Bridge reconstruction operation platform

By designing the bridge transformation operation platform, using guide beams, ladder cage frames and electric hoist lifting mechanisms, the problem of channel interruption during bridge removal is solved, and a stable construction surface is provided, which realizes the convenience of the apparent reinforcement construction of the bridge and Cost reduction.

CN222275290UActive Publication Date: 2024-12-31CRCC HARBOR & CHANNEL ENG BUREAU GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420875586.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-12-31
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

During the renovation and construction of dangerous bridge bridges, the bridge passage is interrupted during the demolition of part of the bridge, resulting in the inability to walk at high altitudes of bridges and the inability to provide construction surfaces, affecting the construction process.

Method used

Design a bridge transformation operation platform, including guide beams, ladder cage frames, trusses and scaffolding. Through the lifting mechanisms of the first lifting mechanism and the second lifting mechanism, ensure that the ladder cage frames and operating platforms can be at various construction points of the beam body. Highly stable placement provides construction surface, including the Beret beam structure of guide beams and electric hoist lifting mechanism.

Benefits of technology

It is possible to provide a stable construction work surface during the demolition of the bridge, ensuring that construction personnel can safely and conveniently carry out the apparent reinforcement of the bridge, and reducing construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222275290U_ABST
    Figure CN222275290U_ABST
Patent Text Reader

Abstract

The utility model discloses a bridge transformation work platform which comprises two guide beams, four ladder cage frames, two trusses and a plurality of scaffold boards, the length direction of the guide beams is the same as the length direction of a beam body, and the two guide beams are used for being arranged on the left side and the right side of the beam body respectively. The four elevator cage frames are distributed in a rectangular shape, two elevator cage frames are connected with one guide beam through two first hoisting mechanisms, and the other two elevator cage frames are connected with the other guide beam through the other two first hoisting mechanisms; one truss is sleeved on the two ladder cage frames which are distributed left and right, and the other truss is sleeved on the other two ladder cage frames which are distributed left and right; a plurality of scaffold boards are laid on the two trusses to form an operation platform. The elevator cage frame and the operation platform are lifted to the height of each construction point of the beam body, constructors can conveniently conduct construction on each construction point of the beam body, the guide beam is stably arranged on the beam body, and even in the process of partially dismantling the bridge, the bridge transformation operation platform can still provide a construction operation face.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a bridge reconstruction operation platform. Background Art

[0002] The renovation of dangerous bridges usually includes crack grouting, concrete surface repair, steel plate pasting and carbon fiber cloth reinforcement. Aerial bridge work vehicles are often used as construction platforms. However, when it comes to the conversion of the dangerous bridge structure system, the beams need to be dismantled and the bridge passage is interrupted, which makes it inconvenient for the aerial bridge work vehicle to move and install, and thus it can no longer provide a construction work surface for construction personnel. Utility Model Content

[0003] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the utility model provides a bridge reconstruction work platform, which can still provide a construction work surface during the process of partial bridge demolition to carry out the construction of bridge surface reinforcement.

[0004] A bridge reconstruction work platform according to an embodiment of the utility model comprises two guide beams, four ladder cages, two trusses and a plurality of scaffolding boards, wherein the length direction of the guide beams is the same as the length direction of the beam body, and the two guide beams are used to be arranged on the left and right sides of the beam body; the four ladder cages are distributed in a rectangular shape, wherein two of the ladder cages are connected to one of the guide beams through two first lifting mechanisms, and the other two ladder cages are connected to the other guide beams through the other two first lifting mechanisms, and the first lifting mechanisms can drive the ladder cages to rise and fall; both ends of the two trusses are provided with limit channels, and the trusses The length direction of the frame is parallel to the left-right direction. One of the trusses is sleeved on the two ladder cage frames distributed on the left and right through the two limiting channels, and the two ends of one of the trusses are respectively connected to the two ladder cage frames distributed on the left and right through two second lifting mechanisms. Another truss is sleeved on the other two ladder cage frames distributed on the left and right through the two limiting channels, and the two ends of the other truss are respectively connected to the other two ladder cage frames distributed on the left and right through two second lifting mechanisms, and the second lifting mechanisms can drive the truss to rise and fall; multiple scaffolding boards are laid on the two trusses to form an operating platform.

