Pre-designed assembly type building bearing capacity compensation composite component system

By predesigning the prefabricated building bearing capacity compensation composite component system, using technologies such as component splicing and fiber composite layers, the problems of material use and construction complexity in building bearing capacity compensation are solved, and rapid in narrow spaces are achieved , low cost compensation, improves construction efficiency and quality.

CN222184229UActive Publication Date: 2024-12-17GUOTIE XINCAI (BEIJING) TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323508857.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-12-17
Estimated Expiration
2033-12-22

AI Technical Summary

Technical Problem

The prior art has problems in the compensation of building bearing capacity, high material integrity requirements, large weight, complex construction and high cost in building bearing capacity. It is difficult to achieve rapid and simple construction in narrow spaces, and it is difficult to remove the original without demolishing it. Efficient compensation is carried out when there are wires or affecting the operation of the equipment.

Method used

Provide a pre-designed prefabricated building bearing capacity compensation composite component system, which is fixed to the inner wall of the building through multi-stage sub-component splicing and bonding, combining fiber composite layer and fire-retardant coating, and connecting cavity members and anchor bolts to achieve rapid assembly. and efficient compensation to avoid welding and large-scale equipment construction.

Benefits of technology

It achieves rapid and low-cost bearing capacity compensation without affecting the operation of the building, improves construction efficiency and quality, extends the service life of the building, and reduces material use and construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222184229U_ABST
    Figure CN222184229U_ABST
Patent Text Reader

Abstract

The utility model provides a pre-designed assembly type building bearing capacity compensation composite component system which comprises a plurality of bearing capacity compensation composite components which are sequentially arranged in the extending direction of the inner wall of a building and used for compensating the bearing capacity of a building structure, and each bearing capacity compensation composite component is composed of a plurality of sections of sub-components, the multiple sections of sub-components are spliced, attached and fixed to the inner wall of a building so as to compensate the bearing capacity of an original structure of the building. According to the bearing capacity compensation composite component system, the design requirement is met, rapid installation can be achieved, materials are not used excessively, existing pipelines and equipment on a building can be avoided in the assembling process through pre-designed sub-components in the production process, and therefore the existing pipelines, various kinds of equipment and the like do not need to be dismantled in the assembling process; the method is safe and effective, reduces the cost, greatly improves the construction efficiency, ensures that the quality and quantity are consistent with the design standard, and prolongs the service life of a building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building bearing capacity compensation, in particular to a pre-designed assembled building bearing capacity compensation composite component system. Background Art

[0002] With the rapid development of national economic construction, there are more and more various building structures, highway tunnels, railway tunnels, underground pipe galleries, underground tunnels and rail transit facilities. During the long-term operation and use of these facilities, due to the aging of their own materials, the operating environment or the influence of factors such as changes in the external environment, their main structures will inevitably experience various deformations and aging, mainly manifested as cracks, falling blocks and convergence deformation. The continuous development of these phenomena will destroy the integrity of the main structure of the building, reduce the bearing capacity of the structure, and also bury hidden dangers to the safe operation of the operation. Therefore, it is urgent to deal with these problems quickly and reliably.

[0003] At present, the existing technology has the following problems when compensating and reinforcing the bearing capacity of building structures:

[0004] 1. When carrying out the bearing capacity compensation of buildings, the existing technology usually uses an integral support structure of a single type of material, resulting in a single performance. Nowadays, steel structures are widely used for compensation. Although they have good bending resistance, in order to meet the designed building bearing capacity compensation, the steel needs to be of sufficient thickness to achieve the bending resistance required for bearing capacity compensation, which wastes materials, makes the materials heavy, and has high costs. If the steel thickness is not enough, the rigidity will be poor, resulting in insufficient bearing capacity compensation. At the same time, the steel is not corrosion-resistant and has poor insulation performance. Therefore, using a single steel cannot meet the full design requirements, especially in some narrow construction sites, and it is impossible to use and transport a single large steel structure for construction.

[0005] 2. In small-space building areas such as rail transit facilities, these places have small spaces and limited downtime. The original building structures have certain rigidity and flexibility, and have high requirements for the insulation, fire prevention, and corrosion resistance of the selected bearing capacity compensation materials. If steel plates are used to reinforce the bearing capacity of the compensation structure, the pipelines and other equipment and facilities that affect the construction on the original structure must be removed in advance, and then transported to the site with large-scale transportation equipment, and then the steel materials are lifted and installed with mechanical equipment. In addition, open flame cutting, welding, pouring, spraying of anti-corrosion coatings and other processes are required on site, resulting in cumbersome construction procedures, high costs, and uncontrollable quality. Since steel must be cut and welded at the construction site, the toxic and harmful gases caused cannot be discharged in time in the small space, causing harm and corrosion to the construction personnel and existing instruments and equipment on site. Therefore, there are problems of difficult construction, high costs and long construction period. At the same time, the material stress generated after the welding of metal materials cannot be eliminated on site, which will harm the structure of the original building and thus affect the overall quality. The high temperature generated during welding will also destroy the performance and strength of the metal materials, and will burn and destroy the anti-corrosion layer on the front and back metal materials; even if post-anti-corrosion is done on site, the quality cannot be guaranteed due to limited conditions, especially the side of the interface between the reinforcement material and the original building structure. After the anti-corrosion layer is burned by the high temperature during welding, it is impossible to carry out anti-corrosion treatment. At the same time, due to the limitations of the processing technology, the steel cannot guarantee that there is no gap between the adjacent surfaces of the original building, and the subsequent glue injection cannot guarantee full filling, and no overlapping force is formed with the inner wall of the original building structure. Therefore, many safety hazards are left, which seriously affect the service life.

[0006] 3. When using concrete and steel bars to compensate for the structural bearing capacity of a building, the supporting compensation structure needs to be made with a larger cross-sectional area to meet the design bending requirements. However, in some narrow spaces, due to limitations and other reasons, construction cannot be achieved.

