Novel ultra-high-speed low-preheating laminator
By using a combination of a vacuum fan and an activated carbon filter element in the glue machine, the problem of dust impurities falling on the glue surface is solved, and the effect of improving product processing quality is achieved.
Patent Information
- Application Number
- CN202420843704.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2025-02-11
- Estimated Expiration
- 2034-04-23
AI Technical Summary
During the use of existing glue machines, due to the dust impurities in the air above the equipment, it is easy to fall on the rubber surface of the board or paper, resulting in the viscosity of the rubber surface of the product after glue, which affects the processing quality.
A new ultra-high speed low preheating glue machine is designed, using a combination of a vacuum fan and an activated carbon filter element to absorb the air above the base through negative pressure and filter dust impurities to reduce impurities falling on the glue surface.
It effectively reduces the drop of dust and impurities in the air, improves the processing quality of the product, and ensures high viscosity and high quality after being glued.
Smart Images

Figure CN222447097U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of laminating machines, in particular to a novel ultra-high-speed low-preheating laminating machine. Background Art
[0002] Laminating refers to the process of covering paper, cloth or synthetic materials with a layer of glue (usually hot melt glue), pressing another layer of material, and bonding the two layers of material together by pressurizing and heating. Laminating equipment is usually used in the processing of paper and board materials. In addition, during the use of existing laminating equipment, dust and impurities in the air above the equipment are easy to fall onto the glue surface of the board and paper. Dust and impurities will reduce the stickiness of the glue surface of the product after laminating, thereby reducing the processing quality of the product. Utility Model Content
[0003] The purpose of the utility model is to provide a novel ultra-high-speed low-preheating laminating machine to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a novel ultra-high-speed low-preheating glue machine, comprising a base, one side of the top of the base is connected to a first side plate, the other side of the top of the base is connected to a second side plate, two limiting pressing rollers are installed between the top of the first side plate and the top of the second side plate, two glue coating rollers are rotatably connected between the bottom of the first side plate and the bottom of the second side plate, a material storage frame is installed in the middle of the top of the base, a glue box is arranged inside the material storage frame, and the bottom of one of the glue coating rollers extends to the glue Inside the water tank, a preheating heating tube is installed at the bottom of the inner wall of the storage frame, two high-speed motors are installed at the bottom of one side of the second side panel, a fixed vertical block is fixedly connected to one side of the back of the base, the top of the fixed vertical block is connected to a ash shielding top cover, an ash inlet pipe is installed at the bottom of the ash shielding top cover, and a plurality of air ports are provided at the bottom of the ash inlet pipe, a fixed box body is installed at the bottom of one side of the base, a dust suction fan is installed inside the fixed box body, the input end of the dust suction fan is connected to a transfer pipe, and an activated carbon filter element is installed inside the transfer pipe.
[0005] Preferably, the high-speed motor, preheating heating tube and dust suction fan are all electrically connected to the switch panel, the output end of the high-speed motor is connected to the glue coating roller, one side of the two glue coating rollers are in contact, and the high-speed motor is used to drive the glue coating roller to rotate at high speed, thereby completing rapid gluing.
[0006] Preferably, a bracket is connected to the bottom of the glue box, and the bracket is connected to the bottom of the inner wall of the material storage frame.
[0007] Preferably, electric telescopic rods are installed on both sides of the bottom of the base, the output ends of the electric telescopic rods are connected to the bottom of the material storage frame, the electric telescopic rods are electrically connected to the switch panel, and the electric telescopic rods are used to adjust the height of the material storage frame.
[0008] Preferably, one end of the transfer pipe is connected to an absorption pipe, one end of the absorption pipe is fixedly connected to one end of the ash inlet pipe, the air port is vertically arranged downward, and the absorption pipe is used for negative pressure absorption of air.
[0009] Compared with the prior art, the beneficial effects of the utility model are:
[0010] During the use of the entire equipment, the dust suction fan inside the fixed box is started to work. The dust suction fan absorbs the air above the base through the negative pressure of the ash inlet pipe. The air and some floating dust impurities will be sucked in through the air port, and then filtered and adsorbed by the activated carbon filter element when passing through the inside of the transfer pipe. The entire equipment can absorb and process some dust impurities that may be floating in the air during use, reduce the phenomenon of impurities falling on the rubber surface, and improve the processing quality of the product. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the structure of the utility model;
[0012] Figure 2 This is a structural diagram of the connection between the base and the material storage frame of the utility model;
[0013] Figure 3 This is the internal structure diagram of the material storage frame of the utility model;
[0014] Figure 4 This is a diagram of the internal structure of the fixed box of the utility model.
