Prefabricated part hydroelectric positioning and fixing tool convenient to disassemble and assemble
Through the water and electricity positioning and fixing tooling of prefabricated components, the combination of magnetic suction force and insertion anchor bolts, the dimensional deviation and repeated positioning problems in the hydropower reserved holes and materials of prefabricated components are solved, and the hydropower is realized The precise positioning and fixing of materials improves installation accuracy and efficiency, and reduces material use and cost.
Patent Information
- Application Number
- CN202421138819.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-23
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-05-23
AI Technical Summary
Prefabricated prefabricated components are prone to dimensional deviations and repeated positioning problems during the hydropower reserved holes and materials pre-embedded process, resulting in difficulty in later installation.
The prefabricated components that are easy to disassemble and assemble, are used to accurately position and fix the hydroelectric material through the combination of magnetic suction force and insertion anchor bolts.
The dimensional deviation and repeated positioning problems in the reserved holes of hydropower and material pre-embedding process are solved, which improves the accuracy and efficiency of installation and reduces the use and cost of materials.
Smart Images

Figure CN222501130U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated water and electricity reserved holes for assembled prefabricated components, in particular to a prefabricated water and electricity positioning and fixing tool that is easy to assemble and disassemble. Background Art
[0002] Prefabricated buildings are green, energy-saving, low-carbon, and environmentally friendly, and are easy to realize building componentization, building industrialization, and industrialization. They have been widely used in my country in recent years. The corresponding prefabricated components of the assembled integral concrete structure include corresponding reserved holes and corresponding reservations for water and electricity during design. The size positioning of the water and electricity reservations requires corresponding positioning and reservation accuracy.
[0003] Prefabricated components are prefabricated in factories. When it comes to the reservation of corresponding water and electricity holes and water and electricity embedded materials during the production process, if conventional methods are used, it is inevitable that the reserved holes and water and electricity materials will deviate, resulting in the inability to use the finished products on site when they are transported to the site. The corresponding water and electricity reservations on site or by the manufacturer need to be modified for the second time. However, most projects now have water and electricity construction that is connected to the upper and lower floors. Once the allowable deviation exceeds the specification, the water and electricity pipes on the upper and lower floors may not be connected in a standardized manner. The traditional prefabricated component water and electricity reserved holes are fixed by binding, which is prone to certain deviations due to vibration and other reasons. However, the use of a prefabricated component water and electricity positioning and fixing tool that is easy to disassemble and assemble can solve the problems of size deviation and repeated production and repeated positioning. Utility Model Content
[0004] The utility model aims to solve the problems of size deviation and repeated production and repeated positioning.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a prefabricated component water and electricity positioning and fixing tool that is easy to disassemble and assemble, including water and electricity materials that have been prepared according to the requirements of the drawings, such as water stop joints, steel casings, and prefabricated water and electricity positioning and fixing tooling. According to the fixing method of the reserved holes for water and electricity marked on the drawings, the base of the prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble is fixed to the bottom mold of the mold by magnetic suction, and the prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble is connected and fixed to its prefabricated component mold base by strong magnetic bonding at the bottom of the tooling. The prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble includes a magnetic base with a certain suction force, and the upper end of the base contains a cylinder with wire teeth; it includes a dowel anchor with an internal thread, which is characterized in that the corresponding dowel anchor can be connected to the magnetic base, the dowel anchor is a hollow cylinder, and the central area of the dowel anchor contains dowels of a certain size that can be inserted as an anchoring device for the tooling positioning water and electricity offset.
[0006] Furthermore, it comprises a magnetic base with a certain magnetic attraction, and the base comprises a cylindrical wire and a cylindrical magnet.
[0007] Further, a dowel anchor bolt with a bottom internal thread, the dowel anchor bolt has an internal thread matching the cylindrical wire drawing matching the magnetic base, and a matching size steel bar with a corresponding hydroelectric fixing inner diameter.
