Green energy-saving fabricated building wall component
By using corner positioning socket components and rib rods to assemble the pipe sleeve structure in green and energy-saving prefabricated building wall components, the problem of low corner positioning and assembly efficiency is solved, and the rapid, stable positioning and efficient assembly of corners is achieved, improving the improvement of the improvement of corners Assembly efficiency.
Patent Information
- Application Number
- CN202420871888.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-25
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-04-25
AI Technical Summary
When assembling existing green and energy-saving prefabricated building wall components, the rapid positioning and assembly efficiency of corners are low, resulting in the problem of low assembly efficiency.
By setting the corner positioning socket assembly and rib rod assembly on the green energy-saving concrete wall, the rounded pin block and movable sleeve cavity structure of the corner positioning socket assembly can achieve stable positioning of the corner, and rotating the screw pipe and thread The groove structure improves the flexible installation and positioning of the rib rods.
It realizes fast, stable positioning and efficient assembly of corners, improves assembly efficiency, and ensures stable connection and installation convenience of components.
Smart Images

Figure CN222161656U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembled buildings, in particular to a green energy-saving assembled building wall component. Background Art
[0002] Prefabricated buildings refer to buildings that are assembled on site using prefabricated components. The advantages of this type of building are that it can be built quickly, is less restricted by climatic conditions, and can effectively save labor and improve building quality.
[0003] When assembling components of existing green energy-saving prefabricated building walls, it is necessary to align and fix the steel bars. However, when the whole is aligned and fixed, the corners on both sides cannot be effectively and quickly assembled and positioned, which makes it not very efficient to assemble and connect the steel bars in the middle.
[0004] In order to solve the above problems, this application proposes a green and energy-saving prefabricated building wall component. Utility Model Content
[0005] The purpose of the utility model is to provide a green and energy-saving assembled building wall component to solve the problem that the existing green and energy-saving assembled building wall components mentioned in the above background technology cannot be effectively and quickly connected and assembled, resulting in low assembly efficiency.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a green and energy-saving prefabricated building wall component, comprising an assembled wall steel frame and a green and energy-saving concrete wall, the assembled wall steel frame is cast with a green and energy-saving concrete wall on the surrounding side, the inner side of the green and energy-saving concrete wall is provided with an intermediate connecting rib rod, the lower end of the intermediate connecting rib rod is provided with a rib rod assembly sleeve, the upper end corner of the green and energy-saving concrete wall is provided with a corner assembly kit, and the lower end corner of the green and energy-saving concrete wall is provided with a corner positioning sleeve assembly.
[0007] Preferably, the corner assembly kit includes an intermediate sleeve hole, a positioning pin hole and a cross assembly kit shell, the interior of the cross assembly kit shell is provided with an intermediate sleeve hole, the inner side of the intermediate sleeve hole is located at the inner side of both ends of the cross assembly kit shell and positioning pin holes are provided, and the cross assembly kit shell is connected to the green energy-saving concrete wall.
[0008] Preferably, the corner positioning socket assembly includes an intermediate positioning rod, a resistance spring, a movable socket cavity, a chamfered pin block and a socket assembly shell. The movable socket cavities are arranged on the inner sides of both ends of the socket assembly shell. The inner side of the movable socket cavity is located on the socket assembly shell and an intermediate positioning rod is arranged. The outer side of the intermediate positioning rod is located on the socket assembly shell and a resistance spring is arranged. The outer ends of the intermediate positioning rod and the resistance spring are provided with chamfered pin blocks. The chamfered pin blocks are sleeved in the movable socket cavity of the socket assembly shell. The socket assembly shell is connected to the green energy-saving concrete wall.
[0009] Preferably, the middle connecting rib rod comprises an upper screw hole tube, an intermediate rod body and a lower screw rod, the lower end of the upper screw hole tube is provided with an intermediate rod body, the lower end of the intermediate rod body is provided with a lower screw rod, the intermediate rod body is connected to the assembled wall steel bar frame, and the lower screw rod is connected to the rib rod assembly pipe sleeve.
