High-throughput satellite terminal test equipment based on automatic test production line

By designing automated testing equipment, the problems of electrostatic impact, personnel fatigue and radio frequency cable instability in high-throughput satellite terminal testing are solved, and an efficient and accurate test process is achieved, improving product quality and testing efficiency.

CN222509443UActive Publication Date: 2025-02-18BEIJING AEROSPACE SCI & IND CENTURY SATELLITE TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420770565.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2025-02-18
Estimated Expiration
2034-04-15

AI Technical Summary

Technical Problem

The existing high-throughput satellite terminal testing methods have problems such as electrostatic impact, low efficiency due to personnel fatigue, and unstable RF cable status, which affects the accuracy of the test and product quality.

Method used

A high-throughput satellite terminal testing equipment based on automated testing production lines was designed, using plug-in and unplugged connection to simplify the docking between the equipment and the terminal, and automatically control the power up and down with the relay control board, and the connection is stable through a fixed radio frequency cable structure. .

Benefits of technology

It improves testing efficiency, reduces the difficulty of personnel work, ensures product quality, and reduces the error rate and static impact of manual operation through automated testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222509443U_ABST
    Figure CN222509443U_ABST
Patent Text Reader

Abstract

The utility model relates to high-throughput satellite terminal test equipment based on an automatic test production line, which is used for replacing part of existing test procedures and realizing automatic test. Comprising an upper part and a lower part, the upper part is used for installing a plurality of high-throughput satellite to-be-tested terminals and is provided with three types of interfaces, namely a power supply fixing seat, a network port fixing seat and an SMB fixing seat, and the three types of interfaces are used for being connected with corresponding ports on the to-be-tested terminals respectively; the lower part is a main body structure and is provided with a plurality of switch modules, two microstrip power dividers and a relay control panel, cascade ports of the plurality of switch modules are mutually connected to realize information intercommunication, one switch module serves as an external port and is used for carrying out information transmission with external equipment through a network cable, and the other switch module serves as an external port and is used for carrying out communication with the external equipment through a network cable. One microstrip power divider corresponds to radio frequency output ports of a plurality of to-be-tested terminals, the other microstrip power divider corresponds to radio frequency input ports of a plurality of to-be-tested terminals, and the relay control panel receives a control instruction of the upper computer and controls power-on and power-off of each to-be-tested terminal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of high-throughput satellite terminal performance testing, and in particular relates to an automatic testing device. Background Art

[0002] In recent years, high-throughput satellite communication business has developed rapidly, the demand in the military and civilian fields has gradually increased, customer requirements have been continuously improved, and the contradiction between high quality and short construction period has gradually intensified. In the production process, the testing process is complicated, and there are problems such as low efficiency and high error rate of manual testing. People prefer to use automated testing equipment to reduce the operating difficulty of testers, improve the accuracy of product testing, and efficiently use the night time for unmanned operations. Therefore, automated equipment came into being.

[0003] The following is a detailed description of the existing schemes and their implementation:

[0004] First, let's introduce the object to be tested, which is a high-throughput satellite terminal. It is a circuit board with modulation and demodulation functions. One end of the circuit board has a DC power socket, three network ports, and two F-type radio heads. The DC power socket is connected to 24V direct current to power the entire circuit board. The three network ports are the management network port, business network port 1, and business network port 2. There are two F-type radio heads, one for transmitting radio frequency signals and the other for receiving radio frequency signals.

[0005] The test process of high-throughput satellite terminal is as follows: Figure 8 As shown in the figure, the testers are in place at each workstation according to the process flow and carry out the work according to the test rules. A large number of repetitive and complex operations need to be completed manually by the testers.

[0006] The shortcomings of the existing technology have gradually emerged:

[0007] 1. The probability of static electricity affecting products increases

[0008] Processes 7, 8, 9, 10, 15, 16, and 17 all require testers to take anti-static measures, power on and off each high-throughput satellite terminal, and touch the product too frequently, affecting electrostatic sensitive components.

[0009] 2. Staff fatigue affects product testing efficiency

[0010] During the RF test, testers test single carriers and modulated waves of different frequencies and powers, and also need to measure a series of parameters such as frequency stability, phase noise, adjacent channel leakage ratio, etc., which requires long-term and uninterrupted operation of the spectrum analyzer. Testers are prone to fatigue, which reduces test efficiency and increases the test error rate.

