Multi-stage adsorption assembly of waste gas recovery tower
By designing multi-stage adsorption components in the exhaust gas recovery tower, using filter mesh, barrier mesh and activated carbon adsorption layer for multiple adsorption, and promoting the regeneration and utilization of adsorbents through electrical heating and fan, the problem of limited effect of a single adsorbent is solved. Improves the efficiency and sustainability of exhaust gas treatment.
Patent Information
- Application Number
- CN202420821224.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2025-01-07
- Estimated Expiration
- 2034-04-19
AI Technical Summary
The adsorption components of the existing exhaust gas recovery tower use a single adsorbent, which has limited adsorption effect and is difficult to recycle and use. It is difficult to replace the adsorbent in time when the equipment is closed, which affects the treatment effect.
A multi-stage adsorption assembly is designed, including a lower filter, a barrier net, an activated carbon adsorption layer, an electric heater and a fan. The harmful substances are released through multi-stage adsorption and heating, and the adsorbent is recycled and utilized, and the adsorbent is rinsed through the flushing disk and nozzle. Carry out components cleaning and maintenance.
The multi-stage adsorption effect is achieved, the service life of the adsorbent is extended, the efficiency and sustainability of waste gas treatment are improved, and the inconvenience caused by saturation of the adsorbent is avoided.
Smart Images

Figure CN222305257U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of waste gas treatment components, in particular to a multi-stage adsorption component of a waste gas recovery tower. Background Art
[0002] In the process of industrial production, the emission of waste gas is an important issue. In order to protect the environment and achieve sustainable development, the recovery and treatment of waste gas has become crucial. At present, when the waste gas is treated, the waste gas is usually introduced into the corresponding waste gas recovery tower outside for treatment. The waste gas recovery tower generally uses liquid medicine to spray from the nozzle to treat the waste gas and achieve the effect of neutralizing the dust and impurities in the waste gas.
[0003] In addition, in order to improve the treatment effect of waste gas, the waste gas recovery towers on the market usually use filters for filtering and adsorption operations. However, most of the adsorption components on the waste gas recovery towers use a single adsorbent for adsorption. The adsorption effect of a single adsorbent is limited and it is easy to saturate, which is not conducive to recycling. In addition, the waste gas recovery tower is generally closed, and it is difficult to replace the adsorbent in time. When the adsorbent is saturated, it will affect the adsorption effect, which brings inconvenience to the user. In view of this, we proposed a multi-stage adsorption component for the waste gas recovery tower. Utility Model Content
[0004] The utility model aims to provide a multi-stage adsorption component of a waste gas recovery tower to solve the defects mentioned in the above background technology.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] The multi-stage adsorption component of the waste gas recovery tower includes an adsorption cylinder, on the inner wall of which a lower filter screen and a blocking screen are fixedly installed in sequence from bottom to top, a flushing tray is arranged above the blocking screen, a plurality of ventilation cylinders for ventilation are fixedly installed between the upper and lower side plates of the flushing tray, ventilation holes are arranged in the ventilation cylinders, a water inlet pipe passing through the adsorption cylinder is fixedly installed on the flushing tray, a plurality of nozzles for flushing operations are fixedly installed on the bottom surface of the flushing tray, an activated carbon adsorption layer is arranged above the blocking screen, a fan is arranged between the blocking screen and the flushing tray, an electric heater is arranged between the fan and the blocking screen, a three-way pipe is fixedly installed on the top of the adsorption cylinder, and an electromagnetic three-way valve is arranged on the three-way pipe.
[0007] Preferably, a plurality of threaded holes communicating with the outside are provided on the bottom wall of the flushing tray, and the nozzles are threadedly connected to the threaded holes to facilitate the connection operation of the nozzles.
[0008] Preferably, a support ring is fixedly mounted on the bottom cylinder of the adsorption cylinder, and the support ring is fixedly mounted on the external exhaust gas treatment tower by a plurality of fastening bolts, so as to facilitate the fixation of the support ring and achieve the effect of fixing the adsorption cylinder.
[0009] Preferably, a plurality of support rods arranged in a ring shape with equal intervals are fixedly installed between the fan and the inner wall of the adsorption cylinder, and the support rods are used for supporting operation.
[0010] Preferably, the vent holes are used for air circulation between the upper and lower sides of the flushing tray, and the water inlet pipe is connected to the external pipe body for water delivery.
[0011] Preferably, an inspection cylinder is fixedly mounted on the cylinder body of the adsorption cylinder, and the inspection cylinder is used for inspection operations.
[0012] Preferably, a sealing disk is hinged on the front side of the inspection cylinder, and end plates are fixedly installed on the sides of the inspection cylinder and the sealing disk. The two end plates are fixedly connected by fastening bolts to facilitate sealing operations using the sealing disk to avoid exhaust gas leakage.
[0013] Preferably, a transparent plate is provided on the sealing disk, and the transparent plate is used for observation operation.