[0007] Therefore, if the existing technology is to meet the demand for bearing capacity compensation, there are problems such as high material integrity requirements, large materials, large weight and volume, and large mechanical equipment must be used for transportation and construction, which leads to slow construction progress and high overall costs. In summary, it is difficult for the existing technology to achieve fast and simple assembly construction without dismantling the original lines in the building or affecting the normal operation of the equipment, and to provide accurate bearing capacity compensation efficiently, with high quality and reasonably. Utility Model Content

[0008] In order to solve the above technical problems, the utility model provides a pre-designed assembled building bearing capacity compensation composite component system, which is used to realize the construction of building structure bearing capacity compensation quickly, on demand and at low cost without affecting the normal operation of buildings or rail transit facilities, and does not need to dismantle the original lines, equipment and other facilities. It is particularly suitable for use in small spaces and occasions with a short construction period. The bearing capacity compensation composite component system includes:

[0009] A plurality of bearing capacity compensating composite components are sequentially arranged along the extension direction of the inner wall of the building, and are used to compensate for the structural bearing capacity of the building, wherein each of the bearing capacity compensating composite components is composed of a plurality of sub-components, and the plurality of sub-components are spliced, fitted and fixed on the inner wall of the building to compensate for the original structural bearing capacity of the building.

[0010] In a specific implementation, each section of the sub-components is formed by a plurality of cavity components fixed side by side, and the cavity component is a grouting metal cavity or a metal cavity.

[0011] In a specific implementation, the bearing capacity compensation composite component system also includes:

[0012] The fiber composite layer is arranged to cover the outer side of each segment of the sub-component and is used to enhance the strength of the sub-component.

[0013] In a specific implementation, the fiber composite layer includes multiple layers of fibers, and the fiber layers are arranged along the extension direction of the sub-component and in a circumferential winding direction, and the laying directions of two adjacent fiber layers are cross-arranged.

[0014] In a specific implementation, the fiber composite layer is composed of resin and fibers, and the fibers include at least one of basalt fibers, carbon fibers, aramid fibers and glass fibers.

[0015] In a specific implementation, the outermost layer of the fiber composite layer is basalt fiber or aramid fiber.

[0016] In a specific implementation, the bearing capacity compensation composite component system also includes:

[0017] The fire retardant coating layer is applied outside the fiber composite layer to improve the fire retardant performance of the fiber composite layer.

[0018] In a specific implementation, after a plurality of segments of the sub-components are spliced, fitted and fixed on the inner wall of a building, the cavity components corresponding to all the sub-components are interconnected to form a cavity body, and the number of the cavity bodies is equal to the number of the cavity components.

[0019] In a specific implementation, the number of segments of the sub-component is 3, and the number of the hollow cavities is 3.

[0020] In a specific implementation, each of the hollow cavity bodies has at least one grouting hole, at least one slurry outlet hole and at least one exhaust observation hole. The grouting hole, the slurry outlet hole and the exhaust observation hole are all provided with opening and closing devices, and the exhaust observation hole is arranged at the top of the hollow cavity body.

[0021] In a specific implementation, the filler poured into the cavity is concrete slurry and / or high molecular polymer.

[0022] In a specific implementation, two adjacent sections of the sub-components are fixedly spliced ​​via an internal connecting sleeve.

[0023] In a specific implementation, the inner connecting sleeve includes a first small-mouth end and a second small-mouth end, wherein:

[0024] The first small opening end and the second small opening end respectively extend into the interior of two adjacent sub-components to splice and fix the two adjacent sub-components;

[0025] The cross-sectional area of ​​the first small opening increases from the end to the middle, so that the first small opening can adjust the connection angle after entering into a sub-component, thereby adjusting the relative connection angle between two adjacent sub-components.

[0026] In a specific implementation, the gap between the load-bearing capacity compensating composite component and the inner wall of the building is fixed by glue and / or anchor bolts.

[0027] In a specific implementation, the bearing capacity compensation composite component system also includes:

[0028] The reinforcing connecting plate is arranged to cover the outside of the connecting ends of the two adjacent sub-components, and the two ends of the reinforcing connecting plate are respectively fixedly connected to the connecting ends of the two adjacent sub-components.

[0029] In a specific implementation, the two ends of the reinforced connecting plate are respectively fixedly connected to the connecting ends of two adjacent sub-components through anchor bolts and / or glue.

[0030] In a specific implementation, the bearing capacity compensation composite component system also includes:

[0031] At least one anchor fixing reserved tube and an anchor, wherein the anchor fixing reserved tube is arranged on the bearing-capacity compensating composite member and is used for the anchor to pass through and fix the bearing-capacity compensating composite member on the inner wall of a building, wherein the anchor fixing reserved tube passes through the bearing-capacity compensating composite member and has flanged portions at both ends extending to the outside of the bearing-capacity compensating composite member.

[0032] In a specific implementation, the anchor bolt is one or any combination of an expansion anchor bolt, a chemical anchor bolt and a pre-expanded chemical anchor bolt.

[0033] In a specific implementation, the bearing capacity compensation composite component is C-shaped, U-shaped, S-shaped, rectangular, trapezoidal or straight, and the cross-section of the cavity component is square, rectangular, polygonal or trapezoidal.

[0034] In a specific implementation, the bearing capacity compensation composite component system also includes:

[0035] The support frames are arranged at both ends of the bearing capacity compensation composite component and are used to eliminate the gaps between the two ends of the bearing capacity compensation composite component and the supporting points of the original building.

[0036] In a specific implementation, the bearing capacity compensation composite component system also includes:

[0037] The gap filling structure is arranged at the gap between the bearing capacity compensating composite component and the inner wall of the building, and is used to improve the fit between the bearing capacity compensating composite component and the inner wall of the building.