[0011] 3. The unstable state of the test RF cable affects the test results

[0012] In RF testing, long-term rotational connection of the RF line can easily cause damage to the RF line, resulting in inaccurate test results and affecting the actual performance of the product. Utility Model Content

[0013] In view of this, the utility model proposes a high-throughput satellite terminal test equipment based on an automated test production line (hereinafter referred to as "test equipment"), which optimizes the previous test method and Figure 8 The processes numbered 7-10 and 15-17 are replaced by the processes of automatic testing using the test equipment. The utility model can improve the test efficiency, reduce the difficulty of personnel work and ensure the product quality.

[0014] The specific technical solutions are as follows:

[0015] A high-throughput satellite terminal test device based on an automated test production line comprises an upper and lower part, wherein the upper part is used to install a plurality of high-throughput satellite terminals to be tested, and is provided with three types of interfaces, namely a power supply fixing seat, a network port fixing seat, and an SMB fixing seat, and the three types of interfaces are used to respectively connect to corresponding ports on the terminals to be tested; the lower part is a main structure, and is provided with a plurality of switch modules, two microstrip power dividers, and a relay control board, wherein the cascade ports of the plurality of switch modules are interconnected to realize information intercommunication, one switch module is used as an external port for information transmission with external equipment through a network cable, one microstrip power divider corresponds to the radio frequency output ports of the plurality of terminals to be tested, and another microstrip power divider corresponds to the radio frequency input ports of the plurality of terminals to be tested, and the relay control board receives control instructions from a host computer to control the power on and off of each terminal to be tested.

[0016] Furthermore, the SMB fixing seat is connected to the F radio frequency head of the high-throughput satellite terminal through the SMB head, which is converted from the SMB head to the SMA head and then from the SMA head to the F head.

[0017] Furthermore, the lower part includes a lower component of the test equipment and a test equipment component. The lower component of the test equipment includes a base plate, a microstrip power divider, a relay control board, a switch support board, a chassis support block and a switch module. The base plate is at the bottom. There are riveted studs on the base plate to support the microstrip power divider and the relay control board. Two microstrip power dividers are stacked together. The switch support board is above the support of the microstrip power divider and the relay control board. Five 10-port switch modules are placed above the switch support board. There are 8 chassis support blocks around the base plate. The test equipment component includes four panels, and ports and components on each panel.

[0018] Furthermore, the front panel of the test equipment assembly is provided with a rocker switch and a foldable handle, the rear panel is provided with a fuse holder and a foldable handle, and two RF connectors and an aviation socket are installed on the outside of the right panel. The two RF connectors are respectively connected to the microstrip power divider, and the aviation socket is used to connect to an external power supply.

[0019] Furthermore, the upper part is the upper component of the test equipment, which is used to install 16 high-throughput satellite terminals to be tested, including an upper panel, 16 power fixing sockets, 32 network port fixing sockets, 32 SMB fixing sockets, 16 power clamping blocks, 16 network port clamping blocks and 32 SMB clamping blocks; the power fixing socket, network port fixing socket and SMB fixing socket are fixed above the upper panel, the power clamping block is used to fix the DC power plug of the terminal to be tested, the network port clamping block is used to fix the network cable head of the terminal to be tested, and the SMB clamping block is used to fix the SMB head of the radio frequency line of the terminal to be tested.

[0020] Beneficial Effects

[0021] 1. The utility model can improve the testing efficiency

[0022] The radio head of the high-throughput satellite terminal is an F head, and the docking method is a nut screw connection. In order to achieve convenient connection, a solution is proposed to use the F head to SMA head, and then from SMA head to SMB head, to transform the nut screw connection into a plug-in connection.

[0023] Use the network cable head fixed by the network port clamping block and remove the automatic clamping device to facilitate the insertion and removal of the circuit board.

[0024] Through plug-in connections, each test tool can quickly install 16 high-throughput satellite terminals and remove them after all test processes are completed. Compared with the installation and disassembly performed in each process in the past, it saves a lot of manual loading and unloading time.

[0025] Make full use of the evening time and schedule the longest RF tests for the evening.

