Hollow thin-wall pier steam curing equipment
By accelerating the solidification and hardening of concrete by using heating pipes and steam generators in hollow thin-walled pier steaming and cooking equipment, the problem of environmental impact of the traditional concrete solidification process is solved, and faster construction process and higher stability are achieved.
Patent Information
- Application Number
- CN202420841149.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-12-10
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional concrete solidification and hardening process is affected by the ambient temperature and humidity, resulting in slow speed, resulting in extended construction process and reduced stability.
A hollow thin-walled pier steaming equipment is designed, including a main tank, a storage tank, an evaporation assembly and a filter assembly. The water is heated through a heating pipe and a steam generator to generate steam and introduce concrete through a connecting pipe to increase its temperature and humidity. This accelerates the solidification and hardening process and ensures the steam quality through a filter.
It significantly shortens the concrete curing time, reduces the risk of extended construction period, improves construction efficiency, and ensures the stability and quality of the concrete solidification process through efficient filtration.
Smart Images

Figure CN222135360U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of steaming devices, and more specifically, particularly relates to a hollow thin-walled butt steaming device. Background Art
[0002] Hollow thin-walled piers are a commonly used pier form in building structures, characterized by a hollow interior and thin walls. Hollow thin-walled piers can reduce the use of building materials, reduce the deadweight of the structure, and at the same time improve the seismic performance and bearing capacity of the pier. This pier form is suitable for various types of buildings. The construction of hollow thin-walled piers is made of concrete. In order to ensure the stability of the building, it is necessary to wait for the concrete to reach a certain strength and hardness, and it takes time to gradually form a tight structure to provide sufficient support. However, the solidification and hardening of traditional concrete mainly rely on natural forces, which makes the solidification and hardening time easily affected by the temperature and humidity of the environment, resulting in slow solidification and hardening of the concrete, which takes a lot of time, prolongs the construction process, and reduces the stability of solidification and hardening. Utility Model Content
[0003] In order to solve the above technical problems, the utility model provides a hollow thin-wall pier steaming equipment to solve the technical problems in the prior art that traditional concrete solidification and hardening are affected by ambient temperature and humidity, resulting in slow solidification and hardening speed, consuming a lot of time, resulting in extended construction period and reduced stability.
[0004] The purpose and effect of the steaming equipment for hollow thin-walled piles of the utility model are achieved by the following specific technical means:
[0005] A hollow thin-walled steaming device comprises a main body tank, a storage tank is arranged in the main body tank, the storage tank is clamped in the main body tank, and a steam cavity is formed between the storage tank and the main body tank, and an evaporation component is arranged in the steam cavity; a cover plate is arranged above the main body tank, the cover plate is clamped on the main body tank, and a storage cavity is formed between the cover plate and the storage tank; a connecting pipe is arranged on the cover plate, and is connected with other equipment through the connecting pipe; a filter component is arranged on one side of the main body tank, and the filter component is connected with the steam cavity and an external water source through a connecting conduit.
[0006] According to a preferred embodiment, the evaporation component includes a heating tube and a steam generator, a power socket is provided on the bottom surface of the main tank, one end of the heating tube is clamped in the power socket, and the power socket is connected to an external power supply; multiple groups of limit blocks are provided in the main tank, the steam generator is clamped between the multiple groups of limit blocks, and is electrically connected to the power socket.
[0007] According to a preferred embodiment, a connecting groove is provided on the storage tank, a first funnel is provided in the connecting groove, and the steam chamber is connected with the storage chamber through the first funnel.
[0008] According to a preferred embodiment, the filter assembly includes a filter tank and a filter cover, a support plate is provided on one side of the main tank, the filter tank is clamped on the support plate, the filter cover is located above the filter tank and connected to the filter tank to form a filter cavity.
[0009] According to a preferred embodiment, the filter assembly further includes a filter screen, which is located in the filter cavity and is clamped on the filter tank.
[0010] According to a preferred embodiment, a mounting groove is provided on the cover plate, a second funnel is provided above the cover plate, and the second funnel is clamped in the mounting groove; one end of the connecting pipe is clamped in the second funnel, and a valve is provided at the other end.