[0010] Preferably, the rib rod assembly sleeve includes a rotating screw tube, a rotating thread groove and a bottom screw head, a rotating screw tube is provided on the inner side of the upper end of the rotating screw tube, a bottom screw head is provided in the middle of the lower end of the rotating screw tube, and the rotating screw tube is connected to the middle connecting rib rod through the rotating thread groove.
[0011] Preferably, two of the corner positioning sleeve components and two of the corner assembly kits are provided, and the assembly positions correspond to each other.
[0012] Preferably, the number of the intermediate connecting ribs and the rib assembly sleeves corresponds.
[0013] Preferably, the lower end of the rib assembly sleeve can be threadedly rotated on the inner side of the upper end of the middle connecting rib.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] By providing a corner positioning sleeve component structure, it can be installed accordingly on the corner assembly kit, so that both ends can be effectively positioned during assembly. The sleeve component shell of the corner positioning sleeve component is fixedly connected to the green energy-saving concrete wall, so that the sleeve component shell is easy to install and place. When the sleeve component shell is sleeved and assembled, the sleeve component shell moves downward, so that the chamfered pin blocks at both ends of the sleeve component shell can contact the corner assembly kit. Due to the chamfered arc of the chamfered pin block, the chamfered pin block moves into the movable sleeve cavity due to extrusion. When the chamfered pin block moves, it is effectively positioned by the middle positioning rod, so that the chamfered pin block is more stable when moving. When the chamfered pin block encounters the positioning pin hole of the corner assembly kit, the chamfered pin block is resisted into the positioning pin hole by the resistance spring, so that the pin shaft is effectively fixed and used, thereby effectively locking and fixing it, so that stable assembly and positioning can be achieved.
[0016] By providing a rib rod assembly sleeve structure, it can be rotated and assembled to the corner assembly kit. The rotating screw of the rib rod assembly sleeve is connected to the middle connecting rib rod by rotating the thread groove, so that the rotating screw can rotate up and down, so that the rotating screw can effectively change its position on the middle connecting rib rod. When the rotating screw rotates and moves downward, the rotating screw can drive the bottom screw head to be rotated and installed on the middle connecting rib rod. This effectively corresponds to the installation positioning, making the assembly more convenient and efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 A three-dimensional structural diagram of a green and energy-saving assembled building wall component proposed by the utility model;
[0018] Figure 2 This is a schematic cross-sectional structure diagram of a corner assembly kit of a green and energy-saving assembled building wall component proposed by the utility model;
[0019] Figure 3 This is a schematic cross-sectional structure diagram of a corner positioning sleeve assembly of a green and energy-saving assembled building wall component proposed by the utility model;
[0020] Figure 4 This is a schematic diagram of the intermediate connecting rib structure of a green and energy-saving assembled building wall component proposed by the utility model;
[0021] Figure 5 This is a schematic diagram of a reinforcing rod assembly pipe sleeve structure of a green and energy-saving prefabricated building wall component proposed by the utility model.
