The anti-bypass joint with a sealing rib, sealing plate, and joint box addresses the issues of water seepage and installation challenges in underground continuous walls, ensuring firm connections and improved construction efficiency and safety.

CN222183309UActive Publication Date: 2024-12-17SHANGHAI YUANFANG GROUNDWORK ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420687559.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-12-17
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

Existing underground continuous wall construction methods using I-beam joints suffer from water seepage due to incomplete sealing, increased safety risks, and installation difficulties due to the bulkiness of I-beams, which complicates the construction process and affects the quality and safety of the foundation pit excavation.

Method used

An anti-bypass joint comprising a sealing rib, sealing plate, and joint box with cavities for stone filling, along with iron plates and bolts for secure attachment to the foundation pit walls, ensuring firm connections and improved stability.

Benefits of technology

The joint effectively prevents concrete bypass, enhances construction quality and safety by providing a stable, easy-to-install solution that improves the strength and stability of the underground continuous wall connections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222183309U_ABST
    Figure CN222183309U_ABST
Patent Text Reader

Abstract

The utility model discloses an underground diaphragm wall anti-streaming connector which comprises a sealing rib and a connector box, the connector box is arranged on the outer side of the sealing rib, a sealing plate is welded to the sealing rib, iron plates are installed on the two sides, close to an underground diaphragm wall foundation pit, of the sealing plate through bolts, and the iron plates are attached to the two side walls of the underground diaphragm wall foundation pit. Fulcrums are arranged on the two sides of the joint of the iron plate and the bolt. Through the design of the sealing plate and the iron plate, the phenomenon that concrete flows around is effectively prevented, and the joint construction quality is improved; the anti-streaming connector for the underground diaphragm wall has the advantages of being simple in structure, convenient to install, good in anti-streaming effect and the like, and the construction quality and safety of the underground diaphragm wall can be effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of underground continuous walls, in particular to an anti-circulation joint for underground continuous walls. Background Art

[0002] The underground continuous wall is a foundation project that uses a trenching machine on the ground to dig a long and narrow deep trench along the peripheral axis of the deep excavation project under the condition of mud wall protection. After the trench is cleared, a steel cage is suspended in the trench, and then underwater concrete is poured using the conduit method to form a unit trench section. This process is carried out section by section to build a continuous reinforced concrete wall underground as a water interception, anti-seepage, load-bearing and water retaining structure.

[0003] During the construction, the underground continuous wall is connected one by one through multiple groove sections to form a closed water-stop curtain on the outer layer of the foundation pit. In the process of connecting the groove sections, joints are naturally formed one after another. At present, I-beam joints are mostly used in the construction of underground continuous walls. During the construction process, the joints are often not cleaned due to bypass flow in the preceding groove section. The subsequent poured concrete and the I-beam joints cannot be tightly combined, resulting in water seepage in the ground-connected wall at the steel joints, affecting the construction quality of the ground-connected wall, increasing the safety risks in the subsequent foundation pit excavation process, and seriously endangering the safety of the foundation pit excavation. In addition, the I-beam is relatively bulky and not easy to install. At the construction site, it is necessary to use large mechanical equipment for hoisting and positioning, which not only increases the construction difficulty, but also affects the construction progress. In order to solve the above problems, the utility model proposes an anti-bypass joint for the underground continuous wall. Utility Model Content

[0004] In view of the problems existing in the prior art, the purpose of the utility model is to provide an underground continuous wall anti-circulation joint.

[0005] In order to achieve the above-mentioned purpose of the utility model, the utility model adopts the following technical scheme: an underground continuous wall anti-circulation joint, comprising: a sealing rib and a joint box, the joint box is placed on the outside of the sealing rib, a sealing plate is welded on the sealing rib, the sealing plate is installed with iron plates on both sides of the sealing plate close to the foundation pit of the ground-connected wall by bolts, the iron plates are attached to the two side walls of the foundation pit of the ground-connected wall, and fulcrums are provided on both sides of the connection between the iron plate and the bolts, and the fulcrums are used to make the iron plate fit more closely to the side walls of the foundation pit of the ground-connected wall and increase the strength of the connection.

[0006] As a preferred solution of the utility model, the sealing rib is a V-shaped structure, and the sealing plate includes a vertical plate, an inclined plate integrally formed on both sides of the vertical plate, and a horizontal plate integrally formed on both sides of the inclined plate. The inclined plate is fitted and fixedly connected to the sealing rib, and the iron plate is installed on the horizontal plate.

[0007] As a preferred solution of the utility model, the sealing plate and the sealing rib are fixed by welding to ensure the firmness and stability of the connection.

[0008] As a preferred solution of the utility model, cavities are provided on both sides of the joint box, and the cavities are used to fill stones to improve the supporting strength of the joint box.

[0009] As a preferred solution of the present invention, the sealing plate has a thickness of 3-4 mm.

[0010] As a preferred solution of the utility model, the iron plate is provided with positioning holes for enabling the iron plate to be accurately and quickly installed on the bolts of the sealing plate.