[0005] At least the following beneficial effects are achieved:

[0006] The first lifting mechanism can adjust the height of the ladder cage, and the second lifting mechanism can adjust the height of the truss and the scaffolding, so as to lift the ladder cage and the operating platform to the height of each construction point of the beam body, so as to facilitate the construction personnel to carry out construction at each construction point of the beam body, and the guide beam can be stably placed on the beam body. Even during the partial demolition of the bridge, the guide beam can still stably hold the ladder cage, truss and scaffolding, and the bridge reconstruction work platform can still provide a construction working surface for the construction of bridge surface reinforcement.

[0007] According to some embodiments of the present invention, the guide beam includes a plurality of first Bailey beams connected in sequence.

[0008] According to some embodiments of the present invention, the ladder cage is connected to the guide beam via a rope set.

[0009] According to some embodiments of the present invention, both the first lifting mechanism and the second lifting mechanism are electric hoists.

[0010] According to some embodiments of the utility model, a ladder structure is provided in the ladder cage.

[0011] According to some embodiments of the present invention, the ladder cage includes a plurality of second Bailey beams connected in sequence.

[0012] According to some embodiments of the present invention, the truss includes a plurality of third Bailey beams connected in sequence.

[0013] According to some embodiments of the utility model, it also includes a lifting trolley and two guide rails, the two guide rails are separately arranged on the two guide beams, and the guide rails have the same length direction as the guide beams, the lifting trolley is straddled on the two guide rails, and the lifting trolley is used to lift the ladder cage, the truss and the scaffolding.

[0014] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The present invention is further described below with reference to the accompanying drawings and embodiments, wherein:

[0016] Figure 1 This is a schematic diagram of the main structure of a bridge reconstruction work platform according to an embodiment of the utility model;

[0017] Figure 2 This is a side structural schematic diagram of a bridge reconstruction work platform according to an embodiment of the utility model;

[0018] Figure Number:

[0019] Guide beam 100; beam body 200; ladder cage 300; first lifting mechanism 400; truss 500; second lifting mechanism 600; scaffolding board 700; lifting crane 800. DETAILED DESCRIPTION

[0020] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0021] In the description of the present invention, it should be understood that descriptions involving orientation, such as up, down, front, back, left, right, etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0022] In the description of the present utility model, "a plurality" means more than two. If there is a description of "first" or "second", it is only for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0023] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0024] Reference Figure 1 and Figure 2The utility model discloses a bridge reconstruction work platform, including two guide beams 100, four ladder cages 300, two trusses 500 and a plurality of scaffolding boards 700. The length direction of the guide beams 100 is the same as the length direction of the beam body 200. The two guide beams 100 are used to be arranged on the left and right sides of the beam body 200; the four ladder cages 300 are distributed in a rectangular shape, wherein two ladder cages 300 are connected to one of the guide beams 100 through two first lifting mechanisms 400, and the other two ladder cages 300 are connected to the other guide beam 100 through the other two first lifting mechanisms 400. The first lifting mechanisms 400 can drive the ladder cages 300 to rise and fall; both ends of the two trusses 500 are provided with limit Channel, the length direction of the truss 500 is parallel to the left-right direction, one truss 500 is sleeved on two ladder cage frames 300 distributed on the left and right through two limiting channels, and the two ends of one truss 500 are respectively connected to the two ladder cage frames 300 distributed on the left and right through two second lifting mechanisms 600, another truss 500 is sleeved on the other two ladder cage frames 300 distributed on the left and right through two limiting channels, and the two ends of another truss 500 are respectively connected to the other two ladder cage frames 300 distributed on the left and right through two second lifting mechanisms 600, and the second lifting mechanisms 600 can drive the truss 500 to rise and fall; multiple scaffolding boards 700 are laid on the two trusses 500 to form an operating platform.