[0038] The utility model provides a pre-designed building assembled building bearing capacity compensation composite component system. Before production, the factory first surveys the shape of the original building structure and the design institute calculates the amount of data of the original building structure that needs to increase the compensatory bearing capacity. The factory pre-selects and tests the corresponding data of each material to be combined, and matches the materials according to the measured data to meet the requirements of the designed bearing capacity compensation amount and shape. The prefabricated composite components are produced into contoured sub-components that can be quickly assembled, and then a plan for rapid assembly and construction on site is formulated, and the sub-components are broken down into small pieces and transported to the construction site for rapid assembly. This pre-designed assembled building load-bearing capacity compensation composite component system can not only meet various design requirements and achieve the purpose of rapid installation, but also avoid excessive use of materials, because the shape of the original building structure and the on-site assembly method are surveyed and designed before production, and an installation plan that can avoid these obstacles is pre-made according to the conditions of the construction site and the conditions of pipelines and equipment. Therefore, there is no need to dismantle existing pipelines and various equipment during on-site installation, nor is there any need for welding and the use of large equipment for construction. The construction is safe and can effectively save costs, greatly improving construction efficiency and ensuring that the construction quality is consistent with the design standards, thereby extending the service life of the building.

[0039] It should be understood that the above general description and the following specific embodiments are only exemplary and illustrative and are not intended to limit the scope of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] The accompanying drawings below are a part of the specification of the present utility model, which illustrate exemplary embodiments of the present utility model. The accompanying drawings together with the description of the specification are used to explain the principle of the present utility model.

[0041] Figures 1A to 1FIt is a schematic diagram, an exploded view, and a side view of the overall structure of a pre-designed assembled building bearing capacity compensation composite component system according to a specific embodiment of the utility model, and a schematic diagram, an exploded view, and a side view of the overall structure with a reinforced connecting plate;

[0042] FIG. 2A to FIG. 2C It is a schematic diagram, an exploded view, and a side view of the overall structure of a U-shaped load-bearing capacity compensation composite component according to a specific implementation of the utility model;

[0043] FIG. 3A to FIG. 3C It is a connection schematic diagram, an exploded view, and a side view of a reinforced connection plate according to a specific embodiment of the utility model;

[0044] FIG. 4A to FIG. 4E It is a top view, a side view, a three-dimensional structural schematic diagram, a cross-sectional view of a cavity sub-component, and a cross-sectional view of an internally injected concrete sub-component of a sub-component with a fiber composite layer according to a specific embodiment of the utility model;

[0045] FIG. 5A to FIG. 5B is a schematic diagram of winding of a fiber composite layer according to a specific embodiment of the utility model;

[0046] FIG. 6A to FIG. 6E It is a top view, a side view, a three-dimensional structure schematic diagram, a connection schematic diagram and a connection cross-sectional schematic diagram of an inner connecting sleeve according to a specific embodiment of the utility model;

[0047] 7A to 7E It is a top view, a side view, a cross-sectional view, a connection schematic diagram and a connection cross-sectional schematic diagram of a reinforced connection plate according to a specific embodiment of the utility model;

[0048] FIG. 8A to FIG. 8C It is a side view, a three-dimensional structural schematic diagram, and a component schematic diagram of an anchor bolt according to a specific embodiment of the utility model;

[0049] FIG. 9A to FIG. 9B It is a schematic diagram of the installation of the reinforced connecting plate and anchor bolts and a schematic diagram of the connection between the sub-components and the inner wall of the original building according to a specific implementation method of the utility model;

[0050] FIG. 10A to FIG. 10D It is a top view and a three-dimensional structure schematic diagram of a horizontal arrangement of grouting holes and a top view and a three-dimensional structure schematic diagram of a triangular arrangement of grouting holes according to a specific embodiment of the utility model;

[0051] FIG. 11A to FIG. 11D It is a top view and a three-dimensional structure schematic diagram of a slurry outlet hole arranged horizontally and a top view and a three-dimensional structure schematic diagram of a grouting hole arranged in a triangle according to a specific embodiment of the utility model; FIG. 12A to FIG. 12B It is a top view and a three-dimensional structural schematic diagram of a scheduling observation hole according to a specific implementation mode of the utility model;

[0052] FIG. 13A to FIG. 13B It is an installation schematic diagram of a gap filling structure and an exploded diagram of a fiber filling structure according to a specific embodiment of the utility model;

[0053] FIG. 14A to FIG. 14B It is a side view and a three-dimensional structural schematic diagram of a steel plate filling structure according to a specific implementation method of the utility model;

[0054] FIG. 15A to FIG. 15E It is a structural schematic diagram of a support frame according to a specific embodiment of the utility model, a side view, a three-dimensional structural schematic diagram, a structural decomposition schematic diagram, and a schematic diagram of the connection between the support frame and the inner wall of the original building and the bearing capacity compensation composite component;

[0055] Description of the accompanying drawings: bearing capacity compensation composite component 100; sub-component 110; cavity component 111; grouting hole 113; grouting hole 114; exhaust observation hole 115; opening and closing device 116; reinforced connecting plate 120; inner connecting sleeve 130; first small end 131; second small end 132; anchor bolt 140; anchor bolt body 141; bolt head 142 locking nut 143; large washer 144; threaded rubber guide groove 145; pre-expansion friction plate 146; linear rubber guide groove 147; support frame 150; fiber composite layer 160; first fiber layer 161; second fiber layer 162; third fiber layer 163; fourth fiber layer 164; anchor bolt fixing reserved tube 170; flange portion 171; flange portion 171; gap filling structure 180; fiber filling structure 180a; steel plate filling structure 180b; grid fiber layer 181; unidirectional fiber layer 182; steel plate 183; fiber layer 184. DETAILED DESCRIPTION

[0056] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention more clearly understood, the spirit of the contents disclosed in the present invention will be clearly explained with the accompanying drawings and detailed descriptions below. After understanding the embodiments of the contents of the present invention, any technician in the relevant technical field can change and modify the contents of the present invention according to the techniques taught by the contents of the present invention without departing from the spirit and scope of the contents of the present invention.

