Shear wall positioning and thickness control device

By designing a shear wall positioning and thickness control device that does not require welding, it is fixed on the main ribs of the concrete shear wall by wire binding, which solves the problem of high welding quality, poor positioning effect and long construction time in traditional construction. The problem has achieved a more efficient and safer construction process.

CN222477859UActive Publication Date: 2025-02-14CHINA CONSTR FIFTH ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421154258.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-24
Publication Date
2025-02-14
Estimated Expiration
2034-05-24

AI Technical Summary

Technical Problem

Traditional shear wall positioning and thickness control devices require welding steel bars during construction, resulting in high welding quality requirements, average positioning effect and long construction time.

Method used

A shear wall positioning and thickness control device was designed, which was fixed to the concrete shear wall by using wire-tied tying to tie it through the combination of upper and lower horizontal bars, left and right fixed bars, U-shaped grooves and structural floor slabs. Welding operations are avoided on the main rib.

Benefits of technology

The device simplifies the construction process, improves the quality of wall positioning and thickness control, reduces on-site welding processes, avoids fire operations, reduces fire hazards, and improves construction efficiency and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222477859U_ABST
    Figure CN222477859U_ABST
Patent Text Reader

Abstract

The utility model discloses a shear wall positioning and thickness control device which comprises an upper horizontal rib and a lower horizontal rib, and a left fixing rib and a right fixing rib are connected to the two sides between the upper horizontal rib and the lower horizontal rib respectively. The left side U-shaped groove is formed in the left side fixing rib, and the right side fixing rib is provided with a right side U-shaped groove; and a concrete shear wall is mounted at the bottom of the structural floor. According to the shear wall positioning and thickness control device, the left side U-shaped groove and the right side U-shaped groove are clamped on main reinforcements of a concrete shear wall; the lower half portion of the device located on the uppermost portion is located in the wall of the current layer, the upper half portion of the device is exposed outside, and after pouring is completed, the exposed upper half portion of the device plays a role in effectively positioning the bottom of the wall of the next layer and controlling the thickness of the wall of the next layer. By adopting the mode, the device does not need to be welded, and the construction quality and the construction efficiency are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of cast-in-place concrete shear wall construction, and particularly relates to a shear wall positioning and thickness control device. Background Art

[0002] Shear walls, also known as wind-resistant walls, earthquake-resistant walls or structural walls, are walls in houses or structures that mainly bear horizontal loads and vertical loads (gravity) caused by wind loads or earthquakes to prevent structural shear (shear) damage. Shear wall structures are extremely common in housing construction projects. Shear wall construction first requires tying steel bars, then setting up formwork, and finally pouring concrete. After the wall takes root, it is also poured from bottom to top. The positioning and thickness control of shear walls are key links in construction, and shear wall positioning and thickness control devices are required.

[0003] Common shear wall positioning and thickness control devices are usually composed of structures such as positioning devices and thickness control devices. The positioning device performs positioning operations by setting reference points, positioning axis lines, installing templates, and positioning steel bars; the thickness control device performs thickness operations by positioning concrete blocks, steel meshes, protective layer control, and pouring control. This is the common structure and use of shear wall positioning and thickness control devices. Traditional shear wall positioning and thickness control devices, at this stage, generally position the shear wall and control the wall thickness by welding steel bars on stirrups after the shear wall steel bars are tied. However, this method has high requirements for welding quality. Secondly, the positioning bars are fixed together with the wall steel bars after all, and the wall positioning effect is average. Finally, it is necessary to wait for the steel bars to be tied before welding the positioning bars, resulting in a long construction time. For this reason, a shear wall positioning and thickness control device is proposed. Summary of the invention

[0004] In view of the deficiencies in the prior art, the utility model provides a shear wall positioning and thickness control device to solve the above-mentioned technical problem of long construction time.

[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a shear wall positioning and thickness control device, comprising:

[0006] An upper horizontal rib, and a lower horizontal rib arranged directly below the upper horizontal rib, and the two sides between the upper horizontal rib and the lower horizontal rib are respectively connected with a left fixing rib and a right fixing rib;

[0007] A left U-shaped groove is arranged at the center of the surface of the left fixing rib, and a right U-shaped groove is installed at the center of the surface of the right fixing rib;

[0008] The structural floor is arranged on the back of the upper horizontal reinforcement, and a concrete shear wall is installed at the bottom center of the structural floor. The device is arranged in sequence by arranging it at intervals of 1m from the bottom of the concrete shear wall. After the left U-shaped groove and the right U-shaped groove of the device are clamped on the main reinforcement of the concrete shear wall, they are tied firmly by wire tying. The lower half of the device located at the top of the concrete shear wall is located in the wall of this layer, and the upper half is exposed to the outside. After the pouring of the concrete of this layer is completed, the exposed upper half of the device plays an effective role in positioning and thickness control of the bottom of the next layer of wall. The device arranged in the middle of the wall can be tied together with the wall reinforcement when tying. In this way, the utility model is simple and convenient to construct, and the quality of wall positioning and thickness control is improved. The device does not need welding, which reduces the on-site welding process, avoids hot work, eliminates the hidden danger of fire, and improves the construction quality and construction efficiency. At the same time, the material of the utility model is on-site waste steel bars, which can be reused.

