Tube well integrated vertical tube convenient to assemble
Through the design of integrated riser pipe and prefabricated assembly combination riser pipe well installation construction technology for easy assembly, combined with BIM technology, the problem of difficulty in installation and low construction efficiency of pipe wells in traditional residential electromechanical installation is solved, and rapid assembly is achieved and efficient construction.
Patent Information
- Application Number
- CN202420910807.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2025-02-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In traditional residential mechanical and electrical installation projects, there are many pipeline systems, complex materials, and diverse pipeline interface forms, which lead to difficult installation operations, difficult construction quality, cumbersome coordination of processes, low construction efficiency, high labor costs, and serious pollution of finished products.
Design a pipe well integrated riser for easy assembly, including fixed steel plates, pipeline sleeves, combined riser pipe body, fixed bracket and fastener bracket. Deeply designed through BIM technology, combined riser pipe well installation and construction technology with prefabricated assembly , realize the construction of the lifting assembly and assembly of the pipe well and the main structure simultaneously.
It realizes rapid assembly of integrated pipe pipe pipe pipes, improves construction efficiency, reduces labor costs, controls installation quality, avoids finished product pollution, and explores the industrialization direction of residential mechanical and electrical installation.
Smart Images

Figure CN222500919U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated assembly combined vertical pipe pipe well installation construction, in particular to a pipe well integrated vertical pipe which is easy to assemble. Background Art
[0002] Prefabricated buildings have advantages such as low pollution and good energy-saving effects. However, in the actual implementation process, there are many problems in mechanical and electrical engineering, such as many professional subcontracts, insufficient depth of design of each professional, ineffective coordination between design and construction, and difficulty in interlacing construction in complex pipe well areas. Building pipe wells are one of the important media of building systems. In traditional residential mechanical and electrical installation projects, there are many pipe well systems, complicated materials, various forms of pipe interfaces, small pipe well space, and difficult installation operations; the progress of cross-construction operations of various professional subcontracts is uncontrollable, and many unfavorable factors will affect the quality of pipe well installation entities; how to achieve synchronous installation of assembled pipe wells with PC main bodies, and how to improve the economic benefits of mechanical and electrical installation projects through digital construction methods are the key points of research.
[0003] In traditional residential mechanical and electrical installation projects, there are many pipe well systems, complicated materials, and various forms of pipe interfaces. There are many difficult-to-control pain points that will be encountered during the construction and installation process. For example, the pipe well space is relatively small, and each casing needs to be welded and fixed, and accurately positioned separately, which makes the installation operation difficult. It is easy to deviate when the riser is aligned, the pipes are limited in mutual fixation, and the distance between the pipes and the wall is too small for operation. The construction quality is difficult to control, and the coordination of the process is cumbersome. Multiple construction operations are carried out in sequence, and the pre-buried and installation involve a relatively long construction period and multiple constructions. The workload is large, the process is cumbersome, the construction efficiency is low, the labor demand is high, and most people need to cooperate. The labor consumption is large, the labor cost is high, and the finished product is seriously polluted. When cross-construction of different parts occurs, it will cause pollution to nearby finished products. Many problems make the pipe well riser pipeline extremely complicated and cumbersome during the installation and construction process.
[0004] Now, a new type of pipe well integrated riser which is easy to assemble is proposed to solve the above-mentioned shortcomings. Utility Model Content
[0005] The utility model aims to provide a pipe-well integrated riser that is easy to assemble, so as to solve the problem in the above background technology that it is inconvenient to quickly assemble the pipe-well integrated riser.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pipe well integrated riser that is easy to assemble, comprising a fixed steel plate, pipe casings are welded and fixed to both sides of the top of the fixed steel plate, and a combined riser body is vertically penetrated inside the pipe casing, a left hook is welded and fixed to the left side of the top of the fixed steel plate, a right hook is welded and fixed to the right side of the top of the fixed steel plate, a water stop joint is installed at the middle position of the front end of the fixed steel plate, a fixed bracket is arranged at the bottom of the rear end of the combined riser body, and a fastening bracket is arranged at the top position of the rear end of the combined riser body.
