The rail welding operation vehicle addresses labor intensity and safety hazards by automating the welding process between adjacent rails, ensuring efficient and safe rail connections while minimizing disruptions to the operation line.
Patent Information
- Application Number
- CN202420593032.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2034-03-26
AI Technical Summary
Existing rail welding vehicles face issues such as labor intensity, safety hazards, lack of separation between people and vehicles, and adverse effects on the operation line during welding, particularly in high-speed railway applications.
A rail welding operation vehicle with a rail welding vehicle, a first loading platform, a leveling mechanism, and a welding machine hoisting device, which includes a fixed base, leveling mechanism, and hydraulic legs, allowing for automated rail welding between adjacent tracks, reducing manual handling, and ensuring safety and efficiency.
The vehicle enables efficient, safe, and high-quality welding of adjacent rails, reducing labor intensity and safety hazards, and minimizing disruptions to the operation line, with the ability to operate on super-elevation lines.
Smart Images

Figure CN222182935U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of railway line maintenance and repair, and in particular, to a rail welding operation vehicle. Background Art
[0002] Railway tracks are generally made up of multiple rails laid end to end, and two adjacent rails are generally connected by welding. At present, there are four main methods of rail welding at home and abroad: flash welding, gas pressure welding, thermite welding and narrow gap arc welding. In related technologies, welding between adjacent rails is generally achieved by a rail welding car.
[0003] At present, pneumatic rail welding vehicles are usually used to weld new rails that are inserted into the section to be replaced. In this process, the movement of new and old rails still needs to rely on manual handling. At the same time, one bogie of the pneumatic rail welding vehicle needs to be supported to be separated from the rails, which is not only labor-intensive, but also takes a certain amount of time. In addition, there is no separation of people and vehicles during the operation of the pneumatic rail welding vehicle, which poses a safety hazard. In addition, there are the following problems during welding: one of the bogies of the rail welding vehicle is pressed on the rail, and there is a relative displacement between the rail and the bogie during welding top forging; after the first sawing welding is completed, the welding position has not been aged for a certain period of time, and the rail welding vehicle passes through the first welding position, which is easy to have an adverse effect on the welding point; when traveling from the first welding point to the second welding point, the fasteners of one side of the rail are completely loosened, and there are risks of vehicle overturning and derailment for super-high lines. At present, the task of high-speed railway thermite welding is heavy, and the existing equipment cannot meet the welding task requirements. Utility Model Content
[0004] A rail welding operation vehicle is provided in an embodiment of the present application to solve the problems that the existing rail welding vehicle is prone to adversely affect the operation line during operation, has high labor intensity, lacks separation between people and vehicles, and has great safety hazards.
[0005] In order to achieve the above objectives, this application provides the following technical solutions:
[0006] A rail welding work vehicle is provided in an embodiment of the present application. The work vehicle is located on a track adjacent to the track being worked on, and the work vehicle includes: a rail welding vehicle, used to weld a new rail to an old rail removed from a rail section to be replaced, and the new rail is compatible with the removed old rail; the rail welding vehicle includes a first loading platform, on which a power room, an operation room and a welding machine hoisting device are sequentially arranged; the welding machine hoisting device includes: a fixed base, arranged on the first loading platform; a leveling mechanism, arranged on the fixed base, used to level the welding machine hoisting device; a welding machine, movably arranged at one end of the fixed base, used to weld the joint between the new rail and the existing rail; a first hoist, arranged in the middle of the leveling mechanism, used to hoist the welding machine.
[0007] Preferably, the leveling mechanism includes: a leveling base, which is arranged on the fixed base; two leveling cylinders, which are vertically symmetrically arranged on both sides of the leveling base, and are used to drive the leveling base to swing up and down; two hydraulic legs, which are symmetrically arranged at both ends of the leveling base, and can move laterally and can also be lifted and lowered vertically. During operation, the two hydraulic legs move laterally and descend onto the sleepers or the roadbed.
[0008] Preferably, the rail welding vehicle further comprises: two slide grooves, respectively arranged on both sides of the first loading platform and extending along the length direction of the vehicle body, the notch of each slide groove facing upward, and at least one connecting component is slidably arranged in each slide groove; a sliding ceiling, connected to the top end of each connecting component, and the sliding ceiling is located above the power room, the operating room and the welding machine hoisting device, when each connecting component moves in the same direction in the corresponding slide groove, it can drive the sliding ceiling to move in the same direction, during operation, the sliding ceiling slides in the direction away from the welding machine hoisting device, and when the sliding ceiling slides into place, the sliding ceiling is located above the power room and the operating room; a ceiling, arranged at the top of the operating room.
