Special splicing type drainage structure for underground engineering

Through the spliced ​​drainage structure, the problem of low efficiency of water accumulation and drainage structures in underground engineering construction is solved, rapid installation and efficient drainage are achieved, cost reduction, and reuse and permanent reinforcement are supported, which is suitable for industrial construction of underground engineering.

CN222183307UActive Publication Date: 2024-12-17NANJING FORESTRY UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420524914.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-12-17
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

During underground construction, water accumulation is caused by the closed and narrow environment. The existing drainage structure has cumbersome processes, high costs and low efficiency, and it is impossible to achieve industrial prefabrication and reusing.

Method used

Provide a special spliced ​​drainage structure for underground engineering, including drainage plates, prefabricated drainage ditches and diversion isolation plates. It is fixed by nails, and uses multiple segment splicing to quickly install drainage channels, and sets up diversion isolation plates to improve drainage efficiency. The material is concrete. Removable and reusable or as a permanent structure.

Benefits of technology

It achieves rapid and effective groundwater discharge, improves construction efficiency and safety, reduces construction costs, supports reuse and permanent reinforcement, and is suitable for industrial construction of underground projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222183307U_ABST
    Figure CN222183307U_ABST
Patent Text Reader

Abstract

The utility model discloses a special splicing type drainage structure for underground engineering, which comprises a drainage plate (1) and a prefabricated drainage ditch (2), the drainage plate (1) and the prefabricated drainage ditch (2) are fixedly combined together through nails (11), and the prefabricated drainage ditch (2) is arranged according to an open ditch method and consists of a cover plate (3), a prefabricated drainage groove (4) and a diversion isolation plate (5). A plurality of handle grooves (6) are formed in the cover plate (3), and a front inserting plate (7), a front inserting groove (8), a rear inserting plate (9) and a rear inserting groove (10) are formed in the bottom of the prefabricated drainage groove (4); the prefabricated drainage ditch is simple in structure, convenient to construct, capable of rapidly installing a drainage channel, well guiding sewage and improving drainage efficiency by splicing and combining the multiple sections of prefabricated drainage ditches (2), capable of being disassembled and transferred to a construction site to be repeatedly used after a project is completed, capable of being used as a permanent drainage structure after being reinforced, energy-saving, environment-friendly and high in economic benefit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of underground engineering drainage, in particular to a special splicing drainage structure for underground engineering. Background Art

[0002] Underground engineering construction projects are an important part of the entire civil engineering construction. The construction environment of underground engineering is relatively special. The construction work surface is relatively closed and narrow, and it is very easy to produce water accumulation, which leads to high drainage pressure in the entire underground project and requires frequent drainage. The construction is difficult and risky. Therefore, it is necessary to pay attention to the construction drainage effect of underground engineering, ensure the construction quality and safety of underground engineering, control construction costs, improve construction efficiency, and obtain more economic benefits.

[0003] During the construction of underground projects, it is necessary to drain groundwater and seepage water from rock or soil layers in a timely manner. If the drainage is not timely, water will accumulate in the underground space, thus affecting the progress and quality of the construction. When open channel drainage is used, the construction waste generated during the construction process will accumulate at the bottom of the open channel drainage ditch, causing the drainage ditch to be blocked. In addition, the existing underground space drainage ditches are mostly brick-built or cast-in-place concrete, with complicated procedures, requiring a large number of workers, long construction time, high construction costs, and unable to achieve industrialization and prefabrication. The efficiency is low, the scope of use is narrow, and it cannot be reused. Therefore, a splicing drainage structure dedicated to underground projects is urgently needed to solve the above problems. Utility Model Content

[0004] The purpose of the utility model is to provide a special splicing drainage structure for underground engineering to solve the above-mentioned shortcomings in the prior art.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A spliced ​​drainage structure specially used for underground engineering comprises a drainage board and a prefabricated drainage ditch, wherein the drainage board and the prefabricated drainage ditch are fixed together by nails, the prefabricated drainage ditch is arranged in an open ditch manner, and consists of a cover plate, a prefabricated drainage ditch and a diversion isolation plate, a plurality of handle grooves are provided on the cover plate, and a front plug-in plate, a front plug-in groove, a rear plug-in plate and a rear plug-in groove are provided at the bottom of the prefabricated drainage ditch.