[0015] In the figure: 1. base; 2. first side panel; 3. second side panel; 4. limit pressing roller; 5. glue coating roller; 6. high-speed motor; 7. fixed vertical block; 8. ash shielding top cover; 9. switch panel; 10. storage frame; 11. electric telescopic rod; 12. glue tank; 13. bracket; 14. preheating heating pipe; 15. fixed box; 16. dust suction fan; 17. transfer pipe; 18. activated carbon filter element; 19. absorption pipe; 20. ash inlet pipe; 21. air outlet. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0017] See also Figure 1-4 The utility model provides a novel ultra-high-speed low-preheating glue machine, including a base 1, one side of the top of the base 1 is connected to a first side plate 2, the other side of the top of the base 1 is connected to a second side plate 3, two limiting pressing rollers 4 are installed between the top of the first side plate 2 and the top of the second side plate 3, two glue coating rollers 5 are rotatably connected between the bottom of the first side plate 2 and the bottom of the second side plate 3, a material storage frame 10 is installed in the middle of the top of the base 1, a glue box 12 is arranged inside the material storage frame 10, the bottom of one of the glue coating rollers 5 extends to the inside of the glue box 12, and the material storage frame 10 A preheating heating pipe 14 is installed at the bottom of the inner wall, two high-speed motors 6 are installed at the bottom of one side of the second side plate 3, a fixed vertical block 7 is fixedly connected to one side of the back of the base 1, a ash shielding top cover 8 is connected to the top of the fixed vertical block 7, an ash inlet pipe 20 is installed at the bottom of the ash shielding top cover 8, and a plurality of air ports 21 are provided at the bottom of the ash inlet pipe 20, a fixed box 15 is installed at the bottom of one side of the base 1, the high-speed motor 6, the preheating heating pipe 14 and the dust suction fan 16 are all electrically connected to the switch panel 9, the output end of the high-speed motor 6 is connected to the glue coating roller 5, and one side of the two glue coating rollers 5 are in contact;
[0018] In this embodiment, water is added to the material storage frame 10 and the preheating heating tube 14 is started to heat the water inside the material storage frame 10 , thereby indirectly heating the glue box 12 , thereby completing the preheating work of the glue inside the glue box 12 .
[0019] See also Figure 2-3 The bottom of the glue box 12 is connected to a bracket 13, the bracket 13 is connected to the bottom of the inner wall of the material storage frame 10, and electric telescopic rods 11 are installed on both sides of the bottom of the base 1, the output end of the electric telescopic rod 11 is connected to the bottom of the material storage frame 10, and the electric telescopic rod 11 is electrically connected to the switch panel 9;
[0020] In this embodiment, starting the electric telescopic rod 11 can adjust the height of the material storage frame 10, so that the glue inside the glue box 12 contacts the bottom of the glue coating roller 5. When gluing, starting the high-speed motor 6 drives the glue coating roller 5 to rotate at high speed, and the bottom of one of the glue coating rollers 5 can be stained with the glue inside the glue box 12, and one side of the two glue coating rollers 5 is in contact. When the glue coating roller 5 rotates, the surface of the other glue coating roller 5 can also be coated with glue.
[0021] See also Figure 1 and Figure 4 A dust suction fan 16 is installed inside the fixed box 15, and the input end of the dust suction fan 16 is connected to a transfer pipe 17, and an activated carbon filter element 18 is installed inside the transfer pipe 17. One end of the transfer pipe 17 is connected to an absorption pipe 19, and one end of the absorption pipe 19 is fixedly connected to one end of the ash inlet pipe 20, and the air port 21 is arranged vertically downward;
[0022] In this embodiment, the dust suction fan 16 inside the fixed box 15 is started to work. The dust suction fan 16 absorbs the air above the base 1 through the ash inlet pipe 20 under negative pressure. The air and some floating dust impurities are sucked in through the air port 21, and then filtered and adsorbed by the activated carbon filter element 18 when passing through the inside of the transfer pipe 17.