[0009] Preferably, the work vehicle also includes at least one rail transport vehicle, each of the rail transport vehicles can be connected or disassembled, and each of the rail transport vehicles is used to place new rails; the rail welding vehicle and each of the rail transport vehicles can be connected or disassembled, and at least one of the rail transport vehicles is connected to the front end of the rail welding vehicle.
[0010] Preferably, each of the rail transport vehicles comprises: a second loading platform for loading new rails; and at least one second crane, arranged on the second loading platform, for lifting the new rails from the second loading platform to a corresponding position in an operating area of an adjacent track section to be replaced.
[0011] Preferably, an electrical control cabinet and a seat are arranged in the operating room.
[0012] Compared with the prior art, the rail welding work vehicle provided in the embodiment of the present application has the following technical effects: it can enable the rail welding vehicle to weld the rails of adjacent tracks, so that the rail welding vehicle can achieve adjacent line welding, thereby eliminating the adverse effects of the rail welding vehicle on the work line and effectively improving the welding effect; in addition, it also realizes the separation of people and vehicles, reduces personnel participation, reduces labor intensity, and improves the safety and work efficiency of the operation. Among them, the rail welding vehicle can weld new rails to the old rails removed from the section to be replaced, and complete the connection between the new rails and the existing rails with quality; the first loading platform in the rail welding vehicle has a simple structure, is easy to use, has a strong load-bearing capacity and is easy to maintain; the power room provides a power source for the welding operation; the operation room can control the travel and braking of the entire vehicle, and control the start and stop and operation of each component; the welding machine hoisting device can hoist the welding machine to the welding position of the adjacent track, so that the rail welding vehicle can weld the rails of the adjacent track on the adjacent track, and realize the adjacent line welding of the rail welding vehicle; the fixed base in the welding machine hoisting device is used to carry the leveling mechanism, the welding machine and the first crane; the leveling mechanism can level the welding machine hoisting device; the welding machine can weld the joints of the new rails and the existing rails; the first crane can hoist the welding machine from the fixed base to the working position of the section to be replaced on the adjacent track, and can also hoist the welding machine after work to the next working position, and can also hoist the welding machine after work to the fixed base, which is flexible and convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0014] Figure 1 A front view of a rail welding vehicle provided in an embodiment of the present application;
[0015] Figure 2 A schematic structural diagram of a rail welding vehicle for a rail welding operation vehicle provided in an embodiment of the present application;
[0016] Figure 3 A front view of a rail welding vehicle for a rail welding operation vehicle provided in an embodiment of the present application;
[0017] Figure 4 A top view of a rail welding vehicle for a rail welding operation vehicle provided in an embodiment of the present application;
[0018] Figure 5 A structural schematic diagram of a welding machine hoisting device for a rail welding vehicle provided in an embodiment of the present application;
[0019] Figure 6 A front view of a welding machine hoisting device for a rail welding vehicle provided in an embodiment of the present application;
[0020] Figure 7 A top view of a welding machine hoisting device for a rail welding vehicle provided in an embodiment of the present application;
[0021] Figure 8 A schematic diagram of the connection structure between a fixed base and a leveling mechanism in a welding machine hoisting device of a rail welding vehicle provided in an embodiment of the present application;
[0022] Fig. 9 A front view of a rail transport vehicle for a rail welding operation vehicle provided in an embodiment of the present application;
[0023] Fig.10 A front view of another rail transport vehicle of a rail welding operation vehicle provided in an embodiment of the present application;
[0024] Fig.11 A schematic diagram of the positional relationship between a rail welding operation vehicle and an operation line track during operation provided in an embodiment of the present application;
[0025] Fig.12 A schematic diagram of a joint after the old rail is removed from a single rail adjacent to a track in an operation method of a rail welding operation vehicle provided in an embodiment of the present application;
[0026] Fig.13 A schematic diagram of a joint of two adjacent tracks after the old rails are removed in an operation method of a rail welding operation vehicle provided in an embodiment of the present application;
[0027] Fig.14 A schematic diagram of a process of welding a single rail of an adjacent rail by a rail welding vehicle in an operation method of the rail welding vehicle provided in an embodiment of the present application;
[0028] Fig.15 A schematic diagram of a process of welding a double rail of an adjacent rail by a rail welding vehicle in an operation method of the rail welding vehicle provided in an embodiment of the present application;
[0029] The following are marked in the accompanying drawings:
[0030] Rail transport vehicle 1, rail welding vehicle 2, second loading platform 11, second crane 12, first loading platform 21, power room 22, operation room 23, welding machine hoisting device 24, slide 25, connecting assembly 26, sliding ceiling 27, ceiling 28, fixed base 241, leveling mechanism 242, welding machine 243, first crane 244, leveling base 2421, leveling cylinder 2422, hydraulic support leg 2423. DETAILED DESCRIPTION
[0031] The embodiment of the present application discloses a rail welding operation vehicle to solve the problems that the existing rail welding vehicles are prone to adverse effects on the operation line during operation, have high labor intensity, lack of separation between people and vehicles, and have great safety hazards.