[0014] Compared with the prior art, the beneficial effects of the utility model are:
[0015] 1. The utility model performs a preliminary filtering and adsorption operation through a lower filter screen, performs a secondary adsorption operation through a blocking screen, and performs a tertiary adsorption operation through an activated carbon adsorption layer, thereby completing a multi-stage adsorption operation. In addition, an electric heater and a fan are provided, and heating is performed by the electric heater, and air is supplied by the fan, thereby promoting the timely discharge of harmful substances adsorbed on the blocking screen and the activated carbon adsorption layer, so that the blocking screen and the activated carbon adsorption layer can be recycled, thereby achieving the effect of multi-stage adsorption and promoting the recycling of adsorption components.
[0016] 2. The utility model provides a flushing plate and a nozzle, and can utilize water to be sprayed from the nozzle to flush the lower filter screen, thereby achieving the effect of removing impurities on the lower filter screen. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is one of the overall structural diagrams of the utility model;
[0018] Figure 2 This is the second schematic diagram of the overall structure of the utility model;
[0019] Figure 3 It is a cross-sectional view of the adsorption cylinder of the utility model;
[0020] Figure 4 It is a cross-sectional view of the flushing plate of the utility model.
[0021] The meaning of each number in the figure is:
[0022] 1. Adsorption cylinder; 10. Lower filter screen; 11. Flushing plate; 12. Ventilator; 121. Ventilation hole; 13. Threaded hole; 14. Nozzle; 15. Water inlet pipe; 16. Blocking net; 17. Activated carbon adsorption layer; 18. Three-way pipe; 181. Solenoid three-way valve; 19. Support ring;
[0023] 2. Fan; 20. Support rod;
[0024] 3. Electric heater;
[0025] 4. Inspection cylinder; 40. Sealing plate; 41. Transparent plate; 42. End plate. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] See also Figure 1-Figure 4 The utility model provides a technical solution: a multi-stage adsorption component of an exhaust gas recovery tower comprises an adsorption cylinder 1, on the inner wall of the adsorption cylinder 1 are fixedly mounted a lower filter screen 10 and a blocking screen 16 in sequence from bottom to top, a flushing plate 11 is arranged above the blocking screen 16, a plurality of ventilating cylinders 12 for ventilation are fixedly mounted between the upper and lower side plates of the flushing plate 11, a vent hole 121 is arranged in the ventilating cylinder 12, a water inlet pipe 15 passing through the adsorption cylinder 1 is fixedly mounted on the flushing plate 11, the vent hole 121 is used for the circulation operation of the air on the upper and lower sides of the flushing plate 11, so as to ensure that the exhaust gas can be normally transported upward, the water inlet pipe 15 is connected to the external pipe body for water transport operation, a plurality of nozzles 14 for flushing operation are fixedly mounted on the bottom surface of the flushing plate 11, so that water can be transported to the nozzle 14 and sprayed outward, so as to realize the flushing operation on the lower filter screen 10, and achieve the effect of removing impurities on the lower filter screen 10;
[0028] Specifically, an activated carbon adsorption layer 17 is arranged above the blocking net 16, a fan 2 is arranged between the blocking net 16 and the flushing disk 11, and an electric heater 3 is arranged between the fan 2 and the blocking net 16. The electric heater 3 heats the activated carbon adsorption layer 17 to promote the discharge of harmful gases adsorbed on the activated carbon adsorption layer 17 so that the activated carbon adsorption layer 17 can be regenerated and reused; a three-way pipe 18 is fixedly installed on the top of the adsorption cylinder 1, and an electromagnetic three-way valve 181 is arranged on the three-way pipe 18, so that one of the tube bodies of the three-way pipe 18 can be used to discharge the treated gas, and the other tube body can be used to discharge the harmful gases released from the activated carbon adsorption layer 17 to the external harmful gas treatment equipment for treatment.
[0029] In this embodiment, a plurality of threaded holes 13 communicating with the outside are provided on the bottom wall of the flushing tray 11 , and the nozzles 14 are threadedly connected to the threaded holes 13 , so as to facilitate the connection operation of the nozzles 14 .
[0030] Specifically, a support ring 19 is fixedly installed on the bottom cylinder of the adsorption cylinder 1, and the support ring 19 is fixedly installed on the top of the external exhaust gas treatment tower by multiple fastening bolts, which is convenient for fixing the support ring 19 and achieving the effect of fixing the adsorption cylinder 1.
[0031] Furthermore, a plurality of support rods 20 arranged in a ring shape and at equal intervals are fixedly installed between the fan 2 and the inner wall of the adsorption cylinder 1, and the support rods 20 are used for supporting operation.
[0032] In addition, an inspection cylinder 4 is fixedly mounted on the cylinder body of the adsorption cylinder 1, and the inspection cylinder 4 is used for inspection operations.
