 1. Pipe body; 2. Wall; 3. Mounting block; 4. First fixing assembly; 41. Load-bearing block; 42. Bolt; 5. First pipe groove; 6. Fixing block; 7. Second pipe groove; 8. Second fixing assembly; 81. First connecting block; 82. Second connecting block; 9. Elastic protrusion; 10. Block; 11. Sliding groove; 12. Bump; 13. Groove; 14. Sleeve; 15. U-shaped buckle. DETAILED DESCRIPTION

[0027] The following is combined with Figure 1-2 This application is described in further detail.

[0028] The present application embodiment discloses a BIM-based building drainage pipeline. Figure 1 and Figure 2 A BIM-based building drainage pipe includes a pipe body and a wall for installing the pipe body. A mounting block is arranged on the wall. The mounting block is arranged in a rectangular parallelepiped shape and is fixed to the wall through a first fixing component. Specifically, the first fixing component includes a bearing block and a bolt. Two bearing blocks are arranged. The two bearing blocks are respectively fixed to the two ends of the mounting block. The same side of the mounting block and the bearing block is arranged flush and abuts against the wall. A threaded hole is provided on the bearing block. The bolt passes through the threaded hole and is threadedly connected to the wall. A first pipe groove is provided on the side of the mounting block away from the wall. The first pipe groove is arranged in an arc shape. The side of the pipe body close to the mounting block is snap-fitted with the first pipe groove.

[0029] A fixing block is provided on the side of the mounting block away from the wall, and a second pipe groove is correspondingly provided on the side wall of the fixing block facing the mounting block, and the second pipe groove is engaged with the pipe body, and the first pipe groove and the second pipe groove are enclosed to form a receiving cavity for receiving the pipe body, and the shape and size of the receiving cavity are adapted to the pipe body. The mounting block and the fixing block are fixedly connected by a second fixing assembly, and specifically, the second fixing assembly includes a first connecting block and a second connecting block, and the first connecting block and the second connecting block are consistent in shape and size, the first connecting block is fixedly connected to the side wall of the mounting block, and the second connecting block is fixedly connected to the side wall of the fixing block. The side wall of the first connecting block abuts against the side wall of the second connecting block, and an elastic protrusion is fixed on the side of the first connecting block away from the wall, and the elastic protrusion is arranged in a hemispherical shape, and a slot is correspondingly provided on the side of the second connecting block close to the wall, and the slot is adapted to the shape and size of the elastic protrusion, and the elastic protrusion is engaged with the slot.

[0030] Furthermore, a clamping block is fixed on the fixed block, and the clamping block is arranged parallel to the axial direction of the pipeline. The clamping block is a T-shaped block, and a sliding groove is provided on the mounting block. The sliding groove is correspondingly arranged as a T-shaped groove. The T-shaped block and the T-shaped groove are adapted in shape and size, and the T-shaped block and the T-shaped groove are snap-fitted. When it is necessary to assemble the fixed block and the mounting block together, the pipeline body is placed in the first pipeline groove of the mounting block, and then the fixed block is placed on one side of the mounting block so that the wall of the second pipeline groove is pressed against the side wall of the pipeline body. Then, the fixed block is slid along the axial direction of the pipeline body so that the clamping block enters the sliding groove, and force is applied to the fixed block so that the side wall of the fixed block squeezes the elastic protrusion, and force is continued to be applied so that the fixed block slides so that the elastic protrusion is snapped into the clamping groove. At this time, the clamping block is completely accommodated in the sliding groove and snap-fitted with the sliding groove.

[0031] In addition, a protrusion is fixed on the fixed block, and a groove is correspondingly provided on the mounting block, and the groove is slidably connected to the protrusion. The arrangement of the protrusion and the groove increases the contact area between the fixed block and the mounting block, increases the friction between the fixed block and the mounting seat, makes the connection between the fixed block and the mounting block tighter, increases the connection strength, and further improves the connection stability between the fixed block and the mounting seat.

[0032] Furthermore, the ends of the first connection block and the second connection block are sleeved with a ferrule, which is arranged in a square tube shape, and the inner side wall of the ferrule abuts against the outer side wall of the first connection block and the second connection block, and the first connection block and the second connection block are fitted together and accommodated in the ferrule, and the inner side wall of the ferrule abuts against the outer side wall of the first connection block and the second connection block. The ferrule limits and fixes the first connection block and the second connection block, so that the connection between the first connection block and the second connection block is more firmly established.

