Smelting furnace aluminum slag recovery device for aluminum alloy production
By designing a aluminum slag recovery device for smelting furnaces for aluminum alloy production, using the technology of vibrating motor screening and cooling pipeline cooling, the operational risks and efficiency problems in high-temperature aluminum slag treatment are solved, and rapid cooling and process optimization are achieved. Reduced production costs.
Patent Information
- Application Number
- CN202420826800.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-22
AI Technical Summary
During the aluminum alloy production process, the recycling and treatment of aluminum slag in high-temperature smelting furnaces poses a risk of burning and fire/explosion among operators, and the prior art is difficult to efficiently cool down and treat high-temperature materials, resulting in process delays and increased costs.
An aluminum slag recovery device including a frame, feed port, water tank, cooling pipe, cold water pipe and hot water pipe was designed. The materials were screened through a vibrating motor, the cooling pipes were cooled down, and the cooling efficiency was improved by using cold water and hot water circulation, which quickly Reduce the material temperature.
It effectively reduces material temperature, improves process efficiency, reduces operating risks, saves time and costs, and improves production efficiency.
Smart Images

Figure CN222123966U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of slag treatment, in particular to an aluminum slag recovery device for a smelting furnace used in aluminum alloy production. Background Art
[0002] The aluminum slag recovery unit for aluminum alloy production involves a series of technologies and engineering practices aimed at recovering valuable aluminum alloy materials from the aluminum slag generated during the smelting process.
[0003] In the current treatment methods, high-temperature operations are still involved in the recycling of slag. The high-temperature working environment may cause burns to operators, especially when handling high-temperature aluminum slag. Without proper protective measures, workers may face serious risks of thermal injuries. In addition, the high-temperature working environment and the presence of flammable substances may increase the risk of fire and explosion. Utility Model Content
[0004] The purpose of the utility model is to provide an aluminum slag recovery device for a smelting furnace for aluminum alloy production. The utility model is provided with a feed port, a water tank, a discharge port, a cooling pipe, a cold water pipe and a hot water pipe. High-temperature materials enter the interior of the metal cooling pipe through the feed port and are cooled by the water tank. At the same time, cold water is pumped into the cold water pipe and hot water is discharged from the hot water pipe to ensure the refrigeration efficiency. Finally, the materials enter the next process through the discharge port. The material temperature is reduced in a short time, and the next process can be carried out quickly, which saves a lot of time and cost, and creates better benefits for the enterprise.
[0005] To achieve the above object, an aluminum slag recovery device for a smelting furnace used in aluminum alloy production is provided, comprising: a frame, springs are fixedly connected to the four corners of the top of the frame, a baffle is fixedly connected to the top of the spring, a screen is provided at the bottom of the baffle, a vibration motor is fixedly connected to one side of the baffle, and slope baffles are fixedly connected to both sides of the inner top of the frame;
[0006] The inner top of the frame is fixedly connected with a first partition, a feed port is provided in the middle of the top of the first partition, a bottom flange of the feed port is connected with a cooling pipe, one end flange of the cooling pipe is connected with a discharge port, and the discharge port is provided in the middle of the top of the second partition.
[0007] According to the aluminum slag recovery device for a smelting furnace used for aluminum alloy production, a loading rail car is arranged inside the bottom end of the frame, and the bottom end of the loading rail car is slidably connected to a track.
[0008] According to the aluminum slag recovery device for a smelting furnace used for aluminum alloy production, a top flange on one side of the frame is connected to a hot water pipe, and a bottom flange on one side of the frame is connected to a cold water pipe.
[0009] According to the aluminum slag recovery device for a smelting furnace used for aluminum alloy production, a filtering channel is opened on the other side of the baffle, and a conveying pipeline is arranged on the other side of the baffle.
[0010] According to the aluminum slag recovery device for a smelting furnace used for aluminum alloy production, the slope baffle is located on both sides below the screen, and the feed port is opened in the middle of the bottom end of the slope baffle.
[0011] According to the aluminum slag recovery device for a smelting furnace used for aluminum alloy production, the hot water pipe and the cold water pipe penetrate the interior of the water tank, and the interior of the water tank is filled with water.
[0012] According to the aluminum slag recovery device for a smelting furnace used for aluminum alloy production, the feed inlet penetrates the first partition, and the discharge outlet penetrates the second partition. According to the aluminum slag recovery device for a smelting furnace used for aluminum alloy production.
[0013] According to the aluminum slag recovery device for a smelting furnace used for aluminum alloy production, the rails run through the bottom end of the frame and are two parallel rails.