[0011] According to a preferred embodiment, a mounting groove is provided on the cover plate, a second funnel is arranged above the cover plate, and the second funnel is clamped in the mounting groove; a connecting piece is provided on the second funnel, and a plurality of connecting ports are provided on the connecting piece, one end of the connecting pipe is clamped in the connecting port, and a valve is provided at the other end.
[0012] According to a preferred embodiment, a limiting ring is arranged in the main tank, a plurality of positioning blocks are arranged on the bottom surface of the storage tank, the limiting ring is provided with positioning grooves corresponding to the positioning blocks, and the positioning blocks are clamped in the positioning grooves.
[0013] According to a preferred embodiment, connecting blocks are provided on both sides of the main tank, rotatable connecting buckles are provided on the connecting blocks, and two groups of connecting slots are opened on the cover plate, and the connecting buckles can be clamped in the connecting slots.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] 1. A storage tank is provided inside the main tank, and an evaporation chamber is formed between the storage tank and the main tank. An evaporation component is provided in the evaporation chamber, and the evaporation component includes a heating tube and a steam generator. The water in the steam chamber can be heated by the heating tube, and then the water is made into steam by the steam generator, and then the steam is introduced into the concrete through the connecting pipe, which can effectively increase the temperature and humidity of the concrete, thereby accelerating the solidification and hardening process of the concrete; it can significantly shorten the time required for concrete curing, reduce the risk of extended construction period, and improve the construction efficiency of the project.
[0016] 2. The filtering components in the equipment include a filter tank and a filter cover. Through the use of the filter net, it can filter the external water resources in the evaporation chamber process, which can effectively remove impurities in the water resources and ensure the purity of the steam quality provided to the concrete. It helps to ensure the stability of the concrete during solidification and hardening, and avoid quality problems caused by fluctuations in ambient temperature and humidity. At the same time, the connecting pipe in the equipment is connected to other equipment to achieve better temperature and humidity control, improve the overall quality and stability of the concrete, and reduce engineering risks. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the first embodiment of the utility model after assembly.
[0018] Figure 2 It is a schematic diagram of the structure after disassembly of the first embodiment of the utility model.
[0019] Figure 3 It is a schematic diagram of the structure of the second embodiment of the utility model after being disassembled.
[0020] Figure 4 It is a schematic diagram of the main tank structure.
[0021] Figure 5 It is a structural diagram of a storage tank.
[0022] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:
[0023] 11. Main tank; 12. Power socket; 13. Limit block; 14. Support plate; 15. Limit ring; 16. Positioning groove; 17. Connecting block; 18. Connecting buckle; 21. Storage tank; 22. Connecting groove; 23. First funnel; 24. Positioning block; 31. Cover plate; 32. Mounting groove; 33. Second funnel; 34. Connecting piece; 35. Connecting port; 36. Connecting card slot; 41. Heating tube; 42. Steam generator; 51. Filter tank; 52. Filter cover; 53. Filter net. DETAILED DESCRIPTION
[0024] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the technical solution of the present invention, but cannot be used to limit the protection scope of the present invention.
[0025] Embodiment 1:
[0026] like Figure 1 , 2As shown, the utility model provides a hollow thin-walled steaming equipment, including a main tank 11, a storage tank 21 is arranged inside the main tank 11, and the storage tank 21 is clamped in the main tank 11, and a steam chamber is formed between the two. An evaporation component is arranged inside the steam chamber, and the evaporation component is used to heat and evaporate water resources to ensure uniform distribution and stable supply of steam. A cover plate 31 is arranged above the main tank 11, and the cover plate 31 is clamped above the main tank 11, and a storage chamber is formed between the storage tank 21, and the storage chamber plays a role in storing steam. A connecting pipe is provided on the cover plate 31, and other equipment can be connected through the connecting pipe to achieve close cooperation and coordinated work between the equipment, thereby improving the overall work efficiency. A filter component is also arranged on one side of the main tank 11, and this filter component is connected to the steam chamber and the external water source through a connecting conduit, so that the equipment can simply filter the incoming water resources to ensure the quality and stability of steam during the steaming process.
