Cable support for construction site

By designing a cable bracket for construction sites, the problem of easy damage and safety hazards of cables at construction sites is solved, and effective protection of cables and safety improvements are achieved.

CN222508730UInactive Publication Date: 2025-02-18青岛市市政公用工程质量安全监督站
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420984511.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-09
Publication Date
2025-02-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

At construction sites, cables are easily crushed by construction equipment or stepped on by construction personnel, resulting in damage and safety hazards.

Method used

Design a cable bracket for construction site, including cable hooks and hook support bodies. The hook support bodies are fixed to the ground by fixing cuttings, and the cable hooks are used to hang cables to prevent the cable from being dragged on the ground.

Benefits of technology

Effectively prevent cable damage, reduce the risks of construction personnel stepping on and mechanical crushing, and improve the safety of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222508730U_ABST
    Figure CN222508730U_ABST
Patent Text Reader

Abstract

The utility model discloses a cable support for a construction site, belongs to the field of tires, and solves the problem of cable damage caused by rolling of self-propelled equipment and treading of constructors in the prior art. In the application, a hook support body metal rod and a cable hook are mounted on the side part of one end of a hook support body and are relatively fixed with the hook support body, and the other end of the hook support body is fixedly connected with a fixed cutting head; a pedal rod is arranged on one side, far away from the end part of the cable hook, of the hook supporting body; and the pedal rod is vertically fixed with the hook supporting body. According to the cable support for the construction site, cables are prevented from being dragged on the ground, damage to the cables is reduced, and safety of constructors is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a cable bracket used at a construction site and belongs to the field of building construction equipment. Background Art

[0002] During the construction process, electricity is an indispensable part, and the cables at the construction site play a vital role in the on-site power supply system. When excavating underground buildings and constructing foundation pits, open-air construction is basically adopted. During open-air construction, the power cables of various construction equipment are led from the power source to the construction site. The cables in the middle are randomly coiled or placed on the ground. The self-propelled construction equipment may crush the cables, and the construction workers may also step on the cables. Not only are the cables easily damaged, but the construction workers are also easily tripped by the cables, causing a variety of unsafe factors. Utility Model Content

[0003] The utility model provides a cable bracket for construction sites, which prevents cables from being dragged on the ground, reduces damage to the cables, and ensures the safety of construction workers.

[0004] The technical solution adopted by the utility model is a cable bracket for construction sites, comprising a cable hook and a hook support body, wherein the cable hook is located on the hook support body;

[0005] The hook support body is a metal rod, the cable hook is installed on the side of one end of the hook support body and is fixed relative to the hook support body, and the other end of the hook support body is fixedly connected with a fixed plug;

[0006] A pedal rod is provided on one side of the end of the hook support body away from the cable hook, and the pedal rod is vertically fixed to the hook support body.

[0007] Optimized, the cable bracket used on the construction site, the cable hook is made of steel bars bent into an L-shape, the pedal rod is a straight steel bar, and the hook support body is a hollow steel pipe;

[0008] The end of the pedal rod is welded and fixed to the side of the hook support body;

[0009] One end of the cable hook is welded and fixed to the side of the hook support body.

[0010] Optimally, the above-mentioned cable support for construction site, the hook support body includes two hollow steel pipe sections and a middle socket rod, and the middle socket rod is located between the two hollow steel pipe sections;

[0011] The two ends of the middle socket rod are respectively inserted into the end openings of the two hollow steel pipe sections and are relatively fixed by means of latches.

[0012] Optimally, the cable bracket used at the construction site is used, the fixed plug is a steel bar, and one end of the fixed plug away from the hook support body is polished into a pointed end.

[0013] Optimally, in the above-mentioned construction site cable bracket, a supporting steel sheet is fixedly welded on the end surface of one end of the hook support body connected to the fixed plug, and the end of the fixed plug close to the hook support body is welded and fixed to the supporting steel sheet.

[0014] Optimally, the cable bracket used at the construction site has a surface of the hook support body wrapped with a reflective warning tape.

[0015] The advantages of this application are:

[0016] In the present application, the rod of the hook support body is inserted into the sandy ground through a fixed plug, so that the hook support body can be fixed on the ground, and then the excessively long part of the cable is coiled and hung on the cable hook to prevent the cable from being dragged on the ground and hindering the operation of the equipment. It can also protect the cable and reduce damage caused by people stepping on it and machinery crushing it.

[0017] The materials of the cable hook, the hook support and the fixed plug of the present application are readily available at the construction site and can be manufactured on site for immediate use at low cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the structure of this application;

[0019] Figure 2 This is a schematic diagram of the internal structure of this application. DETAILED DESCRIPTION

[0020] The technical features of the present invention are further described below in conjunction with the accompanying drawings and specific embodiments.

[0021] As shown in the figure, the utility model is a cable bracket for construction sites, comprising a cable hook 1, a hook support body 2 and a fixed plug 3.

[0022] In this embodiment, the hook support 2 is made of a square steel pipe, and the cable hook 1 and the fixed plug 3 are both made of steel bars.