[0057] In order to solve the above technical problems, the utility model provides a pre-designed assembled building bearing capacity compensation composite component system, which is used to carry out rapid bearing capacity compensation construction of buildings or rail transit facilities structures on demand and in quantity, and with reduced comprehensive costs, without affecting the normal operation of the original lines and equipment in the building, and is particularly suitable for limited small spaces and limited construction time. Figures 1A to 1F As shown, the bearing capacity compensation composite component system includes:

[0058] A plurality of bearing capacity compensating composite components 100 are sequentially arranged along the extension direction of the inner wall of the building, and are used to compensate for the structural bearing capacity of the building, wherein each of the bearing capacity compensating composite components 100 is composed of a plurality of sub-components 110, and the plurality of sub-components 110 are spliced, attached and fixed on the inner wall of the building to compensate for the original structural bearing capacity of the building.

[0059] A plurality of segments of the sub-components 110 are spliced, fitted and fixed on the inner wall surface of a building structure or the inner wall of a shield concrete segment of a rail transit facility to form a bearing capacity compensation composite component 100. A plurality of bearing capacity compensation composite components 100 are arranged in sequence along the inner wall of the building, thereby pre-designing an assembled building bearing capacity compensation composite component system based on the required compensation amount on the compensated building structure, which can effectively support the insufficient structural bearing capacity of the original building structure or the original rail transit facility shield segment and compensate it as needed and in quantity.

[0060] In a specific implementation, there may be a variety of implementation schemes for the arrangement of the sub-component 110. For example, each section of the sub-component 110 may be formed by a plurality of cavity components 111 fixed side by side, and the sub-component 110 may be a grouting metal cavity or a metal hollow cavity according to the design requirements. Furthermore, the sub-component 110 may be a concrete grouting metal cavity or a metal hollow cavity without grouting concrete slurry. Grouting in the metal hollow cavity can effectively improve the bearing capacity compensation capacity and increase the compressive performance and stability of the material. In some cases where the strength of the metal hollow cavity meets the design requirements without grouting concrete slurry, concrete may not be injected to reduce its weight, reduce costs, and improve efficiency, thereby meeting the bearing capacity compensation requirements of different buildings. The metal hollow cavity or grouting metal cavity also serves as the skeleton of the pre-designed prefabricated building bearing capacity compensation composite component system, and plays a role in the bending and tensile resistance of the bearing capacity compensation composite component system in this composite material.

[0061] Furthermore, since stainless steel has relatively good corrosion resistance, fire resistance, rigidity, chemical stability and ductility, the cavity component 111 can preferably be a stainless steel cavity component.

[0062] In specific implementation, FIG. 5A to FIG. 5B As shown, in order to further improve the overall strength of the pre-designed assembled bearing capacity compensating composite component system and improve the bearing capacity, the pre-designed building bearing capacity compensating composite component system may also include:

[0063] The fiber composite layer 160 is disposed on the outer side of each segment of the sub-component 110 to enhance the strength of the sub-component 110 of the load-bearing capacity compensation composite component 100 , resist bending and tension, and restrict its deformation.

[0064] Through fiber composite metal, the performance advantages and characteristics of composite materials formed by the superposition of two or more materials can be effectively and fully utilized.

[0065] In a specific implementation, the fiber composite layer 160 may include multiple layers of fibers.

[0066] The multi-layer fibers can better improve the deformation resistance of the sub-component 110 and strengthen the core restraint of the fibers on the sub-component 110 . Furthermore, two adjacent layers of fibers in the multi-layer fibers can be cross-arranged along the circumference of the sub-component 110 .

[0067] In a specific implementation, there may be a variety of implementation schemes for the limited winding method of the fiber composite layer 160. For example, the fiber winding direction of the fiber composite layer 160 may be axial winding and / or circumferential winding along the component 110 of the load-compensating composite component. When the fiber composite layer 160 is set, the fibers are respectively arranged longitudinally (i.e., along the axial direction of the component 110 of the load-compensating composite component 100) and circumferentially (i.e., along the circumferential direction of the component 110 of the load-compensating composite component 100) and wound crosswise using a composite process on the outside of each section of the component 110 of the load-compensating composite component 100. The longitudinal fibers are arranged to enhance the bending strength and stiffness of the load-compensating composite component 100, and the circumferential fibers are arranged to enhance the core restraint force of the load-compensating composite component 100, which can improve the strength and ductility of the load-compensating composite component 100. Specifically, as Figure 5A As shown, the first fiber layer 161 is wound along the circumferential direction, and the second fiber layer 162 can be arranged along the axial direction. Figure 5B As shown, when the fibers are all wound circumferentially, the third fiber layer 163 and the fourth fiber layer 164 can be wound alternately in opposite directions.

[0068] After the flame-retardant glue is introduced through a special process to achieve a high degree of entanglement and compounding of the two materials, the deformation of the inner layer cavity component 111 is further restrained, and the overall peeling resistance, deformation resistance and coordinated bearing capacity between the two can be greatly enhanced, which can greatly enhance the elastic modulus, shear resistance and compressive resistance of the bearing capacity compensation composite component 100. On the premise of meeting the design requirements, the self-weight and cost of the bearing capacity compensation composite component 100 can be greatly reduced.