[0022] In the figure: 1. Corner assembly kit; 11. Middle sleeve hole; 12. Positioning pin hole; 13. Cross assembly kit shell; 2. Middle connecting rib rod; 21. Upper screw hole tube; 22. Middle rod body; 23. Lower screw rod; 3. Assemble wall reinforcement frame; 4. Corner positioning sleeve assembly; 41. Middle positioning rod; 42. Resistance spring; 43. Movable sleeve cavity; 44. Rounded pin block; 45. Sleeve assembly shell; 5. Rib rod assembly pipe sleeve; 51. Rotating screw tube; 52. Rotating thread groove; 53. Bottom screw head; 6. Green energy-saving concrete wall. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0024] Example 1
[0025] Reference Figure 1-Figure 3A green and energy-saving assembled building wall component comprises an assembled wall reinforcement frame 3 and a green and energy-saving concrete wall 6. The assembled wall reinforcement frame 3 is cast around the green and energy-saving concrete wall 6. The inner side of the green and energy-saving concrete wall 6 is provided with an intermediate connecting rib 2. The lower end of the intermediate connecting rib 2 is provided with a rib assembly pipe sleeve 5. The upper corner of the green and energy-saving concrete wall 6 is provided with a corner assembly kit 1. The lower corner of the green and energy-saving concrete wall 6 is provided with a corner positioning sleeve assembly 4. When in use, the green and energy-saving concrete wall 6 is effectively strengthened and fixed due to the assembled wall reinforcement frame 3 on the inside, so that it is not easy to break and damage. When assembling, the green and energy-saving concrete on the side of the assembled wall reinforcement frame 3 is The earth wall 6 can be correspondingly sleeved in the corner assembly kit 1 at the upper end of another green energy-saving concrete wall 6 due to the corner positioning sleeve component 4 at the lower end, so that the corner assembly kit 1 and the corner positioning sleeve component 4 can be effectively and quickly assembled, so that both sides can be effectively positioned and installed. During assembly, the height position of the corner positioning sleeve component 4 is used to make the corner positioning sleeve component 4 and the corner assembly kit 1 of another device have a certain gap position after assembly, so that the rib assembly pipe sleeve 5 at the lower end of the middle connecting rib 2 can be rotated, so that the rib assembly pipe sleeve 5 can be rotated and assembled to the middle connecting rib 2 of another device below, so that the whole can be correspondingly rotated and assembled, so that the installation is more efficient.
[0026] In the utility model, the corner assembly kit 1 includes an intermediate sleeve hole 11, a positioning pin hole 12 and a cross assembly kit shell 13. The interior of the cross assembly kit shell 13 is provided with an intermediate sleeve hole 11. The inner side of the intermediate sleeve hole 11 is located at the inner sides of the two ends of the cross assembly kit shell 13 and positioning pin holes 12 are provided. The cross assembly kit shell 13 is connected to the green energy-saving concrete wall 6. The cross assembly kit shell 13 of the corner assembly kit 1 is fixedly connected to the green energy-saving concrete wall 6, so that the cross assembly kit shell 13 is easy to install and place. Due to the area of the inner intermediate sleeve hole 11 and the positioning pin hole 12 of the cross assembly kit shell 13, the corner positioning sleeve component 4 can be correspondingly sleeved and installed, and the corner positioning sleeve component 4 can be locked in the cross assembly kit shell 13, so as to avoid loosening and falling off, and effectively fix the corners on both sides.
[0027] In the utility model, the corner positioning sleeve assembly 4 includes an intermediate positioning rod 41, a resistance spring 42, a movable sleeve cavity 43, a chamfered pin block 44 and a sleeve assembly shell 45. The inner sides of the two ends of the sleeve assembly shell 45 are provided with movable sleeve cavities 43. The inner side of the movable sleeve cavity 43 is located on the sleeve assembly shell 45 and an intermediate positioning rod 41 is provided. The outer side of the intermediate positioning rod 41 is located on the sleeve assembly shell 45 and a resistance spring 42 is provided. The outer ends of the intermediate positioning rod 41 and the resistance spring 42 are provided with a chamfered pin block 44. The chamfered pin block 44 is sleeved in the movable sleeve cavity 43 of the sleeve assembly shell 45. The sleeve assembly shell 45 is connected to the green energy-saving concrete wall 6. The sleeve assembly shell 45 of the corner positioning sleeve assembly 4 is fixedly connected to the green energy-saving concrete wall 6. The sleeve assembly shell 45 can be mounted on the concrete wall 6, so that the sleeve assembly shell 45 is easy to install and place. When the sleeve assembly shell 45 is sleeved and assembled, the sleeve assembly shell 45 moves downward, so that the chamfered pin blocks 44 at both ends of the sleeve assembly shell 45 can contact the corner assembly kit 1. Due to the chamfered arc of the chamfered pin block 44, the chamfered pin block 44 moves into the movable sleeve cavity 43 due to extrusion. When the chamfered pin block 44 moves, it is effectively positioned by the middle positioning rod 41, so that the chamfered pin block 44 is more stable when moving. When the chamfered pin block 44 encounters the positioning pin hole 12 of the corner assembly kit 1, the chamfered pin block 44 is resisted by the resisting spring 42 into the positioning pin hole 12, so that the effective pin shaft is fixed and used, thereby effectively locking and fixing it, so that the assembly and positioning can be stable. There are two corner positioning sleeve assemblies 4 and two corner assembly kits 1, and the assembly positions correspond, so they can be installed and positioned accordingly for use. The number of intermediate connecting ribs 2 and rib assembly sleeves 5 corresponds, which is convenient for corresponding installation and use. The lower end of the rib assembly sleeve 5 can be threadedly rotated on the inner side of the upper end of the intermediate connecting rib 2, which is convenient for assembly and allows for stable positioning, installation and use.
