Power supply construction site exploration device for business expansion

By designing the counterweight mechanism in the on-site survey device, using the counterweight injection tank and inlet and outlet water components to increase the weighting of the base, the problems of unstable and inaccurate wind power during wind exploration are solved, and the stability of the survey is improved and accuracy.

CN222503401UActive Publication Date: 2025-02-18NANCHANG POWER SUPPLY BRANCH OF STATE GRID JIANGXI ELECTRIC POWER CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421856353.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2025-02-18
Estimated Expiration
2034-08-02

AI Technical Summary

Technical Problem

When the existing on-site survey device is expanded and installed, it is not convenient to increase the bottom of the bracket and place it. When the wind force of the power supply construction site is large, it is easy to cause the device to shake unstable or even fall. This makes wind power exploration inaccurate.

Method used

A power supply construction site survey device for industrial expansion is designed, using a counterweight mechanism, including a counterweight water injection tank set on the upper surface of the base, filling water with inlet and outlet components, increasing the weight of the base, thereby stably placing the device, and Provides more stable support during wind exploration.

Benefits of technology

Through the design of the counterweight mechanism, the convenience and accuracy of the counterweight placement of the on-site survey device during the expansion of the installation of the power supply construction site is improved, ensuring that the device is more stable under high wind pressure and the wind survey results are more precise.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222503401U_ABST
    Figure CN222503401U_ABST
Patent Text Reader

Abstract

The utility model discloses a power supply construction site investigation device for business expansion installation, which comprises a site investigation device main body, the site investigation device main body comprises a base, the upper surface of the base is fixedly provided with a lifting rod through an installation bolt, the top end of the lifting rod is fixedly provided with a fixing ring through an installation bolt, and the fixing ring is fixedly provided with a power supply. A wind power exploration instrument is fixed to the middle position of the upper surface of the fixing ring through a mounting bolt. By designing a counterweight mechanism, before the on-site investigation device main body is placed in a power supply construction site for investigation, a counterweight water injection tank is fixedly mounted on the upper surface of the base by rotating a fixing bolt, a water outlet is sealed and fixed by rotating a sealing cover, and the interior of the counterweight water injection tank is filled with water through a water inlet; and the sealing cover is rotated again to seal and fix the water inlet, so that the counterweight water injection tank is filled with water to increase the weight of the base, the counterweight of the on-site investigation device main body is placed more stably, and investigation is supported more stably when wind power is applied to power supply construction site investigation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of on-site investigation devices, and in particular relates to a power supply construction on-site investigation device for business expansion and installation. Background Art

[0002] Business expansion registration refers to the entire process from the customer's application for electricity to the formal power supply, including business acceptance, on-site investigation, power supply plan determination and reply, business fee collection, supporting power grid project construction, design document review, intermediate inspection, completion inspection and other links. In addition, during the power supply construction, it is necessary to conduct wind surveys on a certain range of construction sites to ensure that the wind force at the construction location is suitable before construction can be carried out. Usually, the wind force survey of the power supply construction site is carried out through an on-site investigation device, and the existing on-site investigation device is the equipment used for wind force survey at the power supply construction site during business expansion registration. The equipment is adjusted to a suitable height for investigation for wind force investigation. At the same time, the weight is placed to more stably support the investigation, and the investigation structure is more accurate, which improves the convenience and accuracy of the on-site investigation device in placing counterweights when investigating the power supply construction site during business expansion registration.

[0003] According to an authorized patent application with number 202223428790.2, which discloses an electric power engineering construction survey device, when the existing on-site survey device conducts wind survey and monitoring at the power supply construction site during business expansion reporting, the support legs directly contact the ground to place the bracket and the wind survey instrument at the power supply construction site for survey. Therefore, when used for on-site survey, it is not convenient to add weight to the bottom of the bracket, and when the wind force at the power supply construction site is strong, it is easy to cause the on-site survey device to shake unstably, or even cause a fall, resulting in inaccurate wind force survey at the power supply construction site, affecting the convenience of placing counterweights when the on-site survey device is used for surveying the power supply construction site during business expansion reporting. For this reason, the utility model proposes a power supply construction site survey device for business expansion reporting. Utility Model Content

