Vertical edge occlusion metal roof structure of TPO waterproof composite board
Through the vertical edge of the TPO waterproof composite panel, combined with the metal roof panel, waterproof layer and force-holding layer, the problems of water leakage and insufficient strength of the insulation material in the details of the metal roof are solved, and the waterproof and insulation performance are significantly improved.
Patent Information
- Application Number
- CN202421103191.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-21
- Publication Date
- 2025-01-03
- Estimated Expiration
- 2034-05-21
AI Technical Summary
Metal roofs are prone to leakage in detailed structural positions, especially the winding materials in the corners of the yin and yang, through roofs and gutter water droplets, etc., which makes it difficult to fit the base surface and are not easy to weld, resulting in difficult to ensure waterproof performance and insufficient structural strength of the insulation material.
The vertical edge joint metal roof structure adopts TPO waterproof composite panels, including metal roof panels, stainless steel fastener fixed noise reduction layer, waterproof layer, leveling layer, force-holding layer, keel square tube, support square tube and reinforcement mechanism, through these layers The combination improves the roof waterproofness and structural strength of the insulation layer.
The waterproof performance of the metal roof is significantly enhanced, and the structural strength of the insulation layer is improved by burying the reinforcement board in the insulation layer, ensuring the overall waterproof and insulation performance of the roof.
Smart Images

Figure CN222295485U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building curtain walls, in particular to a standing edge biting metal roof structure of a TPO waterproof composite board. Background Art
[0002] In the current metal roof structure, metal roof refers to a roofing form that uses metal plates as roofing materials and combines the structural layer and the waterproof layer into one. There are many types of metal plates, including galvanized plates, aluminum-zinc plates, aluminum alloy plates, aluminum-magnesium alloy plates, titanium alloy plates, copper plates, stainless steel plates, etc. The surface of the plate can be treated with baking varnish, mainly including four types of baking varnish treatments: PE / PE, SMP / PE, HDP\PE, and PVDF\PE. Baking varnish can increase the service life of the plate, which are 5-8 years, 10-15 years, 15-20 years, and more than 20-25 years, respectively. When the metal roof material is processed and manufactured using materials such as aluminum-manganese-magnesium alloy, the roof at the detailed structural position will easily leak, because the coiled materials at the corners, through the roof, and the gutter downspout, overflow port, etc. are difficult to fit the base surface and are not easy to weld, the waterproof performance is difficult to ensure, and the structural strength of the thermal insulation material is insufficient. In view of the above problems, the inventor proposes a vertical edge bite metal roof structure of a TPO waterproof composite panel to solve the above problems. Utility Model Content
[0003] In order to solve the problem that the roof in the detailed structural position of the metal roof is prone to leakage, the roll materials at the corners, roof penetrations, gutter downspouts, overflow outlets and other parts are difficult to fit the base surface and are difficult to weld, the waterproof performance is difficult to ensure, and the structural strength of the thermal insulation material is insufficient; the purpose of the utility model is to provide a standing edge bite metal roof structure of a TPO waterproof composite panel.
[0004] In order to solve the above technical problems, the utility model adopts the following technical scheme: a standing edge bite metal roof structure of a TPO waterproof composite board, comprising a metal roof panel, a noise reduction layer is fixedly provided at the bottom of the metal roof panel through a stainless steel fastener, a waterproof layer is fixedly provided at the bottom of the noise reduction layer, a leveling layer is fixedly provided at the bottom of the waterproof layer, a bearing layer is fixedly provided at the bottom of the leveling layer, keel square tubes are symmetrically fixedly provided at both sides of the bottom of the bearing layer, a plurality of supporting square tubes are fixedly provided at one side of the keel square tube, a thermal insulation layer is fixedly provided at the center of the bottom of the bearing layer, and a plurality of reinforcing mechanisms are provided at the other side of the keel square tube.
[0005] Preferably, the reinforcement mechanism includes a first fixing plate, one side of the first fixing plate is fixedly matched with the other side of the keel square tube by a plurality of first bolts, a plurality of first reinforcement plates are fixedly arranged on the other side of the first fixing plate, and a plurality of second reinforcement plates are fixedly arranged on both sides of the first reinforcement plate.
[0006] Preferably, the bearing layer is made of waterproof composite corrugated steel plate.
[0007] Preferably, the thermal insulation layer is made of thermal insulation cotton.
[0008] Preferably, an angle bracket is fixedly provided on one side of the supporting square tube, and a second bolt is threadedly provided on one end of the angle bracket.
[0009] Preferably, the leveling layer is made of galvanized leveling steel plate.
[0010] Preferably, the waterproof layer is made of a self-adhesive waterproof membrane.
