Large-span cross beam installation auxiliary equipment
By designing large-span beam installation auxiliary equipment, and using automated lifting and precise pushing technology, the problems of low beam lifting efficiency, large labor consumption and high safety risks in the existing technology have been solved, and efficient and accurate beam installation has been achieved to adapt to severe weather construction. .
Patent Information
- Application Number
- CN202421077128.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-17
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-05-17
AI Technical Summary
In the prior art, large-span cross beam lifting has problems such as low construction efficiency, high labor consumption, high safety risks and low installation accuracy, especially in severe weather conditions, which cannot be constructed normally.
A large-span cross beam installation auxiliary equipment is designed, including a walking support mechanism, a mounting frame, a rack and a guide structure, a lift support structure, a gear drive mechanism, a beam support structure and a transverse push mechanism, combined with a horizontal laser meter and an inclination sensor. Achieve automatic lifting and precise pushing of large-span beams.
It improves the installation efficiency of large-span cross beams, reduces labor costs, enhances construction safety and installation accuracy, adapts to severe weather construction, and reduces costs.
Smart Images

Figure CN222276228U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and more specifically, to a large-span beam installation auxiliary device. Background Art
[0002] In the airport construction of the existing technology, the main structure is mostly large space and large span, the frame column spacing is large, generally reaching 12 meters to 18 meters, and there is no horizontal floor in the height direction. The conventional curtain wall form is a vertical column as the main load-bearing curtain wall structure, which needs to be fixed on the horizontal floor. In the airport's large space and large span main structure, only the frame column is used as the support of the curtain wall. A new curtain wall structure system with horizontal large span beams as the main force and combined with vertical hangers came into being. The large span beams are used as the main load-bearing components to bear horizontal loads, and the dead weight is borne by slender hangers, which solves the problem that the airport's main structure has no horizontal floor as the support of the curtain wall columns.
[0003] As the main load-bearing member bearing horizontal loads, the cross-section of the large-span beam is generally large. When aluminum profiles are used as the beam, the weight is about 200kg to 400kg, and when T-steel is used as the beam, the weight is about 500 to 1300kg. The length of the beam is about 6 meters to 12 meters. For the hoisting of this beam, the solution adopted in the prior art is to use at least one automobile crane, one mobile hanging basket and one indoor and outdoor straight-arm aerial work platform to hoist the beam to a certain height. The workers in the hanging basket manually pull the beam to the curtain wall surface, and the workers on the indoor and outdoor aerial work platforms install the beam connectors. After completing these steps, the installation of the beam is completed. Such construction hoisting has great risks, low construction efficiency and is prone to safety accidents. When the ground is uneven or the large beam is pulled, the crane may roll over and have poor stability. At the same time, such a lifting scheme consumes a lot of manpower, and lacks monitoring of horizontal and vertical installation accuracy. It is greatly affected by the level of manual operation, which in turn affects the overall quality of the project and increases costs. In addition, weather factors have a huge impact on lifting work, especially in thunderstorms or strong winds, which make normal construction impossible. Utility Model Content
[0004] The main purpose of the utility model is to provide a large-span beam installation auxiliary device, aiming to solve the technical problems of low efficiency and high manpower consumption of beam hoisting solutions in the prior art.
[0005] To achieve the above purpose, the technical solution adopted by the utility model is: a large-span beam installation auxiliary device, which includes:
[0006] A walking support mechanism and a mounting base arranged on the walking support mechanism, wherein the walking support mechanism is used to support the mounting base and drive the mounting base to move;
[0007] A rack and a first guide structure are arranged on the mounting base, and the rack and the first guide structure both extend in a vertical direction;
[0008] A lifting support structure and a second guide structure, a gear driving mechanism, a beam support structure and a lateral pushing mechanism arranged on the lifting support structure, the beam support structure is used to support a large-span beam to be installed, the second guide structure and the first guide structure limit and guide each other, the gear driving mechanism is connected with a gear, the gear is meshed with the rack, the gear driving mechanism can drive the gear to rotate to move up and down on the rack in the vertical direction, so that the lifting support structure can move up and down in the vertical direction under the limit guidance of the second guide structure and the first guide structure, and the lateral pushing mechanism can drive the beam support structure to reciprocate linearly on the lifting support structure.
