Multi-station breathing blasting machine
By designing a multi-station breathing blasting machine, using multi-station settings and high-pressure bus valve components, the problem of low blasting efficiency in the existing technology is solved, efficient blasting operation for multiple sets of test products is achieved, and the test pressure can be controlled. .
Patent Information
- Application Number
- CN202420950885.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-04-30
AI Technical Summary
The existing blasting machine adopts a single station form, resulting in low blasting efficiency and affecting the progress of the entire test operation.
A multi-station breathing blasting machine is designed, including a frame, a pressurized tank, a first and a second breathing blasting mechanism. The first breathing blasting mechanism consists of a test carrier plate, a support column, a support plate and a driving member fixed on the frame, and is connected with a pressure transmitting connection pipe and a high-pressure bus valve assembly.
Through multi-station setting, the blasting operation efficiency of multiple sets of test products is improved. The setting of the test piece and the pressure transmitting connection pipe can control the test pressure size and meet different blasting requirements.
Smart Images

Figure CN222506056U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of new energy, and specifically relates to a multi-station breathing blasting machine. Background Art
[0002] The new energy test cover needs to be blasted before leaving the factory; the existing blasting machine is set up in a single-station form and can only test one group of products at a time. The blasting efficiency is low, which affects the entire test operation. Utility Model Content
[0003] In order to solve the above technical problems, the utility model provides a multi-station breathing blasting machine, which has the advantage of high blasting operation efficiency.
[0004] In order to achieve the above object, the technical solution of the utility model is as follows:
[0005] A multi-station breathing blasting machine comprises: a frame, in which a booster tank is installed; a first breathing blasting mechanism and a second breathing blasting mechanism installed on the frame, wherein the first breathing blasting mechanism comprises: a first test carrier fixedly mounted on the frame, first support columns arranged along four sides of the first test carrier, a first support plate fixedly arranged on the top of the first support column, and a first driving member installed on the first support plate, wherein a pressure transmitting connecting pipe is connected to the first driving member; a detection member installed on the frame for monitoring the pressure of the first breathing blasting mechanism and the second breathing blasting mechanism; and an air intake assembly fixedly arranged on the side of the frame.
[0006] As a preferred solution of the present utility model, the first breathing blasting mechanism and the second breathing blasting mechanism are connected with a high-pressure confluence valve assembly, and the high-pressure confluence valve assembly is installed in the frame.
[0007] To implement the above technical solution, the high-pressure confluence valve assembly provides sufficient pressure for the first breathing blasting mechanism and the second breathing blasting mechanism, thereby facilitating blasting operations.
[0008] As a preferred solution of the utility model, the first breathing blasting mechanism is provided with three groups, the second breathing blasting mechanism is provided with two groups, and the first breathing blasting mechanism and the second breathing blasting mechanism adopt the same structural setting.
[0009] As a preferred solution of the utility model, the first driving member includes: a first driving cylinder, a first pressure plate connected to the first driving cylinder, and the first pressure change connecting pipe is arranged on the first pressure plate.
[0010] To implement the above technical solution, the first driving cylinder drives the first pressure plate downward to perform a breathing blasting operation.
[0011] As a preferred solution of the utility model, the detection element is arranged in a Rosemount form.
[0012] As a preferred solution of the utility model, the air intake assembly is arranged in the form of an AirTac two-piece, and a control panel is installed on one side of the frame.
[0013] In summary, the utility model has the following beneficial effects:
[0014] By adopting the settings of the first breathing blasting mechanism and the second breathing blasting mechanism, blasting operations can be performed on multiple groups of test products to improve test efficiency; the setting of the detection piece and the pressure transmitter connecting pipe can control the test pressure to meet different blasting requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.
[0017] Figure 2 This is a schematic diagram of the structure of the detection element of the utility model.
[0018] Figure 3 This is a schematic structural diagram of a high-pressure confluence valve assembly of the utility model.
[0019] The numbers and letters in the figure represent the corresponding component names:
[0020] 1. Frame; 2. Booster tank; 3. First test carrier; 4. First support column; 5. First support plate; 6. Detection component; 7. Air intake assembly; 8. Pressure transmitter connecting pipe; 9. High-pressure confluence valve assembly; 10. First drive cylinder; 11. First pressure plate; 12. Control panel; 13. Second test carrier; 14. Second support column; 15. Second pressure plate; 16. Second drive cylinder; 17. Second support plate. DETAILED DESCRIPTION
[0021] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0022] Example
[0023] A multi-station breathing blasting machine, such as Figures 1 to 3 As shown, it comprises: a frame 1, in which a pressurized tank 2 is installed; a first breathing blasting mechanism and a second breathing blasting mechanism installed on the frame 1.