[0011] Preferably, the noise reduction layer is made of a ventilated noise reduction mesh.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. This utility model utilizes metal roof panels, waterproof layers and bearing layers, which can significantly enhance the waterproofness of metal roof structures;
[0014] 2. The present invention utilizes the first reinforcing plate and the second reinforcing plate, and buries the two in the thermal insulation layer, which can significantly improve the structural strength of the thermal insulation layer. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model.
[0017] Figure 2 It is a schematic diagram of the cross-sectional structure of the utility model.
[0018] Figure 3 It is a schematic diagram of the longitudinal structure of the utility model.
[0019] Figure 4 It is a schematic diagram of the connection structure between the keel square tube and the reinforcement mechanism of the utility model.
[0020] Figure 5 It is a schematic diagram of the strengthening mechanism structure of the utility model.
[0021] In the figure: 1. Metal roof panel; 2. Noise reduction layer; 3. Waterproof layer; 4. Leveling layer; 5. Bearing layer; 6. Keel square tube; 7. Support square tube; 8. Insulation layer; 9. Reinforcement mechanism; 901. First fixing plate; 902. First bolt; 903. First reinforcement plate; 904. Second reinforcement plate; 10. Angle code; 11. Second bolt. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example: Figure 1-5 As shown, the utility model provides a vertical edge bite metal roof structure of a TPO waterproof composite board, comprising a metal roof panel 1, a noise reduction layer 2 is fixedly arranged at the bottom of the metal roof panel 1 through a stainless steel fastener, a waterproof layer 3 is fixedly arranged at the bottom of the noise reduction layer 2, a leveling layer 4 is fixedly arranged at the bottom of the waterproof layer 3, a bearing layer 5 is fixedly arranged at the bottom of the leveling layer 4, keel square tubes 6 are symmetrically fixedly arranged at both sides of the bottom of the bearing layer 5, a plurality of supporting square tubes 7 are fixedly arranged at one side of the keel square tube 6, a thermal insulation layer 8 is fixedly arranged at the center of the bottom of the bearing layer 5, and a plurality of reinforcing mechanisms 9 are arranged at the other side of the keel square tube 6.
[0024] The reinforcing mechanism 9 includes a first fixing plate 901 , one side of the first fixing plate 901 is fixedly matched with the other side of the keel square tube 6 by a plurality of first bolts 902 , a plurality of first reinforcing plates 903 are fixedly arranged on the other side of the first fixing plate 901 , and a plurality of second reinforcing plates 904 are fixedly arranged on both sides of the first reinforcing plate 903 .
[0025] By adopting the above technical solution, the first reinforcing plate 903 and the second reinforcing plate 904 are buried in the thermal insulation layer 8 , so as to increase the structural strength of the thermal insulation layer 8 .
[0026] The bearing layer 5 is made of waterproof composite corrugated steel plate.
[0027] By adopting the above technical solution, the waterproof composite corrugated steel sheet has better waterproof performance and can improve the waterproof performance of the entire metal roof structure.
[0028] The heat-insulating layer 8 is made of heat-insulating cotton.
[0029] By adopting the above technical solution, the thermal conductivity of the thermal insulation cotton is low, which can prevent the temperature from being conducted in during the summer and the indoor heat from being lost during the winter.
[0030] An angle bracket 10 is fixedly provided on one side of the supporting square tube 7 , and a second bolt 11 is threadedly provided on one end of the angle bracket 10 .
[0031] By adopting the above technical solution, the second bolt 11 can be tightened to fix the angle bracket 10 and the supporting square tube 7.
[0032] The leveling layer 4 is made of galvanized leveling steel plate.
[0033] By adopting the above technical solution, the galvanized leveling steel plate can level the entire roof.
[0034] The waterproof layer 3 is made of a self-adhesive waterproof membrane.
[0035] By adopting the above technical solution, the self-adhesive waterproof membrane can prevent rainwater from leaking.
[0036] The noise reduction layer 2 is made of a ventilated noise reduction mesh.
[0037] By adopting the above technical solution, the ventilation noise reduction mesh can reduce the transmission effect of outdoor noise.
