Combined type mold bag filling body retaining wall

Through the active top-top design of the expansion bag body of the combined mold bag filling retaining wall, the problems of long construction cycle and leakage of slurry in traditional mine filling retaining walls are solved, and fast, safe and low-cost construction of retaining walls is achieved and the leakage of slurry is prevented by rapid, safe and low-cost retaining wall construction and prevention of leakage of slurry is achieved. Effect.

CN222363023UActive Publication Date: 2025-01-17赖伟
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421167545.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-27
Publication Date
2025-01-17
Estimated Expiration
2034-05-27

AI Technical Summary

Technical Problem

Traditional mine filling retaining walls have a long construction cycle, workers are exposed to dangerous environments for a long time, high material and labor costs, and it is difficult to achieve complete active top-up of mold bag filling retaining walls, which is prone to leakage of slurry.

Method used

The retaining wall is equipped with a combination mold bag filling body, including fixed columns and multi-layer mold bag filling body. The expansion bag is actively connected to the filling bag design, and the active connection of the retaining wall is realized by filling the filling slurry and performing pressure-keeping and extrusion. Top and prevent leakage.

Benefits of technology

It realizes rapid construction, low cost, high safety, and avoids leakage of slurry. It is suitable for mining methods for mining, reducing labor and material costs, and improving the construction efficiency and safety of retaining walls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222363023U_ABST
    Figure CN222363023U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of mine goaf filling, and discloses a combined type mold bag filling body retaining wall which comprises a fixed stand column and a plurality of layers of mold bag filling bodies stacked in sequence. The mold bag filling body comprises filling bags used for filling filling slurry, one sides of the filling bags are provided with filling bag feeding cuffs, and one sides of the multiple layers of filling bags are aligned and are connected with the fixed stand columns through binding bands respectively; the filling bag located on the uppermost layer is an expansion bag body active roof contact filling bag, an expansion bag body is arranged in the filling bag, an inner cavity of the filling bag is divided into a filling slurry filling area and an expansion bag body storage area, and an expansion bag body feeding pipe communicated with the expansion bag body is arranged outside the filling bag. The retaining wall can be directly constructed by using filling slurry, the labor intensity is low, the retaining wall construction cost is low, the construction efficiency is high, the safety is high, and the retaining wall can realize active roof contact and prevent slurry leakage due to the design of the active roof contact filling bag of the expansion bag body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of mine goaf filling, in particular to a combined mold bag filling body retaining wall. Background Art

[0002] The backfill mining method has been widely used in underground mining of metal mines, and the safe, efficient and cost-controlled backfill retaining wall construction method is still the direction of the industry's efforts. Due to the high danger of goaf areas, workers have poor safety when constructing backfill retaining walls in goaf areas. Once a safety accident occurs, it will seriously affect the normal production of the mine. Reducing the time required to construct backfill retaining walls means that workers are exposed to dangerous environments for a shorter time, which has significant safety significance. In addition, the backfill retaining wall construction method should be simple and convenient, otherwise the labor cost and material cost investment will be large, which is not conducive to the mine to control the backfill cost.

[0003] Traditional retaining walls used for underground filling in mines mainly include ordinary wooden retaining walls, brick retaining walls, concrete retaining walls and flexible retaining walls. These retaining wall processes are relatively complex, with long construction periods, and workers are exposed to the goaf for a long time, which is highly dangerous. The cost of retaining wall materials and labor is high, which leads to increased filling costs. At present, some retaining walls filled with mold bags have also appeared. After pouring the filler, it is difficult for such retaining walls filled with mold bags to achieve complete active connection under the action of gravity. There are often gaps at the connection point, which is prone to leakage. Utility Model Content

[0004] In view of the above problems, the utility model provides a combined mold bag filling body retaining wall, which can directly construct the retaining wall using the filling slurry. It has low labor intensity, low retaining wall construction cost, high construction efficiency and high safety. Moreover, due to the design of the expansion bladder actively connecting to the top of the filling bag, the retaining wall can be actively connected to the top to prevent leakage of slurry. It is suitable for mine filling mining method and the construction of a closed retaining wall at the outlet of the space to be filled.