[0024] Among them, the first breathing blasting mechanism includes: a first test carrier plate 3 fixedly arranged on the frame 1, a first support column 4 arranged along the four sides of the first test carrier plate 3, a first support plate 5 fixedly arranged at the top of the first support column 4, and a first driving member installed on the first support plate 5.
[0025] The first driving member is connected to a pressure transmitting connecting pipe 8 ; a detection member 6 mounted on the frame 1 for monitoring the pressure of the first breathing blasting mechanism and the second breathing blasting mechanism; and an air intake assembly 7 fixedly arranged on the side of the frame 1 .
[0026] The detection component 6 is arranged in the form of a Rosemount, and the air intake component 7 is arranged in the form of an AirTac two-piece.
[0027] Specifically, the first breathing blasting mechanism and the second breathing blasting mechanism are connected to a high-pressure confluence valve assembly 9 , and the high-pressure confluence valve assembly 9 is installed in the frame 1 .
[0028] The first driving member includes: a first driving cylinder 10 , a first pressure plate 11 connected to the first driving cylinder 10 , and a first pressure change connecting pipe is disposed on the first pressure plate 11 .
[0029] The product to be tested is placed on the first test carrier plate 3, and the first driving cylinder 10 drives the first pressure plate 11 downward to perform blasting operation on the product.
[0030] The boost tank 2 transmits the pressure to the pressure transmitting connecting pipe 8. Under the action of the first driving cylinder 10 and the second driving cylinder 16, the first pressure plate 11 and the second pressure plate 15 provide sufficient pressure to perform blasting operation on the test product.
[0031] Furthermore, the first breathing blasting mechanism is provided with three groups, and the second breathing blasting mechanism is provided with two groups, and the first breathing blasting mechanism and the second breathing blasting mechanism adopt the same structural setting.
[0032] The second breathing explosion mechanism is composed of a second test carrier plate 13 , a second support column 14 , a second support plate 17 , and a second driving member. The second driving member is composed of a second driving cylinder 16 and a second pressure plate 15 .
[0033] Finally, a control panel 12 is installed on one side of the frame 1 .
[0034] By adopting the settings of the first breathing blasting mechanism and the second breathing blasting mechanism, blasting operations can be performed on multiple groups of test products to improve test efficiency; the settings of the detection member 6 and the pressure transmitting connecting pipe 8 can control the test pressure to meet different blasting requirements.
[0035] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A multi-station breathing blasting machine, characterized in that: include: A frame (1), wherein a booster tank (2) is installed in the frame (1); A first breathing blasting mechanism and a second breathing blasting mechanism mounted on the frame (1), wherein the first breathing blasting mechanism comprises: a first test carrier (3) fixedly mounted on the frame (1), first support columns (4) arranged along four sides of the first test carrier (3), a first support plate (5) fixedly arranged at the top of the first support column (4), and a first driving member mounted on the first support plate (5), wherein the first driving member is connected to a pressure transmitting connecting pipe (8); a detection member (6) mounted on the frame (1) for monitoring the pressure of the first breathing explosion mechanism and the second breathing explosion mechanism; and An air intake assembly (7) is fixedly arranged on the side of the frame (1).
2. A multi-station breathing blasting machine according to claim 1, characterized in that: The first breathing explosion mechanism and the second breathing explosion mechanism are connected to a high-pressure converging valve assembly (9), and the high-pressure converging valve assembly (9) is installed in the frame (1).
3. A multi-station breathing blasting machine according to claim 1, characterized in that: The first breathing blasting mechanism is provided with three groups, the second breathing blasting mechanism is provided with two groups, and the first breathing blasting mechanism and the second breathing blasting mechanism adopt the same structural setting.
4. A multi-station breathing blasting machine according to claim 1, characterized in that: The first driving member comprises: a first driving cylinder (10), a first pressure plate (11) connected to the first driving cylinder (10), and the first pressure change connecting pipe is arranged on the first pressure plate (11).
5. A multi-station breathing blasting machine according to claim 1, characterized in that: The detection element (6) is arranged in a Rosemount form.
6. A multi-station breathing blasting machine according to claim 1, characterized in that: The air intake assembly (7) is arranged in the form of an AirTac two-piece assembly, and a control panel (12) is installed on one side of the frame (1).