[0009] Furthermore, the large-span beam installation auxiliary equipment also includes a horizontal laser instrument arranged on the beam support structure.
[0010] Furthermore, the large-span beam installation auxiliary equipment also includes a leveling support structure arranged on the beam support structure, which is used to adjust the inclination angle of the large-span beam located on the beam support structure, and the large-span beam installation auxiliary equipment also includes an inclination sensor that can be placed on the large-span beam located on the beam support structure.
[0011] Further, the leveling support structure is a leveling bolt that is threadedly connected to the beam support structure and protrudes from the upper surface of the beam support structure.
[0012] Further, the rack is located on a first side of the mounting base, the first guide structure is located on a second side of the mounting base, and the first side of the mounting base and the second side of the mounting base are opposite to each other.
[0013] Further, the number of the racks is 2, and the two racks are arranged in parallel and spaced apart from each other; the number of the first guide structures is 2, and the two first guide structures are arranged in parallel and spaced apart from each other.
[0014] Furthermore, the large-span beam installation auxiliary equipment also includes a supporting inclined beam connected to the first side of the installation base and the walking support mechanism.
[0015] Furthermore, the first guide structure is a guide rail extending in a vertical direction, the second guide structure is a guide rail groove, and both upper and lower ends of the guide rail are provided with limited stop structures to prevent the guide rail groove from separating from the guide rail in a vertical direction.
[0016] Furthermore, a slide rail is installed on the lifting support structure, the beam support structure is a beam support arm that can be horizontally slidably installed on the slide rail, the lateral pushing mechanism is an electric push rod, and the electric push rod is respectively connected to the lifting support structure and the beam support structure, the number of the slide rails is 2, and the two slide rails are arranged parallel to each other, the number of the beam support arms is 2, and the two beam support arms are arranged parallel to each other, and the large-span beam to be installed is supported on the two beam support arms.
[0017] Furthermore, the walking support mechanism includes a base and walking wheels arranged on the base, and the mounting base is arranged on the base and located above the base.
[0018] The beneficial effects of the large-span beam installation auxiliary equipment provided by the present application are:
[0019] Since the large-span beam installation auxiliary equipment provided by the embodiment of the utility model is provided with a lifting support structure and a second guide structure, a gear driving mechanism, a beam supporting structure and a lateral pushing mechanism arranged on the lifting support structure, the beam supporting structure is used to support the large-span beam to be installed, so the gear can be driven to rotate by the gear driving mechanism, so that the gear is meshed with the rack, so that the gear is lifted and lowered along the rack, thereby driving the lifting support structure to lift and lower, and the second guide structure and the first guide structure are mutually limited and guided to ensure the lifting and lowering of the lifting support structure, and the large span to be installed supported on the beam supporting structure can be lifted and lowered smoothly. The beam can be lifted to the height of the required installation position, and the lateral pushing mechanism can drive the beam support structure to move back and forth linearly on the lifting support structure, so that the large-span beam to be installed can be lifted to the height of the required installation position and then pushed laterally (horizontally) to the required installation position, so as to complete the auxiliary work before the installation of the large-span beam. The large-span beam here is especially the main load-bearing member in the large-space and large-span main structure of the airport. In short, the large-span beam installation auxiliary equipment facilitates the automated operation of the lifting and lateral pushing of the large-span beam to reach the required installation position, consumes very little manpower, and improves the operating efficiency of the large-span beam installation.
[0020] In a further solution, the large-span beam installation auxiliary equipment also includes a horizontal laser meter arranged on the beam support structure. A laser receiver can be set at a height corresponding to the installation elevation of the large-span beam to detect the horizontal laser emitted by the horizontal laser meter. If the laser receiver receives the horizontal laser emitted by the horizontal laser meter, it means that the large-span beam has reached the required elevation, thereby facilitating the large-span beam installation auxiliary equipment to achieve the purpose of efficiently and accurately assisting the installation of large-span beams.
