Building engineering management device based on BIM

By introducing a fast moving mechanism and cooling system of motors and screws into the construction engineering management device, the equipment usage efficiency and heat dissipation problems are solved, and convenient operation and efficient cooling of equipment are achieved.

CN222283788UActive Publication Date: 2024-12-31GUANGDONG YUXIN CONSTRUCTION MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420819137.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-12-31
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

The existing construction engineering management devices need to be manually moved when in use, which increases workload and reduces efficiency. Long-term use causes heat to electronic components and may cause equipment damage.

Method used

A BIM-based construction engineering management device was designed, using motor and screw drive device to quickly move to the outside of the box, and effectively dissipate heat through the cooling box and pump system, using the combination of cooling plate and copper sheet for heat conduction and Circulate heat dissipation.

Benefits of technology

The device is quickly moved and efficiently dissipated, reducing the workload of users and avoiding equipment damage caused by heat accumulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222283788U_ABST
    Figure CN222283788U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of constructional engineering, and particularly relates to a BIM (Building Information Modeling)-based constructional engineering management device, which comprises a box body, an inner cavity of the box body is fixedly connected with a positioning frame, an inner cavity of the positioning frame is fixedly connected with a fixing disc, the lower end of the fixing disc is fixedly connected with a motor, an output shaft of the motor is fixedly connected with a main gear, the surface of the main gear is in meshed connection with a plurality of auxiliary gears, and inner cavities of the auxiliary gears are in threaded connection with lead screws. The lower ends of the auxiliary gears are movably connected with an inner cavity of the fixing disc through rotating pairs, and the upper end of the lead screw is fixedly connected with a heat dissipation assembly. And when the equipment needs to be used, the engineering management device body can be conveniently and quickly moved to the outside of the box body through cooperative use of structures such as a motor and a lead screw, so that a user can conveniently operate the equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction engineering, in particular to a construction engineering management device based on BIM. Background Art

[0002] BIM, Chinese name is Building Information Model. It takes the relevant information data of the construction project as the basis of the model to establish the building model, and simulates the real information of the building through digital information simulation. It has eight characteristics: information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and mappability.

[0003] Among the current existing technologies, BIM technology is a digital tool used in engineering design, construction, and management. By integrating the digital and information models of buildings, they are shared and transmitted throughout the entire life cycle of project planning, operation, and maintenance. This enables engineering and technical personnel to correctly understand and efficiently respond to various building information, providing a basis for collaborative work for design teams and all construction entities including construction and operating units, and plays an important role in improving production efficiency, saving costs, and shortening construction periods.

[0004] The existing engineering management devices are mainly placed inside a box to achieve the effect of protecting it. When in use, the user is required to manually move the device to the outside of the box. However, the above method not only increases the workload of the user, but also reduces the working efficiency of the device. When the construction engineering management device is used for a long time, the internal electronic components will generate heat, causing the device to heat up. If effective heat dissipation is not obtained, the device is easily damaged. Therefore, a construction engineering management device based on BIM is proposed to address the above problems. Utility Model Content

[0005] In order to make up for the deficiencies of the prior art and solve at least one technical problem raised in the background technology, the utility model proposes a construction project management device based on BIM.

[0006] The technical solution adopted by the utility model to solve its technical problems is: the utility model described in a BIM-based construction project management device comprises a box body; the inner cavity of the box body is fixedly connected with a positioning frame, the inner cavity of the positioning frame is fixedly connected with a fixed disk, the lower end of the fixed disk is fixedly connected with a motor, the output shaft of the motor is fixedly connected with a main gear, the surface of the main gear is meshingly connected with a plurality of sub-gears, the inner cavity of the sub-gear is threadedly connected with a screw rod, the lower ends of the sub-gears are movably connected with the inner cavity of the fixed disk through a rotating pair, the upper end of the screw rod is fixedly connected with a heat dissipation component, and the upper end of the heat dissipation component is fixedly connected with the project management device body.

[0007] Preferably, the heat dissipation assembly includes two cooling boxes, wherein the upper end of one of the cooling boxes is fixedly connected to a water pump, one end of the water pump is fixedly connected to a delivery pipe, the upper end of the delivery pipe is fixedly connected to a cooling plate, the lower end of the engineering management device body is fixedly connected to the upper end of the cooling plate, the lower end of the cooling plate is fixedly connected to a circulation pipe, the lower end of the circulation pipe is fixedly connected to the upper end of the other cooling box, the inner cavity of the cooling plate is fixedly connected to a plurality of copper sheets, and the upper ends of the copper sheets are in contact with the engineering management device body.