[0007] Preferably, the fixing bracket and the fastening bracket are respectively provided with a plurality of fixing clamps, and the rear end of the outside of the fixing clamp is provided with an external thread groove, the inside of the fixing bracket and the fastening bracket are respectively provided with a plurality of reserved holes, the rear end and the left side of the fixing bracket and the fastening bracket are respectively provided with nuts, the rear ends of the fixing bracket and the fastening bracket are respectively welded and fixed with embedded anchor points, and the inside of the embedded anchor points is provided with through holes, and the combined riser pipe body is respectively fixed to the fixing bracket and the fastening bracket by fixing clamps.
[0008] Preferably, the rear end of the fixing clamp passes through the interior of the reserved hole, and the nut is threadedly connected to the outside of the external thread groove.
[0009] Preferably, a plurality of groups of the pipe sleeves are arranged at the top end of the fixed steel plate, the pipe sleeves penetrate the interior of the fixed steel plate, and the outer side of the combined riser pipe body is tightly fixed between a wooden wedge and the inner side of the pipe sleeve.
[0010] Preferably, the fixing bracket, the fixing steel plate and the fastening bracket are L-shaped structures respectively. The fixing bracket, the fixing steel plate and the fastening bracket are L-shaped structures respectively.
[0011] Preferably, the exterior of the fixed bracket, embedded anchor points, fixed steel plates, fastening brackets, combined riser pipe body, pipe casing and right hook are sprayed with anti-corrosion paint respectively.
[0012] Preferably, a cover is provided at the top of the fixed steel plate, inner holes are respectively opened inside the two sides of the top of the cover, long rods are respectively vertically arranged on the two sides of the top of the cover, and gaskets are sleeved on the top of the outside of the long rods, and a threaded hole is opened in the middle position of the top of the fixed steel plate.
[0013] Preferably, the long rod passes through the interior of the inner hole, an external thread is provided at the bottom end of the exterior of the long rod, and an internal thread matching the external thread is provided inside the threaded hole.
[0014] Compared with the prior art, the utility model has the following beneficial effects: the pipe-well integrated riser that is easy to assemble not only realizes the convenience of rapid assembly of the pipe-well integrated riser, realizes the convenience of anti-corrosion protection of the integrated riser assembly, but also realizes the convenience of auxiliary sealing of the interior of the riser to be installed to prevent foreign objects from getting stuck;
[0015] By setting fixed brackets, embedded anchor points, fixed steel plates, left hooks, fastening brackets, combined riser bodies, pipe casings, right hooks, water stop joints, fixed clamps, reserved holes, nuts and external threaded grooves, the main feature of this method is that it uses BIM technology as a carrier to perform high-precision modeling of the pipe well model, and comprehensively deepens the aluminum mold structure, pipeline positioning, interface position, branch pipe routing, bracket points, etc., thereby improving the quality of the implementation of the in-depth design. At the same time, relying on the construction site processing workshop, the prefabricated riser is assembled together with the bracket, casing, and frame as a whole, realizing the synchronous construction of the pipe well riser hoisting and assembly with the main structure. In addition, an integrated riser system is designed in this method. The pipe support system consists of fixed steel plates, pipe casings, angle steels, combined riser bodies and fixed clamps. The pipe casings are welded to the fixed steel plates. After the pre-assembly of the prefabricated combined riser bodies of various specialties is completed, the overall modular hoisting unit is formed, which is transported to the working surface for fixation by a tower crane.