[0033] Furthermore, a buckle hole is provided on the ferrule, and the first connection block and the second connection block are both provided with buckle holes correspondingly, and a U-shaped buckle is inserted into the buckle hole. The end of the U-shaped buckle is inserted through one side of the ferrule, then through the second connection block, then through the first connection block, and then through the other side of the U-shaped buckle. The middle part of the U-shaped buckle abuts against the hole wall of the buckle hole, so that the U-shaped buckle is tightly connected with the first connection block and the second connection block, and is not easy to loosen. In addition, the outer diameter of the end of the U-shaped buckle is smaller than the outer diameter of the middle part of the U-shaped buckle, which makes it easier for operators to install the U-shaped buckle.

[0034] The implementation principle of a BIM-based building drainage pipeline in the embodiment of the present application is:

[0035] When it is necessary to install the drainage pipe, the operator first fixes the mounting seat on the wall by bolts penetrating the threaded holes of the bearing block, then places the pipe body in the first pipe groove of the mounting block, and then places the fixing block on one side of the mounting block so that the second pipe groove wall is pressed against the side wall of the pipe body. Then slide the fixing block along the axial direction of the pipe body so that the clamping block enters the sliding groove, applies force to the fixing block so that the side wall of the fixing block squeezes the elastic protrusion, and continues to apply force to make the fixing block slide so that the elastic protrusion is clamped into the clamping groove. At this time, the clamping block is completely accommodated in the sliding groove and is clamped with the sliding groove. Then, the clamping sleeve is set on the first connecting block and the second connecting block, and then the end of the U-shaped buckle is passed through one side of the clamping sleeve, then through the second connecting block, then through the first connecting block, and then through the other side of the U-shaped buckle, so that the fixing block and the mounting block are tightly connected, thereby making the drainage pipe stable.

[0036] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A BIM-based building drainage pipeline, characterized by: It includes a pipeline body and a wall for installing the pipeline body, the wall is provided with a mounting block, the mounting block is fixed to the wall by a first fixing component, a first pipeline groove is opened on the mounting block, a side of the pipeline body close to the mounting block is snap-fitted with the first pipeline groove, a fixing block is provided on the side of the mounting block away from the wall, a second pipeline groove is opened on the side wall of the fixing block facing the mounting block, the second pipeline groove is snap-fitted with the pipeline body, the mounting block is fixedly connected to the fixing block by a second fixing component, a clamping block is fixed on the fixing block, a sliding groove is opened on the mounting block, and the clamping block is snap-fitted with the sliding groove.

2. The BIM-based building drainage pipeline according to claim 1, characterized in that: The clamping block is a T-shaped block, the sliding groove is correspondingly configured as a T-shaped groove, and the T-shaped block is clamped and matched with the T-shaped groove.

3. The BIM-based building drainage pipeline according to claim 1, characterized in that: The second fixing assembly includes a first connecting block and a second connecting block, the first connecting block is fixedly connected to the side wall of the mounting block, the second connecting block is fixedly connected to the side wall of the fixing block, the first connecting block is provided with an elastic protrusion, the second connecting block is provided with a card slot, the elastic protrusion is card-engaged with the card slot.

4. The BIM-based building drainage pipeline according to claim 3 is characterized by: The ends of the first connecting block and the second connecting block are sleeved with clamping sleeves, and the clamping sleeves abut against the outer side walls of the first connecting block and the second connecting block.

5. The BIM-based building drainage pipeline according to claim 4 is characterized by: The clamping sleeve is provided with a buckle hole, and the first connecting block and the second connecting block are both correspondingly provided with buckle holes, and a U-shaped buckle is inserted into the buckle hole.

6. The BIM-based building drainage pipeline according to claim 5, characterized in that: The middle part of the U-shaped buckle abuts against the hole wall of the buckle hole, and the outer diameter of the end of the U-shaped buckle is smaller than the outer diameter of the middle part of the U-shaped buckle.

7. The BIM-based building drainage pipeline according to claim 1, characterized in that: A protrusion is also fixed on the fixing block, and a groove is correspondingly provided on the mounting block, and the groove is slidably connected with the protrusion.

8. The BIM-based building drainage pipeline according to claim 7, characterized in that: The first fixing assembly includes a bearing block and a bolt, the bearing block is fixedly connected to the end of the mounting block, one side of the bearing block abuts against the wall, and the bolt passes through the bearing block and is threadedly connected to the wall.