Water conservancy project protection slope reinforcing structure
By using a combination of slope guard plate, screw rod and auger drill bit in the protective slope reinforcement structure of water conservancy engineering, the problem of insertion of the existing slope guard structure is solved, the rapid fixation of slope guard plate and effective reinforcement of slope body is achieved, and the Practicality of slope protection structure.
Patent Information
- Application Number
- CN202420356028.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-27
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-02-27
AI Technical Summary
The existing water conservancy project's anti-shock slope protection structure is troublesome and physically consuming when inserting the slope protection rod, and is prone to damage, and has low practicality.
Adopt a protective slope reinforcement structure including slope guard plate, top plate, bottom plate, mounting block, screw rod and auger drill bit. The screw rod and auger drill bit are twisted and rotated by electric batch tool to drive the screw rod and auger drill bit to rotate, fix the slope guard plate to the slope body, avoiding the use of Hammer strikes.
The rapid and labor-saving fixation of the slope guard plate is achieved, the practicality of the slope guard structure is improved, and the vertical insertion of the drill bit is ensured, the slope body is protected and reinforced through the threaded structure.
Smart Images

Figure CN222500098U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a water conservancy project protection slope reinforcement structure. Background Art
[0002] The river section where the bridge is located and the concave bank of the river bank are eroded by the water flow year by year, which will cause the river bank to collapse continuously. In order to protect the safety of bridges and embankments, it is necessary to build a slope protection structure with erosion resistance on the concave bank. Publication No. CN214271913U discloses an anti-erosion slope protection structure for water conservancy projects, including a number of slope protection bricks that cooperate with each other, a number of slope protection plates are arranged above the slope protection bricks, and a number of slope protection rods are arranged below the slope protection plates. The slope protection rods pass through the slope protection bricks and are inserted into the earth slope. An upper edging is fixed above the slope protection plate, and a top rod is arranged below the upper edging. The top rod is inserted into the earth slope, and a lower edging is fixed below the slope protection plate. A bottom rod is arranged on the left side of the lower edging, and the bottom rod is inserted into the earth slope. Although this type of anti-scour slope protection structure is laid on the earth slope 1 by means of slope protection bricks, and green plants are planted inside, which can effectively protect the earth slope and resist water scour, it is rather troublesome to insert the slope protection rods, and a hammer needs to be used to hammer them in, which consumes a lot of physical strength. In addition, the slope protection rods are easily damaged during the hammering process. Therefore, the practicability is low and needs to be improved. Utility Model Content
[0003] The purpose of the utility model is to solve the technical problems raised in the above background technology.
[0004] The utility model adopts the following technical scheme: a water conservancy project slope reinforcement structure, comprising a slope body, a slope protection board is placed on the surface of the slope body, a top plate is fixedly installed on the top end of the slope protection board, a bottom plate is fixedly installed on the bottom end of the slope protection board, a mounting block is fixedly installed on the surface of the slope protection board, a screw rod is penetrated on the surface of the mounting block, and a spiral drill bit is fixedly installed on one end of the screw rod.
[0005] Preferably, the surface of the slope protection plate is provided with a perforation, and the inner diameter of the perforation is the same as the outer diameter of the screw rod. Here, the perforation can facilitate the passage of the spiral drill bit.
[0006] Preferably, a thread is provided inside the mounting block, and the thread is meshed with the lead screw.
[0007] Preferably, the mounting block is a "U"-shaped structure, and the material of the mounting block is austenitic stainless steel. Here, the service life of the mounting block can be increased.
[0008] Preferably, a rotating nut is fixedly mounted on the top of the screw rod, and clamping plates arranged at equal distances are fixedly mounted on the bottom surface of the slope protection plate. Here, the screw rod can be easily rotated.
[0009] Preferably, the bottom surface of the bottom plate is provided with a metering mechanism, the metering mechanism comprises a chute, the chute is provided on the bottom surface of the bottom plate, a slider is slidably connected to the inner wall of the chute, a collecting box is fixedly installed on the bottom surface of the slider, a rubber block is fixedly installed on the inner wall of the chute, and a hole is provided on the bottom surface of the collecting box. Here, the amount of soil loss can be conveniently observed.
[0010] Preferably, a glass plate is fixed on the surface of the collecting box, and a scale is provided on the inner wall of the glass plate, so that the soil loading amount can be conveniently observed.