[0069] In a specific implementation, there are multiple implementations for selecting the material of the fiber composite layer 160. For example, the fiber composite layer 160 may be composed of a flame retardant resin and fibers, wherein the fibers include at least one of basalt fibers, carbon fibers, aramid fibers, and glass fibers. Furthermore, the outermost layer of the fiber composite layer 160 may be basalt fibers. Specifically, the outer fiber material of the fiber composite layer 160 is preferably basalt fiber, because its tensile strength, elastic modulus, corrosion resistance, insulation, fire resistance and chemical stability are relatively good, and it is cost-effective. The inner fiber material of the fiber composite layer 160 can be selected from other fiber materials that meet the performance requirements according to design requirements. Carbon fiber material is preferred because its fire resistance, corrosion resistance, chemical stability, tensile strength and elastic modulus are better than basalt fiber. However, the insulation of carbon fiber cannot fully meet the requirements of specific scenarios that require insulation, and its price is relatively high. Therefore, it can be used as the inner layer of the fiber composite layer 160 to supplement the performance of basalt fiber. The outer layer uses basalt fiber as a tensile, fire-resistant, corrosion-resistant and insulating layer, which can meet the design requirements.

[0070] In a specific implementation, in order to effectively improve the fireproof performance of the fiber composite layer 160, the pre-designed assembled building bearing capacity compensation composite component system may further include: a fireproof coating layer, which is applied to the outside of the fiber composite layer 160. The fireproof coating layer can further improve the overall fireproof rating of the pre-designed assembled building bearing capacity compensation composite component system.

[0071] In a specific implementation, there are multiple implementation schemes for setting the sub-components 110 of the pre-designed assembled building bearing capacity compensation composite component 100. For example, after the sub-components 110 of multiple sections of the pre-designed building bearing capacity compensation composite component 100 are spliced, fitted and fixed on the inner wall of the building and the inner wall of the shield segment of the rail transit facility, the cavity components 111 corresponding to all the sub-components 110 can be interconnected to form a cavity body, and the number of cavities in the cavity body can be equal to the number of the cavity components 111. Further, as Figures 1A to 1F As shown, the number of sections of the pre-designed assembled building bearing capacity compensation composite component system sub-component 110 can be 3, and the number of the cavities can also be 3.

[0072] In the specific implementation, in order to facilitate the injection of concrete slurry on site, discharge the gas in the cavity, ensure the density of concrete in the metal tube cavity, and effectively improve the bearing capacity of the bearing capacity compensation prefabricated composite component, such as Figures 1A to 1F , FIG. 10A to FIG. 10D , FIG. 11A to FIG. 11D , FIG. 12A to FIG. 12BAs shown, each of the hollow bodies may have at least one grouting hole 113, at least one grouting hole 114 and at least one exhaust observation hole 115. The grouting hole 113, the grouting hole 114 and the exhaust observation hole 115 are all provided with an opening and closing device 116, and the exhaust observation hole 115 is provided at the top of the hollow body. The opening and closing device 116 may be built into the hollow body of the hollow member 111, or may be externally placed in the hollow body or outside the hollow body. The grouting hole 113 and the grouting hole 114 are provided at both ends of the hollow body.

[0073] In specific implementation, FIG. 12A to FIG. 12B As shown, in order to facilitate the grouting of the C-shaped, U-shaped and arc-shaped bearing capacity compensation composite component 100 cavity body to fully exhaust the gas in the arc top cavity, each cavity body arc top highest point may have at least one exhaust observation hole 115, the exhaust observation hole 115 is provided with an opening and closing device 116, the exhaust observation hole 115 can be set at the top of the outer wall of the cavity body or the bottom ends on both sides, and can also be set in the middle of both sides of the cavity body, a metal pipe is set in the exhaust observation hole 115, one end of which extends to the inside of the cavity, and the other end extends to the outside of the cavity.

[0074] In a specific implementation, the filler poured into the cavity can be arranged in a variety of embodiments. For example, the filler poured into the cavity can include at least one of concrete, mortar and high molecular polymer. Further, the filler can be preferably concrete. Concrete is preferred because concrete has advantages such as compression resistance, corrosion resistance, insulation and fire resistance, and concrete has a high cost performance.

[0075] In specific implementation, the pre-designed assembled building capacity-compensating composite component system can inject concrete into the cavity according to design requirements if it is necessary to enhance the compressive and shearing capacity. The concrete can be pre-injected in the factory. In order to adapt to some sites where construction and transportation are inconvenient, it can also be quickly injected on site through the grouting hole 113. The on-site concrete injection method can effectively reduce the weight of the capacity-compensating composite component 100 during installation, facilitate quick installation, and increase the cross-sectional inertia moment performance and compressive and bending performance of the capacity-compensating composite component 100. The bearing capacity compensation performance of the capacity-compensating composite component 100 can be greatly enhanced. It is a high-bearing capacity compensation reinforcement structure that integrates the tensile strength, ductility, compressive strength, bending resistance, corrosion resistance, fire resistance, insulation, suitable elastic modulus and the ability to be quickly assembled on site.

[0076] In a specific implementation, there may be a variety of embodiments for setting the connection between the sub-components 110. For example, FIG. 6A to FIG. 6E As shown, the sub-components 110 can be spliced ​​together through an inner connecting sleeve 130 .

[0077] Furthermore, there are also many embodiments for the arrangement of the inner connecting sleeve 130. For example, FIG. 6A to FIG. 6E As shown, the inner connecting sleeve 130 may include a first small-mouth end 131 and a second small-mouth end 132, wherein:

[0078] The cross-sectional shape of the first small opening 131 and the second small opening 132 is the same as the cross-sectional shape of the sub-component 110, and the cross-sectional area of ​​the first small opening 131 and the second small opening 132 is smaller than the internal cross-sectional area of ​​the sub-component 110 so as to adjust the connection angle of two adjacent sub-components 110; the first small opening 131 and the second small opening 132 are respectively welded to the inner walls of the connecting ends of two adjacent sub-components 110.

