Tower crane super-long attachment device suitable for steel pipe column

By designing an ultra-long attachment device for tower cranes suitable for steel pipe columns, using vertical connecting plates and bottom plate structures, the problem of difficult to fix the attachment points of tower cranes in high-rise buildings is solved, and construction efficiency and safety are improved.

CN222454375UActive Publication Date: 2025-02-11CHINA CONSTR FOURTH BUREAU FOURTH CONSTR ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420367135.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2025-02-11
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

In high-rise buildings, it is difficult to effectively fix the tower crane with the ultra-long attachment points of the steel pipe columns, the existing welding methods are complex and difficult to ensure quality, especially in terms of the connection of ultra-long attachment rods and the force transmission.

Method used

An ultra-long attachment device for tower cranes including a first connecting assembly and a second connecting assembly is designed. By welding vertical connecting plates to the outer surface of steel pipe columns, combining the structure of the base plate and the ear plate, the flexible height adjustment of the tower crane support unit is realized. And it is fixed and connected by high-strength bolts to simplify welding operations.

Benefits of technology

The device improves the efficiency and flexibility of steel pipe strings, reduces construction difficulty and complexity, reduces potential safety hazards, and enhances the stability and load-bearing capacity of the device through optimized structural design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222454375U_ABST
    Figure CN222454375U_ABST
Patent Text Reader

Abstract

The utility model provides a tower crane super-long attachment device suitable for steel pipe columns, which relates to the technical field of building construction and comprises a first connecting component and a second connecting component, the first connecting component comprises a bottom plate, the second connecting component is fixedly arranged on one side of the bottom plate, and a plurality of vertical connecting plates used for connecting the steel pipe columns are fixedly arranged on the other side of the bottom plate. The end of the vertical connecting plate is provided with a cambered surface attached to the outer surface of the steel pipe column and a welding groove. The vertical connecting plates are welded to the steel pipe column in the direction parallel to the axis of the steel pipe column, and a horizontal reinforcing plate is arranged between every two adjacent vertical connecting plates. The first connecting assembly is welded on the ground before the steel pipe column is installed, and the second connecting assembly is fixed on the first connecting assembly through the high-strength bolt according to the required height after the steel pipe column is installed. By means of the structure, the height of the tower crane supporting unit can be flexibly adjusted, the use efficiency and flexibility of the steel pipe column are improved, welding operation can be completed on the ground, the construction difficulty is lowered, and potential safety hazards are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to an extra-long tower crane attachment device suitable for a steel pipe column. Background Art

[0002] In modern high-rise buildings, especially super high-rise buildings, there are many construction problems. Modern buildings are characterized by novel shapes and diversified structures. It is common to use steel structure outer frames to support complex facade designs. This design often faces the problem of how to effectively arrange and attach external tower cranes. In these buildings, due to the complexity of the facade design, in order to facilitate construction, it is often necessary to attach tower cranes at different locations. These attachment points may be far from the ground, resulting in "extra-long attachment" situations. At the same time, the steel outer frame of the building usually uses steel tube concrete columns, which increases the difficulty of fixing the tower crane's attachment parts to these columns.

[0003] The commonly used method at present is to weld the connecting parts of the tower crane directly to the steel pipe column. However, since the commonly used connecting parts on the market are in the shape of straight plates, and the steel pipe column is round, these connecting parts need to be gas-cut into arc shapes at high altitude to adapt to the steel pipe column. Such high-altitude welding is difficult and it is difficult to ensure the welding quality. Moreover, this simple welding method is difficult to adapt to the connection of ultra-long attachment rods and the transmission requirements of bearing force. Utility Model Content

[0004] In order to overcome the defects of the prior art, the technical problem to be solved by the utility model is to propose an extra-long attachment device for a tower crane suitable for a steel pipe column, and adopt the following technical solutions:

[0005] The utility model provides an extra-long tower crane attachment device suitable for a steel pipe column, comprising a first connecting component and a second connecting component;

[0006] The first connection assembly comprises a bottom plate, one side of the bottom plate is fixedly connected to the second connection assembly, and the other side is fixedly provided with a plurality of vertical connection plates for connecting the steel pipe columns, and the plurality of vertical connection plates are welded to the steel pipe columns in a direction parallel to the axis of the steel pipe columns; a horizontal reinforcement plate is fixedly provided between two adjacent vertical connection plates;

[0007] As a further improvement, the plurality of vertical connecting plates include two short connecting plates and two long connecting plates perpendicular to the base plate, the two long connecting plates are located outside the two short connecting plates, and are symmetrically distributed along the axial direction of the steel pipe column.