[0004] The purpose of the utility model is to provide a power supply construction site survey device for business expansion reporting, so as to solve the problem proposed in the above background technology that the existing site survey device is not convenient for placing weight on the bottom of the bracket when conducting wind survey and monitoring at the power supply construction site during business expansion reporting, and when the wind force at the power supply construction site is strong, it is easy to cause the site survey device to shake unstably, or even cause a fall, resulting in inaccurate wind force survey at the power supply construction site, affecting the convenience of placing counterweights when the site survey device is used to survey the power supply construction site during business expansion reporting.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a power supply construction site survey device for business expansion and installation, comprising a site survey device body, the site survey device body comprising a base, a lifting rod is fixedly installed on the upper surface of the base by mounting bolts, a fixing ring is fixedly installed on the top of the lifting rod by mounting bolts, a wind force survey instrument is fixed at the middle position of the upper surface of the fixing ring by mounting bolts, and the site survey device body is also provided with:

[0006] A counterweight mechanism, wherein the counterweight mechanism comprises a counterweight assembly arranged on the upper surface of the base, and water inlet and outlet assemblies are arranged on the upper surface and side surfaces of the counterweight assembly;

[0007] The protection mechanism comprises a fixed connection component, and the surface of the fixed connection component is provided with a protection component.

[0008] Preferably, the counterweight assembly includes a counterweight water filling tank arranged on the upper surface of the base, and the lifting rod passes through the interior of the counterweight water filling tank, and fixing bolts are rotated on both sides of the counterweight water filling tank.

[0009] Preferably, the lower surface of the counterweight water filling tank is structurally consistent with the surface edge of the base, and the lower surface of the counterweight water filling tank is fixed to the surface of the base by fixing bolts.

[0010] Preferably, the water inlet and outlet assembly includes a water inlet arranged on the upper surface of the counterweight water filling tank, a water outlet is arranged on the front surface of the counterweight water filling tank, and sealing covers are rotatably arranged on the surfaces of the water outlet and the water inlet.

[0011] Preferably, the fixed connection assembly comprises a mounting ring arranged at the edge of the upper surface of the fixing ring, and a fixing screw is rotatably arranged at the edge of the mounting ring.

[0012] Preferably, the protection assembly comprises an external threaded ring arranged on the upper surface of the mounting ring, and a protection cover is arranged on the surface of the wind prospecting instrument.

[0013] Preferably, the external thread ring and the mounting ring are an integrated structure, and the protective cover is rotatably connected to the surface of the mounting ring via the external thread ring.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] By designing the counterweight mechanism, before the main body of the on-site investigation device is placed at the power supply construction site for investigation, the fixing bolts can be rotated to fix the counterweight water filling tank on the upper surface of the base, the sealing cover can be rotated to seal and fix the water outlet, and the interior of the counterweight water filling tank can be filled with water through the water inlet, and the sealing cover can be rotated again to seal and fix the water inlet. Therefore, filling the interior of the counterweight water filling tank with water will increase the weight of the base, making the placement of the counterweight of the main body of the on-site investigation device more stable, and more stably supporting the investigation when the power supply construction site is affected by wind, and the investigation structure is more accurate, thereby improving the convenience and accuracy of the placement of the counterweight of the main body of the on-site investigation device during the power supply construction site investigation during business expansion and registration. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the utility model;

[0017] Figure 2 It is a partial cross-sectional structural diagram of the counterweight water filling tank, base and lifting rod of the utility model;

[0018] Figure 3 For this utility model Figure 1 The enlarged structural diagram of part A in the middle;

[0019] Figure 4 It is a partial structural schematic diagram of the wind exploration instrument, protective cover and lifting rod of the utility model;

[0020] Figure 5 For this utility model Figure 4 The enlarged structural diagram of part B in the middle;

[0021] In the figure: 100, main body of the on-site investigation device; 101, base; 1011, counterweight water filling tank; 1012, water outlet; 1013, water inlet; 1014, fixing bolt; 1015, sealing cover; 102, lifting rod; 103, fixing ring; 104, wind investigation instrument; 1041, mounting ring; 1042, fixing screw; 1043, protective cover; 1044, external threaded ring. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figures 1 to 5The utility model provides a technical solution: a power supply construction site survey device for business expansion and installation, including a site survey device body 100, the site survey device body 100 includes a base 101, the upper surface of the base 101 is fixedly installed with a lifting rod 102 by mounting bolts, the top of the lifting rod 102 is fixedly installed with a fixing ring 103 by mounting bolts, and a wind force survey instrument 104 is fixed at the middle position of the upper surface of the fixing ring 103 by mounting bolts. The site survey device body 100 is stably placed at the power supply construction site through the base 101 contacting the ground, and the wind force survey instrument 104 is raised and lowered by the fixing ring 103 to adjust the height of the wind force test after the site survey device body 100 is placed, and the wind force survey instrument 104 is used to conduct wind force survey on the power supply construction site. The site survey device body 100 is also provided with:

