Wedge-shaped block locking and leveling device for flatness of end face of steel tower section

By designing a steel tower segment end plane plane wedge block locking leveling device including base, limiting guide rail, wedge block, support, lead screw and ratchet wrench, the end plane of the steel tower segment in the prior art is solved. The problem of inaccurate degree control achieves efficient and precise leveling and improves the sustainability of manufacturing.

CN222513116UActive Publication Date: 2025-02-21CHINA RAILWAY JIUJIANG BRIDGE ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421083752.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2025-02-21
Estimated Expiration
2034-05-17

AI Technical Summary

Technical Problem

The prior art lacks an accurate and simple method to control the end surface plane of the steel tower segment, resulting in inconvenient operation, low accuracy, waste of materials, and inadequate adjustment, affecting the high efficiency and high quality of manufacturing.

Method used

A steel tower segment end surface plane wedge block locking leveling device is designed, including base, limiting guide rail, wedge block, support, lead screw and ratchet wrench, which adjusts the height through the forward and reverse rotation of the lead screw, and The self-locking property requires no other fixing devices to achieve accurate leveling.

Benefits of technology

It improves the accuracy of the end plane of the steel tower segment, reduces construction period waste, saves materials, reduces manufacturing costs, and improves the sustainability of bridge steel structure manufacturing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222513116U_ABST
    Figure CN222513116U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel tower section end face planeness wedge-shaped block locking leveling device which comprises a base, a top plate and a limiting guide rail are fixedly welded to the head end of the base, a first wedge-shaped block is slidably connected in the limiting guide rail, a second wedge-shaped block is slidably connected to the top face of the first wedge-shaped block, the head end of the second wedge-shaped block abuts against the top plate, and the head end of the second wedge-shaped block abuts against the limiting guide rail. The tail end of the base is detachably connected with a support, the support is in threaded connection with a lead screw, the head end of the lead screw is rotationally connected with the first wedge block, and the tail end of the lead screw is detachably connected with the ratchet wrench. According to the utility model, the hammering moving mode of a wedge block in the prior art is changed, and the precision is higher than that of the existing equipment; a plurality of rows of threaded mounting holes are formed in the base, the relative position of the support and the lead screw can be adjusted, and the adaptability of equipment is improved; in the propelling process, the lead screw can rotate forwards and reversely to adjust the height back and forth, due to the fact that the lead screw has the self-locking performance, the lead screw is automatically locked after propelling, other fixing devices are not needed, and the lead screw can be repeatedly used, and cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of leveling, in particular to a wedge-shaped block locking leveling device for the flatness of the end surface of a steel tower segment. Background Art

[0002] With the rapid development of infrastructure construction at home and abroad, bridges, as important infrastructure for transportation development, have a variety of erection methods and more advanced steel structures. With the continuous maturity of bridge design and production technology, bridge steel structures are becoming increasingly high-end and complex. At present, there is a lack of accurate and simple methods to control the flatness of the end faces of steel tower segments. The old devices for controlling the flatness of the end faces of steel tower segments are not easy to operate and have low precision, waste materials, and are not adjusted properly, so that the functions of the current equipment cannot meet the requirements of high efficiency and high quality, affecting the sustainability of manufacturing. In the manufacturing process of bridge steel structures, the plane and end face processing of steel structures and the flat and vertical splicing processes are complex, time-consuming, and require high precision. The leveling of steel structures has a great impact on subsequent manufacturing processes.

[0003] The original steel tower segment end face flatness adjustment had no fixed equipment. Most of them were cut on site using steel plates, and the steel plates and remaining mechanical parts were welded to ensure relative fixity. Manually cut wedge blocks were placed at the bottom of the steel tower for a week. When adjusting, the wedge blocks were hammered to raise the part. However, manual hammering had almost no accuracy, and the magnitude of the applied force could not be accurately controlled, which often led to mistakes and readjustments, greatly wasting construction time. Moreover, this method was used for the current situation. Most of the manually cut materials could not achieve the required accuracy, and they were used by welding, which was disposable, wasting recyclable materials and increasing manufacturing costs. The materials required for on-site cutting by workers may be irregular, and the bridge steel structure is heavy. If the materials burst out, it will be a great safety hazard to personnel. Utility Model Content

[0004] The utility model aims to provide a wedge-shaped block locking and leveling device for the flatness of the end surface of a steel tower segment to solve the deficiencies in the prior art.