[0016] The pipe shaft integrated riser system of this construction method is assembled into a pipe hoisting module unit. When the main structure is constructed to the corresponding floor, the prefabricated combined riser unit is hoisted to the pipe shaft by on-site hoisting equipment, fixed and connected in place, and the installation of the pipe shaft riser is completed in one go. The electromechanical assembly is combined with BIM technology, and the in-depth design and construction briefing of the assembled pipe shaft are carried out through BIM technology, which greatly improves the quality of in-depth design and avoids problems such as pipeline collision and inability to implement construction. This technology advances the pipe shaft construction process and synchronizes the construction with the main structure, realizing the advanced insertion and industrialized production of the pipe shaft, which can greatly shorten the construction period, reduce the constraints of the installation environment, and control the installation quality. The four core technologies of in-depth design, prefabrication, hoisting and transportation, and assembly construction are used, which can be well matched with the assembled structure for construction, realizing the advanced insertion of pipe shaft installation, exploring the industrialization direction of residential electromechanical installation, and has good promotion value;
[0017] The prefabricated and assembled combined riser pipe shaft installation construction technology is a new type of construction technology that breaks through the traditional high-rise building pipe shaft pipeline installation method. Its process principle is to use BIM technology to arrange and deepen, combine the spatial position of the wall, beam, and aluminum formwork support system, and consider factors such as the insulation thickness of the heating pipe. The pipe spacing is optimized, and the L-shaped arrangement along the wall is adopted to reasonably determine the position of the casing. In the electromechanical processing workshop, the riser is assembled into a modular unit through the pipe support system. When the assembled main structure is constructed to the corresponding floor, the prefabricated combined riser unit is hoisted to the pipe shaft by on-site hoisting equipment, and it is fixed and connected in place to complete the installation of the pipe shaft riser in one go; it has significant advantages such as fast construction speed and no need for reserved and embedded processes;
[0018] Prefabricated and assembled buildings are an inevitable trend in the development of building industrialization. In electromechanical engineering, by applying prefabricated and assembled riser and pipe well installation construction technology, industrialized centralized prefabrication and processing saves labor for sporadic processing of projects, saves vertical fire protection and construction water installation materials in the building, realizes advanced insertion and installation of pipe wells, solves the problem of simultaneous follow-up of fire protection water and construction water on the construction surface; reduces manual handling, makes full use of tower crane assembly operations, and improves installation efficiency. It solves the problem of non-concentricity between risers and casings, avoids the problem of chiseling and filling caused by the deviation of direct-buried steel casings, and reduces the hidden danger of leakage at the root of casings. The four core technologies of in-depth design, prefabrication, hoisting and transportation, and assembly construction are used, which can be well matched with prefabricated structures for construction, and explores the industrial development direction of residential electromechanical installation, which has good promotion value.
[0019] By providing fixed brackets, embedded anchor points, fixed steel plates, fastening brackets, combined riser bodies, pipe casings, right hooks and anti-corrosion paint, the exteriors of the prefabricated combined riser shaft components are sprayed with anti-corrosion paint. The anti-corrosion paint can form a protective layer on the exteriors of the prefabricated combined riser shaft components, thereby reducing moisture and rust damage to the prefabricated combined riser shaft components and extending the service life of the prefabricated combined riser shaft.
[0020] By providing a fixed steel plate, a cover, a threaded hole, a long rod, a gasket and an inner hole, after the prefabricated combined riser pipe shaft is assembled and before construction and installation, the cover can be covered on the top of the combined riser pipe body, and then two sets of long rods are used to penetrate the inner hole and correspondingly screwed into the threaded holes inside the fixed steel plate and locked. Then, the cover can be installed and fixed on the top of the prefabricated combined riser pipe shaft. The provided cover can assist in sealing the interior of the combined riser pipe body, reducing and preventing some external foreign objects from accidentally entering the interior of the combined riser pipe body and causing jamming and inability to be removed. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a front view cross-sectional structural schematic diagram of the utility model;
[0022] Figure 2 It is a schematic diagram of the enlarged structure of the fixed steel plate of the utility model from top view;
[0023] Figure 3 It is a schematic diagram of an enlarged top view of the fixing clamp of the utility model;
[0024] Figure 4 It is a schematic diagram of a partial cross-section enlarged structure of the cover of the utility model in a front view.