[0026] 2. This utility model can ensure product quality

[0027] The RF cables used in high-throughput satellite terminal testing are very unstable due to the frequent rotation of the RF connectors and the unstable position of the RF cables. The insertion loss of the RF cables is prone to large changes, which affects the test data of the product.

[0028] The test equipment fixes all RF cables inside the chassis, and the SMB radio head connected to the high-throughput satellite terminal is also fixed on the panel of the test equipment, which solves the problem of unstable RF cable status and ensures the accuracy of the test.

[0029] 3. The utility model can reduce the difficulty of personnel work

[0030] The test equipment can be used for software burning, voltage initial test, RF test, service initial test, voltage retest, RF retest, and service retest processes. Testers only need to perform simple operations.

[0031] 4. The utility model greatly improves the test efficiency. Before using the utility model, it takes 3.5 hours for each person to test one circuit board. After using the utility model, it takes 0.3 hours for each person to test one circuit board, and the efficiency is improved by 11.6 times.

[0032] 5. The utility model saves a lot of manpower. Before using the utility model, each process requires personnel to repeat work continuously. After using the utility model, each process is automatically tested by the testing equipment.

[0033] 6. The utility model has strong inheritance. In the face of different types of high-throughput satellite terminals, the design principle of the utility model has been borrowed, the structural part has been changed, and test equipment suitable for other types of products has been manufactured.

[0034] 7. The innovative features of the utility model include: the connection method between the test equipment and the high-throughput satellite terminal is plug-in connection, which can realize quick loading and unloading; the test equipment automatically controls power on and off, and tests 16 high-throughput satellite terminals in turn; the fixed RF cable and network cable structure of the upper components of the test equipment makes the test equipment highly stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1a This is a bottom view of the lower component of the utility model;

[0036] Figure 1b This is a front view of the lower component of the utility model;

[0037] Figure 1c It is a top view of the lower component of the utility model;

[0038] Figure 2a It is a schematic diagram of a local interface of the upper component of the utility model;

[0039] Figure 2b It is a schematic diagram of a local pressing block of an upper component of the utility model;

[0040] Figure 3a It is a right view of the utility model with the object to be tested installed;

[0041] Figure 3b It is a front view of the utility model with the object to be tested installed;

[0042] Figure 3c It is a left view of the utility model with the object to be tested installed;

[0043] Figure 3d It is a schematic diagram of the AA section of the utility model with the object to be tested installed;

[0044] Figure 4 This is a schematic diagram for burning software for high-throughput satellite terminals;

[0045] Figure 5 This is a schematic diagram of voltage testing for high-throughput satellite terminals;

[0046] Figure 6 This is a schematic diagram of high-throughput satellite terminal radio frequency testing;

[0047] Figure 7 This is a schematic diagram of high-throughput satellite terminal service testing;

[0048] Figure 8 This is the test process flow chart for high-throughput satellite terminals.

[0049] Among them, 1. bottom plate, 2. microstrip power divider, 3. 16-way relay control board, 4. switch support plate, 5. chassis support block, 6. cross-slot countersunk screws, 7. power supply fixing seat, 8. network port fixing seat, 9. SMB fixing seat, 10. upper panel, 11. power supply clamping block, 12. network port clamping block, 13. SMB clamping block, 14. front panel, 15. rocker switch, 16. foldable handle, 17. rear panel, 18. fuse holder, 19. right panel, 20. parallel connector, 21a, switch module. DETAILED DESCRIPTION

[0050] The specific technical problems that need to be solved are broken down as follows:

[0051] 1. The test equipment should be small in size and light in weight so that the tester can move it during the process flow;

[0052] 2. The docking method between the test equipment and the high-throughput satellite terminal should be simple, enabling fast loading and unloading and saving man-hours;

[0053] 3. The test equipment is versatile and can be used for testing multiple processes;

[0054] 4. The testing equipment has high stability to ensure the consistency of product testing;

[0055] 5. The test equipment has high reliability, can work uninterruptedly for a long time, and can efficiently use the night time to work automatically.

[0056] In order to solve the above technical problems, the technical solution of the utility model is: a high-throughput satellite terminal testing device based on an automated testing production line. First, the relationship between the automated testing production line and the testing device is introduced.

