Modular concrete curing device based on climbing frame
Through the modular concrete curing device based on climbing frames, the time-consuming and labor-intensive problem of traditional maintenance methods is solved by time-consuming and labor-intensive, achieving low-cost and efficient maintenance effects, and avoiding quality problems such as concrete cracking.
Patent Information
- Application Number
- CN202420799730.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-17
- Publication Date
- 2025-01-14
- Estimated Expiration
- 2034-04-17
AI Technical Summary
Traditional concrete curing methods are time-consuming and labor-intensive, and are prone to missing maintenance and insufficient maintenance time, resulting in quality problems such as concrete cracking.
A modular concrete curing device based on climbing frame is designed, including support blocks, spray components, main risers and intelligent controllers. The spray head is sprayed with timed control to spray water for maintenance, simplifying the construction process and reducing labor costs. .
It achieves convenient construction, low maintenance cost and high turnover, ensures on-time and efficient maintenance results, and avoids quality problems such as concrete cracking.
Smart Images

Figure CN222350291U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, and in particular relates to a modular concrete curing device based on a climbing frame. Background Art
[0002] After concrete is poured, moisturizing maintenance should be carried out in time. Moisturizing maintenance can be carried out by sprinkling water, covering, spraying curing agents, etc.
[0003] The curing time of concrete watering is generally not less than 7 days. When retarder is added, the curing time shall not be less than 14 days. Special personnel must be arranged to carry out watering curing to keep the concrete surface moist at all times. The number of watering per day should be enough to keep the concrete in a sufficiently lubricated state. Water at least three times a day at room temperature, once in the morning, noon and evening. Covering curing should be carried out on the exposed surface of the concrete covered with plastic film, plastic film plus sack, or plastic film plus straw mat. Sufficient moisture should be maintained inside the plastic film. Spraying curing agent should be carried out on the exposed surface of the concrete. The coverage should be dense and no leaks should be allowed.
[0004] Therefore, the traditional concrete curing method is time-consuming and labor-intensive. In the highly centralized assembly line operation mode, there are often problems such as missing maintenance and insufficient curing time. It is easy for quality problems such as concrete cracking to occur due to inadequate maintenance. Therefore, it is necessary to provide a new modular concrete curing device based on a climbing frame to solve the above technical problems. Utility Model Content
[0005] The technical problem solved by the utility model is to provide a modular concrete curing device based on a climbing frame that solves the concrete curing problem under the operation of an aluminum formwork climbing frame system, adopts a timing control method, is convenient to construct, has a low maintenance cost, and has extremely high turnover. After installation, it does not require too much labor cost to maintain timely and efficient maintenance effects.
[0006] To solve the above technical problems, the utility model provides a modular concrete curing device based on a climbing frame, comprising: four support blocks and a spray assembly, wherein the spray assembly comprises a support plate, two limit plug rods, a climbing frame main pipe one, two arc-shaped blocks, a turnover bracket, a spray head, a climbing frame main pipe two and an intelligent controller, wherein the support plate is arranged between the four support blocks, the support plate and the corresponding two support blocks are connected and fixed by two limit plug rods, the climbing frame main pipe one is arranged on the top of the support plate, the two arc-shaped blocks are both arranged on the top of the support plate and matched with the support plate, the two arc-shaped blocks are fixed to the support plate by bolts, the turnover bracket is fixedly installed on the climbing frame main pipe one and is connected to the climbing frame main pipe one, the spray head is fixedly installed on the turnover bracket and is connected to the turnover bracket, the climbing frame main pipe two is fixedly installed on the climbing frame main pipe one, and the intelligent controller is arranged on the climbing frame main pipe two.
[0007] As a further solution of the utility model, a base is installed on the bottom end of the main riser, and a limit insert is installed on the main riser, and the limit insert is compatible with the main pipe of the climbing frame.
[0008] As a further solution of the utility model, a same bottom plate is fixedly installed between the four support blocks, and a plurality of limit holes are provided on the support blocks, and the limit holes are adapted to the limit rods.
[0009] As a further solution of the utility model, one end of the main pipe of the climbing frame is connected to a connector, and the connector is connected to the faucet through a telescopic hose.
[0010] As a further solution of the utility model, two corresponding support blocks are provided with slide rails, and the same mesh plate is slidably mounted on the two slide rails.
[0011] Compared with the related art, the modular concrete curing device based on the climbing frame provided by the utility model has the following beneficial effects:
[0012] 1. The utility model solves the problem of concrete maintenance under the operation of the aluminum formwork climbing frame system. It adopts a timing control method, is convenient to construct, has low maintenance cost, and has extremely high turnover. After the installation is completed, it does not need to invest too much labor cost to maintain timely and efficient maintenance effects. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings.
[0014] Figure 1 The structure of the utility model is shown in FIG. Figure 1 ;
[0015] Figure 2 It is a schematic diagram of the assembly of the main vertical pipe, the base and the limit insert in the utility model;
[0016] Figure 3 The structure of the utility model is shown in FIG. Figure 2 .