[0025] In the figure; 1. fixed bracket; 2. embedded anchor point; 3. fixed steel plate; 4. left hook; 5. fastening bracket; 6. cover; 7. combined riser body; 8. pipe casing; 9. right hook; 10. water stop joint; 11. threaded hole; 12. through hole; 13. anti-corrosion paint; 14. fixed clamp; 15. reserved hole; 16. nut; 17. external thread groove; 18. long rod; 19. gasket; 20. inner hole. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Example 1: Please refer to Figure 1-4 , a pipe well integrated riser that is easy to assemble, comprising a fixed steel plate 3, pipe sleeves 8 are welded and fixed at both sides of the top of the fixed steel plate 3, and a combined riser pipe body 7 is vertically penetrated and installed inside the pipe sleeve 8, a left hook 4 is welded and fixed at the left side of the top of the fixed steel plate 3, a right hook 9 is welded and fixed at the right side of the top of the fixed steel plate 3, a water stop joint 10 is installed at the middle position of the front end of the fixed steel plate 3, a fixed bracket 1 is provided at the bottom of the rear end of the combined riser pipe body 7, and a fastening bracket 5 is provided at the top position of the rear end of the combined riser pipe body 7;
[0028] A plurality of fixing clamps 14 are respectively arranged on the fixing bracket 1 and the fastening bracket 5, and an external thread groove 17 is provided at the rear end of the fixing clamp 14, and a plurality of reserved holes 15 are respectively provided inside the fixing bracket 1 and the fastening bracket 5, and a nut 16 is respectively provided at the rear end and the left side of the fixing bracket 1 and the fastening bracket 5, and a pre-buried anchoring point 2 is respectively welded and fixed at the rear end of the fixing bracket 1 and the fastening bracket 5, and a through hole 12 is provided inside the pre-buried anchoring point 2, and the combined riser pipe body 7 is respectively fixed to the fixing bracket 1 and the fastening bracket 5 by the fixing clamp 14, and the rear end of the fixing clamp 14 passes through the inside of the reserved hole 15, and the nut 16 is threadedly connected to the outside of the external thread groove 17, and a plurality of pipe sleeves 8 are arranged on the top of the fixing steel plate 3, and the pipe sleeves 8 pass through the inside of the fixing steel plate 3, and the outside of the combined riser pipe body 7 is fixed by plugging and fixing between a wooden wedge and the inner side of the pipe sleeve 8, and the fixing bracket 1, the fixing steel plate 3 and the fastening bracket 5 are L-shaped structures respectively;
[0029] 3 Specifically, Figure 1-Figure 3 As shown in the figure, the main feature of this method is to use BIM technology as a carrier to carry out high-precision modeling of the pipe well model, and to carry out all-round deepening of the aluminum mold structure, pipeline positioning, interface location, branch pipe routing, bracket point location, etc., thus improving the quality of the implementation of the in-depth design;
[0030] At the same time, relying on the processing workshop at the construction site, the prefabricated riser is assembled together with the bracket, casing, and frame, realizing the synchronous construction of the pipe shaft riser hoisting and assembly and the main structure;
[0031] In addition, an integrated riser system is designed in the present method. The pipe support system is composed of a fixed steel plate 3, a pipe sleeve 8, an angle steel, a combined riser pipe body 7 and a fixed clamp 14. The pipe sleeve 8 is welded to the fixed steel plate 3. After the prefabricated combined riser pipe body 7 of each specialty is preassembled, a modular hoisting unit is formed as a whole, which is transported to the working surface and fixed by a tower crane.
[0032] Embodiment 2: The exterior of the fixed bracket 1, the embedded anchor point 2, the fixed steel plate 3, the fastening bracket 5, the combined riser pipe body 7, the pipe sleeve 8 and the right hook 9 are sprayed with anti-corrosion paint 13 respectively;
[0033] Specifically, Figure 1 and Figure 2 As shown, the outer parts of the prefabricated combined riser pipe well components are sprayed with anti-corrosion paint 13, and the anti-corrosion paint 13 can form a protective layer on the outer parts of the prefabricated combined riser pipe well components to reduce moisture and rust damage to the prefabricated combined riser pipe well components.
[0034] Embodiment 3: A cover 6 is provided at the top of the fixed steel plate 3, inner holes 20 are respectively provided inside the two sides of the top of the cover 6, long rods 18 are respectively provided vertically on the two sides of the top of the cover 6, and the top of the outside of the long rod 18 is sleeved with a gasket 19, a threaded hole 11 is provided at the middle position of the top of the fixed steel plate 3, the long rod 18 passes through the inside of the inner hole 20, an external thread is provided at the bottom end of the outside of the long rod 18, and an internal thread matching the external thread is provided inside the threaded hole 11;
[0035] Specifically, Figure 1 and Figure 4 As shown, after the prefabricated combined riser pipe shaft is assembled, before construction and installation, the cover 6 can be covered on the top of the combined riser pipe body 7, and then two sets of long rods 18 are used to penetrate the inner hole 20, and are correspondingly screwed into the threaded holes 11 inside the fixed steel plate 3 and locked, and then the cover 6 can be installed and fixed on the top of the prefabricated combined riser pipe shaft. The set cover 6 can assist in sealing the interior of the combined riser pipe body 7, reducing and preventing some external foreign objects from accidentally entering the interior of the combined riser pipe body 7 and causing jamming and being unable to be removed.