[0021] In a further solution, the large-span beam installation auxiliary equipment also includes a leveling support structure arranged on the beam support structure, which is used to adjust the inclination of the large-span beam located on the beam support structure. The large-span beam installation auxiliary equipment also includes an inclination sensor that can be placed on the large-span beam located on the beam support structure, so that the horizontality (inclination) of the large-span beam to be installed can be detected according to the inclination sensor, and then the installed large-span beam can be adjusted to the required horizontality through the leveling support structure, thereby ensuring the subsequent installation accuracy (horizontality) of the large-span beam. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0023] Figure 1 A side view of a long-span beam installation auxiliary device provided for one embodiment of the present application;
[0024] Figure 2 for Figure 1 The enlarged view of point A in the middle;
[0025] Figure 3 A top view of a large-span beam installation auxiliary device provided by one embodiment of the present application when it is located near a structural column;
[0026] Figure 4 for Figure 3 The enlarged view of point A in the middle;
[0027] Figure 5 for Figure 3 The enlarged view of point B in the middle;
[0028] Figure 6 A top view of a large-span beam installation auxiliary device provided by an embodiment of the present application when supporting a large-span beam;
[0029] Figure 7 A side view of a large-span beam installation auxiliary device provided by an embodiment of the present application in a working state;
[0030] Figure 8 A side view of a large-span beam installation auxiliary device provided by one embodiment of the present application in another working state;
[0031] Fig. 9A side view of a large-span beam installation auxiliary device provided by an embodiment of the present application in another working state;
[0032] Fig.10 A side view of a large-span beam installation auxiliary device provided by an embodiment of the present application in yet another working state.
[0033] The reference numerals in the above drawings are as follows:
[0034] 1-mounting base; 2-rack; 3-gear; 4-beam support structure; 5-lateral pushing mechanism; 6-large-span beam; 7-servo motor; 8-gearbox; 9-horizontal laser; 10-laser receiver; 11-tilt sensor; 12-leveling bolt; 13-support tilt beam; 14-guide rail; 15-lifting seat; 16-slide rail; 17-structural column; 18-horizontal sliding track; 19-block; 20-target; 21-installed beam; 61-head; 62-vertical part; 100-travel support mechanism; 101-base; 102-travel wheel; 200-guide block; 201-guide rail groove; 300-L-type connecting plate; 301-first plate; 302-second plate. DETAILED DESCRIPTION
[0035] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0036] It should be noted that when an element is referred to as being "fixed to" or "set on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0037] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0038] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0039] In order to illustrate the technical solution described in this application, a detailed description is given below in conjunction with specific drawings and embodiments.
[0040] See also Figures 1 to 6 The utility model embodiment provides a large-span beam installation auxiliary device comprising:
[0041] A walking support mechanism 100 and a mounting base 1 arranged on the walking support mechanism 100, wherein the walking support mechanism 100 is used to support the mounting base 1 and drive the mounting base 1 to move;
[0042] A rack 2 and a first guide structure are arranged on the mounting base 1, and both the rack 2 and the first guide structure extend in a vertical direction;
[0043] A lifting support structure and a second guide structure, a gear driving mechanism, a beam support structure 4 and a lateral pushing mechanism 5 arranged on the lifting support structure. The beam support structure 4 is used to support a large-span beam 6 to be installed. The second guide structure and the first guide structure limit and guide each other. The gear driving mechanism is connected with a gear 3, and the gear 3 is meshed with the rack 2. The gear driving mechanism can drive the gear 3 to rotate to move up and down in the vertical direction on the rack 2, so that the lifting support structure can move up and down in the vertical direction under the limiting guidance of the second guide structure and the first guide structure. The lateral pushing mechanism 5 can drive the beam support structure 4 to reciprocate in a straight line on the lifting support structure.
[0044] The long-span beam 6 mentioned in the present application particularly refers to a beam with a length of 6m to 12m and a T-shaped cross section, but is not limited to a beam with a length of 6m to 12m or a T-shaped cross section.
[0045] Since the large-span beam installation auxiliary equipment provided by the embodiment of the utility model is provided with a lifting support structure and a second guide structure, a gear driving mechanism, a beam supporting structure 4 and a lateral pushing mechanism 5 arranged on the lifting support structure, the beam supporting structure 4 is used to support the large-span beam 6 to be installed, so the gear driving mechanism can drive the gear 3 to rotate, so that the gear 3 and the rack 2 mesh together, so that the gear 3 is lifted and lowered along the rack 2, thereby driving the lifting support structure to lift and lower, and the second guide structure and the first guide structure are mutually limited and guided to ensure the lifting and lowering of the lifting support structure. The large-span beam to be installed supported on the beam supporting structure 4 The beam 6 can be lifted to the height of the required installation position, and the lateral pushing mechanism 5 can drive the beam support structure 4 to perform reciprocating linear motion on the lifting support structure, so that the large-span beam 6 to be installed can be lifted to the height of the required installation position and then be pushed laterally (horizontally) to the required installation position, so as to complete the auxiliary work before the installation of the large-span beam 6. The large-span beam 6 here is especially the main force-bearing member in the large-space and large-span main structure of the airport. In short, the large-span beam installation auxiliary equipment facilitates the automated operation of the lifting and lateral pushing of the large-span beam 6 to reach the required installation position, consumes very little manpower, and improves the installation efficiency of the large-span beam 6.
