Project progress management device

By installing project progress management devices at the temporary construction site of the scenic area, real-time monitoring and management of construction progress has been solved, and the construction environment is complex, urgent construction period, high construction risks and strict quality requirements are solved, and construction efficiency and safety are improved.

CN222507108UActive Publication Date: 2025-02-18GUANGXI LVFA TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323656727.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-31
Publication Date
2025-02-18
Estimated Expiration
2033-12-31

AI Technical Summary

Technical Problem

The temporary construction of the scenic spot faces problems such as complex construction environment, urgent construction period, high construction risks and strict quality requirements, which makes it difficult to manage the project progress.

Method used

Design a project progress management device, including installation rods, display panels, warning lights, cameras, noise sensors, wireless communication modules, solar panels and controllers, to realize real-time monitoring and management of project progress.

Benefits of technology

By monitoring the construction site situation in real time, clearly displaying the construction progress, reminding managers to pay attention to construction safety, realizing remote monitoring and management, improving construction efficiency, and reducing risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222507108U_ABST
    Figure CN222507108U_ABST
Patent Text Reader

Abstract

The utility model discloses a project progress management device, and relates to the technical field of project progress management. Comprising a mounting rod, a display panel arranged on the mounting rod, a warning lamp, a camera, a noise sensor, a wireless communication module, a solar panel and a control box provided with a controller. The camera is mounted on a cross rod at the upper end of the mounting rod through an adjusting device; the display panel is provided with a display area corresponding to a construction range, the display area is divided into sub-areas according to construction points, the sub-areas adopt acrylic lampshade plates and display lamps, and the display lamps comprise various LED lamps corresponding to different color schedules; the display area is further divided into a plurality of progress bars according to construction steps, and progress bars are arranged. According to the utility model, the project progress can be monitored and managed in real time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of project progress management, and particularly relates to a project progress management device. Background Art

[0002] With the rapid development of tourism and the increase in the number of tourists, scenic spot facilities are wearing out faster and faster, making the maintenance of scenic spot facilities and scenic spots more and more frequent. At the same time, scenic spots also adopt new scenic spots, scenic spot upgrades and scenic spot renovations to meet the needs of tourists and improve the attractiveness of scenic spots. However, due to the particularity of scenic spots, such as complex terrain and sensitive environment, temporary construction in scenic spots faces many challenges. In order to ensure the smooth progress of the project, improve construction efficiency and reduce risks, project progress management is particularly important in temporary construction in scenic spots. Temporary construction in scenic spots faces many challenges, such as complex construction environment. Scenic spots are often located in natural environments with complex and changeable terrain and different climatic conditions; strict construction period requirements, temporary construction in scenic spots is often affected by the peak tourist season, and a lot of work needs to be completed in a limited time. The construction process is high-risk. Temporary construction in scenic spots involves multiple professional fields, such as civil engineering, installation, electrical engineering, etc. Various unforeseen risks may occur during the construction process; strict quality requirements. As a tourist destination, the quality of its temporary facilities is directly related to the safety and satisfaction of tourists.

[0003] Therefore, a project progress management device is needed to supervise the construction unit to reasonably arrange the construction plan, supervise the on-site construction safety, strengthen the interaction with tourists, and reduce the anxiety caused by the upgrading of scenic spots. Utility Model Content

[0004] The purpose of the utility model is to overcome the above defects and provide a project progress management device to achieve real-time monitoring and management of project progress.

[0005] The specific technical solutions are as follows:

[0006] A project progress management device includes a mounting rod, a display panel arranged on the mounting rod, a warning light, a camera, a noise sensor, a wireless communication module, a solar panel, and a control box with a controller installed;

[0007] The camera is mounted on a crossbar at the upper end of the mounting rod through an adjusting device;

[0008] The display panel is provided with a display area corresponding to the construction scope, and the display area is divided into sub-areas according to the construction points. The sub-areas use acrylic lampshade panels and display lights. The display lights include a variety of LED lights corresponding to different color progress; the display area is also divided into several progress bars according to the construction steps, and a progress bar is set.