[0032] In order to make the technical solutions and advantages in the embodiments of the present application more clearly understood, the exemplary embodiments of the present application are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict.
[0033] In the present application, the horizontal direction perpendicular to the extension of the railway line is referred to as the transverse direction, and the forward direction of the rail welding operation vehicle is referred to as the operation direction.
[0034] Figure 1 A front view of a rail welding vehicle provided in an embodiment of the present application, such as Figure 1 As shown, in a specific embodiment, a rail welding work vehicle is located on an adjacent track of the work track, and the work vehicle includes: at least one rail transport vehicle 1, each rail transport vehicle 1 can be connected or disassembled, and each rail transport vehicle 1 is used to place new rails, so as to facilitate the use of new rails; a rail welding vehicle 2, used to weld new rails to the old rails removed from the rail section to be replaced, and the new rails are compatible with the removed old rails, the rail welding vehicle 2 and each rail transport vehicle 1 can be connected or disassembled, so as to facilitate connection, inspection and disassembly, and have low maintenance cost, and at least one rail transport vehicle 1 is connected to the front end of the rail welding vehicle 2.
[0035] Compared with the prior art, the rail welding vehicle provided in the embodiment of the present application has the following technical effects: it can enable the rail welding vehicle to weld the rails of adjacent tracks, so that the rail welding vehicle can achieve adjacent line welding, thereby eliminating the adverse effects of the rail welding vehicle on the operation line, and effectively improving the welding effect; in addition, it also realizes the separation of people and vehicles, reduces personnel participation, reduces labor intensity, and improves the safety level and work efficiency of the operation. Among them, the rail welding vehicle can weld the new rails to the old rails removed from the section to be replaced, and completes the connection between the new rails and the existing rails with quality. When the rail welding vehicle is operating, there is no need to lift the bogie on the welding joint side to separate from the rails, which effectively reduces safety hazards. At the same time, the rail welding vehicle can also operate on super-elevation lines, realizing the high-speed rail super-elevation working conditions, and has good adaptability.
[0036] Figure 2 A structural schematic diagram of a rail welding vehicle for a rail welding operation vehicle provided in an embodiment of the present application, Figure 3 A front view of a rail welding vehicle for a rail welding operation vehicle provided in an embodiment of the present application, Figure 4 A top view of a rail welding vehicle for a rail welding operation vehicle provided in an embodiment of the present application, such as Figure 2-4 As shown, further, the rail welding vehicle 2 includes: a first loading platform 21, on which a power room 22, an operation room 23 and a welding machine hoisting device 24 are sequentially arranged, and bogies cooperating with the rails are arranged at both ends of the bottom of the first loading platform, which are used to drive the first loading platform to walk on the track. The first loading platform has a simple structure, is easy to use, has a strong carrying capacity and is easy to maintain. The power room provides a power source for the welding operation, the operation room can control the travel and braking of the whole vehicle, and control the start and stop and operation of each component, and the welding machine hoisting device can hoist the welding machine to the welding position of the adjacent track, so that the rail welding vehicle can weld the rails of the adjacent track on the adjacent track, thereby realizing the adjacent line welding of the rail welding vehicle.
[0037] Furthermore, the welding rail vehicle 2 also includes: two slide grooves 25, which are respectively arranged on both sides of the first loading platform 21 and extend along the length direction of the vehicle body, the notch of each slide groove 25 is upward, and at least one connecting component 26 is slidably arranged in each slide groove 25; a sliding ceiling 27, which is connected to the top of each connecting component 26, and the sliding ceiling 27 is located above the power room 22, the operation room 23 and the welding machine hoisting device 24. When each connecting component 26 moves in the same direction in the corresponding slide groove 25, it can drive the sliding ceiling 27 to move in the same direction. During operation, the sliding ceiling 27 slides in the direction away from the welding machine hoisting device 24. When the sliding ceiling 27 slides into place, the sliding ceiling 27 is located above the power room 22 and the operation room 23, making room for the welding machine hoisting device to work; the ceiling 28 is arranged on the top of the operation room 23, and is heat-insulated to provide a good working environment for the staff.