[0038] Working Principle: When the metal roof structure needs to be installed and fixed, it needs to be carried out according to the following steps:
[0039] (1) Installation of angle steel 10 and second bolts 11: a. At the intersection of the divided grid, use an electric hammer (existing equipment) to drill holes required for the installation of the second bolts 11 (do not penetrate the concrete layer, two holes at each intersection); b. Fix the angle steel 10 with the second bolts 11; c. Weld the supporting square tube 7 to the angle code 10;
[0040] (2) Installation of the keel square tube 6: a. Transport the keel square tube 6 to the required roof according to the required quantity and size; b. Weld the keel square tube 6 to the supporting square tube 7;
[0041] (3) Installation process of the insulation layer 8: a. Check the specifications, quantity, thickness, packaging, and moisture conditions. Unqualified ones, especially those that have been exposed to rain, must be cleared or processed. Thickness measurement: The insulation cotton is fully compressed after being rolled and packaged. The thickness can be measured after the insulation cotton is fully rebounded after being unrolled and patted or rolled over for more than 4 hours; b. The storage site should be in a warehouse, which should be kept dry and equipped with windproof, rainproof and fireproof facilities. When temporarily stacked on site, the surface should be covered with fireproof cloth and fire-fighting equipment should be provided; c. The materials are lifted to the roof by installing a fixed pulley on the roof. The insulation materials transported to the roof should be used up at the same time to avoid large-scale stacking; d. The insulation cotton should be close to the surface of the base layer, the plane joints should be squeezed and tightly joined, and the joints of the upper and lower layers should be staggered; when the roof slope is large, it is advisable to use metal or plastic special fixings to fix the insulation cotton to the base layer; once the insulation cotton is filled, people are not allowed to step on it;
[0042] (4) Installation process of the bearing layer 5: a. The length of the bearing layer 5 is measured by the engineers at the construction site, and the measured values of each part are summarized as a bearing layer 5 processing order, which is then handed over to the factory for processing; b. The bearing layer 5 is transported to the construction site, and then moved to the roof operation area by a combination of manual and mechanical methods, and stacked in the material area, paying attention to rain and waterproof measures; c. Before installation, the bearing layer 5 installation control line must be popped out according to the bearing layer 5 panel design drawing to control the installation position, and it must be laid above the roof keel square tube 6, and then fixed to the keel square tube 6 with self-tapping screws; d. The laying time of the bearing layer 5 The distance must meet the design requirements, and the connection and fixation with the keel square tube 6 should be reliably anchored. When fixing the laid bearing layer 5 with self-tapping screws, the self-tapping screws should be on a horizontal line and checked with a ruler. Any error exceeding 8mm should be re-trimmed and fixed so that the exposed screws will naturally become a straight line when they are straight and an arc when they are curved, with a smooth transition; e. The longitudinal overlap length between each bearing layer 5 shall not be less than 80mm, and the horizontal overlaps shall be a wave crest. If a large gap occurs when the plates contact each other, aluminum rivets should be used to properly tighten them; f. The installed bearing layer 5 has tight joints, straight joints, reliable anchoring, and a straight longitudinal and transverse overlap, and the plate surface is flat and clean;
[0043] (5) Installation of leveling layer 4: a. After the leveling layer 4 is sent to the site from the factory, pay attention to the amount of each roof when hoisting on site; b. The leveling layer 4 and the bearing layer 5 are fixed with rivets at a spacing of 250mm*500mm; c. Each board from top to bottom of the bearing layer 5 must be overlapped; d. The bearing layer 5 should be flat after construction;
[0044] (6) Installation of waterproof layer 3: a. Deliver 1.5 mm thick double-sided waterproof layer 3 to the construction site; b. Deliver as many as needed to the roof, and then transport it to the installation site manually for paving; c. Before installing the waterproof layer 3, clean the debris on the leveling layer 4, and then lay the waterproof layer 3 on it. It must be fully laid without missing or underlaying, and the corners must still be laid tightly; d. When the roof slope is greater than 25%, the waterproof layer 3 is fixed by full bonding and nailing. The waterproof layer 3 is laid parallel to the ridge, and the upper and lower waterproof layers 3 are not The waterproof layers 3 parallel to the ridge should be laid vertically. The overlapping seams of the waterproof layers 3 parallel to the ridge should be in the direction of the water flow. The overlapping seams of the short sides of the two adjacent waterproof layers 3 should be staggered and should not be less than 100mm. The overlapping seams of the long sides should be staggered and should not be less than 100mm. When laying the waterproof layer 3, the isolation paper at the bottom of the self-adhesive should be completely torn off. The air under the waterproof layer 3 should be exhausted and the waterproof layer 3 should be rolled and pasted firmly. The rolled material should be smooth and straight, the overlapping size should be accurate, and it should not be twisted or wrinkled. When constructing at low temperature, the joints should be heated with hot air and then pasted immediately.