[0005] The technical solution of the utility model is as follows:

[0006] A combined mold bag filling body retaining wall, which includes a plurality of fixed columns arranged in parallel and a plurality of layers of mold bag filling bodies stacked in sequence; the mold bag filling body includes a filling bag for pouring filling slurry, a filling bag feeding cuff is provided on one side of the filling bag, and one end of the filling bag feeding cuffs of several layers of the filling bags are aligned and respectively connected to the fixed columns by straps; the filling bag located on the uppermost layer is an expansion bladder active top filling bag, an expansion bladder is provided at one end of the filling bag away from its filling bag feeding cuff, so that the inner cavity of the filling bag is divided into a filling slurry filling area and an expansion bladder storage area, and an expansion bladder feeding pipe connected to the expansion bladder is provided on the outside of the filling bag.

[0007] In a further technical solution, the height of each layer of the mold bag filling body is 0.1m-2m, and the width is the width of the mining field passage opening.

[0008] In a further technical solution, the length of the filling bags in the next layer is greater than or equal to the length of the filling bags in the previous layer.

[0009] In a further technical solution, the length of the mold bag filling body located at the uppermost layer is not less than 0.2 m.

[0010] In a further technical solution, the expansion bladder and the filling bag are separate structures. After the mold bag filling body is solidified to reach the strength requirement, the gas or liquid in the expansion bladder is released, and the expansion bladder is taken out and reused.

[0011] In a further technical solution, the fixed column is a hydraulic column or a screw column, which is fixed between the top and bottom surfaces of the opening to be closed.

[0012] In a further technical solution, the filling bag is provided with cuffs penetrating through two sides thereof, and the cuffs are not connected to the inner cavity of the filling bag.

[0013] In a further technical solution, the filling bag is a membrane material that is permeable to water but impermeable to aggregate.

[0014] In a further technical solution, the expansion bladder is made of a water-impermeable and air-impermeable membrane material.

[0015] In a further technical solution, the binding strap is a braided flexible strap.

[0016] The working principle of the above technical solution is as follows:

[0017] The combined mold bag filling body retaining wall of the utility model is composed of a mold bag filling body formed by consolidation of filling slurry poured by N layers of filling bags. During construction, the fixed columns are first fixed between the top and bottom surfaces of the opening to be closed, and then the filling bags are laid in sequence on the side to be filled in the mining field, and the filling bags are aligned and arranged on the side of the tunnel wall. The filling slurry feeding pipeline is connected to the filling bag through the filling bag feeding cuff. After the filling slurry is poured, the filling bag feeding cuff is tied, and the filling bag is tied and fixed to the fixed column by a binding strap. The multi-layer mold bag filling body is aligned on the side of the maintenance tunnel and is stepped on the side of the space to be filled. Afterwards, the expansion bladder is inflated or filled with water after the filling slurry fills the filling slurry filling area, and the filling slurry filling area is squeezed under pressure to realize the active connection of the filling retaining wall to the top and prevent leakage.

[0018] In addition, through cuffs are provided on both sides of the filling bag body of the utility model, and the filling slurry pipeline leading to the space to be filled, the filling slurry dehydration pipeline, the filling area exhaust pipeline and other functional pipelines in the filling area can pass through the retaining wall through the cuffs.

[0019] The beneficial effects of the utility model are:

[0020] 1. The retaining wall can be directly constructed by using the filling slurry, which has low labor intensity, low retaining wall construction cost and high construction efficiency. The mold bag filling body serves as both the retaining wall and the filling material for the filling space, and the retaining wall sharing cost is low.

[0021] 2. It is possible to construct separation and closed retaining walls at any position to avoid the technical problem that the retaining wall is constructed close to the side of the mining area to be filled, which increases the width of the maintenance tunnel and causes the collapse of the maintenance tunnel.