[0025] The first lifting mechanism 400 can adjust the height of the ladder cage 300, and the second lifting mechanism 600 can adjust the height of the truss 500 and the scaffolding 700. After the ladder cage 300, the truss 500 and the scaffolding 700 are installed on the ground, the ladder cage 300 and the operating platform can be lifted to the height of each construction point of the beam body 200. The operating platform provides space for construction personnel and various construction tools, making it convenient for construction personnel to carry out construction at each construction point of the beam body 200.

[0026] Since the length direction of the guide beam 100 is the same as that of the beam body 200, the two guide beams 100 are respectively arranged on the left and right sides of the beam body 200, and the guide beam 100 can be stably placed on the beam body 200. Even during the partial demolition of the bridge, the guide beam 100 can still stably hold the ladder cage 300, the truss 500 and the scaffolding 700, and the bridge reconstruction work platform can still provide a construction work surface for the construction of the bridge surface reinforcement.

[0027] The truss 500 is sleeved on two ladder cage frames 300 distributed on the left and right through two limiting channels. The limiting channels can limit the truss 500 on the ladder cage frames 300 to avoid excessive horizontal deviation of the truss 500 on the ladder cage frames 300.

[0028] The scaffolding plank 700 can be connected by connecting the two ends of the scaffolding plank 700 to two trusses 500 respectively, or by setting multiple support rods between the two trusses 500, interlacing the multiple support rods and connecting the two trusses 500 together, and then laying multiple scaffolding planks 700 slowly on the multiple support rods.

[0029] In some of the embodiments, the guide beam 100 includes a plurality of first Bailey beams connected in sequence. The first Bailey beams have a simple structure, are easy to assemble, and have a strong bearing capacity.

[0030] The length of the plurality of first Bailey beams connected in series should be long enough so that the contact area between the guide beam 100 and the beam body 200 is large enough so that the guide beam 100 can be sufficiently supported.

[0031] In some of the embodiments, the ladder cage 300 is connected to the guide beam 100 through a rope group, and the rope group firmly drops the ladder cage 300 on the guide beam 100. The rope group and the first lifting mechanism 400 can play a role of double traction of the ladder cage 300, thereby improving the safety of the ladder cage 300.

[0032] According to the installation position requirements of the ladder cage 300, one section of the rope group and the first lifting mechanism 400 are connected to the corresponding position of the guide beam 100, and then the hook of the first lifting mechanism 400 is connected to the upper end of the ladder cage 300. The first lifting mechanism 400 lifts the ladder cage 300 to the construction point, and then the other section of the rope group is connected to the upper end of the ladder cage 300.

[0033] After the second lifting mechanism 600 is connected to the corresponding position of the guide beam 100 or the ladder cage 300, the hook of the second lifting mechanism 600 is then connected to the upper end of the truss 500. After the second lifting mechanism 600 lifts the truss 500 to the construction site, the ladder cage 300 and the truss 500 can be connected together through other rope groups to improve the safety of the truss 500 and the operating platform.

[0034] In some of the embodiments, the first lifting mechanism 400 and the second lifting mechanism 600 are both electric hoists, which are common components, easy to set up and use, and have low cost.

[0035] In some of the embodiments, a ladder structure is provided in the ladder cage 300, and the ladder structure is used for construction workers to pass through. The construction workers can move from the beam body 200 to the operating platform through the ladder structure.

[0036] In some of the embodiments, the ladder cage 300 includes a plurality of second Bailey beams connected in sequence. The second Bailey beams have a simple structure, are easy to assemble, and have a strong bearing capacity.

[0037] In some of the embodiments, the truss 500 includes a plurality of third Bailey beams connected in sequence. The third Bailey beams have a simple structure, are easy to assemble, and have a strong bearing capacity.