[0038] Furthermore, the first loading platform 21 is a NX70 flatbed truck, or a loading platform with a structure and function similar to that of a flatbed truck.
[0039] Furthermore, the power room 22 adopts a box-type structure to integrate various power source systems for easy lifting.
[0040] Specifically, the power room 22 is equipped with an internal combustion engine or a new energy power system to provide power for welding operations.
[0041] As another embodiment, the power room 22 integrates the power source systems in a load-bearing manner with protective devices to facilitate lifting.
[0042] Furthermore, an electrical control cabinet and seats are arranged in the operating room 23 to provide a working space for the staff.
[0043] Specifically, the electrical control cabinet is electrically connected to the first crane, the leveling cylinder and the hydraulic outriggers in the welding machine hoisting device. The electrical control cabinet can control the travel and braking of the whole vehicle, the rotation and lifting of the first crane, the lifting and lowering of the leveling cylinder, and the lateral movement and lowering of the hydraulic outriggers. During operation, the above operations can be achieved by controlling the buttons on the electrical control cabinet or by remote control, which is simple and convenient to operate.
[0044] Specifically, two connecting components 26 are slidably disposed in each sliding groove 25, which effectively increases the stability of the connection between the connecting components and the sliding ceiling.
[0045] Figure 5 This is a structural schematic diagram of a welding machine hoisting device for a rail welding vehicle provided in an embodiment of the present application. Figure 6 This is a front view of a welding machine hoisting device for a rail welding vehicle provided in an embodiment of the present application. Figure 7 A top view of a welding machine hoisting device for a rail welding vehicle provided in an embodiment of the present application, as shown in FIG. Figure 5-7 As shown, further, the welding machine hoisting device 24 includes: a fixed base 241, which is arranged on the first loading platform 21 and is used to carry the leveling mechanism, the welding machine and the first hoist; a leveling mechanism 242, which is arranged on the fixed base 241 and is used to level the welding machine hoisting device 24; a welding machine 243, which is movably arranged at one end of the fixed base 241 and is used to weld the joint between the new rail and the existing rail; a first hoist 244, which is arranged in the middle of the leveling mechanism 242 and is used to hoist the welding machine 243. The first hoist can be used to hoist the welding machine from the fixed base to the working position of the adjacent track to be replaced, and the welding machine after work can also be hoisted to the next working position, and the welding machine after work can also be hoisted to the fixed base 241, and the first boom of the first hoist 244 is a retractable boom, which expands the working range of the first hoist.
[0046] Specifically, the rotating device on the first crane 244 can drive the first boom to rotate freely 360°, making the first crane more practical. During operation, the first crane lifts the welder and rotates it to a suitable angle so that the welder is located above the working position to be welded. Then, the welder is dropped back to the working position of the operation line by the first crane. The welder welds the position to be welded. After the welding operation is completed, the first crane is driven to hoist the welder onto the rail welding vehicle. The rail welding vehicle in the present application realizes the welding of the rails on the adjacent tracks. At the same time, it eliminates the adverse effects of the rail welding vehicle on the operation line and improves the construction quality.
[0047] Specifically, the welding machine 243 uses a flash normalizing integrated machine and its supporting devices to perform pre-welding treatment, welding and post-welding treatment on the rails to be welded, thereby improving work efficiency and saving costs.
[0048] Specifically, the first crane 244 also includes hydraulic legs. After the first crane hoisting welder is rotated to a suitable angle, the hydraulic legs thereon move laterally downward to provide auxiliary support for the first crane and enhance the stability of the device.
[0049] As an implementation manner, the welding machine 243 is disposed at one end of the fixed base 241 away from the operating room 23 , and the hook of the first crane 244 is located above the welding machine 243 .
[0050] Figure 8 A schematic diagram of the connection structure between a fixed base and a leveling mechanism in a welding machine hoisting device for a rail welding vehicle provided in an embodiment of the present application is shown in FIG. Figure 8 As shown, further, the leveling mechanism 242 includes: a leveling base 2421, which is arranged on the fixed base 241; two leveling cylinders 2422, which are vertically symmetrically arranged on both sides of the leveling base 2421, and are used to drive the leveling base 2421 to swing up and down like a seesaw; two hydraulic legs 2423, which are symmetrically arranged at both ends of the leveling base 2421, and can move laterally and can also be lifted and lowered vertically. During operation, the two hydraulic legs 2423 move laterally and descend on the sleepers or the roadbed to assist in supporting the rail welding vehicle and prevent the rail welding vehicle from overturning.