[0057] The automated test production line consists of two parts: software and hardware. The software part includes the MES system and automated test software, and the hardware part is the test equipment. The MES system in the software part is used to manage the test production line, and the automated test software is used to control the work of the test equipment. The test equipment communicates with the software part through the TCP protocol to achieve automated testing.

[0058] The upper panel of the test equipment can be installed with 16 high-throughput satellite terminals. There are 16 relay control boards inside the test equipment. The host computer sends control instructions to the 16 relay control boards to control the power on and off of each high-throughput satellite terminal, and then automatically control each high-throughput satellite terminal to carry out various tests.

[0059] The test equipment consists of two parts: structural and electrical.

[0060] The main parts and components of the structure and their corresponding serial numbers are shown in the following table:

[0061]

[0062] The structural part includes: a lower component of the test equipment, an upper component of the test equipment, and a test equipment component.

[0063] Test equipment lower components (see Figure 1):

[0064] The bottom plate (1) is at the bottom, and there are riveted studs on the bottom plate (1) to support the microstrip power divider (2) and the 16-way relay control board (3). Two microstrip power dividers (2) are stacked together, and above them is a switch support plate (4). Five 10-port switch modules (4) are placed above the switch support plate (7). There are 8 chassis support blocks (5) around the bottom plate (1), which are fastened with cross-slot countersunk screws (6).

[0065] Upper components of the test equipment (see Figure 2): Use screws to fix 16 sets of power supply fixing seats (7), network port fixing seats (8), and SMB fixing seats (9) on the upper panel (10). Use the power supply clamping block (11) to fix the DC power plug, use the network port clamping block (12) to fix the network cable head, and use the SMB clamping block (13) to fix the RF cable SMB head.

[0066] Test equipment assembly (see Figure 3): a rocker switch (15) and a foldable handle (16) are installed on the front panel (14), a fuse holder (18) and a foldable handle (16) are installed on the rear panel (17), four parallel connectors (20) are installed inside the right panel (19), and two radio frequency connectors (21) and an aviation socket (22) are installed outside the right panel.

[0067] Electrical part:

[0068] The device has two SMA ports for external output, namely the RF input port and RF output port.

[0069] The power supply interface of the device is an aviation socket, which provides 24V DC power;

[0070] There are 5 10-port switch modules inside the device. Use network cables to connect the cascade ports of these 5 switch modules to each other to achieve information exchange. Among them, the external port is a 10-port switch module, which can transmit information between this device and external devices through the network cable. The other 4 10-port switch module network ports correspond to the 32 network ports of 16 terminals;

[0071] There are two microstrip power dividers inside the device, one of which corresponds to the RF output ports of 16 terminals, and the other corresponds to the RF input ports of 16 terminals;

[0072] There is a 16-way relay control board inside the device, corresponding to the power lines of 16 terminals;

[0073] Inside the device there are 4 parallel connectors, 1 boat switch, 1 fuse holder, 32 SMAJ-SMBKW RF cables, 2 SMAJ-SMAJ RF cables, 37 ultra-fine Gigabit network cables, a DC5.5C×2.5mm wired power plug, several 0.52mm wires, and several 0.22mm wires.

[0074] In conjunction with the accompanying drawings, four typical processes for automatic testing using the utility model are further described in detail below.

[0075] Example 1:

[0076] The utility model is used for the high-throughput satellite terminal software burning process. The wiring relationship is shown in the attached Figure 5 .

[0077] The first step is to connect the host computer network port to the server network port with network cable 1, and then log in to the MES system client;

[0078] The second step is to enter the tooling loading and unloading process of the MES system's automatic operation, use a barcode scanner to scan the QR code of each high-throughput satellite terminal, and bind the high-throughput satellite terminal's information to the test equipment;

[0079] The third step is to quickly install each high-throughput satellite terminal on the test equipment in the order of scanning the code;

[0080] Step 4: Use a serial cable to connect the host computer to the JTAG writer;

[0081] Step 5: Use a 1:4 burning cable to connect the JTAG programmer to the high-throughput satellite terminal;

[0082] Step 6: Use network cable 2 to connect the host computer network port to the test equipment network port;

[0083] Step 7. Power on the test device and ping the IP address of the test device.