[0024] A counterweight mechanism is provided, and the counterweight mechanism includes a counterweight assembly arranged on the upper surface of the base 101, and water inlet and outlet assemblies are arranged on the upper surface and the side of the counterweight assembly. When the main body 100 of the field investigation device is placed on the power supply construction site for investigation, the counterweight mechanism can add weight to the main body 100 of the field investigation device for stable placement. When the power supply construction site is affected by wind, the investigation is more stably supported, and the investigation structure is more accurate, thereby improving the convenience and accuracy of the field investigation device main body 100 in placing the counterweight when investigating the power supply construction site during business expansion and registration.

[0025] In order to facilitate the weighting and stable placement of the main body 100 of the field investigation device during use through the counterweight assembly, in the present embodiment, preferably, the counterweight assembly includes a counterweight water filling tank 1011 arranged on the upper surface of the base 101, and the lifting rod 102 passes through the interior of the counterweight water filling tank 1011, and both sides of the counterweight water filling tank 1011 are rotated with fixing bolts 1014. After the counterweight water filling tank 1011 is fitted onto the outside of the lifting rod 102, it falls to the surface of the base 101 and is fixedly installed by the fixing bolts 1014, and the interior of the counterweight water filling tank 1011 is filled with water and counterweights are placed to ensure more stable investigation.

[0026] In order to facilitate the filling and drainage of the counterweight water filling tank 1011 through the water inlet and outlet assembly, in the present embodiment, preferably, the water inlet and outlet assembly includes a water inlet 1013 arranged on the upper surface of the counterweight water filling tank 1011, and the water inlet 1013 can be used to facilitate the stable placement of the internal water filling counterweight of the counterweight water filling tank 1011, and the front surface of the counterweight water filling tank 1011 is provided with a water outlet 1012, and after use, the inside of the counterweight water filling tank 1011 can be drained through the water outlet 1012, and the surfaces of the water outlet 1012 and the water inlet 1013 are both rotated with sealing covers 1015, and the sealing covers 1015 are rotated to seal and fix the water outlet 1012 and the water inlet 1013 after the water is in and out.

[0027] A protection mechanism includes a fixed connection component, and a protection component is arranged on the surface of the fixed connection component. When the field investigation device body 100 is not in use and is transported, the protection mechanism can be fixed on the outer surface of the wind investigation instrument 104 for protection. When it is moved or transported and is touched, it directly hits the surface of the protection cover 1043, thereby improving the protection effect of the field investigation device body 100 on the wind investigation instrument 104 after being used for power supply construction site investigation during business expansion and installation.

[0028] In order to facilitate the installation of the external threaded ring 1044 through the fixed connection component and to facilitate the rotation and installation of the protective cover 1043 after installation, in the present embodiment, preferably, the fixed connection component includes a mounting ring 1041 arranged at the edge of the upper surface of the fixing ring 103, and a fixing screw 1042 is rotated at the edge of the mounting ring 1041. The mounting ring 1041 is closed at the edge of the upper surface of the fixing ring 103, and the mounting ring 1041 is fixedly installed by the fixing screw 1042, so as to facilitate the fixed installation and rotation connection.

[0029] In order to facilitate the protection and placement of the wind survey instrument 104 when not in use through the protection component, in the present embodiment, preferably, the protection component includes an external threaded ring 1044 arranged on the upper surface of the mounting ring 1041, and a protective cover 1043 is arranged on the surface of the wind survey instrument 104, and the protective cover 1043 is rotationally connected to the surface of the mounting ring 1041 through the external threaded ring 1044, and the protective cover 1043 is fixed to the outer surface of the wind survey instrument 104 for protection through the inner surface of the protective cover 1043 and the outer surface of the external threaded ring 1044, so as to facilitate protection when not in use.