[0046] According to an embodiment of the present utility model, the gear drive mechanism includes a servo motor 7 and a gearbox 8 which are sequentially connected in transmission, and the output shaft of the gearbox 8 is connected to the gear 3.
[0047] According to a preferred embodiment of the utility model, the large-span beam installation auxiliary equipment also includes a horizontal laser 9 arranged on the beam support structure 4. A laser receiver 10 can be set at a height corresponding to the installation elevation of the large-span beam 6 to detect the horizontal laser emitted by the horizontal laser 9. If the laser receiver 10 receives the horizontal laser emitted by the horizontal laser 9, it means that the large-span beam 6 has reached the required elevation, thereby facilitating the large-span beam installation auxiliary equipment to achieve the purpose of efficiently and accurately assisting the installation of the large-span beam 6.
[0048] According to a preferred embodiment of the utility model, the large-span beam installation auxiliary equipment also includes a leveling support structure arranged on the beam support structure 4, which is used to adjust the inclination angle of the large-span beam 6 located on the beam support structure 4. The large-span beam installation auxiliary equipment also includes an inclination sensor 11 that can be placed on the large-span beam 6 located on the beam support structure 4, so that the horizontality (inclination angle) of the large-span beam 6 to be installed can be detected according to the inclination sensor 11, and then the installed large-span beam 6 can be adjusted to the required horizontality through the leveling support structure, thereby ensuring the subsequent installation accuracy (horizontality) of the large-span beam 6.
[0049] According to a preferred embodiment of the utility model, the leveling support structure is a leveling bolt 12 which is threadedly connected to the beam support structure 4 and protrudes from the upper surface of the beam support structure 4. For example, when the large-span beam 6 is a beam with a T-shaped cross-section, when the T-shaped beam is arranged horizontally, the head 61 of the T-shaped beam contacts and is supported on the beam support structure 4, and the vertical portion 62 of the T-shaped beam is spaced from the beam support structure 4. The upper end of the leveling bolt 12 contacts and supports the vertical portion 62, and the inclination angle of the T-shaped beam can be adjusted by screwing the leveling bolt 12 to lift and lower it.
[0050] According to one embodiment of the utility model, the rack 2 is located on the first side of the mounting base 1, the first guide structure is located on the second side of the mounting base 1, and the first side of the mounting base 1 and the second side of the mounting base 1 are back to back with each other, so the gear 3 is also located on the first side of the mounting base 1 due to the engagement with the rack 2, and the second guide structure is also located on the second side of the mounting base 1 due to the mutual limiting guidance with the first guide structure, so that the gear 3 and the second guide structure can form a certain clamping effect on the mounting base 1 on both sides of the mounting base 1, thereby improving the stability of the lifting support structure installed on the mounting base 1. Of course, the positions of the rack 2 and the first guide structure on the mounting base 1 can also be flexibly designed.
[0051] According to an embodiment of the present utility model, the number of the racks 2 is 2, and the two racks 2 are arranged in parallel and spaced apart from each other; the number of the first guide structures is 2, and the two first guide structures are arranged in parallel and spaced apart from each other.
[0052] In addition, the large-span beam installation auxiliary equipment also includes a supporting inclined beam 13 connected between the first side of the installation base 1 and the walking support mechanism 100, which can improve the stability of the large-span beam installation auxiliary equipment and prevent it from tipping over. The walking support mechanism 100 can specifically include a base 101 and walking wheels 102 arranged on the base 101. The installation base 1 is arranged on the base 101 and is located above the base 101. The walking wheels 102 make it easy for the base 101 to reach the desired installation position. The supporting inclined beam 13 is specifically connected between the first side of the installation base 1 and the base 101, and is arranged at a certain inclination angle (non-vertical and non-horizontal arrangement).