[0051] When the rail welding vehicle of the present application is operating on a superelevation line, the leveling mechanism on it can play a leveling role, ensuring that the hydraulic legs, the first crane, and the welding machine on it are all in a horizontal state, ensuring the efficiency and safety of the operation. In addition, according to actual needs, the leveling mechanism is not limited to flatbed vehicles, and can also be used in conjunction with automobile transportation.
[0052] Furthermore, each rail transport vehicle 1 includes: a second loading platform 11, which is used to load new rails. Bogies that cooperate with the rails are arranged at both ends of the bottom of the second loading platform, which are used to drive the second loading platform to move on the track. The second loading platform has a simple structure, is easy to use, has a strong load-bearing capacity and is easy to maintain; at least one second crane 12 is arranged on the second loading platform 11, which is used to lift the new rails from the second loading platform 11 to the corresponding position of the operating area of the adjacent track to be replaced, and the second boom of each second crane 12 is a retractable boom, which expands the working range of the second crane.
[0053] Specifically, the rotating device on the second crane 12 can drive the second crane arm to rotate 360 degrees freely, making the second crane more practical. During operation, the second crane lifts the new rail and rotates the new rail to the top of the corresponding position of the adjacent track section to be replaced, and then the new rail is dropped back to the corresponding position of the operation area by the second crane.
[0054] Fig. 9 A front view of a rail transport vehicle for a rail welding operation vehicle provided in an embodiment of the present application, such as Fig. 9As shown, specifically, a second crane 12 is provided in the middle of each rail transport vehicle 1 .
[0055] Fig.10 A front view of another rail transport vehicle of a rail welding operation vehicle provided in an embodiment of the present application, as shown in FIG. Fig.10 As shown, as another embodiment, a second crane 12 is provided at both ends of each rail transport vehicle 1. This expands the use scope of the second crane.
[0056] In specific implementation, at least one rail transport vehicle 1 without new rails can be connected to the rear end of the rail welding vehicle 2 to load the dismantled old rails, thereby saving costs.
[0057] The new rails in the present application are lifted or dropped back to the designated position by the second crane on the rail transport vehicle, and the dismantled old rails can also be lifted by the second crane on the rail transport vehicle to the rail transport vehicle or the old rail recovery vehicle, thereby realizing cross-line transportation, reducing manual participation, alleviating manual labor intensity, and improving operation safety.
[0058] Furthermore, the second loading platform 11 is a NX70 flatbed truck, or a loading platform with a structure and function similar to that of a flatbed truck.
[0059] Specifically, each rail transport vehicle also includes a control component, which is electrically connected to the second crane. The control component can be used to control the boom of the second crane to rotate, extend, clamp the new rail and place the new rail in the rail bearing groove of the old rail on the rail section to be replaced, and control the hydraulic support leg on the second crane to move horizontally and descend, which is easy to operate.
[0060] During specific implementation, the selection of the first crane 244 and the second crane 12 is not restricted as long as they can complete the lifting capacity; the first crane 244 can be a single-arm crane or a double-arm crane, and the second crane 12 can be a single-arm crane or a double-arm crane.
[0061] In specific implementation, the rail welding vehicle on the adjacent track can also perform rail replacement operations on the track to be replaced which is separated by at least one track, as long as the booms of the first crane and the second crane can be extended to the rail replacement position.
[0062] Fig.11 A schematic diagram of the positional relationship between a rail welding vehicle and a working line track during operation is provided in an embodiment of the present application, such as Fig.11 As shown, based on the rail welding work vehicle provided in the above embodiment, the present application also provides an operation method of a rail welding work vehicle, the rail welding work vehicle is used to operate on the rails of adjacent tracks, and the operation method includes an operation method of the rail welding work vehicle welding a single rail of an adjacent track and an operation method of the rail welding work vehicle welding a double rail of an adjacent track, and the rail welding work vehicle is the rail welding work vehicle described in any of the above contents.
[0063] In the present application, the above operation method can be used to insert a single rail or two rails into a skylight point. In specific implementation, the above two methods are flexibly selected according to the actual situation of the severely damaged rail on the track.
[0064] The adjacent track single rail in the present application can be a monorail close to the rail welding work vehicle on the work line, or it can be another monorail far away from the rail welding work vehicle on the work line; the adjacent track double rail can be a track adjacent to the rail welding work vehicle, or it can be a track-changing track separated by at least one track, as long as the booms of the first crane and the second crane can be extended to the track-changing position.
