Project cost progress management device
By designing an engineering cost progress management device including storage plate, slide chute and limit slot, the problem of existing devices needing to be disassembled during transportation is solved, the convenience and transportation efficiency are improved, and the loss of documents is avoided.
Patent Information
- Application Number
- CN202421228234.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2025-02-07
- Estimated Expiration
- 2034-05-31
AI Technical Summary
The existing engineering cost progress management device requires disassembly of brackets and display boards during transportation, resulting in poor convenience, low work efficiency, and easy file loss.
A project cost progress management device is designed, using components such as storage plates, slide chutes, display plates, limit slots and tensile springs. Through the cooperation of limit slots and slots, the display plates can be undisassembled without disassembly. It is loaded into the chute and is easy to carry and use through lifting rings and light strips.
It improves the convenience and transportation efficiency of the device, avoids the loss of documents, and enhances the practicality of progress management.
Smart Images

Figure CN222440156U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of engineering cost progress management, and more specifically, particularly relates to an engineering cost progress management device. Background Art
[0002] The major of construction cost is one of the popular majors newly established by the Ministry of Education in accordance with the needs of national economic and social development. It is an emerging discipline developed from the major of construction engineering management with economics, management and civil engineering as its theoretical basis. At present, almost all projects require a full budget from the start to the completion, including the start budget, project progress appropriation, project completion settlement, etc. Whether it is the owner or the construction unit, or a third-party cost consulting agency, they must have their own core budget personnel. Therefore, there is a great demand for talents in construction cost, and there are broad development opportunities.
[0003] When using the construction cost progress management device to manage the progress of the project, sometimes the staff needs to move the device from the office to the construction site for on-site inspection and measurement. When some current construction cost progress management devices are transported, the staff needs to disassemble the device's bracket, display board, paper and other components before transportation, which is less convenient and needs to be reassembled, affecting work efficiency. In addition, documents are easily lost during transportation, which affects progress management.
[0004] Therefore, in view of this, the existing structure and deficiencies are studied and improved, and a construction cost progress management device is provided to achieve a more practical purpose. Utility Model Content
[0005] In order to solve the above technical problems, the utility model provides a construction cost progress management device, which is achieved by the following specific technical means:
[0006] A construction cost progress management device comprises a storage plate, a slide groove is provided at the top of the storage plate, a display plate is slidably installed in the slide groove, a display groove is provided on one side of the display plate, an electronic display board is installed on one side of the display groove, and a plurality of placement plates are installed on the other side of the display groove, a placement groove is provided on the top of the placement plate, a pair of limit grooves are penetrated at the upper and lower ends of the display groove, a pair of tension springs are symmetrically installed at the top of one side of the storage plate, a movable plate is installed on one side of the pair of tension springs, a limit plate is installed on one side of the movable plate at a position between the pair of tension springs, and the limit plate penetrates one side of the storage plate and is slidably connected to the storage plate.
[0007] Furthermore, the size of the limiting plate matches the size of the limiting groove.
[0008] Furthermore, a clamping groove is provided on one side of the slide groove at a position parallel to the limiting plate.
[0009] Furthermore, the size of the card slot matches the size of the limiting plate.
[0010] Furthermore, a lifting ring is installed on the top of the display board.
[0011] Furthermore, a light strip is installed on the top of one side of the storage plate.
[0012] Furthermore, a storage box is installed on one side of the storage plate.
[0013] Compared with the prior art, the utility model has the following beneficial effects:
[0014] The construction cost progress management device in the utility model uses a storage plate, a slide groove, a display plate, a display groove, an electronic display board, a placement plate, a placement groove, a limit groove, a tension spring, a movable plate, a limit plate, a card slot, a pull ring, a light belt and a storage box in coordination. When the carrying device needs to be transported, the movable plate is pulled and the display plate is stored in the slide groove. The display plate is fixed by the limit of the limit plate, the limit groove and the card slot. When the display plate is used, the display plate is pulled out of the slide groove and supported by the limit plate, thereby improving the convenience of the construction cost progress management device and the work efficiency during carrying and transportation, and also avoiding the loss of documents during carrying. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a three-dimensional schematic diagram when the display board of the utility model is folded.
[0016] Figure 2 It is a three-dimensional explosion schematic diagram of the utility model.
[0017] Figure 3 It is a top sectional schematic diagram of the utility model.
[0018] Figure 4 The utility model Figure 2 Enlarged schematic diagram of part A.
[0019] Figure 5 The utility model Figure 3 Schematic diagram of the enlarged portion B.
[0020] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:
[0021] 1. Storage board; 2. Slide; 3. Display board; 4. Display slot; 5. Electronic display board; 6. Placement board; 7. Placement slot; 8. Limiting slot; 9. Tension spring; 10. Movable board; 11. Limiting board; 12. Card slot; 13. Pull ring; 14. Light strip; 15. Storage box. DETAILED DESCRIPTION
[0022] The following is a further detailed description of the implementation of the present utility model in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present utility model, but cannot be used to limit the scope of the present utility model.