[0008] As a further improvement, the end of the short connecting plate is provided with an arc surface fitting the steel pipe column on one side close to the axis of the steel pipe column, and a welding groove of 30° to 45° is provided on the other side; the end of the long connecting plate is provided with an arc surface fitting the steel pipe column.

[0009] As a further improvement, the vertical connecting plate, the bottom plate and the horizontal reinforcing plate are perpendicular to each other; a first horizontal reinforcing plate is arranged between the two short connecting plates, and a second horizontal reinforcing plate is arranged between the short connecting plate and the long connecting plate; the first horizontal reinforcing plate and the second horizontal reinforcing plate are respectively welded to the adjacent vertical connecting plate and the bottom plate.

[0010] As a further improvement, the first reinforcing plate is rectangular; the second reinforcing plate is a right-angled trapezoid, and the long bottom side of the second reinforcing plate is welded to the long connecting plate.

[0011] As a further improvement, the second connecting assembly includes a plate seat, and two ear plates which are parallel to each other and perpendicular to the plate seat, and the plate seat is fixedly connected to the base plate by fasteners.

[0012] As a further improvement, the ear plates are provided with a plurality of through holes, and the through holes on the two ear plates correspond to each other one by one to form a plurality of pairs of pin holes.

[0013] As a further improvement, at least one first reinforcing rib is provided between the two ear plates, and at least one first reinforcing rib is provided between two adjacent pairs of pin holes.

[0014] As a further improvement, a second reinforcement rib is arranged between the side of the ear plate away from the first reinforcement rib and the plate seat, and the second reinforcement rib is in the shape of a right triangle.

[0015] As a further improvement, the fasteners are high-strength bolts, and the plate seat is provided with a plurality of bolt holes for fixing the base plate, and the bolt holes are evenly distributed on both sides of the second reinforcing rib.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] Firstly, the utility model comprises a first connection component and a second connection component. The first connection component is welded to the outer surface of the steel pipe column through a vertical connection plate, and the bottom plate is fixedly provided with an ear plate for connecting the tower crane support unit. Before installing the steel pipe column, the first connection component is welded first. After the steel pipe column is installed, the second connection component of the corresponding height is installed as needed, so as to flexibly adjust the height of the tower crane support unit, thereby improving the use efficiency and flexibility of the steel pipe column. At the same time, the welding operation can be completed on the ground, which significantly reduces the difficulty and complexity of construction and reduces potential safety hazards.

[0018] Secondly, in the utility model, the vertical connecting plates include short connecting plates and long connecting plates, so that the ends of each connecting plate fit the outer surface of the steel pipe column, ensuring a close fit with the steel pipe column, and enhancing the stability and bearing capacity of the entire device in the case of ultra-long attachment. The ends of each connecting plate are also provided with welding grooves of different angles, which not only facilitates welding, but also helps to improve the quality and strength of the welded joints, can more effectively disperse stress, reduce stress concentration, and thus improve the stability of the entire device.

[0019] Thirdly, the utility model sets a horizontal reinforcement plate between the vertical connection plates, which enhances the stability and load-bearing capacity of the entire attachment device. A first reinforcement rib and a second reinforcement rib are set between the ear plates, wherein the second reinforcement rib is in the shape of a right triangle, and its right angle side is fixedly connected to the ear plate and the plate seat. This structure optimizes the force distribution, reduces the risk of deformation due to long-term use or abnormal load, and further improves the stability and safety of the tower crane in long-term use, and is particularly suitable for heavy-load material handling in high-rise building construction.