[0009] Preferably, the progress bar is composed of LED lights.

[0010] Preferably, a column for filling in the reasons for progress delay is provided on the display panel.

[0011] Preferably, the display panel is provided with a display column for displaying a portrait identification of a person not wearing a helmet and a display column for displaying the name of the person not wearing a helmet.

[0012] Preferably, a management interface for administrators to log in is provided on the display panel.

[0013] Preferably, the controller is connected to a remote server via a wireless communication module.

[0014] Preferably, the display panel is provided with a wireless module for contacting and linking with a smart terminal.

[0015] Preferably, the display panel is provided with a display screen for displaying noise, temperature and humidity, and dust concentration.

[0016] Preferably, the solar panel is connected to a battery via a solar energy conversion circuit, and the battery is arranged in a control box.

[0017] Compared with the existing technology, the beneficial effects of the utility model are:

[0018] The utility model realizes real-time monitoring and management of project progress by installing display panels, warning lights, cameras, noise sensors, wireless communication modules, solar panels, controllers and other components on the pole. The display panel is provided with a display area corresponding to the construction range, which can be divided into sub-areas according to construction points and construction steps, and uses LED lights to display progress bars of different colors, so that managers can understand the progress of the project. At the same time, the device also has an alarm function, which can remind managers to pay attention to construction safety through warning lights and sounds. In addition, the device also has a wireless communication function, which can upload data to a remote server for further analysis and management. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the functional modules of the utility model;

[0020] Figure 2 It is a schematic structural diagram of an embodiment of the utility model.

[0021] In the accompanying drawings, 1-installation pole, 2-display panel, 3-warning light, 4-camera, 5-noise sensor, 6-solar panel, 7-control box, 8-display area, 9-display light, 10-progress bar, 11-progress bar. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "top", "bottom", "top surface", "bottom surface", "inside", "outside", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention.

[0024] In the description of the present invention, "several" means one or more, "more" means more than two, "greater than", "less than", "exceed" etc. are understood to exclude the number itself, and "above", "below", "within" etc. are understood to include the number itself. If the terms "first", "second", "third" are described, they are only used for the purpose of description and distinguishing technical features, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0025] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "set" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. The following is an explanation of the embodiments of the present invention based on its overall structure.

[0026] like Figure 1-2 As shown, this embodiment discloses a project progress management device, and the specific scheme is as follows:

[0027] The invention comprises a mounting rod 1, a display panel 2, a warning light 3, a camera 4, a noise sensor 5, a wireless communication module, a solar panel 6 and a control box 7 with a controller installed thereon. The solar panel is connected to a battery through a solar energy conversion circuit, and the battery is arranged in the control box 7.

[0028] The camera 4 is installed on the cross bar at the upper end of the installation rod 1 through the adjustment device.

[0029] Here, a display area 8 corresponding to the construction range is provided on the display panel 2. The display area 8 is divided into sub-areas according to the construction points. The sub-areas use acrylic lampshade panels and display lights 9. The display lights 9 include a plurality of LED lights corresponding to different color progresses. The display area 8 is also divided into a plurality of progress bars 10 according to the construction steps, and a progress bar 11 is provided.

[0030] The above solution is further optimized as follows: wherein the progress bar 11 is composed of LED lights. A filling column for the reason of progress delay is provided on the display panel 2.

[0031] The display panel 2 is provided with a display bar for displaying a portrait identification of a person not wearing a helmet and a display bar for displaying the name of the person not wearing a helmet. The display panel 2 is provided with a management interface for administrators to log in. The controller is connected to a remote server via a wireless communication module.

[0032] The display panel 2 is provided with a wireless module for contacting and linking with the smart terminal. It also includes a temperature sensor for monitoring the temperature change at the construction site and displaying the temperature data on the display. The display panel 2 is provided with a display screen for displaying noise, temperature, humidity and dust concentration.