[0022] 3. The constructed retaining wall is neatly arranged on one side of the maintenance tunnel, and has a good top connection effect. The filling retaining wall can play a role in supporting the maintenance tunnel, has good safety, and is convenient for blocking the openings of adjacent tunnels.

[0023] 4. The expansion bladder can actively connect to the top and the filling bag can maintain pressure and squeeze the filling slurry filling area, so as to realize the active and complete connection of the filling retaining wall to the top and prevent leakage.

[0024] 5. All fixed columns erected on the side of the maintenance tunnel can be recycled. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a structural schematic diagram of the combined mold bag filling body retaining wall described in the embodiment of the utility model;

[0026] Figure 2 yes Figure 1 Schematic diagram of the structure in the AA direction;

[0027] Figure 3 yes Figure 1 Schematic diagram of the structure in the middle BB direction;

[0028] Figure 4 yes Figure 2 Schematic diagram of the structure in the CC direction;

[0029] Figure 5 It is a schematic diagram of the structure of the expansion bladder actively connecting to the top filling bag according to the embodiment of the utility model.

[0030] Description of reference numerals:

[0031] 10. Mold bag filling body; 11. Filling bag; 12. Filling bag feed cuff; 13. Expansion bladder; 14. Expansion bladder feed pipe; 15. Binding strap; 20. Fixed column; 30. Maintenance tunnel; 31. Tunnel side wall; 32. Original side wall of the mine exit; 40. Space to be filled. DETAILED DESCRIPTION

[0032] The embodiments of the present utility model will be further described below in conjunction with the accompanying drawings.

[0033] Example:

[0034] A combined mold bag filling body retaining wall, such as Figure 1-Figure 5 As shown, the retaining wall includes a plurality of fixed columns 20 arranged in parallel and a plurality of layers of mold bag filling bodies 10 stacked in sequence; the mold bag filling body 10 includes a filling bag 11 for pouring filling slurry, a filling bag feeding cuff 12 is provided on one side of the filling bag 11, and one end of the filling bag feeding cuff 12 of several layers of the filling bags 11 is aligned and connected to the fixed columns 20 respectively by straps 15; the filling bag 11 located at the top layer is an expansion bladder active top filling bag, an expansion bladder 13 is provided at one end of the filling bag 11 away from its filling bag feeding cuff 12, so that the inner cavity of the filling bag 11 is divided into a filling slurry filling area and an expansion bladder storage area, and an expansion bladder feeding pipe 14 connected to the expansion bladder 13 is provided on the outside of the filling bag 11.

[0035] In another embodiment, the height of each layer of the mold bag filling body 10 is 0.1m-2m, and the width is the width of the mining field passage.

[0036] In another embodiment, if Figure 1 As shown, the length of the filling bags 11 in the next layer is greater than or equal to the length of the filling bags 11 in the previous layer.

[0037] In another embodiment, the length of the mold bag filling body 10 located at the uppermost layer is not less than 0.2 m.

[0038] In another embodiment, the expansion bladder 13 and the filling bag 11 are separate structures. After the mold bag filling body 10 is solidified to reach the strength requirement, the gas or liquid in the expansion bladder 13 is released, and the expansion bladder 13 is taken out and reused.

[0039] In another embodiment, the fixed column 20 is a hydraulic column or a screw column, which is fixed between the top and bottom surfaces of the opening to be closed.

[0040] In another embodiment, the filling bag 11 is provided with cuffs running through both sides thereof, and the cuffs are not connected to the inner cavity of the filling bag, and a filling slurry pipeline leading to the space to be filled 40, a filling slurry dehydration pipeline, a filling area exhaust pipeline, and other functional pipelines in the filling area pass through the cuffs and out of the retaining wall.

[0041] In another embodiment, the filling bag 11 is a membrane material that is permeable to water but impermeable to aggregate, such as geotextile.