[0079] The cross-sectional area of ​​the first small end 131 and the second small end 132 can be smaller than the internal cross-sectional area of ​​the sub-component 110, and a certain gap is left between the sub-component 110, so that the connection angle of two adjacent sub-components 110 can be relatively adjusted to better adapt to the inner wall of the building.

[0080] Further, such as FIG. 6A to FIG. 6E As shown, the first small opening 131 and the second small opening 132 respectively penetrate into the interior of two adjacent sub-components 110 to splice and fix the two adjacent sub-components 110. The cross-sectional area of ​​the first small opening 131 increases from small to large from the end to the middle, so that the first small opening 131 can adjust the connection angle after penetrating into the interior of one of the sub-components 110, thereby adjusting the relative connection angle of the two adjacent sub-components 110.

[0081] In a specific implementation, the gap between the sub-component 110 and the building can be fixed by various solutions. For example, the gap between the sub-component 110 and the inner wall of the building can be fixed by glue and / or anchor bolts 140 .

[0082] In the specific implementation, in order to effectively improve the connection strength of the connection parts, such as FIG. 7A to FIG. 7D , FIG. 9A to FIG. 9BAs shown, the bearing capacity compensation composite component 100 may also include: a reinforcing connecting plate 120, which is arranged to cover the outside of the connecting ends of the two adjacent sub-components 110, and the two ends of the reinforcing connecting plate 120 are respectively fixedly connected to the connecting ends of the two adjacent sub-components 110. The purpose of setting the reinforcing connecting plate 120 is to enhance the strength of the connecting part and ensure the overall performance of the bearing capacity compensation composite component 100 after the sub-components 110 are connected. Further, in order to effectively ensure the connection stability, the two ends of the reinforcing connecting plate 120 can be respectively fixedly connected to the connecting ends of the two adjacent sub-components 110 through anchor bolts 140 and / or glue layers 123. The anchor bolts 140 can pass through the reinforced connection part and the sub-component 110 in sequence through the reserved anchor bolt holes 122 and the anchor bolt fixing reserved tubes 170, and are fixed to the building. When the reinforcing connecting plate 120 is set, a plurality of reinforcing stamping ribs 121 can be set along the extension direction of the body to enhance the overall strength.

[0083] In a specific implementation, in order to effectively improve the connection stability between the pre-designed assembled building bearing capacity compensation composite component system and the building, such as FIG. 3A to FIG. 3C , FIG. 4A to FIG. 4E , FIG. 9A to FIG. 9B As shown, the pre-designed assembled building bearing capacity compensation composite component system may also include:

[0084] At least one anchor bolt fixing reserved tube 170 and anchor bolt 140, the anchor bolt 140 fixed reserved tube is arranged on the bearing capacity compensation composite component 100, and is used for the anchor bolt 140 to pass through and fix the bearing capacity compensation composite component 100 on the inner wall of the building, wherein the anchor bolt fixing reserved tube 170 passes through the bearing capacity compensation composite component 100, and has flanged portions 171 extending to the outside of the bearing capacity compensation composite component 100 at both ends. The flanged portion 171 is provided to constrain the loosening of broken fibers in the fiber composite layer 160 due to the opening of the reserved hole, thereby suppressing the broken fibers. Further, the anchor bolt 140 can be one or any combination of an expansion anchor bolt, a chemical anchor bolt and a pre-expanded chemical anchor bolt.

[0085] Furthermore, the structure of the anchor bolt 140 can have multiple implementation schemes when it is set, for example, FIG. 8A to FIG. 8CAs shown, the anchor bolt 140 may include an anchor bolt body 141, a locking nut 143, a large washer 144, a threaded rubber guide groove 145, a linear rubber guide groove 147, a pre-expansion friction plate 146 and a bolt head 142, wherein the locking nut 143 and the large washer 144 are sequentially arranged at the root of the anchor bolt body 141, the threaded rubber guide groove 145 is threadedly arranged circumferentially on the anchor bolt body 141, and the linear rubber guide groove 147 is radially arranged on the outside of the anchor bolt body 141, the pre-expansion friction plate 145 and the anchor bolt head 142 are arranged on the top of the anchor bolt body 141, and the anchor bolt head 142 is conically arranged and has two conical surfaces, a positive cone and an inverted cone.

[0086] When installing the pre-designed assembled building bearing capacity compensation composite component system at the building construction site, glue with good weather resistance and flame retardancy and pre-micro-expansion rapid chemical anchor bolts are used to connect with the original building structure surface or the inner wall of the shield pipe segment of the rail transit facility. The original building structure surface and the surface of the pre-designed assembled building bearing capacity compensation composite component system are connected by glue. The glue has a large bonding area and good shear and peeling resistance. It is the main connection and force transmission part of the two. The pre-micro-expansion rapid chemical anchor bolts serve as the reserve connection force-bearing part of the two. The glue and anchor bolts 140 are combined to achieve a double insurance connection effect.

[0087] In a specific implementation, there may be multiple embodiments for setting the cross-sectional shape of the cavity member 111. For example, the cross-sectional shape of the cavity member 111 may include at least one of a square, a rectangle, a polygon and a trapezoid.

[0088] In the specific implementation, in order to further improve the bearing capacity compensation strength of the structure, FIG. 15A to FIG. 15E As shown, the load-bearing capacity compensation composite component system may also be provided with a support frame 150 if necessary:

[0089] The support frame 150 is arranged at both ends of the bearing capacity compensating composite component 100, and is used to eliminate the gap between the two ends of the bearing capacity compensating composite component 100 and the supporting points of the original building. The setting of the support frame 150 is to better eliminate the gap between the bearing capacity compensating composite component 100 and the supporting points of the original building, thereby enhancing the reliability of the connection between the supporting points and the ends of the bearing capacity compensating composite component 100 and the bearing capacity compensation strength. Further, the support frame 150 may include a body 151 and an adjusting bolt 152, and the adjusting bolt 152 may effectively adjust the overall height of the support frame 150, thereby improving adaptability.