[0028] Working principle: When in use, the green energy-saving concrete wall 6 is effectively strengthened and fixed due to the assembled wall reinforcement frame 3 on the inside, so it is not easy to break and damage. When assembling, the green energy-saving concrete wall 6 on the surrounding side of the assembled wall reinforcement frame 3 can be correspondingly sleeved in the corner assembly kit 1 at the upper end of another green energy-saving concrete wall 6 due to the corner positioning sleeve component 4 at the lower end. In this way, the corner assembly kit 1 and the corner positioning sleeve component 4 can be effectively and quickly assembled, so that both sides can be effectively positioned and installed, and then the personnel can rotate the rib assembly sleeve 5 at the lower end of the middle connecting rib 2, so that the rib assembly sleeve 5 can be rotated and assembled to the middle connecting rib 2 below, so that the whole can be rotated and assembled accordingly, so that the installation is more efficient.
[0029] Example 2
[0030] Reference Figure 1 and Figure 4As another preferred embodiment of the invention, the only difference from Embodiment 1 is that the intermediate connecting rib rod 2 includes an upper screw hole tube 21, an intermediate rod body 22 and a lower screw rod 23, the lower end of the upper screw hole tube 21 is provided with an intermediate rod body 22, the lower end of the intermediate rod body 22 is provided with a lower screw rod 23, the intermediate rod body 22 is connected to the assembled wall reinforcement frame 3, and the lower screw rod 23 is connected to the rib rod assembly pipe sleeve 5.
[0031] Working principle: the middle rod body 22 of the middle connecting rib 2 is welded and connected to the assembled wall reinforcement frame 3, so that the middle rod body 22 is easy to install and place. The middle rod body 22 has a lower screw rod 23 at the lower end, so that the rib assembly sleeve 5 can be rotatably installed, and the rib assembly sleeve 5 can be raised and lowered when rotating forward and reversely. The middle rod body 22 passes through the upper screw hole tube 21 at the upper end, so that the rib assembly sleeve 5 can be correspondingly rotated and installed for use.
[0032] Example 3
[0033] Reference Figure 1 and Figure 5 As another preferred embodiment of the invention, the only difference from Embodiment 2 is that the rib rod assembly sleeve 5 includes a rotating screw tube 51, a rotating thread groove 52 and a bottom screw head 53. The rotating screw tube 51 is provided with a rotating thread groove 52 on the inner side of the upper end, and the bottom screw head 53 is provided in the middle of the lower end of the rotating screw tube 51. The rotating screw tube 51 is connected to the middle connecting rib rod 2 through the rotating thread groove 52.