[0009] Furthermore, first rotating columns are added at both ends of the upper horizontal rib and the lower horizontal rib, and first screw rods are transversely installed at the inner ends of the first rotating columns. The first rotating columns drive the first screw rods to rotate on the upper horizontal rib and the lower horizontal rib.

[0010] Furthermore, first screw holes are provided at the centers of both ends of the upper horizontal rib and the lower horizontal rib, and the first screw holes correspond to the first screw rods. The first screw rods translate by rotating inside the first screw holes, thereby adjusting the use lengths of the upper horizontal rib and the lower horizontal rib.

[0011] Furthermore, both ends of the left and right fixed ribs are provided with welding seats, and are connected to the upper horizontal ribs and the lower horizontal ribs through the welding seats. The left and right fixed ribs are welded to the upper horizontal ribs and the lower horizontal ribs through the welding seats.

[0012] Furthermore, the inner side surface of the welding seat is rotatably connected to a second rotating column, and the center of the inner side surface of the second rotating column is transversely installed with a second screw rod. The second rotating column drives the second screw rod to rotate on the welding seat.

[0013] Furthermore, the centers of both ends of the left and right fixed bars are provided with second screw holes, and the second screw holes correspond to the second screw rods. The second screw rods translate by rotating inside the second screw holes, thereby adjusting the use height of the upper left and right fixed bars, so that the device can be adjusted in length and height, and can be used within a certain range to position and control the thickness of concrete shear walls of different areas. Beneficial Effects

[0014] The shear wall positioning and thickness control device is arranged in sequence by placing the device at intervals of 1m from the bottom of the concrete shear wall. After the left U-shaped groove and the right U-shaped groove of the device are clamped on the main reinforcement of the concrete shear wall, they are tied firmly by wire tying. The lower half of the device located at the top of the concrete shear wall is located in the wall of the current layer, and the upper half is exposed to the outside. After the pouring of the current layer of concrete is completed, the exposed upper half of the device plays an effective role in positioning and thickness control of the bottom of the next layer of wall. The device arranged in the middle of the wall can be tied together with the wall reinforcement. In this way, the construction of the utility model is simple and convenient, and the quality of wall positioning and thickness control is improved. The device does not need welding, which reduces the on-site welding process, avoids hot work, eliminates the hidden danger of fire, and improves the construction quality and efficiency. At the same time, the material of the utility model is on-site waste steel bars, which can be reused. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0016] Figure 2 It is a schematic diagram of the upper horizontal ribs and their connection structure of the utility model;

[0017] Figure 3 This is a schematic diagram of the upper horizontal rib separation structure of the utility model;

[0018] Figure 4 It is a schematic diagram of the left side fixed rib separation structure of the utility model.

[0019] In the figure: 1. upper horizontal reinforcement; 2. lower horizontal reinforcement; 3. left fixed reinforcement; 4. right fixed reinforcement; 5. left U-shaped groove; 6. right U-shaped groove; 7. structural floor; 8. concrete shear wall; 9. first rotating column; 10. first screw rod; 11. first screw hole; 12. welding seat; 13. second rotating column; 14. second screw rod; 15. second screw hole. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] The utility model provides a technical solution, a shear wall positioning and thickness control device, including: Figure 1, an upper horizontal rib 1, and a lower horizontal rib 2 arranged directly below the upper horizontal rib 1, and the two sides between the upper horizontal rib 1 and the lower horizontal rib 2 are respectively connected with a left fixing rib 3 and a right fixing rib 4;

[0022] See also Figure 2 , a left U-shaped groove 5 is arranged at the center of the surface of the left fixed rib 3, and a right U-shaped groove 6 is installed at the center of the surface of the right fixed rib 4;

[0023] The structural floor 7 is arranged on the back of the upper horizontal reinforcement 1, and a concrete shear wall 8 is installed at the bottom center of the structural floor 7. The devices are arranged in sequence by arranging them at intervals of 1m from the bottom of the concrete shear wall 8. After the left U-shaped groove 5 and the right U-shaped groove 6 of the device are clamped on the main reinforcement of the concrete shear wall 8, they are tied firmly by wire tying. The lower half of the device at the top of the concrete shear wall 8 is located in the wall of this layer, and the upper half is exposed to the outside. After the concrete pouring of this layer is completed, the upper half of the device exposed to the outside plays an effective role in positioning and thickness control of the bottom of the next layer of the wall. The device arranged in the middle of the wall can be tied together with the wall reinforcement when the wall reinforcement is tied. In this way, the utility model is simple and convenient to construct, and the quality of wall positioning and thickness control is improved. The device does not need welding, which reduces the on-site welding process, avoids hot work, eliminates the hidden danger of fire, and improves the construction quality and construction efficiency. At the same time, the material of the utility model is on-site waste steel bars, which can be reused.