[0065] Fig.12 A schematic diagram of a joint after the old rail is removed from a single rail adjacent to a track in an operation method of a rail welding operation vehicle provided in an embodiment of the present application. Fig.14 A schematic diagram of a process flow of welding a single rail of an adjacent rail by a rail welding vehicle in an operation method of a rail welding vehicle provided in an embodiment of the present application, such as Fig.12 and Fig.14 As shown, further, the operation method of the rail welding operation vehicle for welding the single rail of the adjacent track specifically includes the following steps:
[0066] S1. Block the line;
[0067] S2. Conduct rail flaw detection on the rails on the operating line to determine whether there are old rails on the single rail that need to be replaced, and mark the old rails that need to be replaced;
[0068] S3, the rail transport vehicle 1 in the rail welding operation vehicle is aligned; specifically includes:
[0069] The rail welding operation vehicle drives into the adjacent track adjacent to the operation line track, and moves to a position where the rail transport vehicle 1 corresponds to the section of the operation line track to be replaced, and stops;
[0070] S4. Lift the new rails to the section of the operating line track to be replaced; specifically including:
[0071] The new rail placed on the rail transport vehicle 1 is hoisted and transported to a designated position of the track section to be replaced on the working line track by the second hoist 12;
[0072] S5. Removal of old rails; specifically including:
[0073] S51, removing fasteners of old rails that need to be replaced on the monorail;
[0074] S52, sawing and cutting the two ends of the old rails, and the two ends of the existing rails after the old rails are cut off are 1# joints and 2# joints respectively;
[0075] S53, recycling the cut old rails and loading them onto vehicles;
[0076] S6, placing the new rail at the section to be replaced into the rail bearing groove from which the old rail has been removed;
[0077] S7, the rail welding vehicle 2 in the rail welding operation vehicle is aligned; specifically includes:
[0078] The rail welding operation vehicle on the adjacent track is driven to move until the rail transport vehicle 1 in the rail welding operation vehicle leaves the position corresponding to the section of the track to be replaced on the operation line, and the rail welding vehicle 2 moves to the position corresponding to the 1# joint at the section of the track to be replaced on the operation line, stops, and performs preparation work for the welding machine 243;
[0079] S8, welding new rails. After the welding of the new rails is completed, the rail welding vehicle 2 is retracted and moves to the next welding work station. Then, S3-S8 are repeated until the entire rail welding operation is completed.
[0080] Welding new rails specifically includes:
[0081] S81, pre-treat No. 1 joint;
[0082] S82. After the pretreatment of the 1# joint is completed, one end of the new rail is aligned with the 1# joint, and the welding machine 243 is turned on to perform welding operations;
[0083] S83. After the welding operation at the joint between the new rail and the 1# rail is completed, the rail welding vehicle 2 is retracted and moves to the position corresponding to the 2# joint between the current rail and the working line rail to prepare the welding machine. At the same time, the 1# joint is polished and the rail is bent;
[0084] S84, after the welding machine preparation is completed, pre-treat the 2# joint;
[0085] S85. After the pretreatment of the 2# joint is completed, the other end of the new rail is aligned with the 2# joint, and the bending constraint of the 1# joint is released, and then the welding machine 243 is turned on to perform welding operations;
[0086] S86. After the welding work between the new rail and the 2# joint is completed, the 2# joint is polished;
[0087] S87, After the grinding operation of the 2# joint is completed, the fasteners are restored and fine-tuned;
[0088] S9. Restore the operating line. At the same time, retract the rail welding vehicle and drive it away from the adjacent track.