[0011] Due to the adoption of the above technical solution, the utility model has the following beneficial effects:

[0012] The utility model effectively prevents the occurrence of concrete bypass phenomenon and improves the construction quality of the joint through the design of the sealing plate and the iron plate; the welding connection of the sealing rib and the sealing plate ensures the firmness and stability of the connection and improves the overall strength of the joint; the cavity design of the joint box improves the supporting strength, enhances the stability of the joint and facilitates disassembly and assembly; the reasonable design of the thickness of the sealing plate ensures the strength and reduces the weight, and is easy to install; the positioning hole design of the iron plate improves the installation efficiency and shortens the construction period. The underground continuous wall anti-bypass joint of the utility model has the advantages of simple structure, easy installation, good anti-bypass effect, etc., and can effectively improve the construction quality and safety of the underground continuous wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0014] Figure 2 This is a diagram of the sand and gravel filling state of the joint box of the utility model;

[0015] Figure 3 This is a partial enlarged view of the connection between the iron plate and the sealing plate of the utility model.

[0016] In the figure: 1. Sealing rib; 2. Joint box; 3. Cavity; 4. Sealing plate; 5. Bolt; 6. Fulcrum; 7. Iron plate. DETAILED DESCRIPTION

[0017] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0018] Example 1

[0019] like Figures 1 to 3As shown, a specific embodiment of an underground continuous wall anti-circulation joint described in the utility model includes a sealing rib 1 and a joint box 2, the joint box 2 is placed on the outside of the sealing rib 1, a sealing plate 4 is welded on the sealing rib 1, and the sealing plate 4 is installed with iron plates 7 on both sides of the sealing plate 4 close to the foundation pit of the ground-connected wall through bolts 5. The iron plates 7 are attached to the two side walls of the foundation pit of the ground-connected wall, and fulcrums 6 are provided on both sides of the connection between the iron plate 7 and the bolts 5. The fulcrum 6 is used to make the iron plate 7 fit the side walls of the foundation pit of the ground-connected wall more closely and to increase the strength of the connection.

[0020] The sealing rib 1 adopts a V-shaped structural design, the sealing plate 4 includes a vertical plate, an inclined plate integrally formed on both sides of the vertical plate, and a horizontal plate integrally formed on both sides of the inclined plate. The iron plate 7 is installed on the horizontal plate, and the sealing plate 4 and the sealing rib 1 are fixed by welding to ensure the firmness and stability of the connection.

[0021] Cavities 3 are provided on both sides of the joint box 2 for filling stones to improve the supporting strength of the joint box 2. The thickness of the sealing plate 4 is 3-4 mm, which not only ensures sufficient strength but also reduces the overall weight and is easy to install. The iron plate 7 is provided with positioning holes so that the iron plate 7 can be accurately and quickly installed on the bolts 5 of the sealing plate 4, thereby improving construction efficiency.

[0022] Working principle of the utility model: The utility model effectively seals the gap at the joint through the combination of the sealing rib 1 and the sealing plate 4, preventing the occurrence of concrete bypass. At the same time, the iron plate 7 is installed on the sealing plate 4 through the bolts 5 and is attached to the two side walls of the foundation pit of the ground-connected wall, increasing the fit and strength between the joint and the side walls of the foundation pit. The setting of the joint box 2 improves the supporting strength of the joint and ensures the stability of the joint. During the construction process, the iron plate 7 is quickly and accurately installed on the sealing plate 4 through the positioning hole, which improves the construction efficiency.

[0023] The components in this article are all universal standard parts or components known to those skilled in the art. Their structures and principles can be known to those skilled in the art through technical manuals or conventional experimental methods, so they will not be described in detail here.

[0024] Although the specific embodiments of the present invention are described in detail above, the present invention is not limited to the above embodiments. Various changes can be made within the knowledge of ordinary technicians in the field without departing from the purpose of the present invention, and modifications or deformations without creative labor are still within the scope of protection of the present invention.

Claims

1. An underground continuous wall anti-circulation joint, It is characterized in that include: A sealing rib (1) and a joint box (2), wherein the joint box (2) is placed on the outside of the sealing rib (1), a sealing plate (4) is welded to the sealing rib (1), iron plates (7) are installed on both sides of the sealing plate (4) by bolts (5), the iron plates (7) are attached to the two side walls of the ground-connected wall foundation pit, and fulcrums (6) are provided on both sides of the connection between the iron plate (7) and the bolts (5), and the fulcrums (6) are used to make the iron plate (7) more closely fit the side walls of the ground-connected wall foundation pit and to increase the strength of the connection.

2. The underground continuous wall anti-circulation joint according to claim 1, Features: The sealing rib (1) is a V-shaped structure, and the sealing plate (4) comprises a vertical plate, an inclined plate integrally formed on both sides of the vertical plate, and a horizontal plate integrally formed on both sides of the inclined plate. The inclined plate is fitted and fixedly connected to the sealing rib (1), and the iron plate (7) is installed on the horizontal plate.

3. The underground continuous wall anti-circulation joint according to claim 2, Features: The inclined plate of the sealing plate (4) and the sealing rib (1) are fixed by welding to ensure the firmness and stability of the connection.

4. The underground continuous wall anti-circulation joint according to claim 1, Features: Cavities (3) are provided on both sides of the joint box (2), and the cavity (3) is used to fill stones so as to improve the supporting strength of the joint box (2).

5. The underground continuous wall anti-circulation joint according to claim 1, Features: The sealing plate (4) has a thickness of 3-4 mm.

6. The underground continuous wall anti-circulation joint according to claim 1, Features: The iron plate (7) is provided with positioning holes for enabling the iron plate (7) to be accurately and quickly mounted on the bolts (5) of the sealing plate (4).