[0024] See also Figure 3 , first rotating columns 9 are added to both ends of the upper horizontal rib 1 and the lower horizontal rib 2, and first screw rods 10 are transversely installed at the inner end centers of the first rotating columns 9. The first screw rods 10 are driven by the first rotating columns 9 to rotate on the upper horizontal rib 1 and the lower horizontal rib 2. First screw holes 11 are opened at the centers of both ends of the upper horizontal rib 1 and the lower horizontal rib 2, and the first screw holes 11 correspond to the first screw rods 10. The first screw rod 10 translates by rotating inside the first screw hole 11, thereby adjusting the use length of the upper horizontal rib 1 and the lower horizontal rib 2.

[0025] See also Figure 4, both ends of the left fixed rib 3 and the right fixed rib 4 are provided with welding seats 12, and are connected to the upper horizontal rib 1 and the lower horizontal rib 2 through the welding seats 12. The left fixed rib 3 and the right fixed rib 4 are welded to the upper horizontal rib 1 and the lower horizontal rib 2 through the welding seats 12. The inner side of the welding seat 12 is rotatably connected with a second rotating column 13, and the center of the inner side of the second rotating column 13 is transversely installed with a second screw rod 14. The second rotating column 13 drives the second screw rod 14 to rotate on the welding seat 12. The centers of both ends of the left fixed rib 3 and the right fixed rib 4 are inwardly opened with a second screw hole 15, and the second screw hole 15 corresponds to the second screw rod 14. The second screw rod 14 translates by rotating inside the second screw hole 15, thereby adjusting the use height of the upper left fixed rib 3 and the right fixed rib 4, so that the length and height of the device can be adjusted, and the positioning and thickness control can be performed within a certain range with concrete shear walls 8 suitable for different areas.

[0026] This solution: The devices are installed one by one at intervals of 1m from the bottom of the concrete shear wall 8. The left U-shaped groove 5 and the right U-shaped groove 6 of the device are clamped onto the main reinforcement of the concrete shear wall 8 and then tied securely with wire. The lower half of the device located at the top of the concrete shear wall 8 is located inside the wall of this layer, while the upper half is exposed to the outside. After the pouring of this layer of concrete is completed, the exposed upper half of the device plays an effective role in positioning the bottom of the next layer of wall and controlling the thickness. The device installed in the middle of the wall can be tied together with the wall reinforcement. The first screw 10 is driven to rotate on the upper horizontal rib 1 and the lower horizontal rib 2 by the first rotating column 9, and the first screw 10 is translated inside the first screw hole 11 by rotation, so as to adjust the usable length of the upper horizontal rib 1 and the lower horizontal rib 2. The left fixed rib 3 and the right fixed rib 4 are welded to the upper horizontal rib 1 and the lower horizontal rib 2 through the welding seat 12, and the second rotating column 13 drives the second screw 14 to rotate on the welding seat 12.

Claims

1. A shear wall positioning and thickness control device, characterized in that: include: An upper horizontal rib (1), and a lower horizontal rib (2) arranged directly below the upper horizontal rib (1), and the two sides between the upper horizontal rib (1) and the lower horizontal rib (2) are respectively connected to a left fixing rib (3) and a right fixing rib (4); A left U-shaped groove (5) is arranged at the center of the surface of the left fixed rib (3), and a right U-shaped groove (6) is installed at the center of the surface of the right fixed rib (4); The structural floor slab (7) is arranged on the back side of the upper horizontal reinforcement (1), and a concrete shear wall (8) is installed at the bottom center of the structural floor slab (7).

2. A shear wall positioning and thickness control device according to claim 1, characterized in that: Both ends of the upper horizontal rib (1) and the lower horizontal rib (2) are provided with a first rotating column (9), and the inner end center of the first rotating column (9) is transversely mounted with a first screw rod (10).

3. A shear wall positioning and thickness control device according to claim 2, characterized in that: A first screw hole (11) is provided at the centre of both ends of the upper horizontal rib (1) and the lower horizontal rib (2), and the first screw hole (11) corresponds to the first screw rod (10).

4. A shear wall positioning and thickness control device according to claim 1, characterized in that: Both ends of the left fixed rib (3) and the right fixed rib (4) are provided with welding seats (12), and are connected to the upper horizontal rib (1) and the lower horizontal rib (2) via the welding seats (12).

5. A shear wall positioning and thickness control device according to claim 4, characterized in that: The inner side surfaces of the welding seats (12) are rotatably connected to the second rotating columns (13), and the center of the inner side surfaces of the second rotating columns (13) are transversely mounted with second screw rods (14).

6. A shear wall positioning and thickness control device according to claim 5, characterized in that: The centers of both ends of the left fixing rib (3) and the right fixing rib (4) are provided with second screw holes (15) facing inwards, and the second screw holes (15) correspond to the second screw rods (14).