[0030] The working principle and use process of the utility model: the power supply construction site survey device for industrial expansion and installation, when in use, the main body 100 of the site survey device is stably placed at the power supply construction site through the base 101 contacting the ground, after the main body 100 of the site survey device is placed, the wind force survey instrument 104 is raised and lowered to adjust the height of the wind force test through the fixing ring 103, and the wind force survey instrument 104 is used to conduct wind force survey on the power supply construction site;

[0031] Then, before the main body 100 of the on-site investigation device is placed at the power supply construction site for investigation, the counterweight water filling tank 1011 is sleeved on the outer surface of the fixing ring 103 until it is placed on the surface of the base 101, and the fixing bolts 1014 are rotated to fix the counterweight water filling tank 1011. When the counterweight water filling tank 1011 is fixed and installed, when it is used, the sealing cover 1015 is rotated to seal and fix the water outlet 1012, and the interior of the counterweight water filling tank 1011 is filled with water through the water inlet 1013, and the sealing cover 1015 is rotated again to seal and fix the water inlet 1013. Therefore, the interior of the counterweight water filling tank 1011 is filled with water to increase the weight of the base 101, so that the counterweight water filling tank 1011 is more stably placed on the main body 100 of the on-site investigation device, and the investigation is more stably supported when the power supply construction site is affected by wind, and the investigation structure is more accurate, which improves the convenience and accuracy of the on-site investigation device main body 100 in placing the counterweight during the power supply construction site investigation during the business expansion application.

[0032] Finally, when the main body 100 of the field investigation device is not in use, the mounting ring 1041 is fixed to the upper surface of the fixing ring 103 by means of the fixing screws 1042. After the mounting ring 1041 is fixedly installed, the external threaded ring 1044 is fixedly installed, and the protective cover 1043 is rotated and fixed to the surface of the mounting ring 1041 by means of the external threaded ring 1044, and the wind survey instrument 104 is protected inside the protective cover 1043, so that the main body 100 of the field investigation device is convenient for protecting the wind survey instrument 104 when it is not in use after wind investigation, and directly hits the surface of the protective cover 1043 when it is moved or transported and touched, thereby improving the protection effect of the main body 100 of the field investigation device on the wind survey instrument 104 after being used for on-site investigation of power supply construction during business expansion and registration.

[0033] Although the embodiments of the present invention have been shown and described (see the above detailed description for details), it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A power supply construction site survey device for business expansion and installation, comprising a site survey device body (100), the site survey device body (100) comprising a base (101), a lifting rod (102) being fixedly mounted on the upper surface of the base (101) by means of mounting bolts, a fixing ring (103) being fixedly mounted on the top of the lifting rod (102) by means of mounting bolts, a wind force survey instrument (104) being fixedly mounted at the middle position of the upper surface of the fixing ring (103) by means of mounting bolts, characterized in that: The on-site investigation device body (100) is also provided with: A counterweight mechanism, wherein the counterweight mechanism comprises a counterweight component arranged on the upper surface of the base (101), and the upper surface and side surfaces of the counterweight component are provided with water inlet and outlet components; The protection mechanism comprises a fixed connection component, and the surface of the fixed connection component is provided with a protection component.

2. A power supply construction site survey device for business expansion and installation according to claim 1, characterized in that: The counterweight assembly comprises a counterweight water filling tank (1011) arranged on the upper surface of the base (101), and the lifting rod (102) passes through the interior of the counterweight water filling tank (1011), and fixing bolts (1014) are rotatably provided on both sides of the counterweight water filling tank (1011).

3. A power supply construction site survey device for business expansion and installation according to claim 2, characterized in that: The lower surface of the counterweight water filling tank (1011) is structurally matched with the surface edge of the base (101), and the lower surface of the counterweight water filling tank (1011) and the surface of the base (101) are fixed by fixing bolts (1014).

4. The power supply construction site survey device for business expansion and installation according to claim 2 is characterized by: The water inlet and outlet assembly comprises a water inlet (1013) arranged on the upper surface of a counterweight water filling tank (1011), a water outlet (1012) is arranged on the front surface of the counterweight water filling tank (1011), and sealing covers (1015) are rotatably provided on the surfaces of the water outlet (1012) and the water inlet (1013).

5. The power supply construction site survey device for business expansion and installation according to claim 1 is characterized by: The fixed connection assembly comprises a mounting ring (1041) arranged at the edge of the upper surface of the fixing ring (103), and a fixing screw (1042) is rotatably arranged at the edge of the mounting ring (1041).

6. The power supply construction site survey device for business expansion and installation according to claim 5 is characterized by: The protection assembly comprises an external threaded ring (1044) arranged on the upper surface of the mounting ring (1041), and a protection cover (1043) is arranged on the surface of the wind survey instrument (104).

7. The power supply construction site survey device for business expansion and installation according to claim 6 is characterized by: The external threaded ring (1044) and the mounting ring (1041) are an integrated structure, and the protective cover (1043) and the surface of the mounting ring (1041) are rotatably connected via the external threaded ring (1044).

Citation Information

Patent Citations

  • Electric power engineering construction investigation device

    CN219263806U