[0008] Preferably, the lower end of the cooling box is fixedly connected to the inner cavity of the box body, one end of the water pump is fixedly connected to the inner wall of the box body, and the delivery pipe and the circulation pipe are both telescopic hoses.

[0009] Preferably, the lower end of the box is provided with universal wheels and telescopic fixed feet, there are four universal wheels, the upper ends of the four universal wheels are hingedly connected to the four corners of the lower end of the box, and the upper ends of the telescopic fixed feet are fixedly connected to the lower end of the box.

[0010] Preferably, an observation window is inlaid on the front end of the box body, and a box door is hinged on the upper end of the box body.

[0011] Preferably, a limiting ring is fixedly connected to the surface of the motor, and one end of the limiting ring is fixedly connected to the fixing plate.

[0012] Preferably, a fixing block is fixedly connected to the upper end of the positioning frame, and opposite sides of two fixing blocks are fixedly connected to the inner cavity of the box body.

[0013] Beneficial effects of the utility model:

[0014] 1. The utility model provides a construction project management device based on BIM. By using the above-mentioned structure in combination, the utility model has the following beneficial effects: when the device needs to be used, the construction project management device body can be quickly moved to the outside of the box through the coordinated use of structures such as a motor and a screw rod, thereby facilitating the user to operate.

[0015] 2. The utility model provides a BIM-based construction project management device. By using the above-mentioned structure in combination, it solves the problem that the internal electronic components of the existing construction project management device will generate heat when used for a long time, causing the equipment to heat up, and the equipment will easily be damaged if effective heat dissipation is not obtained. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0017] Figure 1 It is an overall stereogram of the utility model;

[0018] Figure 2 It is a schematic diagram of the structure in the utility model when viewed from above;

[0019] Figure 3 It is a cross-sectional structural schematic diagram of the utility model;

[0020] Figure 4 It is a schematic diagram of the circulation pipe structure in the utility model;

[0021] Figure 5 It is a schematic diagram of the screw rod structure in the utility model.

[0022] Legend:

[0023] 1. Box body; 2. Positioning frame; 3. Fixed plate; 4. Motor; 5. Main gear; 6. Sub gear; 7. Screw; 8. Engineering management device body; 9. Cooling box; 10. Water pump; 11. Delivery pipe; 12. Cooling plate; 13. Circulation pipe; 14. Copper sheet; 15. Universal wheel; 16. Telescopic fixed foot; 17. Observation window; 18. Box door; 19. Limiting ring; 20. Fixed block. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] Specific examples are given below.

[0026] See also Figure 1 - Figure 5The utility model provides a BIM-based construction engineering management device, comprising a box body 1; a positioning frame 2 is fixedly connected to the inner cavity of the box body 1, a fixing plate 3 is fixedly connected to the inner cavity of the positioning frame 2, a motor 4 is fixedly connected to the lower end of the fixing plate 3, a main gear 5 is fixedly connected to the output shaft of the motor 4, a plurality of auxiliary gears 6 are meshedly connected to the surface of the main gear 5, a screw rod 7 is threadedly connected to the inner cavity of the auxiliary gear 6, the lower end of the auxiliary gear 6 is movably connected to the inner cavity of the fixing plate 3 through a rotating pair, a heat dissipation component is fixedly connected to the upper end of the heat dissipation component, and the engineering management device is fixedly connected to the upper end of the heat dissipation component Main body 8. When it is necessary to move the main body 8 of the engineering management device to the outside of the box body 1, the starting motor 4 drives the main gear 5 to rotate, and the main gear 5 drives the sub-gear 6 to rotate. The inner cavity of the sub-gear 6 is provided with a threaded groove, and the threaded groove is used to rotate and drive the screw rod 7 to move the main body 8 of the engineering management device to the outside of the box body 1. By using the above-mentioned structure in combination, the utility model has the following beneficial effects. When the equipment needs to be used, the motor 4 and the screw rod 7 and other structures are used in combination, so that the main body 8 of the engineering management device can be quickly moved to the outside of the box body 1, thereby facilitating the user to operate.