[0084] Step 8: Enter the software burning process of the MES system's automatic operation. Use a barcode scanner to scan the QR code of the test device, and the information of all high-throughput satellite terminals bound to the test device will be displayed. Click the start button, the first terminal will be powered on, and automatic burning will begin. After the burning is completed, the dialog box on the operation interface will display that the burning is successful. At the same time, the host computer automatically sends a command to the test device, the first terminal is powered off, and the second terminal is powered on.

[0085] Step 9. After four terminals are burned, a prompt will pop up on the operation interface, requiring the burning cables to be moved to another four terminals. After the replacement is completed, click Continue to start software burning for the other four terminals until all sixteen terminals are burned.

[0086] Step 10: After the software burning process is completed, move the test equipment to the voltage test station.

[0087] Example 2:

[0088] The utility model is used for the voltage test process of the high-throughput satellite terminal. The voltage test process is performed after the software burning process, and there is no need to bind the high-throughput satellite terminal. The wiring relationship is shown in the attached Figure 6 .

[0089] The first step is to connect the host computer network port to the server network port with network cable 1, and then log in to the MES system client;

[0090] Step 2: Use serial line 1 to connect the host computer and multimeter 1;

[0091] Step 3: Use RF cable 1 to connect multimeter 1 to X2 of the test equipment;

[0092] Step 4: Use serial line 2 to connect the host computer and multimeter 2;

[0093] Step 5: Use RF cable 2 to connect multimeter 2 and X3 of the test equipment;

[0094] Step 6: Use network cable 2 to connect the host computer network port to the test equipment network port;

[0095] Step 7. Power on the test device and ping the IP address of the test device.

[0096] Step 8: Enter the voltage test process of the MES system's automatic operation. Use a barcode scanner to scan the QR code of the test equipment, and the information of all high-throughput satellite terminals bound to the test equipment will be displayed. Click the start button, the first terminal will be powered on, and the automatic voltage test will begin. The dialog box on the operation interface will display the test value and judgment result of each test indicator. When the voltage test of the first terminal is completed, the host computer automatically sends a command to the test equipment, the first terminal is powered off, and the second terminal is powered on, until all sixteen terminals are tested.

[0097] Step 9: After the voltage test process is completed, move the test equipment to the RF test station.

[0098] Example 3:

[0099] The utility model is used for high-throughput satellite terminal radio frequency testing process. The wiring relationship is shown in the attached Figure 7 .

[0100] The first step is to connect the host computer network port to the server network port with network cable 1, and then log in to the MES system client;

[0101] Step 2: Use RF cable 1 to connect the one-to-two power splitter to X2 of the test equipment;

[0102] Step 3: Use RF cable 2 to connect the one-to-two power splitter to X3 of the test equipment;

[0103] Step 4: Use RF cable 3 to connect the one-to-two power splitter and the RF receiving end of the spectrum analyzer;

[0104] Step 5: Use network cable 2 to connect the host computer network port to the test equipment network port;

[0105] Step 6: Use network cable 3 to connect the spectrum analyzer network port to the test equipment network port;

[0106] Step 7. Power on the test device and ping the IP address of the test device.

[0107] Step 8: Enter the RF test process of the MES system's automatic operation. Use a barcode scanner to scan the QR code of the test equipment, and the information of all high-throughput satellite terminals bound to the test equipment will be displayed. Click the start button, the first terminal will be powered on, and the RF automatic test will begin. The dialog box on the operation interface will display the test value and judgment result of each test indicator. When the RF test of the first terminal is completed, the host computer automatically sends a command to the test equipment, the first terminal is powered off, and the second terminal is powered on, until all 16 terminals are tested.

[0108] Step 9: After the RF test process is completed, move the test equipment to the business test station.

[0109] Example 4:

[0110] The utility model is used for high-throughput satellite terminal service test process. The wiring relationship is shown in the attached Figure 8 .

[0111] The first step is to connect the host computer network port to the server network port with network cable 1, and then log in to the MES system client;

[0112] Step 2: Use RF cable 1 to connect the high-throughput satellite master station to X2 of the test equipment;

[0113] Step 3: Use RF cable 2 to connect the high-throughput satellite master station to X3 of the test equipment;

[0114] Step 4: Use network cable 2 to connect the host computer network port to the test equipment network port;

[0115] Step 5: Use network cable 3 to connect the network port of the high-throughput satellite master station to the network port of the test equipment;

[0116] Step 6. Power on the test device and ping the IP address of the test device.