[0045] (7) Installation of noise reduction layer 2: The 6 mm noise reduction layer is installed together with the metal roof panel 1. Before installing the metal roof panel 1, the noise reduction layer 2 is laid flat on the 1.5 mm waterproof layer 3. The laying should be smooth and no gaps should be left;
[0046] (8) Installation of metal roof panels 1: a. Put the metal roof panels 1 in place. When installing the metal roof panels 1, place each panel in the correct position according to the detailed construction drawing. The male buckle of the panel must be completely hooked by the stainless steel fastener. There should be no missing buckle that is not connected to the fixed locking plate. When laying the metal roof panels 1, lay the noise reduction layer 2 first. During the installation of the metal roof panels 1, do not walk on the unfixed metal roof panels 1. For safety reasons, the metal roof panels 1 must be locked immediately after being fastened to achieve composite force and enhance its bearing capacity. b. Installation of stainless steel fasteners: The metal roof panels 1 are connected to the leveling layer 4 by stainless steel fasteners. The fasteners are fixed by 2 aluminum rivets. The roof is installed from the parapet or the middle direction according to the design, and the installation direction is from the large side to the small side. Each panel is measured and laid first, and then fixed on the small side with stainless steel fasteners at a spacing of 400mm. The large side of the next metal roof panel 1 bites the small side of the previous metal roof panel 1 and then fixes the small side of the next metal roof panel 1. In this project, each stainless steel fastener needs 2 screws. In addition, the number of stainless steel fasteners determines the wind resistance of the metal roof panel 1. Therefore, the number of stainless steel fasteners along the length of the board should be strictly installed according to the design drawings, and no missing or insufficient installation is allowed; c. Metal roof Edge locking of board 1: The use of the metal roof board 1 locking machine (existing equipment) should be matched with its board. The tension adjustment device should be checked frequently during edge locking. The edge locking machine can be checked to see if it is working properly by measuring the diameter of the board rib after edge locking. When locking the edge of the metal roof board 1, a worker first walks along the bite of the boards in front, fastening the female buckle of the upper board and the male buckle of the lower board while walking; the next person uses a biter to manually bite the metal roof board 1 tightly. For this project, the key to the quality of edge locking lies in whether the overlapping edges are tightly joined with strong force during the edge biting process. The metal roof board 1 in place on the same day must complete the edge biting to ensure that it is done at night. The panels installed during the evening wind will not be damaged by bad weather; d. Setting of the fixing points of the metal roof panel 1: The setting of the fixing points of the metal roof panel 1 is very important, because after the stainless steel fasteners are engaged with the metal roof panel 1, the metal roof panel 1 can still slide relative to the stainless steel fasteners. In order to prevent the installed roof from sliding down, after fixing it to the stainless steel fasteners, use scissors to cut the small edge of the metal roof panel 1 above the stainless steel fasteners and roll it back on the stainless steel fasteners, and then engage it with the large edge of the next metal roof panel 1 to prevent the metal roof panel 1 from sliding down due to weather reasons. Each panel should be fixed at 2-3 points depending on its length and slope.
[0047] The first reinforcing plate 903 and the second reinforcing plate 904 are buried in the thermal insulation layer 8 , so as to significantly improve the structural strength of the thermal insulation layer 8 .
[0048] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A standing seam metal roof structure of a TPO waterproof composite board, comprising a metal roof panel (1), characterized in that: A noise reduction layer (2) is fixedly provided at the bottom of the metal roof panel (1) via stainless steel fasteners, a waterproof layer (3) is fixedly provided at the bottom of the noise reduction layer (2), a leveling layer (4) is fixedly provided at the bottom of the waterproof layer (3), a bearing layer (5) is fixedly provided at the bottom of the leveling layer (4), keel square tubes (6) are symmetrically fixedly provided at both sides of the bottom of the bearing layer (5), a plurality of supporting square tubes (7) are fixedly provided at one side of the keel square tube (6), a thermal insulation layer (8) is fixedly provided at the center of the bottom of the bearing layer (5), and a plurality of reinforcing mechanisms (9) are provided at the other side of the keel square tube (6).
2. A standing seam metal roof structure of TPO waterproof composite board as claimed in claim 1, characterized in that: The reinforcing mechanism (9) comprises a first fixing plate (901), one side of the first fixing plate (901) being fixedly matched with the other side of the keel square tube (6) via a plurality of first bolts (902), a plurality of first reinforcing plates (903) being fixedly arranged on the other side of the first fixing plate (901), and a plurality of second reinforcing plates (904) being fixedly arranged on both sides of the first reinforcing plate (903).
3. The standing seam metal roof structure of TPO waterproof composite board according to claim 1, characterized in that: The bearing layer (5) is made of a waterproof composite corrugated steel plate.
4. The standing seam metal roof structure of TPO waterproof composite board according to claim 1, characterized in that: The thermal insulation layer (8) is made of thermal insulation cotton.
5. The standing seam metal roof structure of TPO waterproof composite board according to claim 1, characterized in that: An angle bracket (10) is fixedly provided on one side of the supporting square tube (7), and a second bolt (11) is threadedly provided on one end of the angle bracket (10).
6. The standing seam metal roof structure of TPO waterproof composite board according to claim 1, characterized in that: The leveling layer (4) is made of galvanized leveling steel plate.
7. The standing seam metal roof structure of TPO waterproof composite board according to claim 1, characterized in that: The waterproof layer (3) is made of a self-adhesive waterproof coiled material.
8. The standing seam metal roof structure of TPO waterproof composite board according to claim 1, characterized in that: The noise reduction layer (2) is made of a ventilation noise reduction wire mesh.