[0034] Working principle: the rotating screw tube 51 of the rib rod assembly sleeve 5 is threadedly connected to the middle connecting rib rod 2 through the rotating thread groove 52, so that the rotating screw tube 51 can rotate and move up and down, so that the rotating screw tube 51 can effectively change its position on the middle connecting rib rod 2. When the rotating screw tube 51 rotates and moves downward, the rotating screw tube 51 can drive the bottom screw head 53 to be rotated and installed on the middle connecting rib rod 2, which effectively corresponds to the installation positioning, making the assembly more convenient and efficient.
[0035] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A green energy-saving assembled building wall component, comprising an assembled wall reinforcement frame (3) and a green energy-saving concrete wall (6), characterized in that: A green energy-saving concrete wall (6) is cast around the circumference of the assembled wall reinforcement frame (3), an intermediate connecting rib (2) is arranged on the inner side of the green energy-saving concrete wall (6), a rib assembly pipe sleeve (5) is arranged at the lower end of the intermediate connecting rib (2), a corner assembly kit (1) is arranged at the upper corner of the green energy-saving concrete wall (6), and a corner positioning sleeve assembly (4) is arranged at the lower corner of the green energy-saving concrete wall (6).
2. A green and energy-saving assembled building wall component according to claim 1, characterized in that: The corner assembly kit (1) comprises an intermediate sleeve hole (11), a positioning pin hole (12) and a cross assembly kit shell (13); the interior of the cross assembly kit shell (13) is provided with the intermediate sleeve hole (11); the inner side of the intermediate sleeve hole (11) is located at the inner side of both ends of the cross assembly kit shell (13); and the cross assembly kit shell (13) is connected to a green energy-saving concrete wall (6).
3. A green and energy-saving assembled building wall component according to claim 1, characterized in that: The corner positioning sleeve assembly (4) comprises an intermediate positioning rod (41), a resisting spring (42), a movable sleeve cavity (43), a rounded pin block (44) and a sleeve assembly shell (45); movable sleeve cavities (43) are arranged on the inner sides of both ends of the sleeve assembly shell (45); an intermediate positioning rod (41) is arranged on the inner side of the movable sleeve cavity (43) and on the sleeve assembly shell (45); a resisting spring (42) is arranged on the outer side of the intermediate positioning rod (41) and on the sleeve assembly shell (45); rounded pin blocks (44) are arranged on the outer ends of the intermediate positioning rod (41) and the resisting spring (42); the rounded pin blocks (44) are sleeved in the movable sleeve cavity (43) of the sleeve assembly shell (45); and the sleeve assembly shell (45) is connected to a green energy-saving concrete wall (6).
4. A green and energy-saving assembled building wall component according to claim 1, characterized in that: The intermediate connecting rib rod (2) comprises an upper screw hole tube (21), an intermediate rod body (22) and a lower screw rod (23); the lower end of the upper screw hole tube (21) is provided with the intermediate rod body (22); the lower end of the intermediate rod body (22) is provided with the lower screw rod (23); the intermediate rod body (22) is connected to the assembled wall reinforcement frame (3); and the lower screw rod (23) is connected to the rib rod assembly pipe sleeve (5).
5. A green and energy-saving assembled building wall component according to claim 1, characterized in that: The rib rod assembly sleeve (5) comprises a rotating screw tube (51), a rotating thread groove (52) and a bottom screw head (53); the rotating screw tube (51) is provided with a rotating thread groove (52) on the inner side of the upper end thereof, the bottom screw head (53) is provided in the middle of the lower end thereof, and the rotating screw tube (51) is connected to the middle connecting rib rod (2) via the rotating thread groove (52).
6. A green and energy-saving assembled building wall component according to claim 1, characterized in that: The corner positioning sleeve assembly (4) and the corner assembly kit (1) are each provided with two, and the assembly positions correspond.
7. A green and energy-saving assembled building wall component according to claim 1, characterized in that: The number of the intermediate connecting ribs (2) and the rib assembly sleeves (5) corresponds.
8. A green and energy-saving assembled building wall component according to claim 1, characterized in that: The lower end of the rib assembly sleeve (5) can be threadedly rotated on the inner side of the upper end of the middle connecting rib (2).