[0089] Fig.13A schematic diagram of a joint of two adjacent rails after the old rails are removed in an operation method of a rail welding operation vehicle provided in an embodiment of the present application. Fig.15 A schematic diagram of a process of welding a double rail of an adjacent rail by a rail welding vehicle in an operation method of a rail welding vehicle provided in an embodiment of the present application, such as Fig.13 and Fig.15 As shown, further, the operation method of the rail welding operation vehicle for welding the double rails of the adjacent rails specifically includes the following steps:
[0090] S1. Block the line;
[0091] S2. Conduct rail flaw detection on the rails on the operating line to determine whether there are old rails that need to be replaced on both tracks in the same transverse plane, and mark each old rail that needs to be replaced;
[0092] S3, the rail transport vehicle 1 in the rail welding operation vehicle is aligned; specifically includes:
[0093] The rail welding operation vehicle drives into the adjacent track adjacent to the operation line track, and moves to a position where the rail transport vehicle 1 corresponds to the section of the operation line track to be replaced, and stops;
[0094] S4. The new rails are hoisted to the section of the operating line track to be replaced, and the number of new rails is consistent with the number of rails in the section to be replaced; specifically including:
[0095] The new rail placed on the rail transport vehicle 1 is hoisted and transported to a designated position of the track section to be replaced on the working line track by the second hoist 12;
[0096] S5. Removal of old rails; specifically including:
[0097] S51, removing fasteners of old rails that need to be replaced on the double tracks;
[0098] S52, both ends of each old rail are sawn and cut off, and after the old rail is cut off from each existing rail, the 1# joint and the 2# joint are on the same existing rail, the 3# joint and the 4# joint are located on another existing rail adjacent to the existing rails of the 1# joint and the 2# joint, and the 1# joint and the 3# joint are on the same transverse plane, and the 2# joint and the 4# joint are on the same transverse plane;
[0099] S53, recycling the cut old rails and loading them onto vehicles;
[0100] S6, placing the new rail at the section to be replaced into the rail bearing groove from which the old rail has been removed;
[0101] S7, the rail welding vehicle 2 in the rail welding operation vehicle is aligned; specifically includes:
[0102] The rail welding operation vehicle on the adjacent track is driven to move until the rail transport vehicle 1 in the rail welding operation vehicle leaves the position corresponding to the section of the track to be replaced on the operation line, and the rail welding vehicle 2 moves to the position corresponding to the 1# joint at the section of the track to be replaced on the operation line, stops, and performs preparation work for the welding machine 243;
[0103] S8, welding new rails. After the welding of the new rails is completed, the rail welding vehicle 2 is retracted and moves to the next welding work station. Then, S3-S8 are repeated until the entire rail welding operation is completed.
[0104] Welding new rails specifically includes:
[0105] S81, pre-treat No. 1 joint;
[0106] S82. After the pretreatment of the 1# joint is completed, one end of the new rail near the 1# joint and the 2# joint is aligned with the 1# joint, and the welding machine 243 is turned on for welding. At the same time, the 2# joint and the 3# joint are pretreated;
[0107] S83, after the welding operation between the new rail and the 1# joint is completed, the first crane 244 is driven to hoist the welding machine 243 to the 3# joint; after the pretreatment operation of the 3# joint is completed, one end of the new rail near the 3# joint and the 4# joint is aligned with the 3# joint, and the welding machine 243 is turned on for welding operation;
[0108] S84, after the welding operation between the new rail and the 3# joint is completed, the 1# joint and the 3# joint are polished, and at the same time, the rail welding vehicle 2 is retracted and moves to the position corresponding to the 2# joint between the current track and the track of the working line, and the other end of the new rail close to the 1# joint and the 2# joint is aligned with the 2# joint, and the welding machine 243 is turned on for welding. When the 2# joint is welded, the 4# joint is pre-treated;
[0109] S85, after the welding operation between the new rail and the 2# joint is completed, the first crane 244 is driven to hoist the welder 243 to the 4# joint; when the grinding operation of the 1# joint and the 3# joint and the pretreatment operation of the 4# joint are completed, the other end of the new rail near the 3# joint and the 4# joint is aligned with the 4# joint, and the welder 243 is turned on for welding;
[0110] S86. After the welding work between the new rail and the 4# joint is completed, the 2# joint and the 4# joint are polished;
[0111] After the grinding work of S87, 2# joint and 4# joint is completed, the fasteners are restored and fine-tuned;
[0112] S9. Restore the operating line. At the same time, retract the rail welding vehicle and drive it away from the adjacent track.
[0113] Furthermore, the blocking of the line in step S1 is to block the working line track where the rails need to be replaced and the adjacent line track where the rail welding work vehicle enters the working line track.
[0114] Furthermore, when the rail welding vehicle 2 is retracted in step S8, the first crane is driven to lift the welding machine, and the welding machine is lifted to the original position on the fixed base, the hydraulic legs are retracted, and the first crane is returned to the initial state.
[0115] Furthermore, in step S9, the rail welding operation vehicle is retracted so that the rail welding vehicle and each rail transport vehicle return to their initial states.
[0116] Specifically, when replacing the rails on the working line track, a working vehicle can be used to weld the single rail of the adjacent track at the section to be replaced where the old rails of two monorails need to be replaced and the replaced old rails are not on the same horizontal plane. A working vehicle can be used to weld the double rails of the adjacent track at the section to be replaced where the old rails of two monorails need to be replaced and the replaced old rails are on the same horizontal plane.