[0090] In specific implementation, Fig.13AAs shown, in order to effectively improve the fit between the bearing capacity compensating composite component 100 and the building, the bearing capacity compensating composite component system may also include: a gap filling structure 180, which is arranged in the gap between the bearing capacity compensating composite component 100 and the inner wall of the building, and is used to improve the fit between the bearing capacity compensating composite component 100 and the inner wall of the building.

[0091] There are many embodiments for the arrangement of the gap filling structure 180. For example, Fig.13A , Fig. 13B As shown, the gap filling structure 180 may be a fiber filling structure 180a: comprising three layers, namely, a unidirectional fiber layer 182 is arranged between two mesh fiber layers 181, so as to improve the overall strength of the structure. Fig.14A , Fig. 14B As shown, the gap filling structure 180 may be a steel plate filling structure 180b, which is composed of multiple layers of steel plates 183, and fiber layers 184 are provided between each layer of steel plates.

[0092] In summary, the pre-designed assembled building bearing capacity compensation composite component system provided by the utility model can first pre-design the bearing capacity compensation index of the building according to the demand in the factory, pre-select the required materials and test the bearing capacity data of various materials, and then design and match the materials according to the various test data to meet the design requirements, and then prefabricate the various materials that meet the data requirements and design the installation plan, and then transport them to the construction site for assembly. The pre-designed assembled building bearing capacity compensation composite component system not only meets the design requirements, but also achieves the purpose of rapid installation without excessive use of materials. In the production process, the shape of the assembled building bearing capacity compensation composite component system sub-component 110 and the on-site assembly plan are pre-designed according to how to avoid the existing pipelines and equipment conditions at the construction site, so that there is no need to dismantle the existing pipelines and various equipment during on-site installation, and there is no need for welding and construction with the help of large equipment. The construction is safe and can effectively save costs, greatly improve construction efficiency and ensure that the construction quality is consistent with the design standards, and extend the service life of the building.

[0093] The exemplary embodiments and descriptions of the present invention are used to explain the present invention, but are not intended to limit the present invention. In addition, the same or similar reference numerals used in the drawings and embodiments are used to represent the same or similar parts.

[0094] The terms “first”, “second”, etc. used in this document do not particularly refer to an order or sequence, nor are they used to limit the present invention. They are only used to distinguish elements or operations described with the same technical terms.

[0095] The directional terms used in this document, such as up, down, left, right, front or back, etc., are only used to refer to the directions of the drawings. Therefore, the directional terms used are used to illustrate and not to limit the present invention.

[0096] The words “include,” “including,” “have,” “contain,” etc. used in this document are open-ended terms, meaning including but not limited to.

[0097] As used herein, "and / or" includes any or all combinations of the items described.

[0098] As used herein, “plurality” includes “two” and “more than two”; as used herein, “plurality groups” includes “two groups” and “more than two groups”.

[0099] The terms "substantially" and "approximately" used herein are used to modify any quantity or error that may vary slightly, but these slight changes or errors do not change their essence. Generally speaking, the range of slight changes or errors modified by such terms may be 20% in some embodiments, 10% in some embodiments, 5% in some embodiments, or other values. Those skilled in the art should understand that the aforementioned values ​​can be adjusted according to actual needs and are not limited thereto.

[0100] All terms (including technical and scientific terms) used herein have the meanings commonly understood by those skilled in the art, unless otherwise defined. It should be noted that the terms used herein should be interpreted as having a meaning consistent with the context of this specification, and should not be interpreted in an idealized or overly rigid manner.

[0101] In the case of using expressions such as "at least one of A, B, and C, etc.", it should generally be interpreted in accordance with the meaning of the expression generally understood by those skilled in the art (for example, "a system having at least one of A, B, and C" should include but not be limited to a system having A alone, B alone, C alone, A and B, A and C, B and C, and / or A, B, C, etc.). In the case of using expressions such as "at least one of A, B, or C, etc.", it should generally be interpreted in accordance with the meaning of the expression generally understood by those skilled in the art (for example, "a system having at least one of A, B, or C" should include but not be limited to a system having A alone, B alone, C alone, A and B, A and C, B and C, and / or A, B, C, etc.). Those skilled in the art should also understand that any transitional conjunctions and / or phrases that substantially indicate two or more optional items, whether in the specification, claims, or drawings, should be understood to give the possibility of including one of these items, either of these items, or both of these items. For example, the phrase "A or B" should be understood to include the possibilities of "A" or "B", or "A and B".

[0102] Those skilled in the art will appreciate that the features described in the various embodiments and / or claims of the present invention may be combined and / or combined in various ways, even if such combinations and / or combinations are not explicitly described in the present invention. In particular, the features described in the various embodiments and / or claims of the present invention may be combined and / or combined in various ways without departing from the spirit and teachings of the present invention. All of these combinations and / or combinations fall within the scope of the present invention.

[0103] The embodiments of the present invention are described above. However, these embodiments are for illustrative purposes only and are not intended to limit the scope of the present invention. Although the embodiments are described above separately, this does not mean that the measures in the various embodiments cannot be used in combination to advantage. The scope of the present invention is defined by the attached claims and their equivalents. Without departing from the scope of the present invention, a person skilled in the art may make a variety of substitutions and modifications, which should all fall within the scope of the present invention.

Claims

1. A pre-designed assembled building bearing capacity compensation composite component system, characterized in that: The bearing capacity compensation composite component system comprises: A plurality of bearing capacity compensating composite components are sequentially arranged along the extension direction of the inner wall of the building, and are used to compensate for the structural bearing capacity of the building, wherein each of the bearing capacity compensating composite components is composed of a plurality of sub-components, and the plurality of sub-components are spliced, fitted and fixed on the inner wall of the building to compensate for the original structural bearing capacity of the building.