[0038] Of course, the ladder cage 300 and the truss 500 may also be other forms of hollow beam structures. The guide beam 100, the ladder cage 300 and the truss 500 are made of square steel.

[0039] In some of the embodiments, the bridge reconstruction work platform also includes a lifting trolley 800 and two guide rails. The two guide rails are respectively arranged on two guide beams 100, and the guide rails and the guide beams 100 have the same length direction. The lifting trolley 800 is straddled on the two guide rails. The lifting trolley 800 is moved on the two guide beams 100 through the two guide rails, so that the lifting trolley 800 is located on different sections on the beam body 200.

[0040] The hoisting crane 800 is used to hoist the ladder cage 300, the truss 500 and the scaffolding board 700, so as to facilitate the installation of the ladder cage 300, the truss 500 and the scaffolding board 700 in place.

[0041] It can be understood that the hook of the lifting trolley 800 can be connected to four ladder cages 300 at the same time. The lifting trolley 800 lifts the four ladder cages 300, and the lifting trolley 800 can keep the positions of the four ladder cages 300 unchanged. Then the lifting trolley 800 carries the four ladder cages 300 and the operating platform to different sections on the beam body 200, so as to facilitate construction at different construction points of the beam body 200.

[0042] The manufacturing method of the bridge reconstruction work platform is simple. The guide beam 100, ladder cage 300, truss 500, scaffolding board 700, first lifting mechanism 400 and second lifting mechanism 600 and other components used are all common components with low cost. Compared with the cost of renting a bridge aerial work vehicle, the overall cost is lower.

[0043] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0044] Of course, the present invention is not limited to the above-mentioned embodiments, and technicians familiar with the field may make equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A bridge reconstruction work platform, characterized in that: include: Two guide beams, the length direction of the guide beams is the same as the length direction of the beam body, and the two guide beams are used to be arranged on the left and right sides of the beam body; Four ladder cages, the four ladder cages are distributed in a rectangular shape, two of the ladder cages are connected to one of the guide beams through two first lifting mechanisms, and the other two ladder cages are connected to another guide beam through another two first lifting mechanisms, and the first lifting mechanisms can drive the ladder cages to rise and fall; Two trusses, both ends of the two trusses are provided with limiting channels, the length direction of the trusses is parallel to the left and right direction, one truss is sleeved on two ladder cages distributed on the left and right through the two limiting channels, and the two ends of one truss are respectively connected to the two ladder cages distributed on the left and right through two second lifting mechanisms, the other truss is sleeved on the other two ladder cages distributed on the left and right through the two limiting channels, and the two ends of the other truss are respectively connected to the other two ladder cages distributed on the left and right through two second lifting mechanisms, and the second lifting mechanism can drive the truss to rise and fall; A plurality of scaffolding boards are laid on the two trusses to form an operating platform.

2. A bridge reconstruction work platform according to claim 1, characterized in that: The guide beam includes a plurality of first Bailey beams connected in sequence.

3. A bridge reconstruction work platform according to claim 1 or 2, characterized in that: The ladder cage is connected to the guide beam via a rope set.

4. A bridge reconstruction work platform according to claim 3, characterized in that: The first lifting mechanism and the second lifting mechanism are both electric hoists.

5. The bridge reconstruction work platform according to claim 1, characterized in that: A ladder structure is arranged in the ladder cage frame.

6. A bridge reconstruction work platform according to claim 1 or 5, characterized in that: The ladder cage comprises a plurality of second Bailey beams connected in sequence.

7. The bridge reconstruction work platform according to claim 1, characterized in that: The truss includes a plurality of third Bailey beams connected in sequence.

8. The bridge reconstruction work platform according to claim 1, characterized in that: It also includes a lifting trolley and two guide rails, the two guide rails are separately arranged on the two guide beams, and the guide rails have the same length direction as the guide beams. The lifting trolley is straddled on the two guide rails, and the lifting trolley is used to lift the ladder cage, the truss and the scaffolding board.