[0011] Compared with the prior art, the advantages and positive effects of the utility model are:
[0012] 1. In the utility model, when actually using it, when carrying out slope protection, it is only necessary to align the slope protection board with the slope body for laying, and then directly screw the rotating nut with an electric screwdriver, and then the rotating nut drives the screw rod to rotate. At this time, since a thread is provided in the mounting block, the screw rod can move in the mounting block at this time, and then the screw rod drives the spiral drill bit to rotate, and then the drill bit can drill into the slope body. At this time, the slope protection board can be fixed to the slope body through the drill bit, and since there is no need to use a hammer for knocking, it is more labor-saving, and since it is a threaded structure, the screw rod will not deviate when moving in the mounting block, and it can be ensured that the drill bit drills vertically into the slope body, thereby effectively protecting and reinforcing the slope body, and the practicality is high.
[0013] 2. In the utility model, during actual use, the soil flowing down the slope can be collected through the collection box, so that the staff can regularly observe the soil capacity in the collection box, so as to conveniently judge the soil erosion rate of the slope, and then judge the slope protection effect. Since the glass plate is made of transparent material, the staff can judge the soil capacity in the collection box through the glass plate, and the judgment can be made more accurately through the set scale. When the soil in the collection box needs to be dumped, it is only necessary to pull the collection box outward, and the collection box then drives the slider to slide out of the slide slot, and then the collection box can be removed, and then the soil can be processed. After the soil is processed, the slider on the collection box is aligned with the slide slot and slides in, and then the friction between the rubber block and the slider can limit the collection box, thereby ensuring that the collection box is installed firmly. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A schematic diagram of a water conservancy project protection slope reinforcement structure is proposed for the utility model;
[0015] Figure 2 An exploded diagram of a water conservancy project protection slope reinforcement structure is proposed for the utility model;
[0016] Figure 3 The utility model proposes a water conservancy project slope reinforcement structure Figure 2Enlarged view of point A in the middle;
[0017] Figure 4 A bottom view of a water conservancy project protection slope reinforcement structure is proposed for the utility model;
[0018] Figure 5 The utility model proposes a water conservancy project slope reinforcement structure Figure 4 Enlarged view of point B in the middle.
[0019] Legend:
[0020] 1. Slope; 2. Slope protection board; 3. Top plate; 4. Bottom plate; 5. Mounting block; 6. Screw rod; 7. Auger bit; 8. Perforation; 9. Turning nut; 10. Slide groove; 11. Slider; 12. Collection box; 13. Glass plate; 14. Scale; 15. Rubber block; 16. Pallet. DETAILED DESCRIPTION
[0021] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0022] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0023] Embodiment 1
[0024] See also Figure 1-5 The utility model provides a technical solution: a water conservancy project slope reinforcement structure, including a slope body 1, a slope protection board 2 is placed on the surface of the slope body 1, and the bottom surface of the slope protection board 2 is fixedly installed with card plates 16 arranged at equal distances. The card plates 16 can be embedded in the slope body 1 to prevent soil erosion. A top plate 3 is fixedly installed on the top of the slope protection board 2, and a bottom plate 4 is fixedly installed on the bottom end of the slope protection board 2. A mounting block 5 is fixedly installed on the surface of the slope protection board 2. The mounting block 5 is a "U"-shaped structure, and the material of the mounting block 5 is austenitic stainless steel. The mounting block 5 made of austenitic stainless steel is sturdy and durable.
[0025] See also Figure 1-5A screw rod 6 is provided through the surface of the mounting block 5, and a through hole 8 is provided on the surface of the slope protection plate 2. The inner diameter of the through hole 8 is the same as the outer diameter of the screw rod 6. A thread is provided inside the mounting block 5, and the thread is meshed with the screw rod 6. A rotating nut 9 is fixedly installed on the top of the screw rod 6. When performing slope protection, it is only necessary to align the slope protection plate 2 with the slope body 1 for laying, and then directly screw the rotating nut 9 with an electric screwdriver. The rotating nut 9 then drives the screw rod 6 to rotate. At this time, since a thread is provided in the mounting block 5, the screw rod 6 can move in the mounting block 5 at this time, and the screw rod 6 then drives the spiral drill bit 7 to rotate. At this time, the drill bit can drill into the slope body 1. At this time, the slope protection plate 2 can be fixed to the slope body 1 through the drill bit, and a spiral drill bit 7 is fixedly installed on one end of the screw rod 6.