2. The pre-designed assembled building bearing capacity compensation composite component system according to claim 1, characterized in that: Each section of the sub-components is formed by a plurality of cavity components fixed side by side, and the cavity components are grouting metal cavities or metal hollow bodies.

3. The pre-designed assembled building bearing capacity compensation composite component system according to claim 1 or 2, characterized in that: The load-bearing capacity compensation composite component system also includes: The fiber composite layer is arranged to cover the outer side of each segment of the sub-component and is used to enhance the strength of the sub-component.

4. The pre-designed assembled building bearing capacity compensation composite component system according to claim 3, characterized in that: The fiber composite layer includes multiple layers of fibers, each layer of fibers is arranged along the extension direction of the sub-component or is wound and laid circumferentially, and the laying directions of two adjacent layers of fibers are cross-arranged.

5. The pre-designed assembled building bearing capacity compensation composite component system according to claim 3, characterized in that: The fiber composite layer is composed of resin and fibers, and the fibers include at least one of basalt fibers, carbon fibers, aramid fibers and glass fibers.

6. The pre-designed assembled building bearing capacity compensation composite component system according to claim 4, characterized in that: The outermost layer of the fiber composite layer is basalt fiber or aramid fiber.

7. The pre-designed assembled building bearing capacity compensation composite component system according to claim 3, characterized in that: The load-bearing capacity compensation composite component system also includes: The fire retardant coating layer is applied outside the fiber composite layer to improve the fire retardant performance of the fiber composite layer.

8. The pre-designed assembled building bearing capacity compensation composite component system according to claim 1, characterized in that: After a plurality of sections of the sub-components are spliced, fitted and fixed on the inner wall of the building, the cavity components corresponding to all the sub-components are interconnected to form a cavity body, and the number of the cavity bodies is equal to the number of the cavity components.

9. The pre-designed assembled building bearing capacity compensation composite component system according to claim 8, characterized in that: The number of segments of the sub-component is 3, and the number of the hollow cavities is 3.

10. The pre-designed assembled building bearing capacity compensation composite component system according to claim 8, characterized in that: Each of the hollow cavities has at least one grouting hole, at least one grouting hole and at least one exhaust observation hole. The grouting hole, the grouting hole and the exhaust observation hole are all provided with opening and closing devices. The exhaust observation hole is arranged at the top of the hollow cavity.

11. The pre-designed assembled building bearing capacity compensation composite component system according to claim 10, characterized in that: The filler poured into the cavity is concrete slurry and / or high molecular polymer.

12. The pre-designed assembled building bearing capacity compensation composite component system according to claim 1, characterized in that: Two adjacent sections of the sub-components are fixedly spliced ​​by an inner connecting sleeve.

13. The pre-designed assembled building bearing capacity compensation composite component system according to claim 12, characterized in that: The inner connecting sleeve comprises a first small-mouth end and a second small-mouth end, wherein: The first small opening end and the second small opening end respectively extend into the interior of two adjacent sub-components to splice and fix the two adjacent sub-components; The cross-sectional area of ​​the first small opening increases from the end to the middle, so that the first small opening can adjust the connection angle after entering into a sub-component, thereby adjusting the relative connection angle between two adjacent sub-components.

14. The pre-designed assembled building bearing capacity compensation composite component system according to claim 1, characterized in that: The gap between the load-bearing capacity compensation composite component and the inner wall of the building is fixed by glue and / or anchor bolts.

15. The pre-designed assembled building bearing capacity compensation composite component system according to claim 12, characterized in that: The load-bearing capacity compensation composite component system also includes: The reinforcing connecting plate is arranged to cover the outside of the connecting ends of the two adjacent sub-components, and the two ends of the reinforcing connecting plate are respectively fixedly connected to the connecting ends of the two adjacent sub-components.

16. The pre-designed assembled building bearing capacity compensation composite component system according to claim 15, characterized in that: The two ends of the reinforcing connecting plate are respectively fixedly connected to the connecting ends of two adjacent sub-components through anchor bolts and / or glue.

17. The pre-designed assembled building bearing capacity compensation composite component system according to claim 14, characterized in that: The load-bearing capacity compensation composite component system also includes: At least one anchor fixing reserved tube and an anchor, wherein the anchor fixing reserved tube is arranged on the bearing-capacity compensating composite member and is used for the anchor to pass through and fix the bearing-capacity compensating composite member on the inner wall of a building, wherein the anchor fixing reserved tube passes through the bearing-capacity compensating composite member and has flanged portions at both ends extending to the outside of the bearing-capacity compensating composite member.

18. The pre-designed assembled building bearing capacity compensation composite component system according to claim 17, characterized in that: The anchor bolt is one or any combination of an expansion anchor bolt, a chemical anchor bolt and a pre-expansion chemical anchor bolt.

19. The pre-designed assembled building bearing capacity compensation composite component system according to claim 2, characterized in that: The bearing capacity compensation composite component is C-shaped, U-shaped, S-shaped, rectangular, trapezoidal or straight-shaped, and the cross-section of the cavity component is square, rectangular, polygonal or trapezoidal.

20. The pre-designed assembled building bearing capacity compensation composite component system according to claim 1, characterized in that: The load-bearing capacity compensation composite component system also includes: The support frames are arranged at both ends of the bearing capacity compensation composite component and are used to eliminate the gaps between the two ends of the bearing capacity compensation composite component and the supporting points of the original building.

21. The pre-designed assembled building bearing capacity compensation composite component system according to claim 1, characterized in that: The load-bearing capacity compensation composite component system also includes: The gap filling structure is arranged at the gap between the bearing capacity compensating composite component and the inner wall of the building, and is used to improve the fit between the bearing capacity compensating composite component and the inner wall of the building.