[0033] It is worth mentioning that a sealing plate 40 is hinged on the front side of the inspection cylinder 4, and end plates 42 are fixedly installed on the sides of the inspection cylinder 4 and the sealing plate 40. The two end plates 42 are fixedly connected by fastening bolts, which facilitates the sealing operation using the sealing plate 40 to avoid leakage of exhaust gas.
[0034] It is worth noting that a transparent plate 41 is provided on the sealing disk 40 . The transparent plate 41 is made of a transparent material and is used for observation operations.
[0035] When the multi-stage adsorption assembly of the waste gas recovery tower of the utility model is in use, after the waste gas enters along the bottom end of the adsorption cylinder 1, the waste gas will sequentially pass through the lower filter screen 10, the barrier screen 16 and the activated carbon adsorption layer 17 for adsorption operation, and the purified air after adsorption treatment is discharged from a tube body of the three-way pipe 18;
[0036] In addition, the water inlet pipe 15 is connected to an external water source, and after the water enters the flushing tray 11, it can be sprayed out from the nozzle 14 to realize the flushing operation on the lower filter screen 10;
[0037] In addition, when it is necessary to perform processing operations on the activated carbon adsorption layer 17, the electromagnetic three-way valve 181 is controlled to connect the vertical section of the three-way pipe 18 with another horizontal pipe. At this time, the electric heater 3 is connected to the external power supply and made to work, and the electric heater 3 starts to heat. The fan 2 is connected to the external power supply and made to work, and the fan 2 starts to supply air. After the hot air passes through the activated carbon adsorption layer 17, it can promote the release of harmful impurities absorbed on the activated carbon adsorption layer 17, and is discharged outward along the horizontal section of the three-way pipe 18 to the corresponding harmful gas treatment equipment for processing operations.
[0038] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A multi-stage adsorption assembly of a waste gas recovery tower, comprising an adsorption cylinder (1), characterized in that: A lower filter screen (10) and a blocking screen (16) are fixedly mounted on the inner wall of the adsorption cylinder (1) in order from bottom to top; a flushing tray (11) is arranged above the blocking screen (16); a plurality of ventilation cylinders (12) for ventilation are fixedly mounted between upper and lower side plates of the flushing tray (11); ventilation holes (121) are arranged in the ventilation cylinders (12); a water inlet pipe (15) passing through the adsorption cylinder (1) is fixedly mounted on the flushing tray (11); and the flushing tray A plurality of nozzles (14) for flushing operations are fixedly mounted on the bottom surface of the adsorption cylinder (11); an activated carbon adsorption layer (17) is arranged above the blocking net (16); a fan (2) is arranged between the blocking net (16) and the flushing disk (11); an electric heater (3) is arranged between the fan (2) and the blocking net (16); a three-way pipe (18) is fixedly mounted on the top end of the adsorption cylinder (1); and an electromagnetic three-way valve (181) is arranged on the three-way pipe (18).
2. The multi-stage adsorption assembly of the waste gas recovery tower according to claim 1 is characterized in that: A plurality of threaded holes (13) communicating with the outside are provided on the bottom wall of the flushing plate (11), and the nozzles (14) are threadedly connected to the threaded holes (13).
3. The multi-stage adsorption assembly of the waste gas recovery tower according to claim 1 is characterized in that: A support ring (19) is fixedly mounted on the bottom cylinder of the adsorption cylinder (1), and the support ring (19) is fixedly mounted on the external exhaust gas treatment tower via a plurality of fastening bolts.
4. The multi-stage adsorption assembly of the waste gas recovery tower according to claim 1 is characterized in that: A plurality of support rods (20) arranged in a ring shape and at equal intervals are fixedly mounted between the fan (2) and the inner wall of the adsorption cylinder (1), and the support rods (20) are used for supporting operation.
5. The multi-stage adsorption assembly of the waste gas recovery tower according to claim 1 is characterized in that: The vent holes (121) are used for air circulation operations on the upper and lower sides of the flushing tray (11), and the water inlet pipe (15) is connected to the external pipe body for water delivery operations.
6. The multi-stage adsorption assembly of the waste gas recovery tower according to claim 1, characterized in that: A maintenance cylinder (4) is fixedly mounted on the cylinder body of the adsorption cylinder (1), and the maintenance cylinder (4) is used for maintenance operations.
7. The multi-stage adsorption assembly of the waste gas recovery tower according to claim 6, characterized in that: A sealing disc (40) is hingedly connected to the front side of the inspection cylinder (4) via a hinge, and end plates (42) are fixedly mounted on the sides of the inspection cylinder (4) and the sealing disc (40), and the two end plates (42) are fixedly connected via fastening bolts.
8. The multi-stage adsorption assembly of the waste gas recovery tower according to claim 7, characterized in that: A transparent plate (41) is provided on the sealing disk (40), and the transparent plate (41) is used for observation operations.