[0005] In order to achieve the above utility model purpose, the technical solution adopted by the utility model is:

[0006] A wedge block locking and leveling device for the flatness of the end face of a steel tower segment comprises: a base, a top plate and a limiting guide rail are welded and fixed to the base at the head end, a first wedge block is slidably connected in the limiting guide rail, a second wedge block is slidably connected to the top surface of the first wedge block, the head end of the second wedge block abuts against the top plate, the end of the base is detachably connected to a support, a lead screw is threadedly connected to the support, the head end of the lead screw is rotatably connected to the first wedge block, and the end of the lead screw is detachably connected to a ratchet wrench.

[0007] Preferably, the base is provided with a plurality of rows of threaded mounting holes, and the plurality of rows of threaded mounting holes are used to adjust the mounting position of the support.

[0008] The utility model provides a wedge-shaped block locking and leveling device for the flatness of the end surface of a steel tower segment, which has the following advantages compared with the prior art:

[0009] 1. Changed the hammering movement mode of the wedge block, which is more accurate than the existing equipment;

[0010] 2. Multiple rows of threaded mounting holes are opened on the base to adjust the relative position of the support and the lead screw, thus increasing the adaptability of the equipment;

[0011] 3. During the advancement process, the lead screw can rotate forward and reverse to adjust the height. Since the lead screw is self-locking, it will automatically lock after advancement, without the need for other fixing devices, and it can be reused to save costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0013] Figure 1 It is a three-dimensional diagram of the utility model;

[0014] Figure 2 It is a front view of the utility model;

[0015] Figure 3 This is a top view of the utility model without the second wedge-shaped block.

[0016] In the figure: 1-base, 2-top plate, 3-limiting guide rail, 4-first wedge block, 5-second wedge block, 6-support, 7-screw, 8-ratchet wrench, 9-threaded mounting hole. DETAILED DESCRIPTION

[0017] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0018] refer to Figure 1-3As shown, the utility model provides a wedge block locking and leveling device for the flatness of the end face of a steel tower segment, comprising: a base 1, a top plate 2 and a limiting guide rail 3 are welded and fixed to the head end of the base 1, a first wedge block 4 is slidably connected to the limiting guide rail 3, a second wedge block 5 is slidably connected to the top surface of the first wedge block 4, the head end of the second wedge block 5 abuts against the top plate 2, the end of the base 1 is detachably connected to a support 6, a lead screw 7 is threadedly connected to the support 6, the head end of the lead screw 7 is rotatably connected to the first wedge block 4, and the end of the lead screw 7 is detachably connected to a ratchet wrench 8.

[0019] As a preferred embodiment, a plurality of rows of threaded mounting holes 9 are provided on the base 1 , and the plurality of rows of threaded mounting holes 9 are used to adjust the installation position of the support 6 .

[0020] The specific operation scheme of this device is as follows:

[0021] S1: Place the leveling device flat on the tire frame plate. If there is no fixed place, fix it by welding;

[0022] S2: Remove the set screws and adjust the support 6 and the lead screw 7 to the required distance. If the end lifting height exceeds the stroke range of the lead screw 7, adjust the support 6 toward the head end of the base 1 and fix it;

[0023] S3: Multiple leveling devices can be placed at the bottom of a steel tower section. The ratchet wrench 8 is turned, and the lead screw 7 pushes the first wedge block 4 under the action of the support 6 and human rotation. The first wedge block 4 lifts the second wedge block 5 to adjust the end face of the steel tower section to the horizontal. If the mass of the steel tower is too large, the force arm can be increased to save effort in rotation;

[0024] S4: After leveling, the leveling device does not need to be taken out. If the leveling device needs to be taken out, place a pad at the leveling position and take it out one by one.

[0025] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.

[0026] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0027] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A wedge-shaped locking and leveling device for the flatness of the end surface of a steel tower segment, characterized in that: include: A base (1), the head end of the base (1) is welded and fixed with a top plate (2) and a limiting guide rail (3), a first wedge block (4) is slidably connected in the limiting guide rail (3), a second wedge block (5) is slidably connected to the top surface of the first wedge block (4), the head end of the second wedge block (5) is in contact with the top plate (2), the tail end of the base (1) is detachably connected with a support (6), a lead screw (7) is threadedly connected to the support (6), the head end of the lead screw (7) is rotatably connected to the first wedge block (4), and the tail end of the lead screw (7) is detachably connected to a ratchet wrench (8).

2. A wedge-shaped locking and leveling device for the flatness of the end surface of a steel tower segment according to claim 1, characterized in that: The base (1) is provided with a plurality of rows of threaded mounting holes (9), and the plurality of rows of threaded mounting holes (9) are used to adjust the mounting position of the support (6).