[0020] Fourthly, in the present invention, the bottom plate and the plate seat are fixed by high-strength bolts, and the connected parts are evenly distributed on both sides of the second reinforcing rib. The second reinforcing rib of this structure not only ensures the overall strength of the second connecting component, but also ensures the stability of the connection between the first component and the second component. At the same time, this structure is also easy to install and disassemble, which improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the following is a brief introduction to the drawings required for use in the implementation mode. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 It is a schematic diagram of the structure of the utility model assembled with a steel pipe column;

[0023] Figure 2 It is a schematic diagram of the side structure of the utility model assembled with a steel pipe column;

[0024] Figure 3 This is a schematic diagram of the structure of the first connecting component of the utility model from a top view;

[0025] Figure 4 This is a schematic diagram of the structure of the first connecting component of the utility model from a rear perspective;

[0026] Figure 5 This is a schematic diagram of the structure of the second connecting component of the utility model from a top view;

[0027] Figure 6 This is a schematic structural diagram of the second connecting component of the utility model from a front view;

[0028] Figure 7 This is a schematic diagram of the side sectional structure of the second connecting component of the utility model;

[0029] Figure 8 It is a partial schematic diagram of the assembly of the first connecting component and the second connecting component of the utility model.

[0030] Reference numerals:

[0031] 100-Steel pipe column;

[0032] 10-bottom plate; 11-vertical connecting plate; 111-short connecting plate; 112-long connecting plate; 12-horizontal reinforcing plate; 121-first horizontal reinforcing plate; 122-second horizontal reinforcing plate;

[0033] 20-plate seat; 201-bolt hole; 21-ear plate; 22-pin hole; 23-first reinforcing rib; 24-second reinforcing rib; 25-fastener; 26-steel gasket. DETAILED DESCRIPTION

[0034] In order to facilitate understanding by those skilled in the art, the structure of the present invention is further described in detail with reference to the accompanying drawings:

[0035] In the description of the present invention, the terms "first" and "second" are used only for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. The terms "upper", "lower", "side", "end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention.

[0036] like Figure 1-Figure 4 As shown, the present application provides an extra-long attachment device for a tower crane suitable for a steel pipe column, comprising a first connection assembly and a second connection assembly. The first connection assembly comprises a base plate 10, one side of the base plate 10 is fixedly connected to the second connection assembly, and the other side is fixedly provided with a plurality of vertical connection plates 11 for connecting the steel pipe column 100. These vertical connection plates 11 are welded to the steel pipe column 100 in a direction parallel to the axis of the steel pipe column 100, and a horizontal reinforcement plate 12 is fixedly provided between two adjacent vertical connection plates 11 to enhance the overall stability.

[0037] In a specific embodiment, the bottom plate 10 and the vertical connecting plates 11 are both square steel plates, and the width of the bottom plate 10 is generally not less than the diameter of the steel pipe column 100. Among them, the plurality of vertical connecting plates 11 include two short connecting plates 111 and two long connecting plates 112, which are vertically welded to one side of the bottom plate 10, and the two long connecting plates 112 are arranged on the inner side of the two short connecting plates 111 and symmetrically distributed along the axis direction of the steel pipe column 100. The plurality of vertical connecting plates 11 can also be opened at a certain angle (not shown in the figure) in the direction away from the central axis to provide better bearing capacity.

[0038] In a specific embodiment, the contact portion (ie, the welding portion) between the vertical connecting plate 11 and the steel pipe column 100 is parallel to the axial direction of the steel pipe column 100, so that the force borne by the weld is more uniform and better able to withstand vertical loads and lateral forces.

[0039] like Figure 1 and Figure 3 As shown, the end of the short connecting plate 111 is provided with an arc surface fitting the outer surface of the steel pipe column 100 on one side close to the axis of the steel pipe column 100, and a welding groove of 30° to 45° is provided on the other side, and the end of the long connecting plate 112 is provided with an arc surface fitting the outer surface of the steel pipe column 100.

[0040] In a specific embodiment, according to the diameter of the steel pipe column 100 to be installed, the ends of the long connecting plate 112 and the short connecting plate 111 are cut into arc surfaces that fit the steel pipe column 100, and a 45° welding groove is cut on the other side of the arc surface of the end of the short connecting plate 111. During installation, the arc surfaces of the long connecting plate 112 and the short connecting plate 111 are abutted against the outer surface of the steel pipe column 100, and welded on both sides of the contact part. Due to the provision of the groove, the welding material can be more easily filled into the end of the short connecting plate 111 during welding, thereby improving the strength and crack resistance of the joint and achieving better welding.