[0007] Furthermore, the shape of the cover plate is a regular trapezoid plus a rectangular outer edge, the total width of the cover plate is 40 cm, the slope of the trapezoidal hypotenuse is 1:2, the width of the rectangular outer edge is 5 cm, and the height is 2 cm. The drainage board is fixed to the rectangular outer edge of the cover plate by nails.

[0008] Furthermore, the diversion isolation plate is in the shape of a rectangle, with a height of 20 cm, a width of 10 cm, and a thickness of 2 cm, and is arranged at intervals of 10 to 20 cm from each other. The prefabricated drainage trough is in the shape of a concave shape, with a total width of 30 cm and a height of 25 cm. The internal drainage trough is 25 cm wide and 20 cm high. The diversion isolation plate and the top of the prefabricated drainage trough are overlapped with the same cover plate, one end of the diversion isolation plate is abutted against the prefabricated drainage trough, and a hole is opened on the side where the prefabricated drainage trough and the diversion isolation plate abut against each other according to the spacing space of the diversion isolation plate, so that water can flow into the prefabricated drainage trough.

[0009] Furthermore, the prefabricated drainage ditches are connected by plugging the front plug-in plate and the rear plug-in plate into the corresponding rear plug-in groove and the front plug-in groove.

[0010] Furthermore, the prefabricated drainage ditch is made of concrete material, and the front plug-in plate, front plug-in groove, rear plug-in plate and rear plug-in groove provided at the bottom of the prefabricated drainage ditch can be adjusted in size or deleted according to the specific use environment.

[0011] In the above technical scheme, the utility model provides a splicing drainage structure specially used for underground projects, which has a simple structure and is easy to construct. By splicing and using multiple sections of prefabricated drainage ditches, the drainage channel can be installed quickly and well. At the same time, the diversion isolation plate set can divert sewage well and improve drainage efficiency. After the project is completed, it can be disassembled and reused in the turnover construction site, and can also be reinforced as a permanent drainage structure, which is energy-saving, environmentally friendly and has high economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For those skilled in the art, other drawings can also be obtained based on these drawings.

[0013] Figure 1 It is a three-dimensional left schematic diagram of a spliced ​​drainage structure specially used for underground engineering according to the utility model.

[0014] Figure 2 It is a three-dimensional right schematic diagram of a spliced ​​drainage structure specially used for underground engineering according to the utility model.

[0015] Figure 3 It is a front view of a spliced ​​drainage structure specially used for underground engineering according to the utility model.

[0016] Figure 4 It is a top view of a spliced ​​drainage structure specially used for underground engineering according to the utility model.

[0017] Figure 5It is a left view of a spliced ​​drainage structure specially used for underground engineering according to the utility model.

[0018] Description of reference numerals:

[0019] 1 drainage board, 2 prefabricated drainage ditch, 3 cover plate, 4 prefabricated drainage trough, 5 diversion isolation plate, 6 handle groove, 7 front plug-in plate, 8 front plug-in groove, 9 rear plug-in plate, 10 rear plug-in groove, 11 nails. DETAILED DESCRIPTION

[0020] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0021] like Figure 1-5 As shown, an embodiment of the utility model provides a splicing drainage structure specially used for underground engineering, including a drainage board 1 and a prefabricated drainage ditch 2, wherein the drainage board 1 and the prefabricated drainage ditch 2 are fixed together by nails 11, and the prefabricated drainage ditch 2 is arranged in an open ditch manner, and is composed of a cover plate 3, a prefabricated drainage ditch 4 and a diversion isolation plate 5, wherein a plurality of handle grooves 6 are provided on the cover plate 3, and a front plug-in plate 7, a front plug-in groove 8, a rear plug-in plate 9 and a rear plug-in groove 10 are provided at the bottom of the prefabricated drainage ditch 4.

[0022] Specifically in this embodiment, the shape of the cover plate 3 is a regular trapezoid plus a rectangular outer edge. The total width of the cover plate 3 is 40 cm, the slope of the trapezoidal hypotenuse is 1:2, the width of the rectangular outer edge is 5 cm, and the height is 2 cm. The drainage board 1 is fixed to the rectangular outer edge of the cover plate 3 by nails 11.