[0023] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] Example:
[0026] As attached Figure 1 To Attachment Figure 5 As shown:
[0027] The utility model provides a construction cost progress management device, comprising a storage plate 1, a slide groove 2 is provided at the top of the storage plate 1, a display plate 3 is slidably installed in the slide groove 2, a display groove 4 is provided on one side of the display plate 3, an electronic display board 5 is installed on one side of the display groove 4, a plurality of placement plates 6 are installed on the other side of the display groove 4, a placement groove 7 is provided on the top of the placement plate 6, a pair of limiting grooves 8 are penetrated at the upper and lower ends of the display groove 4, a pair of tension springs 9 are symmetrically installed at the top of one side of the storage plate 1, a movable plate 10 is installed on one side of the pair of tension springs 9, a limiting plate 11 is installed on one side of the movable plate 10 at a position between the pair of tension springs 9, and the limiting plate 11 penetrates one side of the storage plate 1 and is slidably connected with the storage plate 1.
[0028] The size of the limiting plate 11 matches the size of the limiting slot 8 , so that the limiting plate 11 can pass through the limiting slot 8 to limit or support the display board 3 .
[0029] A slot 12 is provided on one side of the slide groove 2 at a position parallel to the limiting plate 11 , and the limiting plate 11 is passed through the limiting groove 8 and enters the slot 12 , thereby improving the stability of the limiting plate 11 when providing support for the display board 3 .
[0030] The size of the slot 12 matches the size of the limiting plate 11 , so that the limiting plate 11 can enter the slot 12 .
[0031] A lifting ring 13 is installed at the top of the display board 3 to facilitate the transportation of the device and to quickly pull the display board 3 out of the slide slot 2 when in use.
[0032] A light strip 14 is installed at the top of one side of the storage board 1 to provide lighting for the display board 3 when the light is dim at night.
[0033] A storage box 15 is installed on one side of the storage plate 1 to facilitate the storage of documents and other sundries when the device is transported to prevent loss.
[0034] The working principle of this embodiment is as follows: when the construction cost progress management device needs to be moved and transported, the staff pulls the movable plate 10 to disengage the limiting plate 11 from the card slot 12 and the limiting slot 8 in turn, and then presses the display board 3 downward to put the display board 3 into the slide slot 2, and then releases the movable plate 10. Under the action of the rebound of the tension spring 9, the limiting plate 11 passes through the limiting slot 8 at the top of the display board 3 again and enters the card slot 12, so that the display board 3 can be limited in the slide slot 2. At this time, the staff carries the device by lifting the lifting ring 13. After carrying it to the designated area, the staff can pull the movable plate 10 again, and then pull it upward. The lifting ring 13 is used to completely pull the display board 3 out of the slide slot 2 to the top, and then the movable plate 10 is released to allow the limiting plate 11 to pass through the limiting slot 8 at the bottom of the display board 3 and enter the card slot 12 to provide support for the display board 3. In addition, the placement plate 6 is made of transparent plastic, and the staff can put the documents to be displayed into the placement slot 7 for display. When the content on the document needs to be changed, the document can be taken out of the placement slot 7 and changed, thereby avoiding the loss of documents during mobile transportation. During transportation, the excess documents and other sundries can also be stored in the storage box 15, which improves the convenience and practicality of the device.
[0035] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific purposes.
Claims
1. A construction cost progress management device, comprising a storage plate (1), characterized in that: The top of the storage plate (1) is provided with a slide groove (2), a display plate (3) is slidably installed in the slide groove (2), a display groove (4) is provided on one side of the display plate (3), an electronic display board (5) is installed on one side of the display groove (4), a plurality of placement plates (6) are installed on the other side of the display groove (4), a placement groove (7) is provided on the top of the placement plate (6), a pair of limit grooves (8) are penetrated at the upper and lower ends of the display groove (4), a pair of tension springs (9) are symmetrically installed on the top of one side of the storage plate (1), a movable plate (10) is installed on one side of the pair of tension springs (9), a limit plate (11) is installed on one side of the movable plate (10) at a position between the pair of tension springs (9), and the limit plate (11) penetrates one side of the storage plate (1) and is slidably connected to the storage plate (1).
2. The construction cost progress management device according to claim 1, characterized in that: The size of the limiting plate (11) matches the size of the limiting groove (8).
3. The construction cost progress management device according to claim 1, characterized in that: A clamping groove (12) is provided on one side of the slide groove (2) at a position parallel to the limiting plate (11).
4. The construction cost progress management device according to claim 3, characterized in that: The size of the card slot (12) matches the size of the limiting plate (11).
5. The construction cost progress management device according to claim 1, characterized in that: A lifting ring (13) is installed at the top end of the display board (3).
6. The construction cost progress management device according to claim 1, characterized in that: A light strip (14) is installed at the top end of one side of the storage plate (1).
7. The construction cost progress management device according to claim 1, characterized in that: A storage box (15) is installed on one side of the storage plate (1).