[0036] Working principle: When the utility model is in use, the main feature of this method is to use BIM technology as a carrier to perform high-precision modeling of the pipe well model, and to comprehensively deepen the aluminum mold structure, pipeline positioning, interface position, branch pipe routing, bracket point position, etc., thereby improving the quality of the implementation of the in-depth design. At the same time, relying on the construction site processing workshop, the prefabricated riser is assembled together with the bracket, casing, and frame as a whole, so that the pipe well riser hoisting assembly and the main structure are constructed synchronously. In addition, an integrated riser system is designed in this method. The pipe support system is composed of a fixed steel plate 3, a pipe casing 8, an angle steel, a combined riser pipe body 7, and a fixed clamp 14. The pipe casing 8 is welded to the fixed steel plate 3. After the pre-assembly of each professional prefabricated combined riser pipe body 7 is completed, the overall modular hoisting unit is formed, which is transported to the working surface for fixation by a tower crane.
[0037] The pipe shaft integrated riser system of this construction method is assembled into a pipe hoisting module unit. When the main structure is constructed to the corresponding floor, the prefabricated combined riser unit is hoisted to the pipe shaft by on-site hoisting equipment, fixed and connected in place, and the installation of the pipe shaft riser is completed in one go. The electromechanical assembly is combined with BIM technology, and the in-depth design and construction briefing of the assembled pipe shaft are carried out through BIM technology, which greatly improves the quality of in-depth design and avoids problems such as pipeline collision and inability to implement construction. This technology advances the pipe shaft construction process and synchronizes the construction with the main structure, realizing the advanced insertion and industrialized production of the pipe shaft, which can greatly shorten the construction period, reduce the constraints of the installation environment, and control the installation quality. The four core technologies of in-depth design, prefabrication, hoisting and transportation, and assembly construction are used, which can be well matched with the assembled structure for construction, realizing the advanced insertion of pipe shaft installation, exploring the industrialization direction of residential electromechanical installation, and has good promotion value;
[0038] The prefabricated and assembled combined riser pipe shaft installation construction technology is a new type of construction technology that breaks through the traditional high-rise building pipe shaft pipeline installation method. Its process principle is to use BIM technology to arrange and deepen, combine the spatial position of the wall, beam, and aluminum formwork support system, and consider factors such as the insulation thickness of the heating pipe. The pipe spacing is optimized, and the L-shaped arrangement along the wall is adopted to reasonably determine the position of the casing. In the electromechanical processing workshop, the riser is assembled into a modular unit through the pipe support system. When the assembled main structure is constructed to the corresponding floor, the prefabricated combined riser unit is hoisted to the pipe shaft by on-site hoisting equipment, and it is fixed and connected in place to complete the installation of the pipe shaft riser in one go; it has significant advantages such as fast construction speed and no need for reserved and embedded processes;
[0039] Prefabricated and assembled buildings are an inevitable trend in the development of building industrialization. In electromechanical engineering, by applying prefabricated and assembled riser pipe well installation construction technology, industrialized centralized prefabrication and processing saves labor for sporadic processing of projects, saves vertical fire protection and construction water installation materials in the building, realizes advanced insertion and installation of pipe wells, solves the problem of simultaneous follow-up of fire protection water and construction water on the construction surface; reduces manual handling, makes full use of tower crane assembly operations, and improves installation efficiency. It solves the problem of non-concentricity between the riser and the casing, avoids the problem of chiseling and filling caused by the deviation of the direct buried steel casing, and reduces the hidden danger of leakage at the root of the casing. By using the four core technologies of in-depth design, prefabrication, hoisting and transportation, and assembly construction, the prefabricated structure can be well matched with the construction, and the industrialization direction of residential electromechanical installation is explored, which has good promotion value. The outer parts of the prefabricated combined riser pipe well components are sprayed with anti-corrosion paint 13, and the anti-corrosion paint 13 can form a protective layer on the outer part of the prefabricated combined riser pipe well components, thereby reducing the moisture and rust damage of the prefabricated combined riser pipe well components, extending the service life of the prefabricated combined riser pipe well, and prefabricating the prefabricated combined riser pipe well components. After the assembly of the prefabricated combined riser pipe shaft is completed, before construction and installation, the cover 6 can be covered on the top of the combined riser pipe body 7, and then two sets of long rods 18 are used to penetrate the inner hole 20, and are correspondingly screwed into the threaded holes 11 inside the fixed steel plate 3 and locked. Then, the cover 6 can be installed and fixed on the top of the prefabricated combined riser pipe shaft. The set cover 6 can assist in sealing the interior of the combined riser pipe body 7, reducing and preventing some external foreign objects from accidentally entering the interior of the combined riser pipe body 7 and causing jamming and inability to be removed.