[0014] The above scheme has the following beneficial effects:
[0015] 1. The utility model is provided with a baffle, a filter channel, a screen, a spring, a slope baffle and a vibration motor, and the spring is used to provide support for the baffle to maintain a certain elasticity. When the material enters the baffle, the vibration motor is started to cause part of the material to pass through the screen and be gathered by the slope baffle. The material that does not pass through the filter channel enters the next process. In this way, the screening work by the machine greatly improves the work efficiency and can operate for a long time.
[0016] 2. The utility model is provided with a feed port, a water tank, a discharge port, a cooling pipe, a cold water pipe and a hot water pipe. The high-temperature material enters the metal cooling pipe through the feed port and is cooled by the water tank. At the same time, cold water is pumped into the cold water pipe and hot water is discharged from the hot water pipe to ensure its refrigeration efficiency. Finally, the material enters the next process through the discharge port, which can reduce the temperature of the material in a relatively short time, so the next process can be carried out quickly and a lot of time cost can be saved.
[0017] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The utility model is further described below in conjunction with the accompanying drawings and embodiments;
[0019] Figure 1 This is a three-dimensional diagram of an aluminum slag recovery device for a smelting furnace used in aluminum alloy production according to the utility model;
[0020] Figure 2 This is a front and rear view of an aluminum slag recovery device for a smelting furnace used in aluminum alloy production according to the utility model;
[0021] Figure 3 It is a three-dimensional cross-sectional view of an aluminum slag recovery device for a smelting furnace used for aluminum alloy production according to the utility model;
[0022] Figure 4 It is an enlarged view of point A in the utility model 3;
[0023] Figure 5 It is an enlarged view of point B in the utility model 3;
[0024] Legend:
[0025] 1. Frame; 2. Hot water pipe; 3. Track; 4. Cold water pipe; 5. Second compartment; 6. Loading rail car; 7. Conveying pipeline; 8. Filter channel; 9. Spring; 10. First compartment; 11. Feed inlet; 12. Water tank; 13. Discharge outlet; 14. Cooling pipeline; 15. Baffle; 16. Screen; 17. Slope baffle; 18. Vibration motor. DETAILED DESCRIPTION
[0026] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.
[0027] Reference Figure 1-5 The utility model embodiment is a smelting furnace aluminum slag recovery device for aluminum alloy production, which includes: a frame 1, the top four corners of the frame 1 are fixedly connected with springs 9, which can ensure that the object on the spring 9 can maintain a certain elasticity, the top of the spring 9 is fixedly connected with a baffle 15, the baffle 15 can evenly distribute the weight on the platform to the spring 9, and avoid the spring 9 from being damaged by uneven force, and the bottom end of the baffle 15 is provided with a screen 16, so that the materials that meet the size can be screened to the next layer by the screen 16, and one side of the baffle 15 is fixedly connected with a vibration motor 18, and the function of the vibration motor 18 is to make the baffle 15 and the screen 16 keep the frequency shaking, so that the materials that can pass through the screen 16 are retained, and the materials that cannot pass through are screened out.
[0028] Both sides of the inner top of the frame 1 are fixedly connected with a slope baffle 17. The function of the slope baffle 17 is to gather the materials passing through the screen 16 to facilitate the next process. The inner top of the frame 1 is fixedly connected with a first partition 10. The first partition 10 is used to isolate the outside world from the bottom of the seal. A feed port 11 is opened in the middle of the top of the first partition 10. The materials gathered by the slope baffle 17 will be gathered into the feed port 11 again. The bottom flange of the feed port 11 is connected with a cooling pipe 14 to ensure the airtightness of the feed port 11 and the cooling pipe 14. One end of the cooling pipe 14 is flange-connected with a discharge port 13. The material will reach the discharge port 13 after being sufficiently cooled in the cooling pipe 14, and the discharge port 13 is opened in the middle of the top of the second compartment 5. The discharge port 13 is in the middle of the top of the second compartment 5 to avoid material accumulation in the corner. A loading rail car 6 is arranged inside the bottom end of the frame 1. The function of the loading rail car 6 is to transfer the material that has been sufficiently cooled by the cooling pipe 14 in time. The bottom end of the loading rail car 6 is slidably connected to the track 3. The setting of the track 3 can allow the loading rail car 6 to be easily transferred even if it is heavily loaded.