[0023] When in use, the utility model is a novel ultra-high-speed low-preheating gluing machine. During use, glue is added to the inside of the glue tank 12, water is added to the inside of the material storage frame 10, and the preheating heating tube 14 is started to heat the water inside the material storage frame 10, thereby indirectly heating the glue tank 12. The heat supply is more uniform through water bath heating, and the glue inside the glue tank 12 is preheated. One of the glue coating rollers 5 extends to the inside of the glue tank 12, and the bottom of the glue coating roller 5 contacts the glue surface. By starting the electric telescopic rod 11, the height of the material storage frame 10 can be adjusted, so that the glue inside the glue tank 12 contacts the bottom of the glue coating roller 5. When gluing, the high-speed motor 6 is started to drive the glue coating roller 5 to rotate at a high speed, and the bottom of one of the glue coating rollers 5 can be stained with the glue inside the glue tank 12, and one side of the two glue coating rollers 5 is in contact. When the glue coating roller 5 rotates, the surface of the other glue coating roller 5 can be The surface will also be coated with glue, and then the relevant personnel will place the plate and paper that need to be glued between the glue coating roller 5 and the limiting pressure roller 4. The distance between the glue coating roller 5 and the limiting pressure roller 4 matches the thickness of the product that needs to be glued. The product will be moved to the other side under the rotation of the glue coating roller 5, and the surface will be glued by the two glue coating rollers 5 during the movement to complete the gluing work. During the use of the entire equipment, the dust suction fan 16 inside the fixed box 15 is started to work, and the dust suction fan 16 absorbs the air above the base 1 through the ash inlet pipe 20 negative pressure. The air and some floating dust impurities will be sucked in through the air port 21, and then filtered and adsorbed by the activated carbon filter element 18 when passing through the inside of the transfer pipe 17. The entire equipment can absorb and process some dust impurities that may be floating in the air during use, reduce the phenomenon of impurities falling on the glue surface, and improve the processing quality of the product.
[0024] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A novel ultra-high speed low preheating laminating machine, comprising a base (1), characterized in that: A first side plate (2) is connected to one side of the top of the base (1), and a second side plate (3) is connected to the other side of the top of the base (1). Two limiting pressing rollers (4) are installed between the top of the first side plate (2) and the top of the second side plate (3). Two glue coating rollers (5) are rotatably connected between the bottom of the first side plate (2) and the bottom of the second side plate (3). A material storage frame (10) is installed in the middle of the top of the base (1). A glue box (12) is provided inside the material storage frame (10). The bottom of one of the glue coating rollers (5) extends into the inside of the glue box (12). A preheating heating pipe (14) is installed at the bottom of the inner wall of the material storage frame (10). ), two high-speed motors (6) are installed at the bottom of one side of the second side plate (3), a fixed vertical block (7) is fixedly connected to one side of the back of the base (1), the top of the fixed vertical block (7) is connected to a dust shielding top cover (8), an ash inlet pipe (20) is installed at the bottom of the dust shielding top cover (8), and a plurality of air ports (21) are provided at the bottom of the ash inlet pipe (20), a fixed box body (15) is installed at the bottom of one side of the base (1), a dust suction fan (16) is installed inside the fixed box body (15), the input end of the dust suction fan (16) is connected to a transfer pipe (17), and an activated carbon filter element (18) is installed inside the transfer pipe (17).
2. The new ultra-high speed low preheating laminating machine according to claim 1 is characterized by: The high-speed motor (6), the preheating heating tube (14) and the dust suction fan (16) are all electrically connected to the switch panel (9).
3. The new ultra-high speed low preheating laminating machine according to claim 1 is characterized by: The output end of the high-speed motor (6) is connected to the glue coating roller (5), and one side of the two glue coating rollers (5) are in contact with each other.
4. The novel ultra-high speed low preheating laminating machine according to claim 1 is characterized in that: The bottom of the glue box (12) is connected to a bracket (13), and the bracket (13) is connected to the bottom of the inner wall of the material storage frame (10).
5. The novel ultra-high speed low preheating laminating machine according to claim 1 is characterized in that: Electric telescopic rods (11) are installed on both sides of the bottom of the base (1), the output end of the electric telescopic rod (11) is connected to the bottom of the material storage frame (10), and the electric telescopic rod (11) is electrically connected to the switch panel (9).
6. The novel ultra-high speed low preheating laminating machine according to claim 1 is characterized in that: One end of the transfer pipe (17) is connected to an absorption pipe (19), one end of the absorption pipe (19) is fixedly connected to one end of the ash inlet pipe (20), and the air port (21) is arranged vertically downward.