[0040] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A pipe well integrated riser that is easy to assemble, comprising a fixing steel plate (3), characterized in that: Pipe sleeves (8) are welded and fixed to both sides of the top of the fixed steel plate (3), and a combined vertical pipe body (7) is installed vertically through the inside of the pipe sleeve (8), a left hook (4) is welded and fixed to the left side of the top of the fixed steel plate (3), and a right hook (9) is welded and fixed to the right side of the top of the fixed steel plate (3), a water stop joint (10) is installed at the middle position of the front end of the fixed steel plate (3), a fixed bracket (1) is provided at the bottom of the rear end of the combined vertical pipe body (7), and a fastening bracket (5) is provided at the top position of the rear end of the combined vertical pipe body (7).
2. The easy-to-assemble pipe well integrated riser according to claim 1, characterized in that: The fixing bracket (1) and the fastening bracket (5) are respectively provided with a plurality of fixing clamps (14), and the rear end of the fixing clamp (14) is provided with an external thread groove (17). The fixing bracket (1) and the fastening bracket (5) are respectively provided with a plurality of reserved holes (15). The rear end and the left side of the fixing bracket (1) and the fastening bracket (5) are respectively provided with nuts (16). The rear ends of the fixing bracket (1) and the fastening bracket (5) are respectively welded with embedded anchoring points (2), and the embedded anchoring points (2) are provided with through holes (12). The combined riser pipe body (7) is respectively fixed to the fixing bracket (1) and the fastening bracket (5) by the fixing clamps (14).
3. The easy-to-assemble pipe well integrated riser according to claim 2, characterized in that: The rear end of the fixing clamp (14) passes through the interior of the reserved hole (15), and the nut (16) is threadedly connected to the outside of the external thread groove (17).
4. The easy-to-assemble pipe well integrated riser according to claim 1, characterized in that: The pipe sleeves (8) are provided in multiple groups at the top of the fixed steel plate (3), and the pipe sleeves (8) penetrate the interior of the fixed steel plate (3). The outer side of the combined vertical pipe body (7) is tightly fixed between the inner side of the pipe sleeves (8) by means of wooden wedges.
5. The easy-to-assemble pipe well integrated riser according to claim 1, characterized in that: The fixing bracket (1), the fixing steel plate (3) and the fastening bracket (5) are respectively L-shaped structures.
6. The easy-to-assemble pipe well integrated riser according to claim 1, characterized in that: The exteriors of the fixing bracket (1), the embedded anchor point (2), the fixing steel plate (3), the fastening bracket (5), the combined riser pipe body (7), the pipe sleeve (8) and the right hook (9) are respectively sprayed with anti-corrosion paint (13).
7. The easy-to-assemble pipe well integrated riser according to claim 1, characterized in that: A cover (6) is provided at the top of the fixed steel plate (3), inner holes (20) are respectively provided inside the two sides of the top of the cover (6), long rods (18) are respectively provided vertically on the two sides of the top of the cover (6), and the top of the outside of the long rods (18) is sleeved with a gasket (19), and a threaded hole (11) is provided at the middle position of the top of the fixed steel plate (3).
8. The easy-to-assemble pipe-well integrated riser according to claim 7, characterized in that: The long rod (18) passes through the inner hole (20), the bottom end of the outer portion of the long rod (18) is provided with an external thread, and the inner portion of the threaded hole (11) is provided with an internal thread matching the external thread.