[0041] like Figure 3 and Figure 4 As shown, the vertical connecting plate 11, the bottom plate 10 and the horizontal reinforcing plate 12 are perpendicular to each other. A first horizontal reinforcing plate 121 is arranged between the two short connecting plates 111, and a second horizontal reinforcing plate 122 is arranged between the short connecting plate 111 and the long connecting plate 112. The first horizontal reinforcing plate 121 and the second horizontal reinforcing plate 122 are welded to the adjacent vertical connecting plates 11 and the bottom plate 10, respectively.

[0042] In a specific embodiment, two layers of horizontal reinforcing plates 12 of the same shape are arranged between a plurality of vertical connecting plates 11, wherein the first reinforcing plate is rectangular and the second reinforcing plate is a right-angled trapezoid, and in particular, the long bottom side of the second reinforcing plate is welded to the long connecting plate 112, and the short bottom side is welded to the short connecting plate 111. By arranging the horizontal reinforcing plates 12, the rigidity and stability between the vertical connecting plates 11 are increased, the load is dispersed and additional support is provided, so that the first connecting assembly remains stable when subjected to vertical or horizontal loads.

[0043] like Figure 5-Figure 7 As shown, the second connection assembly includes a plate base 20, and two ear plates 21 parallel to each other and perpendicular to the plate base 20. The plate base 20 is fixedly connected to the base plate 10 by a fastener 25. A plurality of through holes are provided on the ear plates 21, and the through holes on the two ear plates 21 correspond to each other to form a plurality of pairs of pin holes 22. At least one first reinforcing rib 23 is provided between the two ear plates 21, and at least one first reinforcing rib 23 is provided between two adjacent pairs of pin holes 22.

[0044] In a specific embodiment, each ear plate 21 is provided with two through holes, and the through holes on the two ear plates 21 form two pairs of pin holes 22, and each pair of pin holes 22 is fixed with a pin (not shown in the figure). The two pins are respectively connected to the two support units provided on the tower crane support to form two force components, thereby meeting the requirements of connecting and attaching force transmission of the super-long attachment rod. Among them, at least one first reinforcement rib 23 is provided between the two pairs of pin holes 22,

[0045] like Figure 5-Figure 7 As shown, a second reinforcement rib 24 is arranged between the plate seat 20 and the side of the ear plate 21 away from the first reinforcement rib 23 .

[0046] like Figure 1 and Figure 8 As shown, the plate seat 20 is provided with a plurality of bolt holes 201 for fixing the base plate 10 , and the bolt holes 201 are evenly distributed on both sides of the second reinforcing rib 24 . The fasteners 25 are high-strength bolts, and steel gaskets 26 are further provided between the high-strength bolts and the base plate 10 and the plate seat 20 .

[0047] In a specific embodiment, three second reinforcing ribs 24 are arranged between each ear plate 21 and the plate seat 20, and the second reinforcing ribs 24 are in the shape of a right triangle, and two right-angled sides thereof are respectively welded to the ear plate 21 and the plate seat 20. The plate seat 20 is further provided with two rows of bolt holes 201, each row having six bolt holes 201, which are distributed on both sides of the three second reinforcing ribs 24. Figure 4 As shown, threaded holes corresponding to the plate seat 20 are arranged on the bottom plate 10 , and the threaded holes on the bottom plate 10 are arranged between the four vertical connecting plates 11 .

[0048] In a specific embodiment, before the steel pipe column 100 is installed, the first connection assembly is first welded to the outer surface of the steel pipe column 100, and then the horizontal reinforcement plate 12 is welded between two adjacent vertical connection plates 11. After the first connection assembly is installed, the steel pipe column 100 is installed to a preset position around the tower crane support, and then the second connection assembly is fixedly installed at the position of the first connection assembly at a corresponding height by high-strength bolts according to actual needs. The second connection assembly is respectively connected to the two support units on the tower crane support to form a two-force component. This structure improves the efficiency and flexibility of the use of the steel pipe column 100. At the same time, the welding operation can be completed on the ground, which significantly reduces the difficulty and complexity of construction and reduces potential safety hazards. The first connection assembly and the second connection assembly are fixed by high-strength bolts, which are stable and easy to install and disassemble, thereby improving the overall construction efficiency.