[0023] The surface of the hook support body 2 is wrapped with a reflective warning tape, so that the hook support body 2 is more eye-catching at the construction site and is also easier to be found at night, avoiding danger caused by collisions by people and vehicles.

[0024] The cable hook 1 is formed by bending a steel bar into an L-shape, the pedal rod 4 is a straight steel bar, and the fixed plug 3 is a straight steel bar with a sharpened end.

[0025] One end of the cable hook 1 is welded and fixed to the upper side surface of the hook support 2. The cable hook 1 can be one or more. In actual use, multiple cable hooks 1 can be welded to each side of the hook support 2 in an interlaced manner, so that multiple cables can be hung.

[0026] The end of the pedal rod 4 is welded and fixed to the lower side surface of the hook support body 2. When the hook support body 2 is inserted into the ground, the pedal rod 4 can be stepped on to apply greater pressure, which can make the fixed plug 3 at the lower end of the hook support body 2 easier to insert into the ground, and the insertion depth is deeper, and the fixing effect of the hook support body 2 is better.

[0027] The unsharpened end of the fixed skewer plug 3 is welded and fixed to the lower end of the hook support body 2. Since the hook support body 2 is cut from a square steel section, the lower end of the hook support body 2 is in an open form, making it difficult to support the fixed skewer plug 3. Therefore, this embodiment focuses on using a supporting steel sheet to seal the lower end opening of the hook support body 2, and the supporting steel sheet is fixed to the lower end of the hook support body 2 by welding, and then the unsharpened end of the fixed skewer plug 3 is welded to the middle of the supporting steel sheet, so that the fixed skewer plug 3 is easier to be welded and fixed, and the fixing effect is better.

[0028] In order to adapt to different cable hanging height requirements, the hook support body 2 is set to be adjustable in length in the present application. The hook support body 2 is composed of two hollow steel pipe sections 201 and a middle socket rod 202.

[0029] The hollow steel pipe section 201 and the middle socket rod 202 are both cut and formed from square steel pipes, and the outer diameter of the middle socket rod 202 is smaller than the inner diameter of the hollow steel pipe section 201, so that the middle socket rod 202 can be inserted into the end opening of the hollow steel pipe section 201. The middle socket rod 202 is located between the two hollow steel pipe sections 201, and the two ends of the middle socket rod 202 are respectively inserted into the end openings of the two hollow steel pipe sections 201 and fixed relatively by bolts.

[0030] A through hole perpendicular to the axial direction is drilled at each end of the middle socket rod 202, and a plurality of through holes 2 arranged at intervals and perpendicular to the axial direction are drilled on the hollow steel pipe section 201 along its length extension direction. After the middle socket rod 202 is inserted into the end opening of the hollow steel pipe section 201, when the through hole of the middle socket rod 202 overlaps with one of the through holes 2 of the hollow steel pipe section 201, a pin is inserted into the through hole and the through hole 2, so that the middle socket rod 202 is fixed to the hollow steel pipe section 201. When the through hole of the middle socket rod 202 overlaps with different through holes 2 on the hollow steel pipe section 201, the overall length of the hook support body 2 can be changed.

[0031] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Any changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention should fall within the protection scope of the present invention.

Claims

1. A cable support for use at a construction site, comprising a cable hook (1) and a hook support (2), wherein the cable hook (1) is located on the hook support (2); characterized in that: The hook support body (2) is a metal rod, the cable hook (1) is installed on the side of one end of the hook support body (2) and is fixed relative to the hook support body (2), and the other end of the hook support body (2) is fixedly connected with a fixed plug (3); A pedal rod (4) is provided on one side of the end of the hook support body (2) away from the cable hook (1), and the pedal rod (4) is vertically fixed to the hook support body (2).

2. The cable support for construction site according to claim 1, characterized in that: The cable hook (1) is formed by bending a steel bar into an L-shape, the pedal rod (4) is a straight steel bar, and the hook support body (2) is a hollow steel pipe; The end of the pedal rod (4) is welded and fixed to the side of the hook support body (2); One end of the cable hook (1) is welded and fixed to the side of the hook support body (2).

3. The cable support for construction site according to claim 1, characterized in that: The hook support body (2) comprises two hollow steel pipe sections (201) and a middle socket rod (202), wherein the middle socket rod (202) is located between the two hollow steel pipe sections (201); The two ends of the middle socket rod (202) are respectively inserted into the end openings of the two hollow steel pipe sections (201) and are relatively fixed by means of latches.

4. The cable support for construction site according to claim 1, characterized in that: The fixed prong plug (3) is a steel bar, and one end of the fixed prong plug (3) away from the hook support body (2) is polished into a pointed end.

5. The cable support for construction site according to claim 4, characterized in that: A support steel sheet is fixedly welded on the end surface of one end of the hook support body (2) connected to the fixed prong plug (3), and one end of the fixed prong plug (3) close to the hook support body (2) is welded and fixed to the support steel sheet.

6. The cable support for construction sites according to claim 1, characterized in that: The surface of the hook support (2) is wrapped with a reflective warning tape.