[0029] A hot water pipe 2 is connected to the top flange of one side of the frame 1. The function of the hot water pipe 2 is to discharge the hotter cooling water in the water tank 12. A cold water pipe 4 is connected to the bottom flange of one side of the frame 1. The function of the cold water pipe 4 is to pump cold water into the water tank 12 to prevent the water temperature inside the water tank 12 from being too high and unable to cool the materials in the cooling pipe 14. A filter channel 8 is provided on the other side of the baffle 15. The function of the filter channel 8 is to transfer the materials that have not passed through the screen 16. A conveying pipe 7 is provided on the other side of the baffle 15. When the materials reach the end of the filter channel 8, they will enter the conveying pipe 7 for further processing. The slope baffles 17 are located on both sides below the screen 16 to prevent the materials from being There is too much accumulation on one side, and the feed port 11 is opened in the middle of the bottom end of the slope baffle 17. The position of the feed port 11 can send the material gathered by the slope baffle 17 into the cooling pipe 14. The hot water pipe 2 and the cold water pipe 4 pass through the inside of the water tank 12, and the inside of the water tank 12 is full of water, so that the hot water can be discharged in time and the cold water can be replenished in time. The feed port 11 passes through the first compartment 10. The feed port 11 is to connect one side of the slope baffle 17 with the cooling pipe 14, and the discharge port 13 passes through the second compartment 5. The discharge port 13 is to connect one side of the cooling pipe 14 with one side of the loading rail car 6. The track 3 passes through the bottom end of the frame 1, and there are two parallel tracks to facilitate the rapid and stable transportation of the loading rail car 6.
[0030] Working principle: the material is conveyed to the baffle 15 by the conveyor belt, and at the same time, the vibration of the vibration motor 18 causes part of the material to pass through the screen 16, and the spring 9 keeps the entire baffle 15 to move with the vibration motor 18, and at the same time, a part of the material enters the conveying pipe 7 through the filtration channel 8 to reach the next process, and the material passing through the screen 16 is gathered into the feed port 11 by the slope baffle 17, and enters the cooling pipe 14 for sufficient cooling, and at the same time, the cold water is pumped into the water tank 12 by the cold water pipe 4, and the hot water in the water tank 12 is discharged through the hot water pipe 2, so that the cooling pipe 14 wrapped in the water tank 12 has a good cooling effect, and at the same time, the material is cooled by the cooling pipe 14 and falls to the loading rail car 6 through the discharge port 13, and at the same time, the loading rail car 6 is operated by the staff to be transported to the next process on the track 3.
[0031] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A device for recovering aluminum slag from a smelting furnace for aluminum alloy production, comprising: The frame (1) is characterized in that: springs (9) are fixedly connected to the four corners of the top of the frame (1), a baffle (15) is fixedly connected to the top of the spring (9), a screen (16) is provided at the bottom of the baffle (15), a vibration motor (18) is fixedly connected to one side of the baffle (15), and slope baffles (17) are fixedly connected to both sides of the top of the interior of the frame (1); The inner top of the frame (1) is fixedly connected to a first partition (10), a feed port (11) is provided in the middle of the top of the first partition (10), a bottom flange of the feed port (11) is connected to a cooling pipe (14), one end flange of the cooling pipe (14) is connected to a discharge port (13), and the discharge port (13) is provided in the middle of the top of the second partition (5).
2. The aluminum slag recovery device for a smelting furnace used for aluminum alloy production according to claim 1, characterized in that: A loading rail vehicle (6) is arranged inside the bottom end of the frame (1), and the bottom end of the loading rail vehicle (6) is slidably connected to a track (3).
3. The aluminum slag recovery device for a smelting furnace used for aluminum alloy production according to claim 1, characterized in that: A hot water pipe (2) is connected to a top flange on one side of the frame (1), and a cold water pipe (4) is connected to a bottom flange on one side of the frame (1).
4. The aluminum slag recovery device for a smelting furnace used for aluminum alloy production according to claim 1, characterized in that: A filtering channel (8) is provided on the other side of the baffle (15), and a conveying pipeline (7) is provided on the other side of the baffle (15).
5. The aluminum slag recovery device for a smelting furnace used for aluminum alloy production according to claim 1, characterized in that: The slope baffle (17) is located on both sides below the screen (16), and the feed port (11) is opened in the middle of the bottom end of the slope baffle (17).
6. The aluminum slag recovery device for a smelting furnace used in aluminum alloy production according to claim 3, characterized in that: The hot water pipe (2) and the cold water pipe (4) penetrate the interior of the water tank (12), and the interior of the water tank (12) is filled with water.
7. The aluminum slag recovery device for a smelting furnace used for aluminum alloy production according to claim 1, characterized in that: The feed port (11) penetrates the first barrier layer (10), and the discharge port (13) penetrates the second barrier layer (5).
8. The aluminum slag recovery device for a smelting furnace used in aluminum alloy production according to claim 2, characterized in that: The tracks (3) run through the bottom end of the frame (1) and are two parallel tracks.