[0008] Furthermore, the tooling base is a cylinder with a diameter of 50 mm, a base height of 10 mm, and a cylindrical thread size of 14 mm welded on the upper end of the cylindrical base.
[0009] Furthermore, the height of the dowel anchor bolt is 195 mm, the upper and lower ends of the dowel anchor bolt include an internal thread with an inner diameter of 14 mm, and the middle section of the dowel anchor bolt includes a steel bar head of a corresponding size that can be inserted.
[0010] Furthermore, the height of the dowel anchor bolt is 195 mm, and the upper and lower structures of the prefabricated component water and electricity positioning fixing tool that is easy to disassemble and assemble are fixed with threads by an electric wrench, and the total height of the fixing tool is 205 mm.
[0011] Compared with the prior art, the advantages and positive effects of the utility model are:
[0012] 1. The utility model solves the problem of the deviation of the prefabricated components' embedded sleeves and reserved openings for water and electricity, and avoids the long-time deviation of the embedded sleeves and reserved openings in the prefabricated components. It has good economic benefits, convenient operation, improved work efficiency, and is safe and reliable. The prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble can be reused during the production of prefabricated components for water and electricity. The reserved positioning of the water and electricity openings is accurate, convenient to install, simple to disassemble and easy to operate, and the positioning is accurate and accurate. Compared with the conventional water and electricity openings that are embedded by tying wire, it greatly saves the use of materials and reduces costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 The utility model provides a front view of the installation of a prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble;
[0014] Figure 2 The utility model provides a top view of the installation of a prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble;
[0015] Figure 3 The utility model provides a front view of a prefabricated component water and electricity positioning and fixing tool that is easy to disassemble and assemble;
[0016] Figure 4 A top view of a prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble is provided for the utility model;
[0017] Figure 5A top view of a prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble is provided for the utility model;
[0018] Figure 6 The utility model provides a top view of a prefabricated component water and electricity positioning and fixing tool that is easy to disassemble and assemble.
[0019] Legend: 1. Grouting reserved hole tooling; 2. Grouting reserved hole iron parts; 3. Hole plug; 4. Bolt; 5. Mould; 6. Grouting hole plug iron parts; 7. Bolt; 8. Hexagonal nut. DETAILED DESCRIPTION
[0020] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0021] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0022] Embodiment 1, as Figure 1-Figure 6As shown, the utility model provides a prefabricated component water and electricity positioning and fixing tool that is easy to disassemble and assemble, including water and electricity materials that have been prepared according to the requirements of the drawings, such as water stop joints, steel casings, and prefabricated water and electricity positioning and fixing tooling. According to the fixing method of the water and electricity reserved holes marked on the drawings, the base of the prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble is fixed to the bottom mold of the mold by magnetic suction, and the prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble is connected and fixed to its prefabricated component mold platform by strong magnetic bonding at the bottom of the tooling. A prefabricated component water and electricity positioning and fixing tool that is easy to disassemble and assemble includes a magnetic base with a certain suction force, and the upper end of the base contains a cylinder with wire drawing teeth; it includes a dowel anchor bolt with an internal thread, and its characteristics are that the corresponding dowel anchor bolt can be connected to each other with the magnetic base, and the dowel anchor bolt is a hollow cylinder. The central area of the dowel anchor bolt contains a dowel of a certain size that can be inserted as an anchor device for tool positioning water and electricity deviation, including a magnetic base with a certain magnetic suction force, a cylindrical wire drawing, a cylindrical magnet on the base, a dowel anchor bolt with a bottom internal thread, and the dowel anchor bolt has a round bar matching the magnetic base The cylinder has an internal thread that matches the wire drawing, and a matching size of steel bars with a corresponding inner diameter of the water and electricity fixing. The tooling base is a cylinder with a diameter of 50mm, a base height of 10mm, a cylinder with a thread size of 14mm welded on the upper end of the cylindrical base, and a height of 195mm for the rebar anchor bolt. The upper and lower ends of the rebar anchor bolt include an internal thread with an inner diameter of 14mm, and the middle section of the rebar anchor bolt includes a steel bar head of a corresponding size that can be inserted. The height of the rebar anchor bolt is 195mm. The upper and lower structures of a prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble are fixed with threaded connections via an electric wrench, and the total height of the fixing tooling is 205mm.