[0027] like Figure 2 , 4 As shown in Figure 5, the evaporation component includes a heating tube 41 and a steam generator 42. A power socket 12 is provided at the bottom of the main tank 11, and one end of the heating tube 41 is clamped in the power socket 12. The heating tube 41 can be connected to an external power source to realize power supply to the heating tube 41. In addition, multiple groups of limit blocks 13 are also provided inside the main tank 11. The steam generator 42 is cleverly clamped between these limit blocks 13 and electrically connected to the power socket 12. The stable installation and power supply of the steam generator 42 in the equipment are guaranteed, and the stable generation and transmission of steam are ensured. A connecting groove 22 is provided on the storage tank 21, and a first funnel 23 is clamped in the connecting groove 22. Through this first funnel 23, the steam chamber and the storage chamber are connected. The steam can flow smoothly inside the equipment, realizing the effective utilization and transmission of steam, thereby ensuring the smooth progress of the steam curing process and the high-quality curing of concrete.
[0028] The filter assembly is composed of a filter tank 51 and a filter cover 52. A support plate 14 is provided on one side of the main tank 11. The filter tank 51 is clamped on the support plate 14, and the filter tank 51 is firmly installed in the device. The filter cover 52 is located above the filter tank 51 and is connected to the filter tank 51 to form a space of the filter chamber. The filter assembly can effectively filter steam and water sources to ensure the quality and stability of steam. In addition, the filter assembly also includes a filter screen 53, which is located in the filter chamber and clamped on the filter tank 51. The filter screen 53 can effectively filter out impurities and particulate matter to ensure the cleanliness and purity of steam and water sources. The filter assembly can achieve efficient filtration and purification of steam and water sources, ensure the quality and stability of steam during the steaming process, and improve production efficiency and product quality.
[0029] like Figure 2 As shown, a mounting groove 32 is provided on the cover plate 31 for installing other components, and a second funnel 33 is provided above the cover plate 31, and the second funnel 33 is clamped in the mounting groove 32 to ensure its stable installation. One end of the connecting pipe is clamped in the second funnel 33, and the other end is provided with a valve for controlling the flow of steam. A limiting ring 15 is provided in the main tank 11 to limit the movement range of other components. A plurality of positioning blocks 24 are provided on the bottom surface of the storage tank 21, and these positioning blocks 24 are used to position and support other components. The limiting ring 15 is provided with a positioning groove 16 corresponding to the positioning block 24, and the positioning block 24 is clamped in the positioning groove 16 to ensure accurate positioning and stable support of the components. Connecting blocks 17 are provided on both sides of the main tank 11, and a rotatable connecting buckle 18 is provided on the connecting block 17 for connecting other components or components. Two sets of connecting buckles 36 are provided on the cover plate 31, and the connecting buckle 18 can be clamped in the connecting buckle 36 to ensure a firm and reliable connection between the components. This enables the various components in the equipment to be effectively connected and work in coordination, ensuring the smooth progress of the steaming process and the steady improvement of product quality.
[0030] Embodiment 2:
[0031] Based on the hollow thin-walled pile steaming equipment provided in the first embodiment of the present application, the second embodiment of the present application proposes a hollow thin-walled pile steaming equipment. This second embodiment is only a preferred embodiment of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment. The second embodiment of the present utility model will be further described below.
[0032] like Figure 3 As shown, a mounting groove 32 is provided on the cover plate 31, and a second funnel 33 is provided above the cover plate 31. The second funnel 33 is clamped in the mounting groove 32 to ensure that it is firmly fixed. A connector 34 is provided on the top of the second funnel 33, and a plurality of connection ports 35 are provided on the connector 34. These connection ports 35 are used to connect other pipes or components. One end of the connecting pipe is clamped in the connection port 35 to ensure a tight and reliable connection. A valve is provided at the other end to control the flow and regulation of steam, thereby ensuring smooth operation and stable control of steam during the steaming process. The connector 34 enables the device to be installed with multiple groups of connecting pipes, so that steam can be provided to multiple devices at the same time.