[0042] In another embodiment, the expansion bladder 13 is a water-impermeable and air-impermeable membrane material, such as a PA nylon bag, a PP bag or a rubber airbag.

[0043] In another embodiment, the binding strap 15 is a braided flexible strap.

[0044] The combined mold bag filling body 10 retaining wall of the utility model is composed of a mold bag filling body 10 formed by consolidating the filling slurry poured by N layers of filling bags 11. During construction, the fixed column 20 is first fixed between the top and bottom surfaces of the opening to be closed, and then the filling bags 11 are laid on the side to be filled in the mining area in sequence. The filling bags 11 are aligned and arranged on the side of the tunnel wall 31, and the filling slurry feeding pipeline is connected to the filling bag 11 through the filling bag feeding cuff 12. After the filling slurry is poured, the filling bag feeding cuff 12 is tied, and the filling bag 11 is tied and fixed to the fixed column 20 by the strap 15. The multi-layer mold bag filling body 10 has an alignment surface on the side of the maintenance tunnel 30 and a stepped surface on the side of the space to be filled 40. Afterwards, the expansion bladder 13 is inflated with air or water after the filling slurry fills the filling slurry filling area, and the filling slurry filling area is squeezed under pressure to achieve active top connection of the filling retaining wall to prevent leakage.

[0045] In addition, through cuffs are provided on both sides of the bag body of the filling bag 11 of the present invention, and the filling slurry pipeline leading to the space to be filled 40, the filling slurry dehydration pipeline, the filling area exhaust pipeline and other functional pipelines in the filling area can pass through the retaining wall through the cuffs.

[0046] The above-mentioned embodiments only express the specific implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.

Claims

1. A combined mold bag filling body retaining wall, characterized in that: The retaining wall includes a plurality of fixed columns arranged in parallel and a plurality of layers of mold bag filling bodies stacked in sequence; the mold bag filling body includes a filling bag for pouring filling slurry, a filling bag feeding cuff is provided on one side of the filling bag, and one end of the filling bag feeding cuffs of several layers of the filling bags are aligned and connected to the fixed columns respectively by straps; the filling bag located on the uppermost layer is an expansion bladder active top filling bag, an expansion bladder is provided at one end of the filling bag away from its filling bag feeding cuff, so that the inner cavity of the filling bag is divided into a filling slurry filling area and an expansion bladder storage area, and an expansion bladder feeding pipe connected to the expansion bladder is provided on the outside of the filling bag.

2. The combined mold bag filling body retaining wall according to claim 1 is characterized in that: The height of each layer of the mold bag filling body is 0.1m-2m.

3. The combined mold bag filling body retaining wall according to claim 1 is characterized in that: The length of the filling bag in the next layer is greater than or equal to the length of the filling bag in the previous layer.

4. The combined mold bag filling body retaining wall according to claim 3 is characterized in that: The length of the mold bag filling body located at the uppermost layer is not less than 0.2m.

5. The combined mold bag filling body retaining wall according to claim 1 is characterized in that: The expansion bladder and the filling bag are separate structures.

6. The combined mold bag filling body retaining wall according to claim 1 is characterized in that: The fixed pillar is a hydraulic pillar or a screw pillar, which is fixed between the top and bottom surfaces of the opening to be closed.

7. The combined mold bag filling body retaining wall according to claim 1 is characterized in that: The filling bag is provided with cuffs which penetrate through two sides thereof, and the cuffs are not communicated with the inner cavity of the filling bag.

8. The combined mold bag filling body retaining wall according to claim 1 is characterized in that: The filling bag is a membrane material that is permeable to water but not permeable to aggregate.

9. The combined mold bag filling body retaining wall according to claim 1, characterized in that: The expansion bladder is made of a water-tight and air-tight membrane material.

10. The combined mold bag filling body retaining wall according to claim 1, characterized in that: The binding belt is a braided flexible belt.