[0033] In the above scheme, the situation of the construction site can be monitored in real time through the camera 4 and the noise sensor 5, and problems can be discovered and handled in time. The display area 8 on the display panel 2 is divided into sub-areas according to the construction points. The sub-areas use acrylic lampshade plates and display lights 9. The display lights 9 include a variety of LED lights corresponding to different color progress, which can clearly display the construction progress. The progress bar 10 on the display panel 2 is provided with a progress bar 11, which can more intuitively display the construction progress. The display panel 2 is provided with a filling column for the reason of progress delay, which is convenient for recording and analyzing the reasons for the delay of construction progress. The display panel 2 is provided with a portrait logo for displaying a person who is not wearing a helmet and a display column for displaying the name of the person who is not wearing a helmet, which can remind workers to pay attention to safety. The display panel 2 is provided with a management interface for administrators to log in, which is convenient for administrators to manage and control the project progress.

[0034] The controller is connected to the remote server through a wireless communication module, which can realize remote monitoring and management. The display panel 2 is provided with a wireless module for intelligent terminal contact link, which is convenient for intelligent devices to connect and interact with the device. The display panel 2 is provided with a display screen for displaying noise, temperature, humidity and dust concentration, which can monitor the environmental conditions of the construction site in real time. The solar panel 6 is connected to the battery through the solar energy conversion circuit, and the battery is set in the control box 7, which can realize solar power supply, energy saving and environmental protection.

[0035] The technical principle process of the above scheme:

[0036] First, the controller is installed on the crossbar at the upper end of the mounting rod 1 through the camera 4, which is used to shoot the situation at the construction site in real time.

[0037] Secondly, the display panel 2 is provided with a display area 8 corresponding to the construction scope, which is divided into sub-areas according to the construction points and construction steps, and uses acrylic lampshade panels and display lights 9 to display progress bars 11 of different colors. The progress bar 11 is composed of LED lights and can change color according to the progress of the construction. The display panel 2 is also provided with a column for filling in the reasons for progress delay, so that the manager can record the reasons for delay, etc.

[0038] Finally, the controller can be connected to the remote server through the wireless communication module to achieve data upload and remote management. The display panel 2 is provided with a wireless module for smart terminal contact link, which is convenient for on-site personnel to use smart devices to view the project progress.

[0039] The above description is only a preferred feasible embodiment of the present invention and is not intended to limit the scope of the patent application of the present invention. All equivalent changes, equivalent substitutions or modified changes performed within the technical spirit and principles suggested by the present invention should be included in the scope of patent protection covered by the present invention.

Claims

1. A project progress management device, comprising a mounting rod, a display panel, a warning light, a camera, a noise sensor, a wireless communication module, a solar panel and a control box with a controller installed thereon; characterized in that: The camera is mounted on a crossbar at the upper end of the mounting rod through an adjusting device; The display panel is provided with a display area corresponding to the construction scope, and the display area is divided into sub-areas according to the construction points. The sub-areas use acrylic lampshade panels and display lights. The display lights include a variety of LED lights corresponding to different color progress; the display area is also divided into several progress bars according to the construction steps, and a progress bar is set.

2. A project progress management device according to claim 1, characterized in that: The progress bar is composed of LED lights.

3. A project progress management device according to claim 1, characterized in that: The display panel is provided with a column for filling in the reasons for progress delay.

4. A project progress management device according to claim 1, characterized in that: The display panel is provided with a display column for displaying a portrait mark of a person not wearing a helmet and a display column for displaying the name of the person not wearing a helmet.

5. A project progress management device according to claim 1, characterized in that: The display panel is provided with a management interface for administrators to log in.

6. A project progress management device according to claim 1, characterized in that: The controller is connected to a remote server via a wireless communication module.

7. A project progress management device according to claim 1, characterized in that: The display panel is provided with a wireless module for contacting and linking with the smart terminal.

8. A project progress management device according to claim 1, characterized in that: The display panel is provided with a display screen for displaying noise, temperature and humidity, and dust concentration.

9. A project progress management device according to claim 1, characterized in that: The solar panel is connected to a battery via a solar energy conversion circuit, and the battery is arranged in a control box.