[0033] The difference between the second embodiment and the first embodiment is that a connector 34 is provided on the cover plate 31, and multiple groups of connection ports 35 are provided on the connector 34, and multiple groups of connection pipes can be installed, so that the device can transport steam to multiple devices through the connection pipes, which can improve the connection efficiency and flexibility of the device, and also increase the versatility and applicability of the device. The remaining conditions are consistent with the first embodiment, so this embodiment will not be repeated.
[0034] The basic principle and main features of the present invention and the advantages of the present invention are shown and described above. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments.
Claims
1. A hollow thin-walled pier steaming equipment, characterized in that: The invention comprises a main tank (11), wherein a storage tank (21) is arranged inside the main tank (11), wherein the storage tank (21) is clamped inside the main tank (11) and a steam chamber is formed between the storage tank (21) and the main tank (11), wherein an evaporation component is arranged inside the steam chamber; a cover plate (31) is arranged above the main tank (11), wherein the cover plate (31) is clamped on the main tank (11), and a storage chamber is formed between the cover plate (31) and the storage tank (21); a connecting pipe is arranged on the cover plate (31) and connected to other equipment via the connecting pipe; and a filter component is arranged on one side of the main tank (11), wherein the filter component is connected to the steam chamber and an external water source via a connecting conduit.
2. The steaming equipment for hollow thin-walled piles according to claim 1, characterized in that: The evaporation component comprises a heating tube (41) and a steam generator (42); a power socket (12) is arranged on the bottom surface of the main tank (11); one end of the heating tube (41) is clamped in the power socket (12); and the power socket (12) is connected to an external power supply; a plurality of groups of limit blocks (13) are arranged in the main tank (11); the steam generator (42) is clamped between the plurality of groups of limit blocks (13) and is electrically connected to the power socket (12).
3. The steaming equipment for hollow thin-walled piles according to claim 2, characterized in that: The storage tank (21) is provided with a connecting groove (22), a first funnel (23) is arranged in the connecting groove (22), and the steam chamber is connected with the storage chamber through the first funnel (23).
4. The steaming equipment for hollow thin-walled piles according to claim 1, characterized in that: The filter assembly comprises a filter tank (51) and a filter cover (52); a support plate (14) is provided on one side of the main tank (11); the filter tank (51) is clamped on the support plate (14); the filter cover (52) is located above the filter tank (51) and is connected to the filter tank (51) to form a filter cavity.
5. The steaming and curing equipment for hollow thin-walled piles according to claim 4, characterized in that: The filter assembly also includes a filter screen (53), which is located in the filter cavity and is clamped on the filter tank (51).
6. The steaming and curing equipment for hollow thin-walled piles according to claim 1, characterized in that: The cover plate (31) is provided with a mounting groove (32), a second funnel (33) is provided above the cover plate (31), and the second funnel (33) is clamped in the mounting groove (32); one end of the connecting pipe is clamped in the second funnel (33), and the other end is provided with a valve.
7. The steaming equipment for hollow thin-walled piles according to claim 1, characterized in that: The cover plate (31) is provided with a mounting groove (32); a second funnel (33) is provided above the cover plate (31); the second funnel (33) is clamped in the mounting groove (32); a connecting piece (34) is provided on the second funnel (33); a plurality of connecting ports (35) are provided on the connecting piece (34); one end of the connecting pipe is clamped in the connecting port (35); and a valve is provided at the other end.
8. A steaming and curing equipment for hollow thin-walled piles according to claim 6 or 7, characterized in that: A limiting ring (15) is arranged in the main tank (11), a plurality of groups of positioning blocks (24) are arranged on the bottom surface of the storage tank (21), the limiting ring (15) is provided with positioning grooves (16) corresponding to the positioning blocks (24), and the positioning blocks (24) are clamped in the positioning grooves (16).
9. The steaming and curing equipment for hollow thin-walled piles according to claim 8, characterized in that: The main body tank (11) is provided with connecting blocks (17) on both sides, and a rotatable connecting buckle (18) is provided on the connecting block (17). The cover plate (31) is provided with two groups of connecting buckles (36), and the connecting buckles (18) can be clamped in the connecting buckles (36).