[0026] Embodiment 2
[0027] See also Figure 4-5 A metering mechanism is provided on the bottom surface of the bottom plate 4, and the metering mechanism includes a chute 10, which is opened on the bottom surface of the bottom plate 4. A slider 11 is slidably connected to the inner wall of the chute 10, and a collecting box 12 is fixedly installed on the bottom surface of the slider 11. The soil flowing down the slope 1 can be collected by the collecting box 12, so that the staff can regularly observe the soil capacity in the collecting box 12, so as to conveniently judge the soil and water loss rate of the slope 1. A glass plate 13 is fixedly installed on the surface of the collecting box 12. Since the glass plate 13 is made of transparent material, the staff can judge the soil in the collecting box 12 through the glass plate 13. The holding capacity is determined by a scale 14 on the inner wall of the glass plate 13. The scale 14 can be used to make a more accurate judgment. A rubber block 15 is fixedly installed on the inner wall of the slide 10. The collection box 12 is pulled outward, and the collection box 12 then drives the slider 11 to slide out of the slide 10. Then the collection box 12 can be removed, and the soil can be processed. After the soil is processed, the slider 11 on the collection box 12 is aligned with the slide 10 and slides in. The friction between the rubber block 15 and the slider 11 can limit the collection box 12. The bottom surface of the collection box 12 is provided with holes, and the holes can facilitate water seepage.
[0028] Working principle: when carrying out slope protection, it is only necessary to align the slope protection board 2 with the slope body 1 for laying, and then directly screw the rotating nut 9 with an electric screwdriver, and the rotating nut 9 then drives the screw rod 6 to rotate. At this time, since there is a thread in the mounting block 5, the screw rod 6 can move in the mounting block 5 at this time, and the screw rod 6 then drives the spiral drill bit 7 to rotate, and the drill bit can drill into the slope body 1. At this time, the slope protection board 2 can be fixed to the slope body 1 through the drill bit, and since there is no need to use a hammer for knocking, it is more labor-saving, and because it is a threaded structure, the screw rod 6 will not deviate when moving in the mounting block 5, which can ensure that the drill bit drills vertically into the slope body 1, thereby effectively protecting and reinforcing the slope body 1. During use, the soil flowing down from the slope body 1 can be collected through the collection box 12. The staff can regularly observe the soil capacity in the collection box 12, so as to conveniently judge the speed of soil erosion of the slope 1, and then judge the slope protection effect. Since the glass plate 13 is made of transparent material, the staff can judge the soil capacity of the collection box 12 through the glass plate 13, and the set scale 14 can be used for more accurate judgment. When the soil in the collection box 12 needs to be dumped, it is only necessary to pull the collection box 12 outward, and the collection box 12 then drives the slider 11 to slide out of the slide groove 10, and then the collection box 12 can be removed, and then the soil can be processed. After the soil is processed, the slider 11 on the collection box 12 is aligned with the slide groove 10 and slides in, and then the friction between the rubber block 15 and the slider 11 can limit the collection box 12.
[0029] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A water conservancy project slope reinforcement structure, comprising a slope body (1), characterized in that: A slope protection plate (2) is placed on the surface of the slope body (1); a top plate (3) is fixedly mounted on the top end of the slope protection plate (2); a bottom plate (4) is fixedly mounted on the bottom end of the slope protection plate (2); a mounting block (5) is fixedly mounted on the surface of the slope protection plate (2); a screw rod (6) is provided through the surface of the mounting block (5); and a spiral drill bit (7) is fixedly mounted on one end of the screw rod (6).
2. The water conservancy project slope reinforcement structure according to claim 1 is characterized in that: A through hole (8) is provided on the surface of the slope protection plate (2), and the inner diameter of the through hole (8) is the same as the outer diameter of the screw rod (6).
3. The water conservancy project slope reinforcement structure according to claim 1 is characterized in that: The interior of the mounting block (5) is provided with a thread, and the thread is meshed with the screw rod (6).
4. The water conservancy project slope reinforcement structure according to claim 1 is characterized in that: The mounting block (5) is a "U"-shaped structure, and the material of the mounting block (5) is austenitic stainless steel.
5. The water conservancy project slope reinforcement structure according to claim 1 is characterized in that: A rotating nut (9) is fixedly mounted on the top of the screw rod (6), and clamping plates (16) arranged at equal distances are fixedly mounted on the bottom surface of the slope protection plate (2).
6. The water conservancy project slope reinforcement structure according to claim 1 is characterized by: The bottom surface of the bottom plate (4) is provided with a metering mechanism, the metering mechanism comprising a slide groove (10), the slide groove (10) is opened on the bottom surface of the bottom plate (4), the inner wall of the slide groove (10) is slidably connected with a slider (11), the bottom surface of the slider (11) is fixedly mounted with a collection box (12), the inner wall of the slide groove (10) is fixedly mounted with a rubber block (15), and the bottom surface of the collection box (12) is provided with a hole.
7. The water conservancy project slope reinforcement structure according to claim 6 is characterized in that: A glass plate (13) is fixedly mounted on the surface of the collection box (12), and a scale (14) is provided on the inner wall of the glass plate (13).