[0027] Further, such as Figure 4 and Figure 5 As shown, the heat dissipation assembly includes two cooling boxes 9, wherein the upper end of one cooling box 9 is fixedly connected to a water pump 10, one end of the water pump 10 is fixedly connected to a delivery pipe 11, the upper end of the delivery pipe 11 is fixedly connected to a cooling plate 12, the lower end of the engineering management device body 8 is fixedly connected to the upper end of the cooling plate 12, the lower end of the cooling plate 12 is fixedly connected to a circulation pipe 13, the lower end of the circulation pipe 13 is fixedly connected to the upper end of another cooling box 9, the inner cavity of the cooling plate 12 is fixedly connected to a plurality of copper sheets 14, the upper end of the copper sheet 14 is in contact with the engineering management device body 8, and when the engineering management device body 8 is in use, the water pump 10 is started to extract the coolant inside the cooling box 9 and deliver it to The inside of the delivery pipe 11 has a good thermal conductivity due to the copper sheet 14, which delivers the heat dissipated by the engineering management device body 8 to the cooling plate 12, and then the coolant circulates inside the cooling plate 12 to offset the heat. The coolant delivered to the inside of the cooling plate 12 is delivered to the inside of the cooling box 9 again through the circulation pipe 13. The two cooling boxes 9 are connected by a pipeline. Such circulation makes it convenient to dissipate the heat of the engineering management device body 8. The use of the above-mentioned structure solves the problem that the internal electronic components of the existing construction engineering management device will generate heat when used for a long time, causing the equipment to heat up, and the equipment is easily damaged when effective heat dissipation is not obtained.

[0028] Further, such as Figure 2As shown, the lower end of the cooling box 9 is fixedly connected to the inner cavity of the box body 1, one end of the water pump 10 is fixedly connected to the inner wall of the box body 1, the delivery pipe 11 and the circulation pipe 13 are both telescopic hoses, and the box body 1 is used to limit the cooling box 9 to prevent the position of the cooling box 9 from moving when the equipment is in use. The delivery pipe 11 and the circulation pipe 13 are telescopic pipes, so that the lengths of the delivery pipe 11 and the circulation pipe 13 can be easily adjusted when the engineering management device body 8 is raised or lowered.

[0029] Further, such as Figure 1 and Figure 2 As shown, the lower end of the box body 1 is provided with a universal wheel 15 and a telescopic fixed foot 16, the number of the universal wheels 15 is four, the upper ends of the four universal wheels 15 are connected to the four corner hinges of the lower end of the box body 1, and the upper ends of the telescopic fixed feet 16 are fixedly connected to the lower end of the box body 1. By setting the universal wheel 15 and the telescopic fixed foot 16 for coordinated use, the effect of facilitating the rapid movement and fixation of the device when the device is in use is achieved.

[0030] Further, such as Figure 1 As shown, an observation window 17 is embedded in the front end of the box body 1, and a box door 18 is hinged at the upper end of the box body 1. When it is necessary to observe the interior of the device, the observation window 17 is used to observe the interior of the box body 1.

[0031] Further, such as Figure 5 As shown, a limit ring 19 is fixedly connected to the surface of the motor 4, and one end of the limit ring 19 is fixedly connected to the fixed plate 3. The limit ring 19 is used to reinforce the motor 4 and the fixed plate 3 to prevent the position of the motor 4 from being offset when it is working.

[0032] Further, such as Figure 3 As shown, the upper end of the positioning frame 2 is fixedly connected with a fixing block 20, and the opposite sides of the two fixing blocks 20 are fixedly connected to the inner cavity of the box body 1. The fixing blocks 20 are used to reinforce the positioning frame 2 and the box body 1, thereby achieving the effect of limiting the positioning frame 2 when the equipment is in use.