[0023] Furthermore, the diverter isolation plate 5 is in the shape of a rectangle, with a height of 20 cm, a width of 10 cm, and a thickness of 2 cm, and is arranged at intervals of 10 to 20 cm from each other. The prefabricated drainage trough 4 is in the shape of a concave shape, with a total width of 30 cm and a height of 25 cm. The internal drainage trough is 25 cm wide and 20 cm high. The diverter isolation plate 5 and the top of the prefabricated drainage trough 4 are overlapped with the same cover plate 3, one end of the diverter isolation plate 5 is abutted against the prefabricated drainage trough 4, and a hole is opened on the side where the prefabricated drainage trough 4 and the diverter isolation plate 5 are abutted according to the spacing space of the diverter isolation plate 5, so that water can flow into the prefabricated drainage trough 4.

[0024] Furthermore, the prefabricated drainage ditches 2 are connected by plugging the front plug-in plate 7 and the rear plug-in plate 9 into the corresponding rear plug-in groove 10 and the front plug-in groove 8 .

[0025] Furthermore, the prefabricated drainage ditch 2 is made of concrete material, and the front plug-in plate 7, the front plug-in groove 8, the rear plug-in plate 9 and the rear plug-in groove 10 provided at the bottom of the prefabricated drainage ditch 4 can be adjusted in size or deleted according to the specific use environment.

[0026] Example 1

[0027] The embodiment of the utility model provides a spliced ​​drainage structure specially used for underground projects. With the help of the set cover plate 3, it can effectively prevent the fallen construction waste from clogging the prefabricated drainage ditch 2, and through the splicing and combination of multiple sections of prefabricated drainage ditches 2, the drainage channel can be quickly installed, the sewage can be well diverted, and the drainage efficiency can be improved. After the project is completed, it can be disassembled and reused at the turnover construction site, and can also be reinforced as a permanent drainage structure.

[0028] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A splicing drainage structure for underground engineering, characterized in that: The invention comprises a drainage board (1) and a prefabricated drainage ditch (2), wherein the drainage board (1) and the prefabricated drainage ditch (2) are fixed together by nails (11), and the prefabricated drainage ditch (2) is arranged in an open ditch manner, and is composed of a cover plate (3), a prefabricated drainage ditch (4) and a diversion isolation plate (5), wherein the cover plate (3) is provided with a plurality of handle grooves (6), and the bottom of the prefabricated drainage ditch (4) is provided with a front plug-in plate (7), a front plug-in groove (8), a rear plug-in plate (9) and a rear plug-in groove (10).

2. The splicing drainage structure for underground engineering according to claim 1 is characterized in that: The shape of the cover plate (3) is a regular trapezoid plus a rectangular outer edge, the total width of the cover plate (3) is 40 cm, the slope of the trapezoidal hypotenuse is 1:2, the width of the rectangular outer edge is 5 cm, and the height is 2 cm. The drainage board (1) is fixed to the rectangular outer edge of the cover plate (3) by nails (11).

3. The splicing drainage structure for underground engineering according to claim 1 is characterized in that: The diverter isolation plate (5) is rectangular in shape, 20 cm in height, 10 cm in width and 2 cm in thickness, and is arranged at intervals of 10 to 20 cm from each other. The prefabricated drainage trough (4) is concave in shape, 30 cm in total width and 25 cm in height, and the internal drainage trough is 25 cm wide and 20 cm high. The diverter isolation plate (5) and the prefabricated drainage trough (4) are overlapped with the same cover plate (3) on top. One end of the diverter isolation plate (5) abuts against the prefabricated drainage trough (4), and a hole is opened on the side where the prefabricated drainage trough (4) abuts against the diverter isolation plate (5) according to the spacing space of the diverter isolation plate (5), so that water can flow into the prefabricated drainage trough (4).

4. The splicing drainage structure for underground engineering according to claim 1 is characterized in that: The prefabricated drainage ditches (2) are connected by inserting a front plug-in plate (7) and a rear plug-in plate (9) into corresponding rear plug-in grooves (10) and front plug-in grooves (8).

5. The splicing drainage structure for underground engineering according to claim 1 is characterized in that: The prefabricated drainage ditch (2) is made of concrete material. The front plug-in plate (7), the front plug-in groove (8), the rear plug-in plate (9) and the rear plug-in groove (10) provided at the bottom of the prefabricated drainage ditch (4) can be adjusted in size or deleted according to the specific use environment.