[0117] Further, the preparation work of the welding machine 243 specifically includes:
[0118] S10, after the rail welding vehicle 2 is in place, the sliding ceiling 27 slides toward the power room 22 to make room for the first crane 244 to lift the equipment;
[0119] S20, when the sliding ceiling 27 slides into place, the welding machine hoisting device 24 is leveled by the leveling mechanism 242, so that the first hoist 244, the welding machine 243 and the two leveling cylinders 2422 are all in a horizontal state, and at the same time, the two hydraulic legs 2423 are driven to move horizontally downward and abut against the sleeper or the ballast bed;
[0120] S30, after the welding machine hoisting device 24 is leveled, the first hoist 244 is driven to hoist the welding machine 243, and after the first hoist 244 is rotated to a suitable angle, the hydraulic legs on the first hoist 244 are moved horizontally downward and abutted against the sleeper or the ballast bed, and then the welding machine 243 is hoisted to the working position of the operation line by the first hoist 244;
[0121] S40, welding machine 243 is in place.
[0122] Furthermore, pretreatment operations include rust removal and end milling to facilitate subsequent welding.
[0123] Furthermore, a rail saw is used to cut off the old rails.
[0124] The operation method of a rail welding vehicle of the present application is simple to operate and convenient to use. In addition, the operation method can realize the rail welding vehicle to weld the rails on the adjacent track, which not only reduces the adverse impact of the operation vehicle on the line after welding and improves the construction quality, but also does not need to lift the whole vehicle during operation, which improves the safety of the operation and reduces the potential safety hazards at the construction site.
[0125] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0126] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A rail welding vehicle, It is characterized in that The working vehicle is located on the adjacent track of the working track, and the working vehicle comprises: A rail welding vehicle (2) is used to weld a new steel rail to the disassembled old steel rail on the rail section to be replaced, and the new steel rail is compatible with the disassembled old steel rail; The rail welding vehicle (2) comprises a first loading platform (21), on which a power room (22), an operation room (23) and a welding machine hoisting device (24) are sequentially arranged; The welding machine hoisting device (24) comprises: a fixed base (241) arranged on the first loading platform (21); A leveling mechanism (242) is arranged on the fixed base (241) and is used for leveling the welding machine hoisting device (24); A welding machine (243), movably arranged at one end of the fixed base (241), used for welding the joint between the new rail and the existing rail; The first hoist (244) is arranged in the middle of the leveling mechanism (242) and is used for hoisting the welding machine (243).
2. The rail welding vehicle according to claim 1, It is characterized in that The leveling mechanism (242) comprises: a leveling base (2421) arranged on the fixed base (241); Two leveling oil cylinders (2422) are vertically symmetrically arranged on both sides of the leveling base (2421) and are used to drive the leveling base (2421) to swing up and down; Two hydraulic legs (2423) are symmetrically arranged at the two ends of the leveling base (2421), and can move horizontally and vertically. During operation, the two hydraulic legs (2423) move horizontally and descend onto the sleeper or the track bed.
3. The rail welding vehicle according to claim 1, It is characterized in that The rail welding vehicle (2) further comprises: two slide grooves (25), which are respectively arranged on both sides of the first loading platform (21) and extend along the length direction of the vehicle body, the notch of each slide groove (25) faces upward, and at least one connecting component (26) is slidably arranged in each slide groove (25); A sliding ceiling (27) is connected to the top of each of the connecting components (26), and the sliding ceiling (27) is located above the power room (22), the operating room (23) and the welding machine hoisting device (24). When each of the connecting components (26) moves in the same direction in the corresponding sliding groove (25), the sliding ceiling (27) can be driven to move in the same direction. During operation, the sliding ceiling (27) slides in a direction away from the welding machine hoisting device (24). When the sliding ceiling (27) slides into place, the sliding ceiling (27) is located above the power room (22) and the operating room (23); A ceiling (28) is arranged on the top of the operating room (23).
4. The rail welding vehicle according to claim 1, It is characterized in that The working vehicle further comprises at least one rail transport vehicle (1), each of the rail transport vehicles (1) can be connected or disassembled, and each of the rail transport vehicles (1) is used to place new rails; The rail welding vehicle (2) and each rail transport vehicle (1) can be connected or disconnected, and at least one rail transport vehicle (1) is connected to the front end of the rail welding vehicle (2).
5. The rail welding vehicle according to claim 4, It is characterized in that Each of the rail transport vehicles (1) comprises: a second loading platform (11) for loading new rails; At least one second crane (12) is arranged on the second loading platform (11) and is used to lift the new rail from the second loading platform (11) to a corresponding position in the operation area of the adjacent track section to be replaced.
6. The rail welding vehicle according to claim 1, It is characterized in that An electrical control cabinet and a seat are arranged in the operating room (23).
Citation Information
Cited By
Steel rail welding operation vehicle and operation method thereof
CN118087323A
Retracting and releasing device of rail welding machine arranged on flat car
CN121468020A