[0049] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. An extra-long tower crane attachment device suitable for a steel pipe column, characterized in that: comprising a first connection component and a second connection component; The first connection assembly comprises a base plate (10), one side of the base plate (10) is fixedly connected to the second connection assembly, and the other side is fixedly provided with a plurality of vertical connection plates (11) for connecting the steel pipe column (100), and the plurality of vertical connection plates (11) are welded to the steel pipe column (100) in a direction parallel to the axis of the steel pipe column (100); a horizontal reinforcement plate (12) is fixedly provided between two adjacent vertical connection plates (11).

2. The super-long tower crane attachment device suitable for a steel pipe column as claimed in claim 1, characterized in that: The plurality of vertical connecting plates (11) include two short connecting plates (111) and two long connecting plates (112) perpendicular to the bottom plate (10); the two long connecting plates (112) are located outside the two short connecting plates (111) and are symmetrically distributed along the axis direction of the steel pipe column (100).

3. The super-long tower crane attachment device suitable for a steel pipe column as claimed in claim 2, characterized in that: The end of the short connecting plate (111) is provided with a curved surface that fits the steel pipe column (100) on one side close to the axis of the steel pipe column (100), and a welding groove with a 30° to 45° angle is provided on the other side; the end of the long connecting plate (112) is provided with a curved surface that fits the steel pipe column (100).

4. The super-long tower crane attachment device suitable for a steel pipe column as claimed in claim 3, characterized in that: The vertical connecting plate (11), the bottom plate (10) and the horizontal reinforcing plate (12) are perpendicular to each other; a first horizontal reinforcing plate (121) is arranged between the two short connecting plates (111), and a second horizontal reinforcing plate (122) is arranged between the short connecting plate (111) and the long connecting plate (112); the first horizontal reinforcing plate (121) and the second horizontal reinforcing plate (122) are respectively welded to the adjacent vertical connecting plate (11) and the bottom plate (10).

5. The extra-long tower crane attachment device suitable for a steel pipe column as claimed in claim 4, characterized in that: The first horizontal reinforcing plate (121) is rectangular; the second horizontal reinforcing plate (122) is a right-angled trapezoid, and the long bottom side of the second horizontal reinforcing plate (122) is welded to the long connecting plate (112).

6. The extra-long tower crane attachment device suitable for a steel pipe column as claimed in claim 1, characterized in that: The second connecting assembly comprises a plate seat (20) and two ear plates (21) which are parallel to each other and perpendicular to the plate seat (20); the plate seat (20) is fixedly connected to the base plate (10) via a fastener (25).

7. The extra-long tower crane attachment device suitable for a steel pipe column as claimed in claim 6, characterized in that: The ear plates (21) are provided with a plurality of through holes, and the through holes on the two ear plates (21) correspond to each other one by one, forming a plurality of pairs of pin holes (22).

8. The extra-long tower crane attachment device suitable for a steel pipe column as claimed in claim 7, characterized in that: At least one first reinforcing rib (23) is arranged between the two ear plates (21), and at least one first reinforcing rib (23) is arranged between two adjacent pairs of pin holes (22).

9. The extra-long tower crane attachment device suitable for a steel pipe column as claimed in claim 8, characterized in that: A second reinforcing rib (24) is provided between the side of the ear plate (21) away from the first reinforcing rib (23) and the plate seat (20), and the second reinforcing rib (24) is in the shape of a right triangle.

10. The super-long tower crane attachment device suitable for a steel pipe column according to claim 9, characterized in that: The fastener (25) is a high-strength bolt, and the plate seat (20) is provided with a plurality of bolt holes (201) for fixedly connecting the base plate (10), and the bolt holes (201) are evenly distributed on both sides of the second reinforcing rib (24).