[0033] Working principle: when it is necessary to move the engineering management device body 8 to the outside of the box body 1, the motor 4 is started to drive the main gear 5 to rotate, and the main gear 5 is used to drive the sub-gear 6 to rotate. The inner cavity of the sub-gear 6 is provided with a thread groove, and the thread groove is used to rotate and drive the screw rod 7 to move the engineering management device body 8 to the outside of the box body 1. By using the above structure in combination, the utility model has the following beneficial effects. When the device needs to be used, the motor 4 and the screw rod 7 and other structures are used in combination, so that the engineering management device body 8 can be quickly moved to the outside of the box body 1, thereby It is convenient for users to operate. When the engineering management device body 8 is used, the water pump 10 is started to extract the coolant inside the cooling box 9 and transport it to the inside of the delivery pipe 11. The copper sheet 14 has a good thermal conductivity and transports the heat dissipated by the engineering management device body 8 to the cooling plate 12. The coolant circulates inside the cooling plate 12 to offset the heat. The coolant transported to the inside of the cooling plate 12 is transported to the inside of the cooling box 9 again through the circulation pipe 13. The two cooling boxes 9 are connected by a pipeline. This circulation is convenient for The engineering management device body 8 is cooled. The above-mentioned structure is used in combination to solve the problem that the internal electronic components of the existing construction engineering management device will generate heat when used for a long time, causing the equipment to heat up, and the equipment is easily damaged when effective heat dissipation is not obtained. The box body 1 is used to limit the cooling box 9 to prevent the position of the cooling box 9 from moving when the equipment is in use. The delivery pipe 11 and the circulation pipe 13 are telescopic pipes, so that when the engineering management device body 8 is lifted, the length of the delivery pipe 11 and the circulation pipe 13 can be adjusted. By setting the universal wheel 15 and the telescopic fixed foot 16, the equipment can be quickly moved and fixed when the equipment is in use. When it is necessary to observe the inside of the equipment, the observation window 17 is used to observe the inside of the box body 1. The limiting ring 19 is used to reinforce the motor 4 and the fixed plate 3 to prevent the problem of displacement of the position of the motor 4 when it is working. The fixing block 20 is used to reinforce the positioning frame 2 and the box body 1, so as to achieve the effect of limiting the positioning frame 2 when the equipment is in use.

[0034] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, and these changes and improvements fall within the scope of the utility model to be protected.

Claims

1. A BIM-based construction project management device, comprising a box (1); characterized in that: The inner cavity of the box body (1) is fixedly connected to a positioning frame (2), the inner cavity of the positioning frame (2) is fixedly connected to a fixing plate (3), the lower end of the fixing plate (3) is fixedly connected to a motor (4), the output shaft of the motor (4) is fixedly connected to a main gear (5), the surface of the main gear (5) is meshingly connected to a plurality of auxiliary gears (6), the inner cavity of the auxiliary gear (6) is threadedly connected to a screw rod (7), the lower end of each auxiliary gear (6) is movably connected to the inner cavity of the fixing plate (3) via a rotating pair, the upper end of the screw rod (7) is fixedly connected to a heat dissipation component, and the upper end of the heat dissipation component is fixedly connected to a body (8) of the engineering management device.

2. A BIM-based construction project management device according to claim 1, characterized in that: The heat dissipation component includes two cooling boxes (9), wherein the upper end of one cooling box (9) is fixedly connected to a water pump (10), one end of the water pump (10) is fixedly connected to a delivery pipe (11), the upper end of the delivery pipe (11) is fixedly connected to a cooling plate (12), the lower end of the engineering management device body (8) is fixedly connected to the upper end of the cooling plate (12), the lower end of the cooling plate (12) is fixedly connected to a circulation pipe (13), the lower end of the circulation pipe (13) is fixedly connected to the upper end of the other cooling box (9), the inner cavity of the cooling plate (12) is fixedly connected to a plurality of copper sheets (14), and the upper ends of the copper sheets (14) are in contact with the engineering management device body (8).

3. A BIM-based construction project management device according to claim 2, characterized in that: The lower end of the cooling box (9) is fixedly connected to the inner cavity of the box body (1), one end of the water pump (10) is fixedly connected to the inner wall of the box body (1), and the delivery pipe (11) and the circulation pipe (13) are both telescopic hoses.

4. A BIM-based construction project management device according to claim 1, characterized in that: The lower end of the box body (1) is provided with a universal wheel (15) and a telescopic fixed foot (16), the number of the universal wheels (15) is four, the upper ends of the four universal wheels (15) are hingedly connected to the four corners of the lower end of the box body (1), and the upper ends of the telescopic fixed foot (16) are fixedly connected to the lower end of the box body (1).

5. The BIM-based construction project management device according to claim 1, characterized in that: The front end of the box body (1) is inlaid with an observation window (17), and the upper end of the box body (1) is hinged with a box door (18).

6. A BIM-based construction project management device according to claim 1, characterized in that: A limiting ring (19) is fixedly connected to the surface of the motor (4), and one end of the limiting ring (19) is fixedly connected to the fixed disk (3).

7. A BIM-based construction project management device according to claim 1, characterized in that: The upper end of the positioning frame (2) is fixedly connected to a fixing block (20), and opposite sides of the two fixing blocks (20) are fixedly connected to the inner cavity of the box body (1).