[0117] Step 7: Enter the automatic business test process of the MES system. Use a barcode scanner to scan the QR code of the test device, and the information of all high-throughput satellite terminals bound to the test device will be displayed. Click the start button, the first terminal will be powered on, and the automatic business test will begin. The dialog box of the operation interface will display the test value and judgment result of each test indicator. When the business test of the first terminal is completed, the host computer automatically sends a command to the test device, the first terminal is powered off, and the second terminal is powered on, until all sixteen terminals are tested.

[0118] Step 8. After the service testing process is completed, move the testing equipment to the software burning test station.

[0119] The above description is for explanation purposes only and does not constitute a limitation on the technical solution.

Claims

1. A high-throughput satellite terminal test equipment based on an automated test production line, characterized in that: The invention comprises an upper and lower part, wherein the upper part is used for installing a plurality of high-throughput satellite terminals to be tested and is provided with three types of interfaces, namely a power supply fixing seat (7), a network port fixing seat (8), and an SMB fixing seat (9), and the three types of interfaces are used to respectively connect to corresponding ports on the terminals to be tested; the lower part is a main structure, and is provided with a plurality of switch modules (21a), two microstrip power dividers (2) and a relay control board (3), wherein the cascade ports of the plurality of switch modules are interconnected to realize information intercommunication, one switch module is used as an external port for information transmission with external equipment through a network cable, one microstrip power divider corresponds to the radio frequency output ports of the plurality of terminals to be tested, and another microstrip power divider corresponds to the radio frequency input ports of the plurality of terminals to be tested, and the relay control board receives control instructions from a host computer and controls the power on and off of each terminal to be tested.

2. A high-throughput satellite terminal testing device based on an automated test production line according to claim 1, characterized in that: The SMB fixing seat (9) is connected to the F radio frequency head of the high-throughput satellite terminal through the SMB head, which is then converted to the SMA head and then converted to the F head.

3. A high-throughput satellite terminal testing device based on an automated test production line according to claim 1 or 2, characterized in that: The lower part comprises a test equipment lower component and a test equipment component. The test equipment lower component comprises a bottom plate (1), a microstrip power divider (2), a relay control board (3), a switch support board (4), a chassis support block (5) and a switch module (21a). The bottom plate (1) is at the bottom. The bottom plate (1) is provided with riveted studs to support the microstrip power divider (2) and the relay control board (3). Two microstrip power dividers (2) are stacked together. The switch support board (4) is located above the microstrip power divider (2) and the relay control board (3). Five 10-port switch modules (21a) are placed above the switch support board (4). Eight chassis support blocks (5) are arranged around the bottom plate (1). The test equipment component comprises four panels, and ports and components on each panel.

4. A high-throughput satellite terminal testing device based on an automated test production line according to claim 3, characterized in that: The front panel (14) of the test equipment assembly is provided with a rocker switch (15) and a foldable handle (16), the rear panel (17) is provided with a fuse holder (18) and a foldable handle (16), and the right panel (19) is externally installed with two radio frequency connectors (21) and a navigation socket (22), the two radio frequency connectors (21) are respectively connected to the microstrip power divider (2), and the navigation socket (22) is used to connect to an external power supply.

5. A high-throughput satellite terminal testing device based on an automated test production line according to claim 4, characterized in that: The upper part is an upper component of the test equipment, which is used to install 16 high-throughput satellite terminals to be tested, and comprises an upper panel (10), 16 power supply fixing seats (7), 32 network port fixing seats (8), 32 SMB fixing seats (9), 16 power supply clamping blocks (11), 16 network port clamping blocks (12) and 32 SMB clamping blocks (13); the power supply fixing seats (7), the network port fixing seats (8) and the SMB fixing seats (9) are fixed above the upper panel (10); the power supply clamping block (11) is used to fix the DC power plug of the terminal to be tested, the network port clamping block (12) is used to fix the network cable head of the terminal to be tested, and the SMB clamping block (13) is used to fix the radio frequency line SMB head of the terminal to be tested.