[0017] In the figure: 1. Support block; 2. Support plate; 3. Limit plug rod; 4. Climbing frame main pipe 1; 5. Arc-shaped clamp block; 6. Turnaround bracket; 7. Sprinkler head; 8. Climbing frame main pipe 2; 9. Intelligent controller; 10. Main riser; 11. Base; 12. Limit plug cylinder; 13. Bottom plate; 14. Connector; 15. Slide rail; 16. Mesh plate. DETAILED DESCRIPTION
[0018] Please refer to Figure 1 , Figure 2 and Figure 3 ,in, Figure 1 The structure of the utility model is shown in FIG. Figure 1 ; Figure 2 It is a schematic diagram of the assembly of the main vertical pipe, the base and the limit insert in the utility model; Figure 3 The structure of the utility model is shown in FIG. Figure 2 The modular concrete curing device based on the climbing frame includes: four support blocks 1, a spray assembly and a main riser 10, the spray assembly includes a support plate 2, two limit plug rods 3, a climbing frame main pipe 1 4, two arc-shaped blocks 5, a turnover bracket 6, a spray head 7, a climbing frame main pipe 2 8 and an intelligent controller 9, the support plate 2 is arranged between the four support blocks 1, the support plate 2 and the corresponding two support blocks 1 are plugged and fixed by two limit plug rods 3, the climbing frame main pipe 1 4 is arranged on the top of the support plate 2, the two arc-shaped blocks 5 are arranged on the top of the support plate 2 and are adapted to the support plate 2, the two arc-shaped blocks 5 are fixed to the support plate 2 by bolts, the turnover bracket 6 is fixedly installed on the climbing frame main pipe 1 4 and communicated with the climbing frame main pipe 1 4, the spray head 7 is fixedly installed on the turnover bracket 6 and communicated with the turnover bracket 6, the climbing frame main pipe 2 8 is fixedly installed on the climbing frame main pipe 1 4, and the intelligent controller 9 is arranged on the climbing frame main pipe 2 8.
[0019] A base 11 is installed on the bottom end of the main riser 10, and a limit insert 12 is installed on the main riser 10. The limit insert 12 is compatible with the main trunk pipe 28 of the climbing frame. The main riser 10 can be selected as a round tube or a square tube.
[0020] A common bottom plate 13 is fixedly installed between the four support blocks 1 . A plurality of limit holes are provided on the support blocks 1 , and the limit holes are matched with the limit rods 3 .
[0021] One end of the climbing frame main pipe 4 is connected to a connector 14, and the connector 14 is connected to the faucet through a telescopic hose.
[0022] The two corresponding support blocks 1 are each provided with a slide rail 15 , and the same mesh plate 16 is slidably mounted on the two slide rails 15 .
[0023] The working principle of the modular concrete curing device based on the climbing frame provided by the utility model is as follows:
[0024] The first step: The climbing frame is composed of four support blocks 1, a support plate 2, two limit rods 3, two slide rails 15 and a mesh plate 16, and then the main riser 10 is installed. Then, the climbing frame main pipe 1 4 is installed on the support plate 2 through two arc-shaped blocks 5 and bolts, and the climbing frame main pipe 2 8 is connected to the climbing frame main pipe 1 4 (the turnover bracket 6 is connected to the valve, which is not shown in the figure). The intelligent controller 9 controls the opening and closing of the valve, so that water is sprayed through the sprinkler head 7 to perform concrete maintenance work, and the intelligent controller 9 can set a timer, and then regular maintenance can be performed to complete the concrete maintenance task. By pulling out the two support plates 2, the height of the support plate 2 can be adjusted, and by inserting the two support plates 2, the support plate 2 can be limited and fixed.
[0025] It should be noted that the equipment structure and drawings of the utility model mainly describe the principle of the utility model. In terms of the technology of the design principle, the settings of the power mechanism, power supply system and control system of the device are not fully described. On the premise that the technical personnel in this field understand the principle of the above utility model, the details of the power mechanism, power supply system and control system can be clearly known. The control method of the application document is automatic control through a controller, and the control circuit of the controller can be realized by simple programming by the technical personnel in this field;
[0026] The standard parts used therein can all be purchased from the market and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. The machinery, parts and equipment all adopt conventional models in the prior art, and the structures and principles of the components known to technical personnel in this field can be known by these technical personnel through technical manuals or through conventional experimental methods.
[0027] Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations or direct or indirect applications may be made to these embodiments without departing from the principles and spirit of the present invention. In other related technical fields, the scope of the present invention is defined by the attached claims and their equivalents, which are equally included in the scope of patent protection of the present invention.
Claims
1. A modular concrete curing device based on a climbing frame, characterized in that: include: Four support blocks, a spray assembly and a main riser, the spray assembly includes a support plate, two limit rods, a climbing frame main pipe one, two arc-shaped blocks, a turnover bracket, a spray head, a climbing frame main pipe two and an intelligent controller, the support plate is arranged between the four support blocks, the support plate and the corresponding two support blocks are fixed by two limit rods, the climbing frame main pipe one is arranged on the top of the support plate, the two arc-shaped blocks are arranged on the top of the support plate and are adapted to the support plate, the two arc-shaped blocks are fixed to the support plate by bolts, the turnover bracket is fixedly installed on the climbing frame main pipe one and is connected to the climbing frame main pipe one, the spray head is fixedly installed on the turnover bracket and is connected to the turnover bracket, the climbing frame main pipe two is fixedly installed on the climbing frame main pipe one, and the intelligent controller is arranged on the climbing frame main pipe two.
2. The modular concrete curing device based on the climbing frame according to claim 1 is characterized in that: A base is installed on the bottom end of the main riser, and a limit insert is installed on the main riser. The limit insert is compatible with the main pipe of the climbing frame.
3. The modular concrete curing device based on the climbing frame according to claim 1 is characterized in that: A common bottom plate is fixedly installed between the four support blocks. A plurality of limit plug holes are provided on the support blocks, and the limit plug holes are matched with the limit plug rods.
4. The modular concrete curing device based on the climbing frame according to claim 1 is characterized in that: One end of the main pipe of the climbing frame is connected with a connector, and the connector is connected to the faucet through a telescopic hose.
5. The modular concrete curing device based on the climbing frame according to claim 1 is characterized in that: Two corresponding support blocks are both provided with slide rails, and the same mesh plate is slidably mounted on the two slide rails.