[0053] According to a specific embodiment of the utility model, the first guide structure is a guide rail 14 extending in a vertical direction, the second guide structure is a guide rail groove 201, and limited stop structures (such as stop blocks 19) are provided at both upper and lower ends of the guide rail 14 to prevent the guide rail groove 201 from separating from the guide rail 14 in the vertical direction. The lifting support structure may specifically include a lifting seat 15, an L-shaped connecting plate 300 and a guide block 200. The L-shaped connecting plate 300 includes a first plate 301 and a second plate 302 connected to each other at right angles. The lifting seat 15, the first plate 301 and the guide block 200 are connected in sequence, specifically by a bolt structure. The guide rail groove 201 may be formed on the guide block 200, the crossbeam support structure 4 and the lateral pushing mechanism 5 are arranged on the lifting seat 15, and the gear drive mechanism is installed on the second plate 302. Of course, the utility model is not limited to the specific structural forms listed above.
[0054] According to an embodiment of the utility model, a slide rail 16 is installed on the lifting support structure, the beam support structure 4 is a beam support arm that can be horizontally slidably installed on the slide rail 16, and the lateral pushing mechanism 5 is an electric push rod, which is respectively connected to the lifting support structure and the beam support structure 4. The number of slide rails 16 is 2, and the two slide rails 16 are arranged parallel to each other and spaced apart. The number of beam support arms is 2, and the two beam support arms are arranged parallel to each other and spaced apart. The large-span beam 6 to be installed is supported on the two beam support arms. The slide rail 16 is specifically installed on the lifting seat 15, and one end of the electric push rod is connected to the lifting seat 15. The two ends of the two beam support arms are connected to the base 15, and the other end is connected to the beam support arm. A horizontal laser instrument 9 can be installed on the sides of the two beam support arms facing away from each other, and correspondingly, two laser receivers 10 can be set at a certain horizontal distance on the outside of the two beam support arms. Specifically, a horizontal sliding track 18 can be installed on the two structural columns 17 on the outside of the two beam support arms. The laser receiver 10 can be a laser receiver 10 of a target 20 that can be horizontally slidably installed on each horizontal sliding track 18. The laser receiver 10 can be locked by a screw after the horizontal sliding track 18 slides to the desired position along the horizontal direction.
[0055] See also Figure 1 and Figure 2 , Figures 7 to 10 According to one embodiment of the utility model, the working process of the large-span beam installation auxiliary device can be:
[0056] 1. Place the large-span beam 6 to be installed on two beam supports, and place an inclination sensor 11 on the large-span beam 6. The inclination of the large-span beam 6 is detected by the inclination sensor 11 to ensure that the inclination of the large-span beam 6 is within the allowable range. If not, use the leveling bolts 12 to level the large-span beam 6.
[0057] 2. According to the predetermined elevation line (for example, 0.5 meter elevation H1), mark this elevation on the structural column 17.
[0058] 3. A horizontal sliding track 18 is installed at a height of 0.5 meters of the structural column 17, and the laser receiver 10 with the target 20 is installed on the horizontal sliding track 18 and locked by screws.
[0059] 4. The laser receiver 10 moves on the horizontal sliding track 18 to a position where the elevation is 0.5 meters and intersects with the vertical line direction of the horizontal laser instrument 9, and the screw 2 fixes the laser receiver 10 in place.
[0060] 5. The gear drive mechanism drives the gear 3 to operate, and the lifting support structure is lifted up with the large-span beam 6. When the horizontal laser instrument 9 on the side of the two beam support arms emits laser, the laser receiver 10 does not receive the laser and issues an alarm. The lifting support structure continues to move upward until it reaches 0.5 meters, when the laser receiver receives the laser and the alarm stops. If the two laser transmitters on the left and right do not stop the alarm at the same time.
[0061] 6. The laser receiver 10 is installed to the specified elevation H2, the laser transmitter is turned on, and the previous steps are repeated. The lifting support structure continues to move upward. The laser receiver 10 does not receive the laser and an alarm is issued. The lifting support structure continues to move upward.
[0062] 7. When the specified elevation H2 is reached, the laser receiver receives the laser and the alarm stops.
[0063] 8. The laser receiver 10 is adjusted on the horizontal sliding track 18 to the vertical line (the indoor edge line L where the beam is scheduled to be installed) of the calibration point of the large-span beam 6.