[0023] The effect achieved by the entire embodiment 1 is that after the use of the tooling for grouting reserved holes of the easily detachable prefabricated component in this prefabricated component is completed, the concrete on the tooling for grouting reserved holes of the easily detachable prefabricated component is removed, and after smearing with butter, it can be repeatedly recycled and used in the next prefabricated component.
[0024] Working principle: It solves the problem of prefabricated components' embedded sleeves and reserved openings' deviation, avoids the long production time and easy deviation of embedded sleeves and reserved openings in prefabricated components, has good economic benefits, convenient operation, improved work efficiency, and is safe and reliable. The prefabricated components' hydropower positioning and fixing tooling, which is easy to disassemble and assemble, can be reused in the production of prefabricated components' hydropower. The reserved positioning of the hydropower opening is accurate, convenient to install, and easy to disassemble and operate, with high positioning accuracy. Compared with the conventional hydropower openings that are embedded by wire tying, it greatly saves the use of materials and reduces costs.
[0025] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A prefabricated component water and electricity positioning and fixing tool that is easy to assemble and disassemble, including water and electricity materials that have been prepared according to the requirements of the drawings, such as water stop joints and steel casings, and the prefabricated water and electricity positioning and fixing tool, characterized in that: According to the fixing method of the reserved holes for water and electricity marked on the drawings, a prefabricated component water and electricity positioning and fixing tooling base that is easy to disassemble and assemble is fixed on the mold bottom mold by magnetic suction. A prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble is connected and fixed to its prefabricated component mold base by strong magnetic bonding at the bottom of the tooling. A prefabricated component water and electricity positioning and fixing tooling that is easy to disassemble and assemble includes a magnetic base with a certain suction force, and the upper end of the base contains a cylinder with wire teeth; it includes a dowel anchor bolt with an internal thread, which is characterized in that the corresponding dowel anchor bolt can be interconnected with the magnetic base, the dowel anchor bolt is a hollow cylinder, and the central area of the dowel anchor bolt contains dowels of a certain size that can be inserted as an anchoring device for tooling positioning water and electricity deviation.
2. The prefabricated component water and electricity positioning and fixing tool that is easy to assemble and disassemble according to claim 1 is characterized by: It includes a magnetic base with a certain magnetic attraction, a cylindrical wire and a cylindrical magnet on the base.
3. The prefabricated component water and electricity positioning and fixing tool that is easy to assemble and disassemble according to claim 2 is characterized by: A dowel anchor with a bottom internal thread, a dowel anchor with a cylindrical wire drawing matching the internal thread that matches the magnetic base, and a matching size steel bar of the corresponding hydroelectric fixing inner diameter.
4. The prefabricated component water and electricity positioning and fixing tool that is easy to assemble and disassemble according to claim 1 is characterized by: The tooling base is a cylinder with a diameter of 50 mm and a base height of 10 mm. The cylindrical thread size welded on the upper end of the cylindrical base is 14 mm.
5. The prefabricated component water and electricity positioning and fixing tool that is easy to assemble and disassemble according to claim 4 is characterized by: The height of the dowel anchor bolt is 195 mm, the upper and lower ends of the dowel anchor bolt include internal threads with an inner diameter of 14 mm, and the middle section of the dowel anchor bolt includes a steel bar head of a corresponding size that can be inserted.
6. The prefabricated component water and electricity positioning and fixing tool that is easy to assemble and disassemble according to claim 5 is characterized by: The upper and lower structures of a prefabricated component water and electricity positioning fixing tool that is easy to disassemble and assemble are connected by threaded connection through an electric wrench, and the total height of the fixing tool is 205mm.