[0064] 9. The electric push rod pushes the beam support arm to push the large-span beam 6 toward the inner side of the indoor edge line L where the beam is scheduled to be installed (i.e., the side of the indoor edge line L where the beam is scheduled to be installed away from the large-span beam installation auxiliary equipment), and the horizontal laser instrument 9 is turned on. If the laser receiver 10 does not receive the laser before reaching the scheduled installation position, the alarm continues. If the laser receiver 10 receives the laser when reaching the scheduled position, the alarm stops. The large-span beam 6 to be installed has been pushed to the scheduled elevation.
[0065] 10. Push the long-span beam 6 to the expected installation position and connect it with the installed beam 21 (i.e., the beam installed on the structural column 17).
[0066] The above description is only an optional embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A large-span beam installation auxiliary device, characterized in that: include: A walking support mechanism and a mounting base arranged on the walking support mechanism, wherein the walking support mechanism is used to support the mounting base and drive the mounting base to move; A rack and a first guide structure are arranged on the mounting base, and the rack and the first guide structure both extend in a vertical direction; A lifting support structure and a second guide structure, a gear driving mechanism, a beam support structure and a lateral pushing mechanism arranged on the lifting support structure, the beam support structure is used to support a large-span beam to be installed, the second guide structure and the first guide structure limit and guide each other, the gear driving mechanism is connected with a gear, the gear is meshed with the rack, the gear driving mechanism can drive the gear to rotate to move up and down on the rack in the vertical direction, so that the lifting support structure can move up and down in the vertical direction under the limit guidance of the second guide structure and the first guide structure, and the lateral pushing mechanism can drive the beam support structure to reciprocate linearly on the lifting support structure.
2. The large-span beam installation auxiliary equipment according to claim 1, characterized in that: The large-span beam installation auxiliary equipment also includes a horizontal laser instrument arranged on the beam support structure.
3. The large-span beam installation auxiliary equipment according to claim 2, characterized in that: The large-span beam installation auxiliary equipment also includes a leveling support structure arranged on the beam support structure, which is used to adjust the inclination angle of the large-span beam located on the beam support structure. The large-span beam installation auxiliary equipment also includes an inclination sensor that can be placed on the large-span beam located on the beam support structure.
4. The large-span beam installation auxiliary equipment according to claim 3 is characterized in that: The leveling support structure is a leveling bolt that is threadedly connected to the beam support structure and protrudes from an upper surface of the beam support structure.
5. The long-span beam installation auxiliary device according to any one of claims 1 to 4, characterized in that: The rack is located on a first side of the mounting base, the first guide structure is located on a second side of the mounting base, and the first side of the mounting base and the second side of the mounting base are opposite to each other.
6. The large-span beam installation auxiliary equipment according to claim 5, characterized in that: The number of the racks is 2, and the two racks are arranged in parallel and spaced apart from each other. The number of the first guide structures is 2, and the two first guide structures are arranged in parallel and spaced apart from each other.
7. The large-span beam installation auxiliary device according to claim 5, characterized in that: The large-span beam installation auxiliary device also includes a supporting inclined beam connected to the first side of the installation base and the walking support mechanism.
8. The long-span beam installation auxiliary device according to any one of claims 1 to 4, characterized in that: The first guide structure is a guide rail extending in a vertical direction, and the second guide structure is a guide rail groove. Both upper and lower ends of the guide rail are provided with limited stop structures to prevent the guide rail groove from being separated from the guide rail in a vertical direction.
9. The long-span beam installation auxiliary device according to any one of claims 1 to 4, characterized in that: The lifting support structure is equipped with a slide rail, the beam support structure is a beam support arm that can be horizontally slidably installed on the slide rail, the lateral pushing mechanism is an electric push rod, and the electric push rod is respectively connected to the lifting support structure and the beam support structure. The number of the slide rails is 2, and the two slide rails are arranged parallel to each other and spaced apart. The number of the beam support arms is 2, and the two beam support arms are arranged parallel to each other and spaced apart. The large-span beam to be installed is supported on the two beam support arms.
10. The long-span beam installation auxiliary device according to any one of claims 1 to 4, characterized in that: The walking support mechanism comprises a base and walking wheels arranged on the base, and the mounting base is arranged on the base and located above the base.